CN208532844U - A kind of double bell structure top charging devices - Google Patents

A kind of double bell structure top charging devices Download PDF

Info

Publication number
CN208532844U
CN208532844U CN201820822556.2U CN201820822556U CN208532844U CN 208532844 U CN208532844 U CN 208532844U CN 201820822556 U CN201820822556 U CN 201820822556U CN 208532844 U CN208532844 U CN 208532844U
Authority
CN
China
Prior art keywords
small clock
fixedly connected
hopper
bell
pull rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820822556.2U
Other languages
Chinese (zh)
Inventor
于长东
白书亭
李理
程程
张建堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luohe Baoshitong Metallurgical Machinery Co Ltd
Original Assignee
Luohe Baoshitong Metallurgical Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luohe Baoshitong Metallurgical Machinery Co Ltd filed Critical Luohe Baoshitong Metallurgical Machinery Co Ltd
Priority to CN201820822556.2U priority Critical patent/CN208532844U/en
Application granted granted Critical
Publication of CN208532844U publication Critical patent/CN208532844U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Blast Furnaces (AREA)

Abstract

The utility model relates to top charging technical fields, in particular a kind of double bell structure top charging devices, it include receiving cone and small clock pendant, the bottom port of receiving cone is fixedly connected with small clock hopper, side wall of the small clock hopper close to inclined surface is fixedly connected to small clock hopper support block, the bottom of small clock hopper support block is fixedly connected with hydraulically extensible module, hydraulically extensible module is fixedly connected with fixing seat far from one end of small clock hopper support block, the side wall of fixing seat is fixedly connected with great bell hopper, the inside gear of small clock pendant is connected to small clock draw piece, the bottom of small clock draw piece is fixedly connected with small clock pull rod, small clock pull rod is fixedly connected with small clock far from one end of small clock draw piece, the inner wall of small clock pull rod is socketed with large bell pull rod, large bell pull rod is fixedly connected with great bell far from one end of great bell draw piece.The utility model is greatly convenient and meets practical operation demand, greatly improves work efficiency.

Description

A kind of double bell structure top charging devices
Technical field
The utility model relates to top charging technical field more particularly to a kind of double bell structure top charging devices.
Background technique
Blast furnace is to make furnace shell with steel plate, and fireproof brick inner lining is built in shell.Blast-furnace body is divided into furnace throat, shaft, furnace from top to bottom Waist, bosh, 5 part of cupola well.Since blast furnace technology economic indicator is good, simple process, output is big, labor productivity Height, low power consumption and other advantages, therefore the iron of this method production accounts for the overwhelming majority of world iron total output.
Iron ore, coke, slag making are packed into flux (lime stone), from lower furnace is located at along furnace from furnace roof when blast fumance The air port in week is blown into preheated air.Coke (also fire the blast furnace having by the auxiliary such as coal injection, heavy oil, natural gas at high temperature Material) in carbon with blast in air oxygen burning generate carbon monoxide and hydrogen, iron ore is removed in uphill process in furnace In oxygen, thus reduction obtain iron.The molten iron produced is released from iron mouth.The flux such as unreduced impurity and lime stone in iron ore In conjunction with clinker is generated, it is discharged from cinder notch.The coal gas of generation from furnace roof be discharged, after dedusting, as hot-blast stove, heating furnace, coke oven, The fuel of boiler etc..The major product of blast furnace process is the pig iron, and there are also by-product blast furnace slag and blast furnace gases.
Top charging device in the prior art is not easy to control, leverages working efficiency.
Summary of the invention
Purpose of the utility model is to solve disadvantages existing in the prior art, and a kind of double bell structure furnaces proposed Push up feeding device.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of double bell structure top charging devices include receiving cone and small clock pendant, the bottom of the receiving cone Port is fixedly connected with small clock hopper, and the bottom of the small clock hopper is the setting that slopes inwardly, and the small clock hopper is close to inclination The side wall in face is fixedly connected to small clock hopper support block, and the bottom of the small clock hopper support block is fixedly connected with hydraulically extensible Module, the hydraulically extensible module are fixedly connected with fixing seat, the side of the fixing seat far from one end of small clock hopper support block Wall is fixedly connected with great bell hopper, and the bottom of the great bell hopper is the setting that slopes inwardly, and the great bell hopper is close to inclined surface Side wall be fixedly connected to upper flange sealing, the bottom of upper flange sealing is fixedly connected with lower flange sealing, described small The inside gear of clock pendant is connected to small clock draw piece, and the bottom of the small clock draw piece is fixedly connected with small clock pull rod, the small clock pull rod To be hollow, the small clock pull rod is fixedly connected with small clock far from one end of small clock draw piece, and the inner wall of the small clock pull rod is socketed with Large bell pull rod, the top of the large bell pull rod are fixedly connected with great bell draw piece, the one end of the large bell pull rod far from great bell draw piece It is fixedly connected with great bell, the side wall of the lower flange sealing is fixedly connected with furnace shell.
Preferably, the side wall that the small clock hopper is located above small clock hopper support block is fixedly connected with dust cover.
Preferably, the hydraulically extensible module includes hydraulic cylinder and the telescopic rod for being socketed on the hydraulic inside wall of cylinder, the liquid The bottom of cylinder pressure is fixedly connected on fixing seat, and small clock hopper support block is fixedly connected at the top of the telescopic rod.
Preferably, the basal plane of the upper flange sealing offers through-hole, and the inner wall of the through-hole is equipped with screw, the spiral shell Silk is connected to lower flange sealing, and the outer wall thread of the screw is connected with nut.
Preferably, the small clock section is triangle, and the bottom of the small clock is located under the bottom port of small clock hopper Side, the base diameter of the small clock are slightly larger than the bottom port bore of small clock hopper.
Preferably, the great bell section is triangle, and the bottom of the great bell is located under the bottom port of great bell hopper Side, the base diameter of the great bell are slightly larger than the bottom port bore of great bell hopper.
Compared with prior art, the utility model has the beneficial effects that
1, by side wall of the small clock hopper close to inclined surface be fixedly connected to small clock hopper support block, small clock hopper branch The bottom of bracer is fixedly connected with hydraulically extensible module, and hydraulically extensible module is fixedly connected far from one end of small clock hopper support block There is fixing seat, the side wall of fixing seat is fixedly connected with great bell hopper, can facilitate according to practical condition and adjust small clock hopper In the distance of great bell hopper, meet practical operation demand.
2, small clock draw piece being connected to by the inside gear of small clock pendant, the bottom of small clock draw piece is fixedly connected with small clock pull rod, Small clock pull rod be it is hollow, small clock pull rod is fixedly connected with small clock far from one end of small clock draw piece, and the inner wall of small clock pull rod is socketed with Large bell pull rod, the top of large bell pull rod are fixedly connected with great bell draw piece, and large bell pull rod is fixedly connected far from one end of great bell draw piece There is great bell, can conveniently adjust small clock and great bell, greatly improve work efficiency.
3, the side wall by great bell hopper close to inclined surface is fixedly connected to upper flange sealing, the bottom of upper flange sealing It is fixedly connected with lower flange sealing, good seal performance.
In the utility model, it is not directed to part in the device and is the same as those in the prior art or can be used the prior art and be subject to reality Existing, the utility model is greatly convenient and meets practical operation demand, greatly improves work efficiency.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of double bell structure top charging devices whole structural schematic diagram;
Fig. 2 be the utility model proposes a kind of double bell structure top charging devices part structural schematic diagram;
Fig. 3 be the utility model proposes a kind of double bell structure top charging devices part structural schematic diagram.
In figure: 1 receiving cone, 2 small clock pendants, 3 small clock hoppers, 4 small clock hopper support blocks, 5 dust covers, 6 hydraulically extensibles Module, 7 fixing seats, 8 hydraulic cylinders, 9 telescopic rods, 10 great bell hoppers, the sealing of 11 upper flanges, the sealing of 12 lower flanges, 13 through-holes, 14 spiral shells Silk, 15 nuts, 16 small clock draw pieces, 17 small clock pull rods, 18 small clocks, 19 large bell pull rods, 20 great bell draw pieces, 21 great bell, 22 furnace shells.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be understood that term " on ", "lower", "front", "rear", "left", "right", The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
Fig. 1-3 is please referred to, a kind of double bell structure top charging devices include receiving cone 1 and small clock pendant 2, material feeding The bottom port of funnel 1 is fixedly connected with small clock hopper 3, and the bottom of small clock hopper 3 is the setting that slopes inwardly, and small clock hopper 3 leans on The side wall of nearly inclined surface is fixedly connected to small clock hopper support block 4, and the bottom of small clock hopper support block 4 is fixedly connected with hydraulic Flexible module 6, hydraulically extensible module 6 are fixedly connected with fixing seat 7, the side of fixing seat 7 far from one end of small clock hopper support block 4 Wall is fixedly connected with great bell hopper 10, and the bottom of great bell hopper 10 is the setting that slopes inwardly, and great bell hopper 10 is close to inclined surface Side wall is fixedly connected to upper flange sealing 11, and the bottom of upper flange sealing 11 is fixedly connected with lower flange sealing 12, and small clock is hung The inside gear of part 2 is connected to small clock draw piece 16, and the bottom of small clock draw piece 16 is fixedly connected with small clock pull rod 17, during small clock pull rod 17 is Sky, small clock pull rod 17 are fixedly connected with small clock 18 far from one end of small clock draw piece 16, and the inner wall of small clock pull rod 17 is socketed with great bell Pull rod 19, the top of large bell pull rod 19 are fixedly connected with great bell draw piece 20, and the one end of large bell pull rod 19 far from great bell draw piece 20 is solid Surely it is connected with great bell 21, the side wall of lower flange sealing 12 is fixedly connected with furnace shell 22.
The side wall that small clock hopper 3 is located at small 4 top of clock hopper support block is fixedly connected with dust cover 5.
Hydraulically extensible module 6 includes hydraulic cylinder 8 and the telescopic rod 9 for being socketed on 8 inner wall of hydraulic cylinder, the bottom of hydraulic cylinder 8 It is fixedly connected on fixing seat 7, the top of telescopic rod 9 is fixedly connected on small clock hopper support block 4.
The basal plane of upper flange sealing 11 offers through-hole 13, and the inner wall of through-hole 13 is equipped with screw 14, and screw 14 is connected to Lower flange sealing 12, the outer wall thread of screw 14 is connected with nut 15.
Small 18 section of clock is triangle, and the bottom of small clock 18 is located at the lower section of the bottom port of small clock hopper 3, small clock 18 Base diameter is slightly larger than the bottom port bore of small clock hopper 3.
21 section of great bell is triangle, and the bottom of great bell 21 is located at the lower section of the bottom port of great bell hopper 10, great bell 21 Base diameter be slightly larger than great bell hopper 10 bottom port bore.
The working process of the utility model is as follows: the side wall by small clock hopper 3 close to inclined surface is fixedly connected to small clock The bottom of hopper support block 4, small clock hopper support block 4 is fixedly connected with hydraulically extensible module 6, and hydraulically extensible module 6 is far from small One end of clock hopper support block 4 is fixedly connected with fixing seat 7, and the side wall of fixing seat 7 is fixedly connected with great bell hopper 10, Ke Yigen Facilitate according to practical condition and adjust small clock hopper 3 in the distance of great bell hopper 10, meets practical operation demand;It is hung by small clock The inside gear of part 2 is connected to small clock draw piece 16, and the bottom of small clock draw piece 16 is fixedly connected with small clock pull rod 17, during small clock pull rod 17 is Sky, small clock pull rod 17 are fixedly connected with small clock 18 far from one end of small clock draw piece 16, and the inner wall of small clock pull rod 17 is socketed with great bell Pull rod 19, the top of large bell pull rod 19 are fixedly connected with great bell draw piece 20, and the one end of large bell pull rod 19 far from great bell draw piece 20 is solid Surely it is connected with great bell 21, small clock 18 and great bell 21 is can conveniently adjust, greatly improves work efficiency;It is leaned on by great bell hopper 10 The side wall of nearly inclined surface is fixedly connected to upper flange sealing 11, and the bottom of upper flange sealing 11 is fixedly connected with lower flange sealing 12, good seal performance.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of double bell structure top charging devices include receiving cone (1) and small clock pendant (2), which is characterized in that described The bottom port of receiving cone (1) is fixedly connected with small clock hopper (3), and the bottom of the small clock hopper (3) is to slope inwardly to set It sets, side wall of the small clock hopper (3) close to inclined surface is fixedly connected to small clock hopper support block (4), the small clock hopper The bottom of supporting block (4) is fixedly connected with hydraulically extensible module (6), and the hydraulically extensible module (6) is far from small clock hopper support One end of block (4) is fixedly connected with fixing seat (7), and the side wall of the fixing seat (7) is fixedly connected with great bell hopper (10), described The bottom of great bell hopper (10) is the setting that slopes inwardly, and side wall of the great bell hopper (10) close to inclined surface is fixedly connected to Upper flange seals (11), and the bottom of the upper flange sealing (11) is fixedly connected with lower flange sealing (12), the small clock pendant (2) inside gear is connected to small clock draw piece (16), and the bottom of the small clock draw piece (16) is fixedly connected with small clock pull rod (17), described Small clock pull rod (17) be it is hollow, the small clock pull rod (17) is fixedly connected with small clock (18) far from one end of small clock draw piece (16), The inner wall of the small clock pull rod (17) is socketed with large bell pull rod (19), and the top of the large bell pull rod (19) is fixedly connected with great bell Draw piece (20), the large bell pull rod (19) are fixedly connected with great bell (21), the lower flange far from the one end of great bell draw piece (20) The side wall of sealing (12) is fixedly connected with furnace shell (22).
2. a kind of double bell structure top charging devices according to claim 1, which is characterized in that the small clock hopper (3) Side wall above small clock hopper support block (4) is fixedly connected with dust cover (5).
3. a kind of double bell structure top charging devices according to claim 1, which is characterized in that the hydraulically extensible module It (6) include hydraulic cylinder (8) and the telescopic rod (9) for being socketed on hydraulic cylinder (8) inner wall, the bottom of the hydraulic cylinder (8) is fixed to be connected It is connected to fixing seat (7), small clock hopper support block (4) is fixedly connected at the top of the telescopic rod (9).
4. a kind of double bell structure top charging devices according to claim 1, which is characterized in that the upper flange sealing (11) basal plane offers through-hole (13), and the inner wall of the through-hole (13) is equipped with screw (14), and the screw (14) is connected to Lower flange seals (12), and the outer wall thread of the screw (14) is connected with nut (15).
5. a kind of double bell structure top charging devices according to claim 1, which is characterized in that small clock (18) section For triangle, the bottom of the small clock (18) is located at the lower section of the bottom port of small clock hopper (3), the bottom of the small clock (18) Diameter is slightly larger than the bottom port bore of small clock hopper (3).
6. a kind of double bell structure top charging devices according to claim 1, which is characterized in that great bell (21) section For triangle, the bottom of the great bell (21) is located at the lower section of the bottom port of great bell hopper (10), the bottom of the great bell (21) Portion's diameter is slightly larger than the bottom port bore of great bell hopper (10).
CN201820822556.2U 2018-05-30 2018-05-30 A kind of double bell structure top charging devices Expired - Fee Related CN208532844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820822556.2U CN208532844U (en) 2018-05-30 2018-05-30 A kind of double bell structure top charging devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820822556.2U CN208532844U (en) 2018-05-30 2018-05-30 A kind of double bell structure top charging devices

Publications (1)

Publication Number Publication Date
CN208532844U true CN208532844U (en) 2019-02-22

Family

ID=65381944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820822556.2U Expired - Fee Related CN208532844U (en) 2018-05-30 2018-05-30 A kind of double bell structure top charging devices

Country Status (1)

Country Link
CN (1) CN208532844U (en)

Similar Documents

Publication Publication Date Title
CN103924100B (en) A kind of method and device producing needle antimony containing weisspiessglanz material bath smelting
CN101386897B (en) Iron-smelting technology of SDRF furnace
CN101008554A (en) Shaft furnace for production of ferrochromium and smelting method thereof
CN103451344B (en) CEO compound smelting reduction ironmaking plant and technology
CN107419051B (en) Promote the smelting process of converter scrap melting using gasification dephosphorized slag
CN104878147A (en) Method for making iron by smelting reduction
CN203397607U (en) Blast furnace ironmaking model system
CN208532844U (en) A kind of double bell structure top charging devices
CN103194557A (en) Novel gas fusing and melting furnace
CN110923381B (en) Short-flow blast furnace iron-making process
CN201149421Y (en) Dual purpose shaft furnace reduction apparatus for coal base and gas base
CN202465741U (en) Low-carbon energy-saving blast furnace
CN201104092Y (en) Built-in coal based sponge iron shaft furnace
CN201217665Y (en) Novel furnace cupola system for melting carbonaceous ball of iron oxide
CN208362381U (en) A kind of clock valve arrangement top charging device
CN107354259A (en) A kind of coal-based direct reduction shaft furnace and the method smelted using the shaft furnace
CN207498403U (en) A kind of inner lining structure of fire-proof
Zhou et al. Development of Smelting Reduction Ironmaking Process
CN208362383U (en) A kind of funnel structure top charging device
CN217628463U (en) Blast furnace is maintained with swift stifled wind gap subassembly
CN208183008U (en) A kind of pyrogenic process enrichment furnace
CN109929957A (en) A kind of device and method of pre-reduced iron ore high melt production molten iron
CN216808892U (en) Device for adjusting blanking speed of blast furnace ironmaking raw material
CN216712142U (en) Mechanical type blast furnace stock rod matched with iron-making blast furnace
CN103468849B (en) External heated shaft furnace reduction grinding sefstromite concentrate produces micro alloy iron powder technique

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190222

Termination date: 20210530

CF01 Termination of patent right due to non-payment of annual fee