CN215105454U - Prefabricated and cast-in-place piled raft foundation that combines together - Google Patents
Prefabricated and cast-in-place piled raft foundation that combines together Download PDFInfo
- Publication number
- CN215105454U CN215105454U CN202121648591.5U CN202121648591U CN215105454U CN 215105454 U CN215105454 U CN 215105454U CN 202121648591 U CN202121648591 U CN 202121648591U CN 215105454 U CN215105454 U CN 215105454U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- cast
- place
- tubular pile
- wing plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model provides a prefabricated and cast-in-place piled raft foundation that combines together, include: prefabricating a raft plate; the prefabricated raft plate is formed by splicing a plurality of first prefabricated plates and second prefabricated plates; the first precast slab is provided with a tubular pile hole; a tubular pile; the tubular pile can be arranged in the tubular pile hole and is fixedly connected through cast-in-place concrete. The utility model discloses simplify the construction process of piled raft foundation, reduced required manpower of construction, material resources and engineering time.
Description
Technical Field
The utility model relates to a piled raft foundation specifically is a prefabricated and cast-in-place piled raft foundation who combines together.
Background
The existing pile-raft foundation structure construction taking reinforced concrete as a material basically adopts a wood mould, a steel mould or a combined template to carry out cast-in-place construction, and reinforcing steel bars must be bound, and the templates must be installed, adjusted, dismantled and maintained in the construction process. The method has the following defects: (1) the construction process involves a plurality of working procedures, a large amount of work is needed, and the construction cost is greatly improved; (2) a great deal of time is consumed from construction to later maintenance; (3) the quality problems are difficult to control, the quality problems of honeycombs, pitted surfaces and the like are often caused by various reasons such as unclean templates in the prior art, and in recent years, serious safety quality accidents such as concrete expansion and mold explosion and the like caused by various factors are generated.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned prior art, the utility model provides a prefabricated and cast-in-place piled raft basis that combines together.
The utility model provides a pair of prefabricated and cast-in-place piled raft basis that combines together, include:
prefabricating a raft plate; the prefabricated raft plate is formed by splicing a plurality of first prefabricated plates and second prefabricated plates; the first precast slab is provided with a tubular pile hole;
a tubular pile; the tubular pile can be arranged in the tubular pile hole and is fixedly connected through cast-in-place concrete.
Preferably, the first precast slab is provided with a lower wing plate along the periphery, and the first precast slab and the lower wing plate form a first L-shaped clamping groove; the second precast slab is provided with an upper wing plate along the periphery, and the second precast slab and the upper wing plate form a second L-shaped clamping groove; the first L-shaped clamping groove and the second L-shaped clamping groove are clamped and spliced and are detachably connected.
Preferably, the lower wing plate is provided with a plurality of bolt grooves, and the upper wing plate is provided with a plurality of bolt holes; the bolt slot and the bolt hole may be connected by a bolt assembly.
Preferably, be equipped with a plurality of screw rod holes on the tubular pile, the screw rod certainly the inside of tubular pile is passed the screw rod hole extends to the outside of tubular pile.
Preferably, a rubber water stop belt is arranged at the joint of the first prefabricated plate and the second prefabricated plate.
Preferably, the tubular pile is a PHC tubular pile.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a prefabricated and cast-in-place mode that combines together has simplified the construction process of piled raft foundation, has reduced required manpower of construction, material resources and engineering time.
Drawings
Fig. 1 is a schematic structural diagram of a first prefabricated panel in the embodiment of the present invention.
Fig. 2 is a schematic structural diagram of a second prefabricated panel in the embodiment of the present invention.
Fig. 3 is the embodiment of the utility model provides an in the structural schematic diagram of PHC tubular pile.
Fig. 4-6 are schematic views of the partial structures of the embodiment of the present invention.
In the figure, 1, a first prefabricated plate; 1-1, a lower wing plate; 1-2, bolt grooves; 1-3, pipe pile holes; 2. a second prefabricated panel; 2-1, an upper wing plate; 2-2, bolt holes; 3. a bolt; 4. a rubber waterstop; 5. PHC tubular pile; 5-1, screw holes; 5-2, a screw; 6. and (5) casting concrete in situ.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand and understand, the present invention is further explained by combining with the specific drawings.
Examples
As shown in fig. 1-6, a combined prefabricated and cast-in-place piled raft foundation comprises: and (4) prefabricating a raft plate and pipe piles.
Referring to fig. 1 and 2, the prefabricated raft is formed by splicing a first prefabricated plate 1 and a second prefabricated plate 2, wherein a lower wing plate 1-1 is arranged on the first prefabricated plate 1 along the periphery, a first L-shaped clamping groove is formed between the side end of the first prefabricated plate 1 and the upper end of the lower wing plate 1-1, a plurality of bolt grooves 1-2 are uniformly distributed on the lower wing plate 1-1, the distance between the bolt grooves 1-2 and the plate edge is 20cm, and pipe pile holes 1-3 are formed in the first prefabricated plate 1; an upper wing plate 2-1 is arranged along the periphery of a second prefabricated plate 2, a second L-shaped clamping groove is formed at the side end of the second prefabricated plate 2 and the lower end of the upper wing plate 2-1, a plurality of bolt holes 2-2 are uniformly distributed on the upper wing plate 2-1, the bolt holes 2-2 are 20cm away from the plate edge, referring to fig. 4, after the first L-shaped clamping groove and the second L-shaped clamping groove are clamped and spliced, a bolt 3 extends into the bolt groove 1-2 from the bolt hole 2-2 on the upper side and is fastened through a nut, and in addition, a rubber water stop belt 4 is arranged at the splicing position of the first L-shaped clamping groove and the second L-shaped clamping groove.
Referring to fig. 3, the pipe pile is a PHC pipe pile 5, the end of the PHC pipe pile 5 is provided with a plurality of screw holes 5-1, referring to fig. 5 and 6, screws 5-2 pass through the screw holes 5-1 from the inside of the PHC pipe pile 5 to extend to the outside of the PHC pipe pile 5 and are fastened by nuts, and after the end of the PHC pipe pile 5 is placed in the pipe pile holes 1-3, the PHC pipe pile 5 is fixedly connected with the first precast slab 1 by cast-in-place concrete 6. The bolt 5-2 is 20cm longer than the diameter of the PHC tubular pile 5, so that the screw rod 5-2 after the screw cap is screwed down has enough length to be exposed outside the PHC tubular pile 5 to serve as a stressed steel bar of the cast-in-place concrete 6.
The present embodiment adopts the mode that prefabrication and cast-in-place combined together, has simplified the construction process of piled raft foundation, has reduced required manpower, material resources and the engineering time of construction.
The above is only the embodiment of the present invention, not the limitation of the patent scope of the present invention, all the equivalent structures made by the contents of the specification and the drawings are directly or indirectly applied to other related technical fields, all the same principle is within the patent protection scope of the present invention.
Claims (6)
1. The utility model provides a prefabricated and cast-in-place piled raft basis that combines together which characterized in that includes:
prefabricating a raft plate; the prefabricated raft plate is formed by splicing a plurality of first prefabricated plates and second prefabricated plates; the first precast slab is provided with a tubular pile hole;
a tubular pile; the tubular pile can be arranged in the tubular pile hole and is fixedly connected through cast-in-place concrete.
2. A combined prefabricated and cast-in-place piled raft foundation according to claim 1, wherein the first prefabricated slab is provided with a lower wing plate along a peripheral portion, and the first prefabricated slab and the lower wing plate form a first L-shaped slot; the second precast slab is provided with an upper wing plate along the periphery, and the second precast slab and the upper wing plate form a second L-shaped clamping groove; the first L-shaped clamping groove and the second L-shaped clamping groove are clamped and spliced and are detachably connected.
3. A prefabricated and cast-in-place piled raft foundation as claimed in claim 2, wherein the lower wing plate is provided with a plurality of bolt slots and the upper wing plate is provided with a plurality of bolt holes; the bolt slot and the bolt hole may be connected by a bolt assembly.
4. A prefabricated and cast-in-place combined piled raft foundation according to claim 1, wherein the pipe piles are provided with a plurality of screw holes, and screws extend from the inside of the pipe piles to the outside of the pipe piles through the screw holes.
5. A combined prefabricated and cast-in-place piled raft foundation according to claim 1 or 2, wherein a rubber water stop is provided at the joint of the first and second prefabricated panels.
6. A combined prefabricated and cast-in-place piled raft foundation according to claim 1 or 4, wherein the tube piles are PHC tube piles.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121648591.5U CN215105454U (en) | 2021-07-20 | 2021-07-20 | Prefabricated and cast-in-place piled raft foundation that combines together |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121648591.5U CN215105454U (en) | 2021-07-20 | 2021-07-20 | Prefabricated and cast-in-place piled raft foundation that combines together |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215105454U true CN215105454U (en) | 2021-12-10 |
Family
ID=79321896
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121648591.5U Active CN215105454U (en) | 2021-07-20 | 2021-07-20 | Prefabricated and cast-in-place piled raft foundation that combines together |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215105454U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114809134A (en) * | 2022-04-28 | 2022-07-29 | 陕西省建筑科学研究院有限公司 | Multi-layer concrete building jacking deviation rectifying construction method of raft foundation |
-
2021
- 2021-07-20 CN CN202121648591.5U patent/CN215105454U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114809134A (en) * | 2022-04-28 | 2022-07-29 | 陕西省建筑科学研究院有限公司 | Multi-layer concrete building jacking deviation rectifying construction method of raft foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101538939B (en) | Construction method for preset nut type steel-reinforced concrete compound pier template fixing device | |
CN107245934A (en) | A kind of assembled steel profiled sheet concrete combined board small box girder | |
CN211007659U (en) | Device for controlling forming of embedded steel plate in concrete column on column surface | |
CN1297095A (en) | In-situ cast hollow reinforced concrete slab pre-provided with hollow hard thin-wall members and its construction method | |
CN109267585B (en) | Assembled prismatic table type foundation and column structure and assembling method | |
CN209817167U (en) | Section steel concrete superimposed shear wall | |
CN207988490U (en) | A kind of easy device that deformation joint shear wall formwork installs | |
CN215105454U (en) | Prefabricated and cast-in-place piled raft foundation that combines together | |
CN111472811B (en) | Assembled integral GFRP-framework concrete mouth lining structure for rapid repair of tunnel mouth and rapid repair method | |
CN110630011A (en) | Template reinforcing system for double shear walls at deformation joint and construction method thereof | |
CN210976588U (en) | Template reinforcing system for double shear walls at deformation joint | |
CN209585431U (en) | Frame column formwork and exempt from template reinforced column | |
CN112942626B (en) | Formwork-supporting-free assembled shear wall structure and connecting method | |
CN112302209B (en) | Steel and concrete shear wall mixed structure and manufacturing method thereof | |
CN219080981U (en) | Non-support fixing device for post-pouring strip of superimposed sheet | |
CN207999071U (en) | A kind of wall column root concrete capping tools | |
CN217518272U (en) | Frock is consolidated to cross brickwork wall junction constructional column | |
CN215055279U (en) | Thickness control device for steel plate concrete shear wall symmetrical wall body | |
CN113356405A (en) | Prefabricated composite wall structure based on embedded profile steel and construction method thereof | |
CN209369324U (en) | Side form reinforcing apparatus of shear force wall | |
CN202194369U (en) | Vibration-free integrated injection construction mold and apparatus | |
CN221167814U (en) | Variable angle assembled steel template for anchor cable concrete waist rail | |
CN219241311U (en) | Punching-free template reinforcing structure of cast-in-place concrete shear wall | |
CN212866869U (en) | Reinforced composite cement-based U-shaped beam shell | |
CN216884492U (en) | Box girder hogging moment stretch-draw notch quick detach template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |