CN215164260U - A pier brick for preventing ponding on ground - Google Patents

A pier brick for preventing ponding on ground Download PDF

Info

Publication number
CN215164260U
CN215164260U CN202023152549.2U CN202023152549U CN215164260U CN 215164260 U CN215164260 U CN 215164260U CN 202023152549 U CN202023152549 U CN 202023152549U CN 215164260 U CN215164260 U CN 215164260U
Authority
CN
China
Prior art keywords
brick body
drainage
symmetrical
pier
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023152549.2U
Other languages
Chinese (zh)
Inventor
陈连
熊磊
朱留莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Lvhe Environment Technology Co ltd
Original Assignee
Jiangsu Lvhe Environment Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Lvhe Environment Technology Co ltd filed Critical Jiangsu Lvhe Environment Technology Co ltd
Priority to CN202023152549.2U priority Critical patent/CN215164260U/en
Application granted granted Critical
Publication of CN215164260U publication Critical patent/CN215164260U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a pier brick for preventing ground ponding relates to building materials technical field. The utility model comprises a pier brick body; the dock brick body comprises an upper brick body and a lower brick body; the linear arrays on the two sides of the upper brick body are both provided with first clamping blocks; two adjacent first clamping blocks are provided with inclined extending grooves; two first drainage channels which are symmetrical to each other are arranged at the two side edges of the bottom of the upper brick body; two second drainage grooves which are symmetrical to each other are formed in the edges of the two ends of the bottom of the upper brick body; two third drainage grooves which are symmetrical to each other are formed in the edges of the two sides of the upper surface of the lower brick body; two symmetrical fourth drainage channels are arranged at the edges of the two ends of the upper surface of the lower brick body. The utility model discloses an go up the brick body and the mutual joint cooperation of brick body down, go up brick body bottom first water drainage tank and second water drainage tank and cooperate with brick body top third water drainage tank and fourth water drainage tank down, can effectually prevent surface ponding, make people can normally go on a journey, guarantee the security of rainy day trip.

Description

A pier brick for preventing ponding on ground
Technical Field
The utility model belongs to the technical field of the building materials, especially, relate to a pier brick for preventing ponding.
Background
The dock brick is specially laid on urban sidewalks and docks, has the effect of beautifying the environmental pavement, can be natural or colored with or without a surface layer (material) on the surface, and has the advantages of natural color, texture, fastness, compression resistance, acid resistance, wear resistance, slip prevention, water permeability and the like.
Current pier brick is after chain concatenation, and the gap between each fragment of brick is very little, and pier brick's drainage performance is not very good, is unfavorable for rainy day drainage, causes surface ponding, influences the trip, and pier brick fixed effect is poor simultaneously, and is not hard up easily.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pier brick for preventing ponding on ground cooperatees through pier brick body, the last brick body and the lower brick body to solve pier brick drainage, the poor problem of fixed effect.
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model relates to a wharf brick for preventing ground water accumulation, which comprises a wharf brick body; the wharf brick body comprises an upper brick body and a lower brick body; the opposite surfaces of the upper brick body and the lower brick body are clamped and matched;
the linear arrays on the two sides of the upper brick body are both provided with first clamping blocks; two adjacent first clamping blocks are provided with inclined extending grooves; the inclined extension groove and the first clamping block are arranged in a matched manner; two first drainage channels which are symmetrical to each other are formed in the two side edges of the bottom of the upper brick body; two second drainage grooves which are symmetrical to each other are formed in the edges of the two ends of the bottom of the upper brick body;
two third drainage grooves which are symmetrical to each other are formed in the edges of the two sides of the upper surface of the lower brick body; the bottom of the third drainage tank is matched with the top of the first drainage tank; two fourth drainage grooves which are symmetrical to each other are formed in the edges of the two ends of the upper surface of the lower brick body; and the bottom of the fourth drainage groove is matched with the top of the second drainage groove.
Furthermore, one side of the upper brick body is fixedly connected with a first connecting plate; and a first connecting groove matched with the first connecting plate is formed in the other side of the upper brick body.
Furthermore, a second connecting plate is fixedly connected to one side of the lower brick body and far away from the bottom of the first connecting plate; and a second connecting groove matched with the second connecting plate is formed in the other side of the lower brick body.
Furthermore, two symmetrical clamping blocks are fixedly connected to the two side edges of the bottom of the upper brick body.
Furthermore, clamping grooves matched with the second clamping blocks are formed in the edges of the two sides of the top of the lower brick body.
Furthermore, the rectangular arrays on the top of the upper brick body are provided with anti-skid lugs; and drainage holes are formed in the two adjacent anti-skid lug supports.
The utility model discloses following beneficial effect has:
1. through the joint cooperation of the upper brick body and the lower brick body, the quick splicing of the pier brick body can be realized, and the work efficiency is improved.
2. Through the cooperation of fixture block and oblique extending groove, can realize the ascending spacing of width direction of pier brick body.
3. Through last brick body bottom first water drainage tank and second water drainage tank and lower brick body top third water drainage tank and fourth water drainage tank cooperate, can realize good drainage effect.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a pier brick for preventing water accumulation on the ground according to the present invention;
FIG. 2 is a schematic structural view of an upper brick body;
FIG. 3 is a schematic bottom structure view of the upper brick body;
FIG. 4 is a schematic structural view of a lower brick body;
fig. 5 is a schematic view of a construction for splicing wharf tiles for preventing ground water accumulation.
In the drawings, the components represented by the respective reference numerals are listed below:
1-a wharf brick body, 2-an upper brick body, 3-a lower brick body, 201-a first fixture block, 202-an inclined extension groove, 203-a first drainage groove, 204-a second drainage groove, 205-a first connecting plate, 206-a first connecting groove, 207-a second fixture block, 208-an anti-skid bump, 209-a drainage hole, 301-a third drainage groove, 302-a fourth drainage groove, 303-a second connecting plate, 304-a second connecting groove and 305-a clamping groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention relates to a wharf brick for preventing water accumulation on ground, which comprises a wharf brick body 1; the wharf brick body 1 comprises an upper brick body 2 and a lower brick body 3; the opposite surfaces of the upper brick body 2 and the lower brick body 3 are clamped and matched; in short, through the form of joint fixed brick body 2 and lower brick body 3, when laying, preferentially use cement mortar to lay with the lower brick body 3 of ground contact, then peg graft the top of the brick body 3 down with last brick body 2 again, can improve work efficiency.
The linear arrays on the two sides of the upper brick body 2 are both provided with first clamping blocks 201; two adjacent first fixture blocks 201 are provided with inclined extension grooves 202; the inclined extension groove 202 and the first fixture block 201 are matched; in short, the upper brick body is provided with a first fixture block 201 and an inclined extension groove 202 in the length direction, and the first fixture block 201 and the inclined extension groove 202 have the same width, so that when two upper brick bodies 2 are spliced, the first fixture block 201 can be inserted into the inclined extension groove 202 of the adjacent upper brick body 2, and the splicing of the upper brick bodies 2 in the length direction is completed; two first drainage channels 203 which are symmetrical to each other are arranged at the two side edges of the bottom of the upper brick body 2; two second drainage grooves 204 which are symmetrical to each other are formed in the edges of the two ends of the bottom of the upper brick body 2; two third drainage grooves 301 which are symmetrical to each other are formed in the edges of the two sides of the upper surface of the lower brick body 3; the bottom of the third drainage channel 301 is matched with the top of the first drainage channel 203; two fourth drainage grooves 302 which are symmetrical to each other are formed in the edges of the two ends of the upper surface of the lower brick body 3; the bottom of the fourth water drainage groove 302 is matched with the top of the second water drainage groove 204; in short, two first drainage channels 203 which are symmetrical to each other are formed in the length direction of the bottom surface of the upper brick body 2, and two second drainage channels 204 which are symmetrical to each other are formed in the width direction; the length direction of the top surface of the lower brick body 3 has been seted up two mutual symmetries of third water drainage tank 301, the last fourth water drainage tank 302 of two mutual symmetries of having seted up of width direction, the width of first water drainage tank 203 and third water drainage tank 301 equals, second water drainage tank 204 equals with the width of fourth water drainage tank 302, when last brick body 2 splices with lower brick body 3, first water drainage tank 203 and third water drainage tank 301 can make up into the last drainage channel of a length direction, second water drainage tank 204 and fourth water drainage tank 302 can make up into the ascending drainage channel of a width direction, the diameter of drainage channel can be increased to this kind of design, and all drainage channels communicate each other, increase the drainage ability to pier brick body 1.
Wherein, one side of the upper brick body 2 is fixedly connected with a first connecting plate 205; the other side of the upper brick body 2 is provided with a first connecting groove 206 matched with the first connecting plate 205. Wherein, a second connecting plate 303 is fixedly connected to one side of the lower brick body 3 and the bottom of the lower brick body is far away from the first connecting plate 205; the other side of the lower brick body 3 is provided with a second connecting groove 304 matched with the second connecting plate 303; in short, through the first connecting plate 205 and the first connecting groove 206, and the second connecting plate 303 and the second connecting groove 304, when the upper brick body 2 is spliced in the width direction, only the first connecting plate 205 needs to be spliced in the first connecting groove 206 of the adjacent upper brick body 2, and the lower brick body 3 is spliced in the width direction, only the second connecting plate 303 needs to be spliced in the second connecting groove 304 of the adjacent lower brick body 3, so that the working efficiency is improved.
Wherein, two symmetrical second blocks 207 are fixedly connected to two side edges of the bottom of the upper brick body 2. The clamping grooves 305 matched with the second clamping blocks 207 are formed in the edges of the two sides of the top of the lower brick body 3, in short, the second clamping blocks 207 can be inserted into the clamping grooves 305, and the brick body 2 and the lower brick body 3 are spliced only by aligning the second clamping blocks 207 with the clamping grooves 305 and inserting the second clamping blocks 207 into the clamping grooves 305.
Wherein, the rectangular array on the top of the upper brick body 2 is provided with anti-skid lugs 208; the brackets of two adjacent anti-skid lugs 208 are provided with drainage holes 209; in short, when walking on the brick body 2, skid proof block 208 can avoid the condition that personnel took place to fall down, and drainage hole 209 runs through the brick body and with first drainage tank 203 and second drainage tank 204 intercommunication, can realize the drainage to the rainwater.
One specific application of this embodiment is: splice a plurality of pier brick body 1 each other, pier brick body 1 is through last brick body 2 and the mutual joint cooperation of lower brick body 3, it cooperatees with oblique extending groove 202 to go up brick body 2 and 3 both sides of lower brick body to have seted up first fixture block 201, and go up brick body 2 and 3 both sides of lower brick body and be equipped with first connecting plate 205 and second connecting plate 303 and the mutual joint cooperation of first connecting groove 206 and second connecting groove 304 respectively, make pier brick body 1 more firm, it is difficult not hard up, it has seted up first drainage tank 203 and second drainage tank 204 and has seted up some third drainage tank 301 and fourth drainage tank 302 with 3 tops of lower brick body respectively to go up 2 bottoms of brick body and cooperate, and it is equipped with skid proof block 208 to go up 2 tops of brick body, can effectually prevent ponding, make people can normally go on a journey, guarantee the security of rainy day.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (6)

1. The utility model provides a pier brick for preventing ponding, includes pier brick body (1), its characterized in that:
the wharf brick body (1) comprises an upper brick body (2) and a lower brick body (3); the opposite surfaces of the upper brick body (2) and the lower brick body (3) are clamped and matched;
the linear arrays on the two sides of the upper brick body (2) are respectively provided with a first fixture block (201); two adjacent first clamping blocks (201) are provided with inclined extending grooves (202); the inclined extension groove (202) and the first fixture block (201) are arranged in a matched manner; two first drainage grooves (203) which are symmetrical to each other are formed in the two side edges of the bottom of the upper brick body (2); two second drainage grooves (204) which are symmetrical to each other are formed in the edges of the two ends of the bottom of the upper brick body (2);
two third drainage grooves (301) which are symmetrical to each other are formed in the two side edges of the upper surface of the lower brick body (3); the bottom of the third water drainage groove (301) is matched with the top of the first water drainage groove (203); two fourth drainage grooves (302) which are symmetrical to each other are formed in the edges of the two ends of the upper surface of the lower brick body (3); the bottom of the fourth water drainage groove (302) is matched with the top of the second water drainage groove (204).
2. A pier brick for preventing ground water accumulation according to claim 1, characterized in that a first connecting plate (205) is fixedly connected to one side of the upper brick body (2); and a first connecting groove (206) matched with the first connecting plate (205) is formed in the other side of the upper brick body (2).
3. A pier brick for preventing ground water accumulation according to claim 2, characterized in that a second connecting plate (303) is fixedly connected to the lower brick body (3) on one side and away from the bottom of the first connecting plate (205); and a second connecting groove (304) matched with the second connecting plate (303) is formed in the other side of the lower brick body (3).
4. A pier brick for preventing ground water accumulation according to claim 3, wherein two symmetrical clamping blocks (207) are fixedly connected to two side edges of the bottom of the upper brick body (2).
5. The wharf brick for preventing ground water accumulation as claimed in claim 4, wherein the lower brick body (3) is provided with a slot (305) at two side edges of the top for matching with the second block (207).
6. A pier tile for preventing ground water accumulation according to claim 5, characterized in that the rectangular array on top of the upper tile body (2) is provided with anti-skid bumps (208); and drainage holes (209) are formed in the two adjacent anti-skid bump (208) brackets.
CN202023152549.2U 2020-12-24 2020-12-24 A pier brick for preventing ponding on ground Active CN215164260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023152549.2U CN215164260U (en) 2020-12-24 2020-12-24 A pier brick for preventing ponding on ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023152549.2U CN215164260U (en) 2020-12-24 2020-12-24 A pier brick for preventing ponding on ground

Publications (1)

Publication Number Publication Date
CN215164260U true CN215164260U (en) 2021-12-14

Family

ID=79379615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023152549.2U Active CN215164260U (en) 2020-12-24 2020-12-24 A pier brick for preventing ponding on ground

Country Status (1)

Country Link
CN (1) CN215164260U (en)

Similar Documents

Publication Publication Date Title
CN215164260U (en) A pier brick for preventing ponding on ground
CN215104356U (en) Anti-drop is from locking-type pier brick
CN214783037U (en) Assembled sponge city pavement brick that permeates water
CN213653090U (en) Multi-layer multidirectional environment-friendly water permeable brick
CN216891822U (en) Road plate and assembled road
CN209941422U (en) Splicing pressure-resistant ecological water permeable brick
CN217601129U (en) Splice plate for laying blind sidewalk
CN215164265U (en) Concrete pavement brick structure
CN216551403U (en) Combined type concrete pavement water permeable brick
CN213295940U (en) Permeable brick and permeable pavement
CN213596724U (en) Water permeable brick
CN211571232U (en) Concrete interlocking piece road surface structure
CN215801699U (en) Main building block
CN213509388U (en) Be applied to archaize building's porous type archaize brick that excels in
CN212077534U (en) Novel permeable brick
CN210916848U (en) Sponge city square structure of mating formation
CN212865478U (en) Urban and rural garden antiskid type brick that permeates water
CN219670987U (en) Gap water permeable brick and water permeable brick module
CN215051706U (en) Assembled road surface capable of being integrally stressed in water seepage prevention mode
CN210216056U (en) Interlocking type heavy-load gap pavement brick
CN214328345U (en) Locking sponge city brick that permeates water that moves
CN214301059U (en) Ecological brick that permeates water of high water permeability
CN216712631U (en) Pavement water permeable brick structure capable of self-adapting to foundation damage
CN217922888U (en) Concrete block made of recycled building wastes
CN218026981U (en) Spliced and combined water permeable brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant