CN215103359U - Blast furnace flange gas leakage timely processing device - Google Patents

Blast furnace flange gas leakage timely processing device Download PDF

Info

Publication number
CN215103359U
CN215103359U CN202120992243.3U CN202120992243U CN215103359U CN 215103359 U CN215103359 U CN 215103359U CN 202120992243 U CN202120992243 U CN 202120992243U CN 215103359 U CN215103359 U CN 215103359U
Authority
CN
China
Prior art keywords
blast furnace
fixed
connecting strip
gas leakage
semi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120992243.3U
Other languages
Chinese (zh)
Inventor
侯建
王计平
田鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baotou Ande Kiln Technology Co ltd
Original Assignee
Baotou Ande Kiln Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baotou Ande Kiln Technology Co ltd filed Critical Baotou Ande Kiln Technology Co ltd
Priority to CN202120992243.3U priority Critical patent/CN215103359U/en
Application granted granted Critical
Publication of CN215103359U publication Critical patent/CN215103359U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The utility model provides a blast furnace flange coal gas leakage in time processing apparatus, including the outer housing of bowl form, evenly be fixed with four screw thread posts on the outside of outer housing, threaded connection has the screw thread drilling rod in the screw thread post respectively, accomplishes the fixed of outer housing on the blast furnace shell through the screw thread drilling rod, has placed the gasbag in the semi-closed intracavity of outer housing, has seted up a plurality of inflation inlets on the gasbag, and the inflation inlet is fixed on the outer housing, and the connecting strip has been cup jointed to the open end in semi-closed chamber, and the outside at the gasbag is fixed on the top of connecting strip, and the bottom mounting of connecting strip has the sealing washer. The utility model discloses a when the gasbag expands, the gasbag drives the connecting strip and outwards removes, and the bottom mounting of connecting strip has the sealing washer, and the connecting strip and then promote the sealing washer to support in the blast furnace shell outside, continues to aerify in to the gasbag, can make the leakproofness of sealing washer better to can reach the sealed effect inside the housing of outer with the coal gas that flange department leaked.

Description

Blast furnace flange gas leakage timely processing device
Technical Field
The utility model belongs to the technical field of blast furnace gas leakage processing apparatus, concretely relates to blast furnace flange gas leakage in time processing apparatus.
Background
The cross section of the blast furnace is a round iron-making shaft furnace, a steel plate is used as a furnace shell, and a refractory brick lining is built in the shell. The blast furnace body is divided into a furnace throat, a furnace body, a furnace waist, a furnace belly and a furnace hearth 5 from top to bottom. Because of the advantages of good economic index, simple process, large production capacity, high labor production efficiency, low energy consumption and the like of the blast furnace ironmaking technology, the iron produced by the method accounts for the vast majority of the total iron production in the world. In the production of a blast furnace, iron ore, coke, and a flux for slag formation are charged from the top of the furnace, and preheated air is blown into the furnace through tuyeres located along the periphery of the furnace at the lower part of the furnace. Carbon in the coke is burnt with oxygen blown into the air at high temperature to generate carbon monoxide and hydrogen, and oxygen in the iron ore is removed in the ascending process in the furnace, so that iron is obtained by reduction. The smelted molten iron is discharged from the iron notch. Unreduced impurities in the iron ore are combined with fluxes such as limestone to generate slag, and the slag is discharged from a slag hole. The generated gas is discharged from the top of the furnace, and is used as fuel for hot blast stoves, heating furnaces, coke ovens, boilers and the like after dust removal. The main products of blast furnace smelting are pig iron, and blast furnace slag and blast furnace gas are also by-products.
In a newly-built blast furnace or an on-line blast furnace, the steel structure and the internal refractory of the blast furnace inevitably expand to different degrees along with the rise of temperature and long-time production. The blast furnace is characterized in that a hard connection mode is adopted between the blast furnace large sleeve and the flange, although a gasket is used for sealing between the blast furnace large sleeve and the flange when the blast furnace large sleeve and the flange are connected, the thermal expansion and cold contraction stress is large, the upwarp deformation condition is easily generated at a joint, gaps with different sizes are also generated between the inner refractory material and the cooling wall as well as between the cooling wall and the steel shell, high-temperature coal gas in the furnace is blown out along the gaps, the coal gas is leaked out from the gaps between the tuyere large sleeve and the flange, and the coal gas leakage can be caused.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that the not enough to above-mentioned prior art provides a blast furnace flange gas leakage in time processing apparatus to solve the problem that proposes in the above-mentioned background art.
In order to solve the technical problem, the utility model discloses a technical scheme is: a blast furnace flange gas leakage timely processing device comprises a bowl-shaped outer casing, four threaded columns are uniformly fixed on the outer edge of the outer casing, threaded drill rods are respectively connected in the threaded columns in a threaded manner, and the outer casing is fixed on the blast furnace casing through the threaded drill rods;
a baffle is fixed in the outer housing shell, a semi-closed cavity is formed between the baffle and the inner wall of the outer housing shell, an air bag is placed in the semi-closed cavity, a plurality of inflation ports are formed in the air bag, and the inflation ports are fixed on the outer housing shell;
the opening end of the semi-closed cavity is sleeved with a connecting strip, the top end of the connecting strip is fixed on the outer side of the air bag, and the bottom end of the connecting strip is fixed with a sealing ring.
Furthermore, an outer discharge pipe is fixed on the outer side of the outer casing, and a control valve is arranged on the outer discharge pipe.
Furthermore, the front end of the threaded drill rod is a sharp end and is used for drilling into the blast furnace shell, and the tail end of the threaded drill rod is fixed with an operating plate.
Furthermore, the connecting strip is a hard rubber strip and is sleeved in the semi-closed cavity.
Furthermore, the connecting part of the baffle plate in the semi-closed cavity and the outer encloser is provided with a round angle.
Furthermore, the sealing ring is composed of a first sealing ring on the inner side and a second sealing ring on the outer side, and the first sealing ring and the second sealing ring are both made of high-temperature-resistant flexible rubber.
Compared with the prior art, the utility model has the following advantage:
1. the utility model arranges four threaded columns outside the outer cover shell, the threaded columns are respectively connected with threaded drill rods in a threaded way, the four threaded drill rods are sequentially drilled into the shell of the blast furnace to complete the fixation of the outer casing on the shell of the blast furnace, the baffle is fixed in the outer casing, a semi-closed cavity is formed between the baffle and the inner wall of the outer casing, the air bag is arranged in the semi-closed cavity, a plurality of inflation ports are arranged on the air bag, the air bag is inflated and deflated through the inflation ports to expand the air bag for use, when the air bag expands, the air bag drives the connecting strip to move outwards, the bottom end of the connecting strip is fixed with a sealing ring, the connecting strip further pushes the sealing ring to prop against the outer side of the blast furnace shell to continuously inflate the air bag, the sealing performance of the sealing ring is better, so that the effect of sealing the coal gas leaked from the flange in the outer housing can be achieved, and the timely treatment of the coal gas leakage of the blast furnace flange is completed.
2. The utility model discloses a sealing washer comprises the first sealing washer in inboard and the second sealing washer in the outside, and first sealing washer and second sealing washer are made by high temperature resistant flexible rubber, accomplish the inside multilayer sealed effect of housing by the second sealing washer in first sealing washer and the outside, can further avoid gas leakage, have improved sealed effect.
Drawings
FIG. 1 is a sectional view of the overall structure of the present invention;
fig. 2 is a bottom view of the overall structure of the present invention;
description of reference numerals:
the device comprises an outer housing 1, a threaded column 11, a threaded drill rod 2, an operating plate 21, a baffle 3, a semi-closed cavity 31, an air bag 4, an inflation inlet 41, a connecting strip 5, a sealing ring 6, a first sealing ring 61, a second sealing ring 62 and an outer discharge pipe 7.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1 and fig. 2, the utility model provides a technical solution: a device for timely treating gas leakage of a blast furnace flange comprises a bowl-shaped outer casing 1, wherein the outer casing 1 is used for covering a flange with gas leakage and covering the leaked gas in the outer casing 1.
Four threaded columns 11 are uniformly fixed on the outer edge of the outer housing 1, threaded drill rods 2 are respectively connected into the threaded columns 11 in a threaded mode, the front ends of the threaded drill rods 2 are sharp ends and are used for drilling into the blast furnace housing, an operating plate 21 is fixed at the tail ends of the threaded drill rods 2 and is used for operating the threaded drill rods 2 by an operator, the threaded drill rods 2 sequentially drill into the blast furnace housing, and the outer housing 1 is fixed on the blast furnace housing.
The utility model discloses an outer housing 1, including outer housing 1, baffle 3, gasbag 4, baffle 3, outer housing 1, the baffle 3 is fixed with baffle 3 in the outer housing 1, and the bottom of baffle 3 is no longer than the outside end of outer housing 1, form semi-closed chamber 31 between the inner wall of baffle 3 and outer housing 1, gasbag 4 has been placed in the semi-closed chamber 31, baffle 3 sets up to the fillet with the junction of outer housing 1 in the semi-closed chamber 31, and the fillet can avoid gasbag 4 to damage in the use.
The air bag 4 is provided with a plurality of inflation ports 41, the inflation ports 41 are used for inflating and deflating the air bag 4 to expand the air bag 4 for use, the inflation ports 41 are fixed on the outer casing 1, and the inflation ports 41 can also complete the fixing effect on the position of the air bag 4.
The open end of semi-closed chamber 31 has cup jointed connecting strip 5, and connecting strip 5 is the stereoplasm rubber strip, and it cup joints in semi-closed chamber 31, and the top of connecting strip 5 is fixed in the outside of gasbag 4, and when gasbag 4 expanded, gasbag 4 drove connecting strip 5 and outwards removed, the bottom of connecting strip 5 is fixed with sealing washer 6, and connecting strip 5 and then promote sealing washer 6 and support in the blast furnace casing outside, continue to aerify in gasbag 4, can make sealing washer 6's leakproofness better to can reach the effect of sealing the coal gas that leaks in flange department in housing 1 inside, accomplish the timely processing of blast furnace flange coal gas leakage.
The sealing ring 6 is composed of a first sealing ring 61 on the inner side and a second sealing ring 62 on the outer side, the first sealing ring 61 and the second sealing ring 62 are made of high-temperature-resistant flexible rubber, the effect of multi-layer sealing inside the outer housing 1 is achieved through the first sealing ring 61 and the second sealing ring 62 on the outer side, gas leakage can be further avoided, and the sealing effect is improved.
The outer side of the outer housing 1 is also fixed with an outer discharge pipe 7, the outer discharge pipe 7 can be externally connected with an air supply pipe, the condition that the air pressure in the outer housing 1 is too large can be avoided, the sealing efficiency is improved, and the outer discharge pipe 7 is provided with a control valve, so that the on-off of the outer discharge pipe can be controlled conveniently.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The blast furnace flange gas leakage timely processing device is characterized by comprising a bowl-shaped outer casing (1), wherein four threaded columns (11) are uniformly fixed on the outer edge of the outer casing (1), threaded drill rods (2) are respectively connected in the threaded columns (11) in a threaded manner, and the outer casing (1) is fixed on the blast furnace casing through the threaded drill rods (2);
a baffle (3) is fixed in the outer housing (1), a semi-closed cavity (31) is formed between the baffle (3) and the inner wall of the outer housing (1), an air bag (4) is placed in the semi-closed cavity (31), a plurality of inflation ports (41) are formed in the air bag (4), and the inflation ports (41) are fixed on the outer housing (1);
the opening end of the semi-closed cavity (31) is sleeved with a connecting strip (5), the top end of the connecting strip (5) is fixed on the outer side of the air bag (4), and a sealing ring (6) is fixed at the bottom end of the connecting strip (5).
2. The device for timely processing the gas leakage of the blast furnace flange as per claim 1, wherein an outer discharge pipe (7) is further fixed on the outer side of the outer casing (1), and a control valve is arranged on the outer discharge pipe (7).
3. The blast furnace flange gas leakage timely processing device according to claim 1, characterized in that the front end of the threaded drill rod (2) is a sharp end for drilling into the blast furnace shell, and the tail end of the threaded drill rod (2) is fixed with an operation plate (21).
4. The device for timely treating the gas leakage of the blast furnace flange as per claim 1, wherein the connecting strip (5) is a hard rubber strip and is sleeved in the semi-closed cavity (31).
5. The blast furnace flange gas leakage timely processing device according to the claim 1, characterized in that the connection of the inner baffle (3) and the outer casing (1) of the semi-closed cavity (31) is set to be a round angle.
6. The blast furnace flange gas leakage timely processing device according to the claim 1, characterized in that the sealing ring (6) is composed of a first sealing ring (61) at the inner side and a second sealing ring (62) at the outer side, and the first sealing ring (61) and the second sealing ring (62) are made of high temperature resistant flexible rubber.
CN202120992243.3U 2021-05-11 2021-05-11 Blast furnace flange gas leakage timely processing device Active CN215103359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120992243.3U CN215103359U (en) 2021-05-11 2021-05-11 Blast furnace flange gas leakage timely processing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120992243.3U CN215103359U (en) 2021-05-11 2021-05-11 Blast furnace flange gas leakage timely processing device

Publications (1)

Publication Number Publication Date
CN215103359U true CN215103359U (en) 2021-12-10

Family

ID=79295242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120992243.3U Active CN215103359U (en) 2021-05-11 2021-05-11 Blast furnace flange gas leakage timely processing device

Country Status (1)

Country Link
CN (1) CN215103359U (en)

Similar Documents

Publication Publication Date Title
SU569293A3 (en) Expansion joint of oxygen lance of blast furnace
CN100595284C (en) Maintaining method for blast furnace
CN215103359U (en) Blast furnace flange gas leakage timely processing device
CN208964956U (en) A kind of blast-furnace tuyere device with compression and sealing function
CN207091453U (en) Converter movable hood
CN105948048A (en) Energy-saving environment-friendly carbon bisulfide gasification reaction furnace
CN205773374U (en) Energy saving and environment friendly Carbon bisulfide gasification reacting furnace
CN109022651A (en) A kind of device preventing blast furnace copper cooling stave inlet and outlet pipes leak
CN212833848U (en) Movable hammer device for poking blast furnace tuyere
CN112522462A (en) Blast furnace for smelting iron material
CN116516093B (en) Production device for direct reduced iron
CN210978959U (en) Blast furnace base water pipe with sealing head structure
CN209877608U (en) Electric heating cupola furnace for rock wool production
CN206266647U (en) Radiant tube is reduced directly shaft furnace
CN217628463U (en) Blast furnace is maintained with swift stifled wind gap subassembly
CN208532844U (en) A kind of double bell structure top charging devices
CN220132252U (en) Blast furnace belly and waist structure
CN2393059Y (en) Hot-air iron-bits melting furnace
CN110331248A (en) A kind of energy saving regulation method of blast funnace hot blast stove combustion fan
CN218026177U (en) Air inlet device of blast furnace for metallurgy
CN204185429U (en) A kind of annular air channel with high stability bearing structure
CN218600997U (en) Auxiliary device is suppressed fast to airtight cooling arrangement
CN218026185U (en) Novel low-carbon blast furnace smelting energy-saving device for u
CN213951238U (en) Water cooling belly pipe for blast furnace air supply system
JP2608737B2 (en) Furnace hood of smelting reduction furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A timely treatment device for gas leakage from blast furnace flanges

Effective date of registration: 20230602

Granted publication date: 20211210

Pledgee: Shanghai Pudong Development Bank Co.,Ltd. Baotou Branch

Pledgor: BAOTOU ANDE KILN TECHNOLOGY Co.,Ltd.

Registration number: Y2023150000076

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20211210

Pledgee: Shanghai Pudong Development Bank Co.,Ltd. Baotou Branch

Pledgor: BAOTOU ANDE KILN TECHNOLOGY Co.,Ltd.

Registration number: Y2023150000076

PC01 Cancellation of the registration of the contract for pledge of patent right