CN215106892U - Non-dismantling brick maintenance structure for sunken toilet - Google Patents

Non-dismantling brick maintenance structure for sunken toilet Download PDF

Info

Publication number
CN215106892U
CN215106892U CN202120867346.7U CN202120867346U CN215106892U CN 215106892 U CN215106892 U CN 215106892U CN 202120867346 U CN202120867346 U CN 202120867346U CN 215106892 U CN215106892 U CN 215106892U
Authority
CN
China
Prior art keywords
layer
maintenance structure
interface agent
brick maintenance
treatment hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120867346.7U
Other languages
Chinese (zh)
Inventor
石小成
吴建港
姚国友
金鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Jiagushi New Material Technology Co ltd
Original Assignee
Suzhou Jiagushi New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Jiagushi New Material Technology Co ltd filed Critical Suzhou Jiagushi New Material Technology Co ltd
Priority to CN202120867346.7U priority Critical patent/CN215106892U/en
Application granted granted Critical
Publication of CN215106892U publication Critical patent/CN215106892U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a to exempt from to tear open brick maintenance structure of formula bathroom down, including the landfill layer, arrange on the landfill layer and be provided with the ground ceramic tile, there is 1 ~ 15 mm's seam clearance between the adjacent ground ceramic tile, the landfill layer with set up cement mortar layer between the ground ceramic tile, be provided with the treatment hole in the seam clearance, the treatment hole intussuseption is filled with acrylate thick liquids, the various sand of waterborne epoxy has been laid to the treatment hole top, the upper surface of the various sand of waterborne epoxy with the opening face in seam clearance keeps level, the top of the various sand of waterborne epoxy is provided with silane interface agent layer, the top on silane interface agent layer sets up transparent polyurea waterproof coating. In this way, the utility model discloses need not the ceramic tile and lay again and maintain, material combination adaptation formula bathroom space environment and deformation stress have saved a large amount of time, manpower and cost to sink.

Description

Non-dismantling brick maintenance structure for sunken toilet
Technical Field
The utility model relates to a building engineering technical field especially relates to an exempt from to tear open brick maintenance structure to formula bathroom that sinks.
Background
In recent years, a sink toilet is widely used in residential buildings, and in this type of construction, the toilet room is lowered by about 40cm from the rest of the room, and a drainage system must be installed in this place to avoid affecting the next floor. After the pipeline of the sink toilet is installed, the part lower than the ground of the house is backfilled, and the backfilling mode adopted at present is generally to fill light building blocks and foam concrete, and then fill gaps with cement mortar, or fill concrete with ceramsite as aggregate.
The thickness of the sinking toilet in the prior art is relatively thin, the seepage of ponding leads to easily, and water-proof effects is relatively poor, and the long-time landfill layer can sink, and above-mentioned cement layer, waterproof layer can and then appear the crack, and water can leak to the filled soil region, and the structural design of sinking toilet is comparatively complicated, and the probability of seepage appears is great, and in case the seepage appears in the sinking toilet, the inside landfill layer is ponding, hardly finds the water leakage point.
In order to solve the leakage problem, the common treatment mode is to chisel out the ceramic tiles and the buried layer, rework the waterproof layer and the buried layer, and then restore the ceramic tiles, so that the period is long, the cost is high, time and labor are wasted, and the cost is high, and particularly, the normal use of high-end building places can be influenced; if the maintenance effect of water leakage prevention can be achieved without dismantling the ceramic tiles, time and labor are saved, labor cost and material cost are saved, and the ceramic tile has a good market prospect.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the main technical problem who solves provides a to the exempting from to tear open brick maintenance structure of formula bathroom that sinks, need not the ceramic tile and lay again and maintain, and material combination adapts to formula bathroom space environment and deformation stress that sinks, has saved a large amount of time, manpower and cost.
In order to solve the technical problem, the utility model discloses a technical scheme be: the utility model provides a to non-dismantling brick maintenance structure of formula bathroom that sinks, including the landfill layer, arrange on the landfill layer and be provided with the ground ceramic tile, there is 1 ~ 15 mm's seam clearance between the adjacent ground ceramic tile, the landfill layer with set up cement mortar layer between the ground ceramic tile, be provided with the treatment hole in the seam clearance, it has acrylate thick liquids to handle downthehole packing, the various sand of waterborne epoxy has been laid to the treatment hole top, the upper surface of the various sand of waterborne epoxy with the opening face in seam clearance keeps flat, the top of the various sand of waterborne epoxy is provided with silane interface agent layer, the top on silane interface agent layer sets up transparent polyurea waterproof coating.
Preferably, the buried layer is a structural layer obtained by injecting an acrylate slurry into the foamed concrete layer through the treatment holes.
Preferably, the thickness of the silane interface agent layer is set to be 0.1-0.3 mm.
Preferably, the treatment holes are arranged every other meter along the length of the slot gap.
Preferably, the silane interface agent layer covers the upper surface of the floor tile and the gap thereof.
Preferably, the thickness of the transparent polyurea waterproof coating is 0.2-0.5 mm.
The utility model has the advantages that: the utility model provides a pair of exempt from to tear open brick maintenance structure to formula bathroom that sinks need not to pound the brick and lay again, solves the problem that general construction can not be solved according to specific occasion, and the material of adoption combines rigidly and softly, and the material is complementary, effectively adapts to bathroom environment, temperature and deformation stress, has saved a large amount of spaces, manpower and cost, and safety ring protects, can adapt to the base face and subside and warp, protects lastingly, and the construction is simple and convenient, has good market prospect and construction value.
Drawings
FIG. 1 is a schematic structural view of a brick-dismantling-free maintenance structure for a sink toilet of the present invention;
the parts in the drawings are numbered as follows:
1. filling a buried layer; 2. a floor tile; 3. a gap; 4. cement mortar; 5. processing the hole; 6. an acrylate slurry; 7. water-based epoxy colored sand; 8. a silane interfacial agent layer; 9. transparent polyurea waterproof paint.
Detailed Description
The following detailed description of the preferred embodiments of the present invention will be provided in conjunction with the accompanying drawings, so as to enable those skilled in the art to more easily understand the advantages and features of the present invention, and thereby define the scope of the invention more clearly and clearly.
Example (b):
as shown in fig. 1 and 2, a demolition-free brick maintenance structure for a sink toilet comprises a buried layer 1, wherein the buried layer 1 is a structural layer obtained by injecting acrylate slurry into a foam concrete layer through a processing hole 5, so that a waterproof layer is integrally formed inside the buried layer, low-pressure grouting is adopted during construction of the waterproof layer, the gelling time is adjusted to about 10min, the acrylate slurry is more environment-friendly and more stable than common water curing on the market, the product viscosity is low, the controllable diffusion radius can be accurately adjusted, impermeable gel is generated, concrete is filled, the aging resistance in water is good, a reconstructed waterproof layer is formed, and the purposes of seepage prevention and leakage stoppage are achieved.
As shown in figure 2, floor tiles 2 are arranged on the upper row of the landfill layer 1, a gap 3 of 1-15 mm exists between every two adjacent floor tiles 2, cleaning tools are used for cleaning the tile gaps before construction, sundries in the gaps are cleaned up, and cement mortar 4 is arranged between the landfill layer 1 and the floor tiles 2 and used for leveling and adhering. Treatment holes 5 are formed in the cement mortar 4, acrylate slurry is injected into the foam concrete layer through the treatment holes 5 to obtain the filling layer 1, water in the filling layer can be drained through the treatment holes 5, and in order to ensure the construction balance and thoroughness, the treatment holes 5 are arranged every other meter along the length direction of the gap 3.
As shown in figure 2, the treatment hole 5 is filled with acrylate slurry 6, the waterborne epoxy color sand 7 is smeared into a tile gap above the treatment hole 5 through a scraper, then the tile gap is scraped and extruded through the scraper, the waterborne epoxy color sand is ensured to be fully filled into the tile gap, the upper surface of the waterborne epoxy color sand 7 is kept flat with the opening surface of the gap 3, the waterborne epoxy color sand has large bonding force and strength, the tile gap is blocked, water cannot pass through the tile gap, the material strength is high and attractive, and the water-proof and aesthetic finishing treatment method is suitable for water-proof and aesthetic finishing treatment of 1-15 mm in the gap width in the environments of wet toilets or long-term water immersion and the like.
As shown in figure 2, a silane interface agent layer 8 is arranged above the water-based epoxy color sand 7 through a brush, the silane interface agent coating is colorless and transparent liquid, the bonding force between the coating in the next process and the tile surface can be improved, so that the surface waterproof coating is guaranteed not to fall off in the soaking and using processes, the thickness of the silane interface agent layer 8 is preferably set to be 0.1-0.3 mm, and the silane interface agent layer 8 covers the upper surfaces of the tiles 2 and the gaps 3 thereof, so that a good bonding effect is guaranteed.
As shown in fig. 2, a transparent polyurea waterproof coating 9 is finally coated on the silane interfacial agent layer 8 in a scraping mode, so that a colorless and transparent waterproof film is formed on the surface of the tile, the coating is high in mechanical strength, colorless and transparent, does not affect the appearance of the tile, and has excellent water bubble resistance and ultraviolet ray resistance, the thickness of the transparent polyurea waterproof coating 9 is preferably set to be 0.2-0.5 mm, the coating is compact and crack-free, construction is simple and convenient, and the coating has a certain elongation rate to prevent cracks from generating water seepage.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.

Claims (6)

1. The utility model provides a to exempt from to tear open brick maintenance structure of formula bathroom that sinks which characterized in that: the floor tile is characterized by comprising a filling layer (1), floor tiles (2) are arranged on the filling layer (1), a seam gap (3) of 1-15 mm exists between adjacent floor tiles (2), the filling layer (1) and a cement mortar layer (4) is arranged between the floor tiles (2), a treatment hole (5) is formed in the seam gap (3), acrylate slurry (6) is filled in the treatment hole (5), water-based epoxy colored sand (7) is laid above the treatment hole (5), the upper surface of the water-based epoxy colored sand (7) is flush with the opening surface of the seam gap (3), a silane interface agent layer (8) is arranged above the water-based epoxy colored sand (7), and transparent polyurea waterproof paint (9) is arranged above the silane interface agent layer (8).
2. The disassembly-free brick maintenance structure for the sunken toilet according to claim 1, wherein: the buried layer (1) is a structural layer obtained by injecting acrylate slurry into the foam concrete layer through the processing holes (5).
3. The disassembly-free brick maintenance structure for the sunken toilet according to claim 1, wherein: the thickness of the silane interface agent layer (8) is set to be 0.1-0.3 mm.
4. The disassembly-free brick maintenance structure for the sunken toilet according to claim 1, wherein: the processing holes (5) are arranged every other meter along the length direction of the seam gap (3).
5. The disassembly-free brick maintenance structure for the sunken toilet according to claim 1, wherein: the silane interface agent layer (8) covers the upper surfaces of the floor tiles (2) and the gaps (3) of the floor tiles.
6. The disassembly-free brick maintenance structure for the sunken toilet according to claim 1, wherein: the thickness of the transparent polyurea waterproof coating (9) is 0.2-0.5 mm.
CN202120867346.7U 2021-04-26 2021-04-26 Non-dismantling brick maintenance structure for sunken toilet Active CN215106892U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120867346.7U CN215106892U (en) 2021-04-26 2021-04-26 Non-dismantling brick maintenance structure for sunken toilet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120867346.7U CN215106892U (en) 2021-04-26 2021-04-26 Non-dismantling brick maintenance structure for sunken toilet

Publications (1)

Publication Number Publication Date
CN215106892U true CN215106892U (en) 2021-12-10

Family

ID=79271900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120867346.7U Active CN215106892U (en) 2021-04-26 2021-04-26 Non-dismantling brick maintenance structure for sunken toilet

Country Status (1)

Country Link
CN (1) CN215106892U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115126281A (en) * 2022-08-22 2022-09-30 清清通(大连)厨卫科技有限公司 Method for renovating and waterproofing water-leakage toilet wall without dismantling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115126281A (en) * 2022-08-22 2022-09-30 清清通(大连)厨卫科技有限公司 Method for renovating and waterproofing water-leakage toilet wall without dismantling

Similar Documents

Publication Publication Date Title
CN109356295A (en) The construction technique of toilet and kitchen antiseep
CN104179263A (en) Building exterior wall external thermal insulation system waterproof and drainage construction method
CN215669744U (en) Masonry structure basement seepage slip casting repair structure
CN101418641A (en) Obligate pore construction method for construction floor
CN109184253A (en) A kind of method for repairing and mending of exterior wall leakage
CN215106892U (en) Non-dismantling brick maintenance structure for sunken toilet
CN205857593U (en) A kind of stone material wet combining structure of anti-stone material pathological changes
CN103452081B (en) A kind of construction method of flexible composite impermeable layer of upstream face of high arch dam
CN206220272U (en) Ground hot water lays heating toilet doorway sealing damp proof insulation construction
CN208380085U (en) The draining pipe-through floor slab structure of a kind of ground leak
CN112392157A (en) Toilet waterproof structure, construction process and protection process thereof
CN104278717A (en) Waterproof and drainage structure of sunken toilet
CN208668951U (en) A kind of sanitary ware draining pipe-through floor slab structure
CN103912123B (en) Caisson type washroom water leakage preventing-draining construction method
KR102387546B1 (en) Waterpoof method of widow frame and outer wall
CN214117025U (en) Wear floor riser waterproof construction
CN211472734U (en) Toilet drainage system
CN212028771U (en) Integrated plugging structure for floor penetrating pipeline in kitchen and toilet
CN208329204U (en) A kind of reinforced waterproof leakage-proof structure of toilet base
TW451019B (en) Water-proof and damp-proof method for basement side wall
CN113503056A (en) Building deformation joint leakage maintenance method
CN214329723U (en) Interior decoration waterproof construction
CN111519865A (en) Waterproof construction method for toilet base layer
CN111396639A (en) Integrated plugging structure for floor penetrating pipeline in kitchen and toilet
CN206545284U (en) A kind of subsided rest room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant