CN215106007U - Frame-shear wall building structure - Google Patents
Frame-shear wall building structure Download PDFInfo
- Publication number
- CN215106007U CN215106007U CN202023244643.0U CN202023244643U CN215106007U CN 215106007 U CN215106007 U CN 215106007U CN 202023244643 U CN202023244643 U CN 202023244643U CN 215106007 U CN215106007 U CN 215106007U
- Authority
- CN
- China
- Prior art keywords
- shear wall
- prefabricated base
- base
- shear
- edge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a frame-shear wall building structure, which comprises a first shear wall, a second shear wall, a third shear wall and a prefabricated base, the two ends of the first shear wall, the second shear wall and the third shear wall are respectively provided with a rectangular opening and a connector which are arranged through the first shear wall, the second shear wall and the third shear wall, the connecting port is communicated with the rectangular port and extends to the edge of the shear wall, the prefabricated base comprises an edge prefabricated base and a middle prefabricated base, pouring openings which are arranged in a penetrating way are formed in the middle positions of the edge prefabricated base and the middle prefabricated base, so that the prefabricated base can be conveniently set at a specified position, thereby facilitating the positioning and arrangement of each shear wall, and being clamped by a connecting piece consisting of the inserted bar, the connecting bar and the clamping plate, therefore, when the shear wall is poured, the better connectivity between the shear wall and the base can be ensured, and the requirements of building indexes can be met.
Description
Technical Field
The utility model relates to a building technical field specifically is frame-shear force wall building structure.
Background
The frame-shear wall structure has the characteristics of good stress performance, flexible building arrangement and the like, and is widely applied in engineering practice. The concrete structure part of the existing frame-shear wall structure generally adopts a cast-in-place concrete structure. In the construction process of the cast-in-place concrete structure, the number of on-site manufacturing is large, the number of wet operations is large, a large number of intermediate links such as formwork engineering, scaffold engineering and the like exist, resources are wasted, and the environment is polluted, so that a frame-shear wall building structure is provided.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a frame-shear force wall building structure has solved the above-mentioned problem that proposes.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the frame-shear wall building structure comprises a first shear wall, a second shear wall, a third shear wall and a prefabricated base, wherein rectangular ports and connectors which are set through the first shear wall, the second shear wall and the third shear wall are formed in two ends of the first shear wall, the second shear wall and the third shear wall respectively, and the connectors are communicated with the rectangular ports and extend to the edges of the shear walls;
the prefabricated base comprises an edge prefabricated base and a middle prefabricated base, and pouring openings which are arranged in a penetrating mode are formed in the middle of the edge prefabricated base and the middle of the middle prefabricated base;
two opposite corners of the edge prefabricated base are respectively provided with a first supporting groove for supporting a first shear wall and a second supporting groove for supporting a second shear wall, the opposite corners of the edge prefabricated base and a pouring opening on the edge prefabricated base are provided with floor slab supporting grooves, and the side surface of the pouring opening of the edge prefabricated base is provided with mounting openings which are communicated with the edge prefabricated base and extend to the first supporting groove and the second supporting groove;
the side surface of a pouring opening on the middle prefabricated base is provided with a preset opening communicated with the pouring opening, the extending positions of the preset openings on two opposite positions are provided with base positioning grooves, the extending position of the other preset opening is provided with a base supporting groove, and two sides of the base supporting groove are provided with floor positioning grooves;
and connecting pieces clamped in rectangular openings of the shear wall are arranged in pouring openings of the edge prefabricated base and the middle prefabricated base.
Preferably, the connecting piece comprises an inserted bar, a connecting rod and a clamping plate, the connecting rod is connected between the inserted bar and the clamping plate, the inserted bar is arranged in the pouring opening, and the clamping plate is clamped in a rectangular opening of the shear wall.
Preferably, the height of the clamping plate corresponds to that of the shear wall, and a gap for pouring concrete is reserved between the clamping plate and the rectangular opening.
Preferably, the top surfaces of the first shear wall, the second shear wall and the third shear wall are flush after the first shear wall, the second shear wall and the third shear wall are assembled, and the edge prefabricated base and the middle prefabricated base are flush with the top surfaces of the shear walls.
Preferably, the floor support grooves on the two edge prefabricated bases and the floor positioning grooves on one side of the two corresponding middle prefabricated bases are used for erecting floors.
Preferably, when the shear wall is erected on the edge prefabricated base and the middle prefabricated base, the connecting port on the shear wall corresponds to the mounting port on the edge prefabricated base and the preset port on the middle prefabricated base.
(III) advantageous effects
The utility model provides a frame-shear force wall building structure. The method has the following beneficial effects: can conveniently make prefabricated base set in assigned position department, and then conveniently fix a position and set up each shear force wall to the connecting piece through inserted bar, connecting rod, cardboard constitution is blocked and is established, thereby makes it when the pouring, can guarantee that the connectivity between shear force wall and the base is better, makes it can satisfy the building index demand.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of area A in FIG. 1;
FIG. 3 is a schematic structural view of the middle edge prefabricated base according to the present invention;
FIG. 4 is an enlarged view of the area B in FIG. 1;
fig. 5 is a schematic structural view of the middle prefabricated base of the present invention.
In the figure: 1. a first shear wall; 2. a second shear wall; 3. a third shear wall; 4. prefabricating a base at the edge; 41. a first support groove; 42. a second support groove; 43. a floor support channel; 5. prefabricating a base in the middle; 51. presetting a port; 52. a base positioning slot; 53. a base support groove; 54. Floor positioning slots; 6. a rectangular opening; 7. a connecting port; 8. pouring a mouth; 9. an installation port; 10. Inserting a rod; 11. a connecting rod; 12. and (4) clamping the board.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: the frame-shear wall building structure comprises a first shear wall 1, a second shear wall 2, a third shear wall 3 and a prefabricated base, wherein rectangular ports 6 and connectors 7 which are set through the first shear wall 1, the second shear wall 2 and the third shear wall 3 are formed in two ends of the first shear wall 1, the second shear wall 2 and the third shear wall 3 respectively, and the connectors 7 are communicated with the rectangular ports 6 and extend to the edges of the shear walls;
the prefabricated base comprises an edge prefabricated base 4 and a middle prefabricated base 5, and pouring openings 8 which are arranged in a penetrating mode are formed in the middle of the edge prefabricated base 4 and the middle of the middle prefabricated base 5;
two opposite corners of the edge prefabricated base 4 are respectively provided with a first supporting groove 41 for supporting the first shear wall 1 and a second supporting groove 42 for supporting the second shear wall 2, the opposite corners of the edge prefabricated base 4 and the pouring opening 8 thereon are provided with floor supporting grooves 43, and the side surface of the pouring opening 8 of the edge prefabricated base 4 is provided with a mounting opening 9 communicated with the pouring opening and extending to the first supporting groove 41 and the second supporting groove 42;
the side surface of the pouring opening 8 on the middle prefabricated base 5 is provided with preset openings 51 communicated with the pouring opening, the extending parts of the two preset openings 51 at opposite positions are provided with base positioning grooves 52, the extending part of the other preset opening 51 is provided with a base supporting groove 53, and two sides of the base supporting groove 53 are provided with floor positioning grooves 54;
all be equipped with the connecting piece that the card was established in shear force wall rectangle mouth 6 in pouring mouth 8 of prefabricated base 4 in the edge and middle prefabricated base 5, the connecting piece includes inserted bar 10, connecting rod 11, cardboard 12, connecting rod 11 is connected between inserted bar 10 and cardboard 12, inserted bar 10 is as for pouring among the mouth 8, cardboard 12 is arranged in the card to be established in shear force wall's rectangle mouth 6, the height of cardboard 12 corresponds with the height of shear force wall, leave the clearance that is used for pouring concrete between cardboard 12 and the rectangle mouth 6, the settlement of connecting piece makes shear force wall and base its connectivity better after pouring and being connected.
In order to ensure the regularity after installation, the top surfaces of the first shear wall 1, the second shear wall 2 and the third shear wall 3 are flush after the tool is installed, and the edge prefabricated base 4 and the middle prefabricated base 5 are flush with the top surfaces of the shear walls.
The floor supporting grooves 43 on the two edge prefabricated bases 4 and the corresponding floor positioning grooves 54 on one side of the two middle prefabricated bases 5 are used for erecting the floor, so that the floor can be conveniently positioned and installed.
In order to conveniently arrange the connecting pieces, when the shear wall is erected on the edge prefabricated base 4 and the middle prefabricated base 5, the connecting ports 7 on the shear wall correspond to the mounting ports 9 on the edge prefabricated base 4 and the preset ports 51 on the middle prefabricated base 5.
During construction, the edge prefabricated bases 4 and the middle prefabricated base 5 can be placed at specified positions, so that the first shear wall 1 can be placed in the corresponding first supporting grooves 41 on the two edge prefabricated bases 4, the connecting ports 7 on the first shear wall are covered above the mounting openings 9, the second shear wall 2 can be placed between the second supporting grooves 42 on the edge prefabricated base 4 and the base positioning grooves 52 on the middle prefabricated base 5, the connecting ports 7 at the two ends of the second shear wall 2 are respectively covered above the mounting openings 9 and the preset openings 51, the third shear wall 3 can be placed in the floor positioning grooves 54 of the two middle prefabricated bases 5, the connecting ports 7 on the third shear wall 3 are covered above the preset openings 51 of the middle prefabricated base, so that the inserting rods 10 of the connecting piece can be placed in the pouring openings 8, and the connecting rods 11 in the connecting piece on the edge prefabricated base 4 can be placed in the mounting openings 9 and pass through the connecting ports 7 of the shear wall, thereby conveniently make cardboard 12 as for in rectangle mouth 6, and connecting rod 11 in connecting piece 11 can be located predetermine mouthful 51 and pass from connector 7 on middle prefabricated base 4, thereby conveniently make cardboard 12 as for in rectangle mouth 6, thereby can make concrete placement pour in pouring mouth 8 and in rectangle mouth 6, it is fixed to pour the connecting piece, it is more firm to make the connection between the two, thereby can conveniently make prefabricated base set in assigned position department, and then conveniently fix a position and set up each shear force wall, and through the inserted bar, the connecting rod, the connecting piece that the cardboard is constituteed is blocked and is established, thereby make it when the pouring, can guarantee that the connectivity between shear force wall and the base is better, make it can satisfy the building index demand.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation. The use of the phrase "comprising one of the elements does not exclude the presence of other like elements in the process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. Frame-shear force wall building structure, including first shear force wall (1), second shear force wall (2), third shear force wall (3) and prefabricated base, its characterized in that: rectangular openings (6) and connectors (7) which are set through the first shear wall (1), the second shear wall (2) and the third shear wall (3) are formed in the two ends of the first shear wall, the second shear wall and the third shear wall, and the connectors (7) are communicated with the rectangular openings (6) and extend to the edges of the shear walls;
the prefabricated base comprises an edge prefabricated base (4) and a middle prefabricated base (5), and pouring openings (8) which are arranged in a penetrating mode are formed in the middle of the edge prefabricated base (4) and the middle prefabricated base (5);
two opposite corners of the edge prefabricated base (4) are respectively provided with a first supporting groove (41) for supporting the first shear wall (1) and a second supporting groove (42) for supporting the second shear wall (2), the opposite corners of the edge prefabricated base (4) and the pouring opening (8) on the edge prefabricated base are provided with floor supporting grooves (43), and the side surface of the pouring opening (8) of the edge prefabricated base (4) is provided with a mounting opening (9) which is communicated with the side surface and extends to the first supporting groove (41) and the second supporting groove (42);
the side surface of a pouring opening (8) in the middle prefabricated base (5) is provided with a preset opening (51) communicated with the side surface, the extending positions of the two preset openings (51) which are positioned at opposite positions are provided with base positioning grooves (52), the extending position of the other preset opening (51) is provided with a base supporting groove (53), and two sides of the base supporting groove (53) are provided with floor positioning grooves (54);
and connecting pieces clamped in rectangular openings (6) of the shear wall are arranged in pouring openings (8) of the edge prefabricated base (4) and the middle prefabricated base (5).
2. A frame-shear wall building structure according to claim 1, wherein: the connecting piece comprises an inserted bar (10), a connecting bar (11) and a clamping plate (12), wherein the connecting bar (11) is connected between the inserted bar (10) and the clamping plate (12), the inserted bar (10) is arranged in the pouring opening (8), and the clamping plate (12) is used for being clamped in the rectangular opening (6) of the shear wall.
3. A frame-shear wall building structure according to claim 2, wherein: the height of the clamping plate (12) corresponds to that of the shear wall, and a gap for pouring concrete is reserved between the clamping plate (12) and the rectangular opening (6).
4. A frame-shear wall building structure according to claim 1, wherein: the top surfaces of the first shear wall (1), the second shear wall (2) and the third shear wall (3) are flush after the tools are assembled, and the edge prefabricated base (4) and the middle prefabricated base (5) are flush with the top surfaces of the shear walls.
5. A frame-shear wall building structure according to claim 1, wherein: floor support grooves (43) on the two edge prefabricated bases (4) and floor positioning grooves (54) on one sides of the two corresponding middle prefabricated bases (5) are used for erecting floors.
6. A frame-shear wall building structure according to claim 1, wherein: when the shear wall is erected on the edge prefabricated base (4) and the middle prefabricated base (5), the connecting port (7) on the shear wall corresponds to the mounting port (9) on the edge prefabricated base (4) and the preset port (51) on the middle prefabricated base (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023244643.0U CN215106007U (en) | 2020-12-29 | 2020-12-29 | Frame-shear wall building structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023244643.0U CN215106007U (en) | 2020-12-29 | 2020-12-29 | Frame-shear wall building structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215106007U true CN215106007U (en) | 2021-12-10 |
Family
ID=79308798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023244643.0U Active CN215106007U (en) | 2020-12-29 | 2020-12-29 | Frame-shear wall building structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215106007U (en) |
-
2020
- 2020-12-29 CN CN202023244643.0U patent/CN215106007U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN216920792U (en) | Prefabricated wallboard, in-line shear force wall assembly and building structure | |
EP1544368A1 (en) | Formwork element | |
CN215106007U (en) | Frame-shear wall building structure | |
CN213115100U (en) | Cross plug-in structure for assembled shear wall | |
CN210239240U (en) | Novel assembled sentry box of dry-type connection | |
CN216921105U (en) | Assembled fast-assembling wall built-up member | |
CN211194338U (en) | Can make cuboid concrete prefabricated section mould that can have enough to meet need | |
CN213508961U (en) | Cement concrete prefabricated part assembly structure | |
KR20080041977A (en) | A mold type block | |
KR102477121B1 (en) | Deck panel for Euroform | |
CN212453255U (en) | Quick assembling structure for floor slab | |
CN210562806U (en) | Building module splicing wall | |
CN114319839A (en) | Basement template building method | |
CN216041813U (en) | Fastening connection structure of precast concrete wall | |
CN213837726U (en) | Reinforced concrete post preparation auxiliary device for building | |
CN214784666U (en) | Novel assembly building module | |
CN210482668U (en) | Building module structure wall | |
CN216840563U (en) | A assembled building concrete form for civil engineering | |
CN213390508U (en) | Assembled building balcony | |
CN220117746U (en) | Primary and secondary bridge connector | |
CN210482669U (en) | Building module corner structure wall | |
CN217325515U (en) | Basement side wall concrete anti-cracking structure | |
CN219280938U (en) | Corner wallboard and die | |
CN212670933U (en) | Steel clamping point connection type composite heat-insulation formwork wall heat-insulation system | |
CN211228934U (en) | Reinforced concrete structure using inorganic cementing material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |