CN101538939B - Construction Method of Preset Nut Type Steel Concrete Composite Column Formwork Fixing Device - Google Patents

Construction Method of Preset Nut Type Steel Concrete Composite Column Formwork Fixing Device Download PDF

Info

Publication number
CN101538939B
CN101538939B CN2009100254967A CN200910025496A CN101538939B CN 101538939 B CN101538939 B CN 101538939B CN 2009100254967 A CN2009100254967 A CN 2009100254967A CN 200910025496 A CN200910025496 A CN 200910025496A CN 101538939 B CN101538939 B CN 101538939B
Authority
CN
China
Prior art keywords
nut
template
formwork
steel
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009100254967A
Other languages
Chinese (zh)
Other versions
CN101538939A (en
Inventor
吴碧桥
朱学农
唐兵
王爱军
张传捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huajian Construction Co Ltd
Original Assignee
Jiangsu Huajian Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huajian Construction Co Ltd filed Critical Jiangsu Huajian Construction Co Ltd
Priority to CN2009100254967A priority Critical patent/CN101538939B/en
Publication of CN101538939A publication Critical patent/CN101538939A/en
Application granted granted Critical
Publication of CN101538939B publication Critical patent/CN101538939B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种预置螺母式型钢混凝土组合柱模板固定装置及施工方法。该装置主要由模板、螺母、螺杆,PVC护套管和内龙骨、外龙骨构成。螺母焊接在型钢柱上,模板包围在型钢柱外围,外龙骨圈设在模板外侧,内龙骨设置在模板与外龙骨之间,螺杆的一端与螺母螺纹连接,PVC护套管套置在螺杆上,螺杆的另一端通过“3”形卡扣固定在外龙骨上。本发明结构简单,成本低,施工简便快捷,解决了型钢混凝土组合柱模板固定的难题,方便现场施工操作,减轻工作量和劳动强度。内、外龙骨、模板和螺杆都可周转重复使用,节约成本,保证了模板施工安全和提高混凝土柱成型质量,并且采用普通的材料,成本经济,便于推广应用。

The invention discloses a pre-installed nut type steel concrete composite column formwork fixing device and a construction method. The device is mainly composed of templates, nuts, screw rods, PVC sheath pipes, inner keels, and outer keels. The nut is welded on the shaped steel column, the formwork is surrounded by the outer edge of the shaped steel column, the outer keel ring is set outside the formwork, the inner keel is set between the formwork and the outer keel, one end of the screw is threaded with the nut, and the PVC sheath is sleeved on the screw , the other end of the screw is fixed on the outer keel through a "3"-shaped buckle. The invention has the advantages of simple structure, low cost, convenient and fast construction, solves the problem of fixing the formwork of the steel-concrete composite column, facilitates on-site construction operations, and reduces workload and labor intensity. The inner and outer keels, formwork and screws can be reused repeatedly, saving costs, ensuring the safety of formwork construction and improving the quality of concrete column formation, and using ordinary materials, the cost is economical and easy to popularize and apply.

Description

预置螺母式型钢混凝土组合柱模板固定装置的施工方法 Construction Method of Preset Nut Type Steel Concrete Composite Column Formwork Fixing Device

技术领域technical field

本发明涉及一种型钢混凝土组合柱模板固定装置的施工方法,属于建筑施工技术领域。The invention relates to a construction method of a formwork fixing device for a steel-concrete composite column, and belongs to the technical field of building construction.

背景技术Background technique

随着城市建设的迅猛发展,越来越多的超高层建筑在城市中涌现,为满足高度、空间变化和结构受力的要求,相当多的超高层建筑采用了型钢混凝土组合结构,由于型钢混凝土组合柱中设置了型钢柱,型钢柱不能随意穿孔,用于浇筑柱混凝土的模板固定时无法像普通混凝土柱一样设置对拉螺杆来承受柱模板的侧压力,此前主要采用的方法是在施工现场在型钢柱上焊接对拉螺杆以固定模板,费工费时,螺杆还不能周转使用,因此设计一种新的型钢混凝土组合柱模板固定装置,并提出有针对性的施工方法具有非常显著的现实意义。With the rapid development of urban construction, more and more super high-rise buildings have emerged in the city. In order to meet the requirements of height, space change and structural force, quite a few super high-rise buildings have adopted steel-concrete composite structures. The steel column is installed in the composite column, and the steel column cannot be perforated at will. When the formwork used to cast the column concrete is fixed, it is impossible to set the tension screw to bear the lateral pressure of the column formwork like the ordinary concrete column. It is labor-intensive and time-consuming to weld the half-stayed screw on the steel column to fix the formwork, and the screw cannot be used repeatedly. Therefore, it is of great practical significance to design a new formwork fixing device for steel-concrete composite columns and to propose a targeted construction method. .

发明内容Contents of the invention

本发明的目的是针对现有的型钢混凝土组合柱模板固定存在的上述不足,提供一种结构简单,成本低,施工简便快捷的预置螺母式型钢混凝土组合柱模板固定装置施工方法。The object of the present invention is to aim at the above-mentioned deficiency that existing steel concrete composite column formwork fixation exists, provide a kind of structure simple, cost is low, the construction method of preset nut type steel concrete composite column formwork fixing device is simple and fast.

本发明的第一个目的是这样实现的,预置螺母式型钢混凝土组合柱模板固定装置的施工方法,包括以下步骤:First purpose of the present invention is achieved like this, the construction method of preset nut type steel concrete composite column formwork fixing device, comprises the following steps:

1)根据混凝土浇筑的侧压力设计,设计制备螺母、螺杆,PVC管,确定型钢柱上螺母的布置间距;1) According to the lateral pressure design of concrete pouring, design and prepare nuts, screw rods, PVC pipes, and determine the arrangement spacing of nuts on steel columns;

2)在型钢柱上对焊接螺母位置定位放线,按柱轴线方向进行螺母焊接,焊缝高度4mm,位置误差控制在3mm以内,型钢柱的焊接表面与模板平行,螺母与型钢柱之间有缝隙较大一侧垫铁片;3)模板安装前用扳手将螺杆的一端拧进螺母,套上PVC管;2) Position the welding nut on the shaped steel column and set out the wires, and weld the nut according to the direction of the column axis. The weld seam height is 4mm, and the position error is controlled within 3mm. 3) Before installing the formwork, screw one end of the screw into the nut with a wrench and put it on the PVC pipe;

4)根据型钢柱上的螺母定位图确定模板开孔位置,绘制模板开孔图,根据图纸在模板上开孔,开孔与螺母位置对应;4) Determine the position of the template hole according to the nut positioning diagram on the steel column, draw the template hole diagram, and drill holes in the template according to the drawing, and the hole corresponds to the position of the nut;

5)安装模板、内龙骨、外龙骨,模板采用18mm厚胶合板,模板立在型钢柱外围,内龙骨采用50mm×100mm木方,竖向设置在模板外侧,间距小于200mm,外龙骨采用Φ48×3.5mm双钢管,外龙骨设在内龙骨外周,内龙骨挤顶住模板和外龙骨。5) Install formwork, inner keel, and outer keel. The formwork is made of 18mm thick plywood. The formwork stands on the periphery of the steel column. The inner keel is made of 50mm×100mm wooden squares, which are vertically arranged outside the formwork with a spacing of less than 200mm. The outer keel is Φ48×3.5 mm double steel pipe, the outer keel is set on the outer periphery of the inner keel, and the inner keel squeezes against the formwork and the outer keel.

6)螺杆穿过模板开孔,螺杆的另一端通过“3”形卡扣固定在外龙骨上。6) The screw rod passes through the opening of the formwork, and the other end of the screw rod is fixed on the outer keel through a "3"-shaped buckle.

所述的外龙骨双钢管通过对拉螺杆连接固定。The double steel pipes of the outer keel are connected and fixed by means of tension screw rods.

根据混凝土浇筑侧压力计算公式和螺母、螺杆、焊缝的受力性能,对螺杆的规格、间距进行计算、设计,确定螺母尺寸、规格和布置的间距及焊接的要求;计算过程如下:According to the calculation formula of lateral pressure of concrete pouring and the mechanical performance of nuts, screws and welds, the specifications and spacing of screws are calculated and designed, and the nut size, specification and arrangement spacing and welding requirements are determined; the calculation process is as follows:

①柱模板荷载标准值计算新浇混凝土侧压力计算公式为下式中的较小值:① Calculation of the standard value of the column formwork load The calculation formula for the lateral pressure of the newly poured concrete is the smaller value in the following formula:

F = 0.2 2 γ c t β 1 β 2 V F=γcH f = 0.2 2 γ c t β 1 β 2 V F= γcH

其中γc——混凝土的重力密度;Where γc - the gravity density of concrete;

t——新浇混凝土的初凝时间;t—the initial setting time of newly poured concrete;

T——混凝土的入模温度;T - mold temperature of concrete;

V——混凝土的浇筑速度;V - concrete pouring speed;

H——混凝土侧压力计算位置处至新浇混凝土顶面总高度;H - the total height from the calculation position of the concrete side pressure to the top surface of the newly poured concrete;

β1——外加剂影响修正系数;β1——Correction coefficient for admixture influence;

β2——混凝土坍落度影响修正系数。β2——correction coefficient for concrete slump influence.

②柱模板面板的计算②Calculation of column formwork panels

面板直接承受模板传递的荷载,按照均布荷载下的三跨连续梁计算,计算如下The panel directly bears the load transmitted by the formwork, and is calculated according to the three-span continuous beam under uniform load, and the calculation is as follows

(1)抗弯强度计算(1) Bending strength calculation

f=M/W<[f]f=M/W<[f]

其中f——面板的抗弯强度计算值(N/mm2);where f—calculated value of flexural strength of panel (N/mm2);

M——面板的最大弯距(N.mm);M - the maximum bending moment of the panel (N.mm);

W——面板的净截面抵抗矩;W——net section resistance moment of panel;

[f]——面板的抗弯强度设计值,取15.00N/mm2;[f]——design value of flexural strength of panel, take 15.00N/mm2;

M=0.100ql2M=0.100ql2

其中q——荷载设计值(kN/m);Where q——load design value (kN/m);

(2)抗剪计算(2) Shear calculation

T=3Q/2bh<[T]T=3Q/2bh<[T]

(3)挠度计算(3) Deflection calculation

v=0.677ql4/100EI<[v]=1/250v=0.677ql4/100EI<[v]=1/250

③木方内龙骨的计算③Calculation of the inner keel of the wooden square

竖楞木方直接承受模板传递的荷载,按照均布荷载下的三跨连续梁计算,计算如下The vertical corrugated wooden square directly bears the load transmitted by the formwork, and is calculated according to the three-span continuous beam under the uniform load, and the calculation is as follows

(1)抗弯强度计算(1) Bending strength calculation

抗弯计算强度f=M/WBending calculation strength f=M/W

(2)抗剪计算(2) Shear calculation

最大剪力的计算公式如下:Q=0.6qlThe formula for calculating the maximum shear force is as follows: Q=0.6ql

截面抗剪强度必须满足:T=3Q/2bh<[T]Sectional shear strength must satisfy: T=3Q/2bh<[T]

(3)挠度计算(3) Deflection calculation

最大挠度小于400.0/250。The maximum deflection is less than 400.0/250.

④双钢管外龙骨的计算④Calculation of double steel pipe outer keel

经过连续梁的计算得到最大弯矩Mmax、最大变形vmax、最大支座力Qmax。The maximum bending moment Mmax, the maximum deformation vmax, and the maximum support force Qmax are obtained through the calculation of the continuous beam.

抗弯计算强度f=M/WBending calculation strength f=M/W

⑤螺杆的计算⑤Screw calculation

计算公式:N<[N]=fACalculation formula: N<[N]=fA

其中N——对拉螺栓所受的拉力;Among them, N——the pulling force on the pulling bolt;

A——对拉螺栓有效面积(mm2);A - the effective area of the pull bolt (mm2);

f——对拉螺栓的抗拉强度设计值,取170N/mm2。f——Design value of the tensile strength of the pull bolts, to be taken as 170N/mm2.

本发明结构简单,成本低,施工简便快捷,可解决型钢混凝土组合柱模板固定的难题,大大方便现场施工操作,减轻现场工作量和劳动强度。型钢混凝土柱混凝土浇筑硬化成型后,用扳手旋转螺杆,拆除螺杆及外、内龙骨、模板,不仅内、外龙骨、模板可周转重复使用,螺杆也可周转重复使用,大大节省了螺杆材料,保证了模板施工安全和混凝土柱成型观感质量,并且采用普通的材料,成本经济,便于推广应用。The invention has the advantages of simple structure, low cost, convenient and quick construction, can solve the problem of fixing the formwork of the steel-concrete composite column, greatly facilitates on-site construction operations, and reduces on-site workload and labor intensity. After the steel concrete column concrete is poured and hardened, use a wrench to rotate the screw to remove the screw, outer and inner keels and formwork. Not only the inner and outer keels and formwork can be recycled and reused, but also the screw can be recycled and reused, which greatly saves the material of the screw and ensures It ensures the safety of formwork construction and the quality of concrete column forming appearance, and uses common materials, which is economical in cost and easy to popularize and apply.

附图说明Description of drawings

下面结合附图对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings.

图1为本发明的型钢柱为圆钢管的结构示意图;Fig. 1 is the structural representation that shaped steel column of the present invention is a circular steel pipe;

图2为本发明的型钢柱为H型、十字型材料的结构示意图。Fig. 2 is a schematic structural view of the H-shaped and cross-shaped material of the steel column of the present invention.

图中:1螺母、2螺杆、3模板、4内龙骨、5外龙骨、6型钢柱、7PVC管、8“3”形卡扣In the figure: 1 nut, 2 screw rod, 3 template, 4 inner keel, 5 outer keel, 6-shaped steel column, 7 PVC pipe, 8 "3"-shaped buckle

具体实施方式Detailed ways

实施例一Embodiment one

本实例的预置螺母式型钢混凝土组合柱模板固定装置用于型钢柱为圆钢管,如图1所示,构建时的施工具体步骤为:The pre-installed nut-type steel concrete composite column formwork fixing device in this example is used for the steel column as a round steel pipe, as shown in Figure 1, and the specific construction steps are as follows:

1、型钢柱6采用圆钢管,螺母1采用加长型螺母,在圆钢管柱上对螺母1位置定位放线,焊接人员按柱轴线方向进行螺母焊接,焊缝高度4mm,位置误差控制在3mm以内。螺母1与钢管壁之间缝隙较大一侧适当垫铁片,焊缝高度4mm。1. The shaped steel column 6 is made of round steel pipe, and the nut 1 is made of an elongated nut. Position the nut 1 on the round steel pipe column and set out the wire. Welding personnel weld the nut in the direction of the column axis. The weld seam height is 4mm, and the position error is controlled within 3mm. . The gap between the nut 1 and the steel pipe wall is relatively large, and the welding seam height is 4mm.

2、模板安装前用扳手先将螺杆2拧进螺母1,螺杆2上套上PVC管7,调整方向。2. Before installing the formwork, screw the screw 2 into the nut 1 with a wrench, put the PVC pipe 7 on the screw 2, and adjust the direction.

3、根据钢管柱螺母定位图确定模板开孔位置,绘制模板开孔图,根据图纸安排木工加工场专人进行下料、开孔,确保其位置准确,减小与螺母位置的偏差。3. Determine the opening position of the formwork according to the position diagram of the steel pipe column nut, draw the opening diagram of the formwork, and arrange special personnel in the woodworking processing plant to cut the material and open the hole according to the drawing to ensure that the position is accurate and reduce the deviation from the position of the nut.

4、先后安装模板3、内龙骨4、外龙骨5,模板采用18mm厚胶合板,内龙骨采用50mm×100mm木方,竖向设置,间距不大于200mm,外龙骨采用Φ48×3.5mm双钢管,间距不大于400mm。4. Install formwork 3, inner keel 4, and outer keel 5 successively. The template is made of 18mm thick plywood, the inner keel is made of 50mm×100mm wooden squares, set vertically, and the spacing is not greater than 200mm, and the outer keel is made of Φ48×3.5mm double steel pipes, with a spacing of Not greater than 400mm.

5、通过“3”形卡扣8将螺杆固定在外龙骨双钢管上,承受模板侧压力。最终构成图1所示的M14加长型螺母1、两头均设螺纹的Φ14螺杆2,护套螺杆的PVC管7,以及模板3、内龙骨4、外龙骨5的型钢混凝土柱模板固定装置。5. Fix the screw rod on the double steel pipe of the outer keel through the "3"-shaped buckle 8 to bear the side pressure of the formwork. Finally constitute the M14 elongated nut 1 shown in Figure 1, the Φ14 screw rod 2 with threads at both ends, the PVC pipe 7 of the sheath screw rod, and the steel concrete column formwork fixture of the formwork 3, the inner keel 4, and the outer keel 5.

实施例二Embodiment two

本实施例的预置螺母式型钢柱混凝土组合柱模板固定装置用于型钢柱为H型、十字型型钢,如图2所示,与实施例1基本结构相同,不同之处在于预置螺母1是预先焊接在型钢柱6柱腹板上,模板安装前用扳手先将螺杆2拧进螺母1,螺杆2套上PVC管7,再先后安装柱模板3、内龙骨木方4、外龙骨双钢管5。The preset nut-type steel column concrete composite column formwork fixing device of this embodiment is used for H-shaped and cross-shaped steel columns, as shown in Figure 2. It has the same basic structure as that of Embodiment 1, except that the preset nut It is pre-welded on the 6-column web of the steel column. Before the formwork is installed, screw the screw 2 into the nut 1 with a wrench, put the screw 2 on the PVC pipe 7, and then install the column formwork 3, the inner keel wooden square 4, and the outer keel double steel pipe 5.

除上述实施例外,本发明还可以是其它结构形式的型钢柱的混凝土组合柱模板固定、施工实施。Except above-mentioned embodiment, the present invention also can be the concrete combination column formwork fixing of the shaped steel column of other structural forms, construction implementation.

Claims (2)

1. the job practices of a preset nut type steel-reinforced concrete compound pier template fixing device is characterized in that may further comprise the steps:
1) according to the design of the lateral pressure of concreting, design preparation nut, screw rod, pvc pipe is determined the arrangement pitch of steel column top nut;
2) on steel column, unwrapping wire is located in the welded nut position, carry out the nut welding by the mast axis direction, weld bead height 4mm, site error is controlled in the 3mm, and the face of weld of steel column is parallel with template, and the bigger side parallels plate in slit is arranged between nut and the steel column;
3) with spanner one end of screw rod is screwed into nut before template is installed, puts pvc pipe;
4) determine the template position of opening according to the nut network for location on the steel column, draw template perforate figure, according to drawing perforate on template, perforate is corresponding with nut location;
5) mounting template, keelson, outer keel, template adopts the thick veneer of 18mm, template stands in the steel column periphery, keelson adopts 50mm * 100mm flitch, vertically be arranged on the template outside, spacing is less than 200mm, and outer keel adopts the two steel pipes of Φ 48 * 3.5mm, outer keel is located at the keelson periphery, and keelson squeezes and withstands template and outer keel.
6) screw rod passes the template perforate, and the other end of screw rod passes through " 3 " shape snap fit on outer keel.
2. the job practices of preset nut type steel-reinforced concrete compound pier template fixing device according to claim 4 is characterized in that the two steel pipes of described outer keel are connected and fixed by Screw arbor with nut at both-ends.
CN2009100254967A 2009-03-03 2009-03-03 Construction Method of Preset Nut Type Steel Concrete Composite Column Formwork Fixing Device Expired - Fee Related CN101538939B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100254967A CN101538939B (en) 2009-03-03 2009-03-03 Construction Method of Preset Nut Type Steel Concrete Composite Column Formwork Fixing Device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100254967A CN101538939B (en) 2009-03-03 2009-03-03 Construction Method of Preset Nut Type Steel Concrete Composite Column Formwork Fixing Device

Publications (2)

Publication Number Publication Date
CN101538939A CN101538939A (en) 2009-09-23
CN101538939B true CN101538939B (en) 2010-10-27

Family

ID=41122312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100254967A Expired - Fee Related CN101538939B (en) 2009-03-03 2009-03-03 Construction Method of Preset Nut Type Steel Concrete Composite Column Formwork Fixing Device

Country Status (1)

Country Link
CN (1) CN101538939B (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383411B (en) * 2011-08-23 2014-03-05 中国葛洲坝集团股份有限公司 Method for positioning template corner
CN103161309A (en) * 2011-12-13 2013-06-19 永升建设集团有限公司 Narrow deformation joint inner side template installation and construction method
CN102444283A (en) * 2011-12-22 2012-05-09 中建二局大连建筑工程有限公司 Horizontal supporting structure of building templates
CN102733598A (en) * 2012-07-13 2012-10-17 中建八局第三建设有限公司 Straight threaded sleeve combined structure for reinforcing figured steel rib column template
CN102864927A (en) * 2012-10-10 2013-01-09 南通纺织职业技术学院 Large-section special-shaped combined steel and concrete column construction method
CN104141382A (en) * 2013-12-10 2014-11-12 中建四局第五建筑工程有限公司 Construction method of building steel pipe column protective coating and cylindrical template
CN103912120B (en) * 2014-04-22 2015-10-28 山西省宏图建设集团有限公司 Tool type rectangular column mould reinforcement device
CN104251801B (en) * 2014-09-12 2016-11-30 上海建工集团股份有限公司 For measuring the test device of concrete blinding lateral pressure
CN105649330B (en) * 2015-12-31 2017-12-01 上海欧本钢结构有限公司 A kind of plug-in formwork system and its application method for making skeleton using steel reinforcement cage
CN105715039A (en) * 2016-04-15 2016-06-29 中铁五局集团路桥工程有限责任公司 Movable recyclable template back rib device
CN106320704A (en) * 2016-08-22 2017-01-11 陕西建工第建设集团有限公司 Steel reinforced concrete structure formwork sleeve threaded rod pulling construction method
CN107905528A (en) * 2017-10-23 2018-04-13 中国十七冶集团有限公司 A kind of half bag column template of reinforced concrete quickly pacifies dismantling device and its construction method
CN109025251A (en) * 2018-09-04 2018-12-18 上海宝冶建筑工程有限公司 A kind of arc plank sheathing bracing means and construction equipment
CN110424732A (en) * 2019-09-03 2019-11-08 中国电建集团山东电力建设有限公司 The construction method of template system for concreting
CN114232993A (en) * 2021-12-07 2022-03-25 中建八局南方建设有限公司 Multi-directional adjustable sleeve device for aluminum mould of steel reinforced concrete member and construction method
CN116537536B (en) * 2023-05-23 2025-09-09 中建八局第三建设有限公司 Construction method of ultrahigh independent concrete column
CN117468703A (en) * 2023-10-31 2024-01-30 中建三局集团(浙江)有限公司 A cross-stiff steel column threaded sleeve reinforcement device
CN120156000B (en) * 2025-05-06 2025-11-18 五矿二十三冶建设集团有限公司 Adjustable steel column external casting concrete mould

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4159097A (en) * 1976-09-13 1979-06-26 Strickland Systems Inc. Tie having integrally molded sleeve
JPH0849418A (en) 1994-05-30 1996-02-20 Masato Sugano Concrete form holding device
JPH08199670A (en) 1995-01-19 1996-08-06 Toshiyuki Kawakita Formwork panel and formwork for storage pool using the same
JPH09203206A (en) 1996-01-29 1997-08-05 Okabe Co Ltd Form device for construction of post-like concrete structure
CN2632213Y (en) * 2003-06-18 2004-08-11 沈小林 Formwork fastener
CN201401010Y (en) * 2009-04-15 2010-02-10 江苏省华建建设股份有限公司 Fixing device for preset nut type steel reinforced concrete combined column template

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4159097A (en) * 1976-09-13 1979-06-26 Strickland Systems Inc. Tie having integrally molded sleeve
JPH0849418A (en) 1994-05-30 1996-02-20 Masato Sugano Concrete form holding device
JPH08199670A (en) 1995-01-19 1996-08-06 Toshiyuki Kawakita Formwork panel and formwork for storage pool using the same
JPH09203206A (en) 1996-01-29 1997-08-05 Okabe Co Ltd Form device for construction of post-like concrete structure
CN2632213Y (en) * 2003-06-18 2004-08-11 沈小林 Formwork fastener
CN201401010Y (en) * 2009-04-15 2010-02-10 江苏省华建建设股份有限公司 Fixing device for preset nut type steel reinforced concrete combined column template

Also Published As

Publication number Publication date
CN101538939A (en) 2009-09-23

Similar Documents

Publication Publication Date Title
CN101538939B (en) Construction Method of Preset Nut Type Steel Concrete Composite Column Formwork Fixing Device
WO2022062294A1 (en) Suspension connection node for large-span cantilever steel truss and construction method therefor
CN110593485A (en) Main material damage-free detachable steel-concrete combined beam
CN211114418U (en) A detachable steel-concrete composite beam with damage-free main material
CN211873350U (en) Assembled type through bolt unequal-height beam-square steel tube concrete column joint structure
CN109025353A (en) Device and construction method for reinforcing reinforced concrete beam by prestressed FRP (fiber reinforced plastic) sheet
CN201649623U (en) Large basement shear wall truss type steel pipe single-side support formwork structure
CN207194268U (en) Steel bar truss floor support plate with reusable bottom die
CN202755649U (en) Rebar mold-supporting frame of cantilever slab
CN217780474U (en) Large-scale prefabricated case roof beam hoist and mount crack control device
CN107237437A (en) Combined type reinforced truss floor support plate and its construction method
CN113152893A (en) Template for building construction and using method
CN206090577U (en) Steel sheet pile supports in strutting combination welded truss
CN204266572U (en) Scaffold wall connecting piece
CN105952045A (en) Pre-stress post-pouring floor construction method
WO2023123319A1 (en) Fabricated shear wall
CN101701493B (en) Template support system of box type girder cast-in-place concrete floor plate of steel frame construction
CN110284594B (en) Full-bolt connection assembly type floor composite beam steel pipe column frame joint and forming method thereof
CN201539098U (en) Detachable and convenient support device for steel structure building formwork
CN110821147A (en) Expansion joint shear wall combination template capable of being assembled and disassembled quickly
CN212404844U (en) Bracket system for cast-in-situ flange plate of I-shaped steel-concrete composite beam
CN112177154B (en) A structure of a steel tube concrete assembled building and its assembly method
CN214246612U (en) Template system for post-cast plate construction of pipe shaft
CN202117390U (en) Segmentally spliced water tank tower
CN116411652A (en) A prefabricated shear wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101027

CF01 Termination of patent right due to non-payment of annual fee