CN215101719U - Material lifting device for building engineering - Google Patents

Material lifting device for building engineering Download PDF

Info

Publication number
CN215101719U
CN215101719U CN202120447127.3U CN202120447127U CN215101719U CN 215101719 U CN215101719 U CN 215101719U CN 202120447127 U CN202120447127 U CN 202120447127U CN 215101719 U CN215101719 U CN 215101719U
Authority
CN
China
Prior art keywords
base
plate
hopper
motor
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120447127.3U
Other languages
Chinese (zh)
Inventor
曹洪志
郭猛
朱庄林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120447127.3U priority Critical patent/CN215101719U/en
Application granted granted Critical
Publication of CN215101719U publication Critical patent/CN215101719U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

A material lifting device for constructional engineering comprises a base, a support, a top plate, a motor, a rope winding roller, a guide vertical rod and a lifting base. The base has the roof through leg joint, the both sides of support are provided with the direction pole setting respectively, wear to be equipped with the lift base that can reciprocate in the direction pole setting, the lift base overhead has the hopper, the central point department of putting of roof is provided with the motor, the output shaft of motor has drive gear, the both sides of motor are provided with the rope woolding cylinder respectively, the pivot of rope woolding cylinder is connected with the driven gear who meshes with drive gear mutually, the both ends of roof are provided with guide roller respectively, the last connection rope of rope woolding cylinder is walked around guide roller and is connected with lift base's rear end. A material hoisting device for building engineering, its reasonable in design, simple structure, the fortune material of being convenient for and unload, can effectively reduce staff's intensity of labour, improve work efficiency.

Description

Material lifting device for building engineering
Technical Field
The utility model relates to a building engineering construction equipment especially relates to a material lifting device for building engineering.
Background
In the construction operation of building engineering, especially in the wall body construction, the staff need promote the eminence with materials such as building brick, grit in order to make things convenient for the operation, and traditional method in present stage mainly accomplishes through the manual work, and not only work efficiency is low, and intensity of labour is big moreover, still has certain danger simultaneously. Although some can replace artificial lifting machines at present, when in actual use, the material transporting and the unloading can only be carried out independently and in a single mode, the operation time is long, the continuity of construction cannot be guaranteed, the practicability is poor, in addition, the hoppers of most of the lifting machines are very inconvenient when the materials are unloaded, the materials are easy to remain in the hoppers, the unloading is not easy, and the time and the labor are wasted. Therefore, the technical problem to be solved is to provide a material lifting device for construction engineering by those skilled in the art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the weak point among the prior art, provide a material hoisting device for building engineering, its reasonable in design, simple structure is convenient for fortune material and is unloaded, can effectively reduce staff's intensity of labour, improves work efficiency.
A material lifting device for building engineering, including base, support, roof, motor, rope winding cylinder, direction pole setting and lifting base. The base have the roof through leg joint, the both sides of support are provided with the direction pole setting respectively in the space between base and roof promptly, wear to be equipped with the lift base that can reciprocate on the direction pole setting. The lifting base on put and to have the hopper, the front end of hopper is provided with the discharge gate, discharge gate department is provided with the striker plate, the top of striker plate is articulated with the top of discharge gate to constitute the structure that can open and shut, the bottom of discharge gate articulates there is the connecting plate, be provided with the locating plate with striker plate matched with on the connecting plate, one side of connecting plate is provided with the intubate, one side of hopper be provided with intubate matched with spring bolt, spring bolt inserts the position of locating the intraductal fixable connecting plate of intubate to make the locating plate block the striker plate, the front end at the bottom of the bucket of hopper is articulated with lifting base's front end, so that the hopper constitutes the structure that can upturn. The center position department of roof be provided with the motor, the output shaft of motor has drive gear, the both sides of motor are provided with rope winding cylinder respectively on the roof promptly, rope winding cylinder's pivot is connected with the driven gear who meshes with drive gear mutually, the both ends of roof are provided with respectively with rope winding cylinder matched with guide roller, the last connection rope of rope winding cylinder is walked around guide roller and is connected with lifting base's rear end.
Furthermore, the discharge gate be provided with the opening for the slope, striker plate and discharge gate corresponding, for the plate body that the slope set up, locating plate and striker plate corresponding, also for the plate body that the slope set up.
Furthermore, a handle is arranged at the rear end of the hopper.
Further, a buffer spring is arranged on the top surface of the lifting base.
Furthermore, the bottom surface of the base is provided with a self-locking universal roller.
A material hoisting device for building engineering, its reasonable in design, simple structure, the fortune material of being convenient for and unload, can effectively reduce staff's intensity of labour, improve work efficiency.
Drawings
Fig. 1 is a schematic structural diagram of a material lifting device for building engineering of the present invention.
Fig. 2 is a schematic structural diagram of the hopper of the present invention.
Fig. 3 is a schematic view of the material storage state of the hopper of the present invention.
Fig. 4 is a schematic view of the discharge state of the hopper according to the present invention.
1-base 2-support 3-roof 4-drive gear 5-rope-wound roller 6-driven gear 7-guide roller 8-connecting rope 9-guide upright rod 10-lifting base 11-self-locking universal roller 12-hopper 13-striker plate 14-connecting plate 15-locating plate 16-insertion tube 17-spring bolt 18-buffer spring 19-handle 20-discharge hole.
Detailed Description
Referring now to the drawings in the specification, in conjunction with specific embodiments, there is illustrated the following: a material hoisting device for building engineering, including base 1, support 2, roof 3, motor, rope winding cylinder 5, direction pole setting 9 and lift base 10. The base 1 be connected with roof 3 through support 2, the both sides of support 2, be provided with direction pole setting 9 respectively in the space between base 1 and roof 3 promptly, wear to be equipped with the lift base 1 that can reciprocate on the pole setting 9 of direction. The guiding vertical rod 9 can be a rod body with a non-circular cross section so as to prevent the lifting base 1 from deflecting on the guiding vertical rod 9 when moving up and down. Lifting base 1 on put and to have hopper 12, the front end of hopper 12 is provided with discharge gate 20, 20 departments of discharge gate are provided with striker plate 13, striker plate 13's top is articulated with discharge gate 20's top to constitute the structure that can open and shut, discharge gate 20's bottom articulates there is connecting plate 14, be provided with on the connecting plate 14 with striker plate 13 matched with locating plate 15, one side of connecting plate 14 is provided with intubate 16, one side of hopper 12 is provided with and intubate 16 matched with spring bolt 17, spring bolt 17 is inserted and is located the position of intubate 16 internal fixation connecting plate 14, so that locating plate 15 blocks striker plate 13, the front end at the bottom of the bucket of hopper 12 is articulated with lifting base 10's front end, so that hopper 12 constitutes the structure that can upturn. The center position department of roof 3 be provided with the motor, the output shaft of motor has drive gear 4, the both sides of motor, be provided with rope winding cylinder 5 on roof 3 respectively promptly, rope winding cylinder 5's pivot is connected with driven gear 6 with drive gear 4 engaged with, the both ends of roof 3 are provided with respectively with rope winding cylinder 5 matched with guide roller 7, the last connection rope 8 of rope winding cylinder 5 is walked around guide roller 7 and is connected with the rear end of lifting pedestal 10.
Further, discharge gate 20 be provided with the opening for the slope, striker plate 13 correspond with discharge gate 20, for the plate body that the slope set up, locating plate 15 and striker plate 13 corresponding, also be the plate body that the slope set up.
Further, a handle 19 is arranged at the rear end of the hopper 12.
Further, a buffer spring 18 is disposed on the top surface of the lifting base 10.
Furthermore, a self-locking universal roller 11 is arranged on the bottom surface of the base 1.
When the lifting hopper is used, a worker only needs to start the motor, the motor rotates and drives the rope winding roller 5 to rotate through the driving gear 4 and the driven gear 6, and the rope winding roller 5 can drive the lifting base 10 to move up and down through the connecting rope 8 when rotating, namely the hopper 12 moves up and down. The staff member loads when the hopper 12 reaches low and unloads when the hopper reaches high. Referring to fig. 1, because the winding directions of the connecting ropes 8 on the two rope winding rollers 5 are opposite, different lifting of the lifting base 10 can be realized, and then one lifting of the left hopper and the right hopper 12 is realized, namely, the loading and unloading can be realized by one-time operation, the operation is flexible and convenient, the operation time is reduced, the construction continuity is ensured, the construction efficiency is improved, and the practicability is strong. When discharging, the worker turns up the hopper 12 through the handle 19, and the material in the hopper 12 can be discharged. Referring to fig. 2, when the materials are remained in the hopper 12, the worker pulls the spring bolt 17 open, the connecting plate 14 rotates downwards with the positioning plate 15 under the action of gravity, the positioning plate 15 loses the positioning effect, the striker plate 13 is opened immediately, the remained materials in the hopper 12 can be discharged, and the automatic discharging device is very convenient, time-saving and labor-saving.
A material hoisting device for building engineering, its reasonable in design, simple structure, the fortune material of being convenient for and unload, can effectively reduce staff's intensity of labour, improve work efficiency.

Claims (5)

1. The utility model provides a material lifting device for building engineering, is including base (1), support (2), roof (3), motor, rope winding cylinder (5), direction pole setting (9) and lift base (10), its characterized in that: the base (1) is connected with a top plate (3) through a support (2), two sides of the support (2), namely, a space between the base (1) and the top plate (3), are respectively provided with a guide upright rod (9), and the guide upright rod (9) is provided with a lifting base (1) capable of moving up and down in a penetrating way; the lifting base (1) is provided with a hopper (12), the front end of the hopper (12) is provided with a discharge hole (20), the discharge hole (20) is provided with a baffle plate (13), the top end of the baffle plate (13) is hinged with the top end of the discharge hole (20) to form a structure capable of opening and closing, the bottom end of the discharge hole (20) is hinged with a connecting plate (14), the connecting plate (14) is provided with a positioning plate (15) matched with the baffle plate (13), one side of the connecting plate (14) is provided with an insertion tube (16), one side of the hopper (12) is provided with a spring bolt (17) matched with the insertion tube (16), the spring bolt (17) is inserted into the position of the fixed connecting plate (14) in the insertion tube (16) to enable the positioning plate (15) to block the baffle plate (13), the front end of the bottom of the hopper (12) is hinged with the front end of the lifting base (10), so that the hopper (12) forms a structure capable of being turned upwards; the central point department of putting of roof (3) be provided with the motor, the output shaft of motor has drive gear (4), the both sides of motor, be provided with rope winding cylinder (5) on roof (3) respectively promptly, the pivot of rope winding cylinder (5) is connected with driven gear (6) with drive gear (4) engaged with, the both ends of roof (3) are provided with respectively and twine rope winding cylinder (5) matched with guide roller (7), the rear end that guide roller (7) and lifting base (10) were walked around in connection rope (8) on the rope winding cylinder (5) is connected.
2. A material lifting device for construction engineering according to claim 1, characterized in that: discharge gate (20) be provided with the opening for the slope, striker plate (13) corresponding with discharge gate (20), the plate body that sets up for the slope, locating plate (15) corresponding with striker plate (13), also be the plate body that the slope set up.
3. A material lifting device for construction engineering according to claim 1, characterized in that: the rear end of the hopper (12) is provided with a handle (19).
4. A material lifting device for construction engineering according to claim 1, characterized in that: and a buffer spring (18) is arranged on the top surface of the lifting base (10).
5. A material lifting device for construction engineering according to claim 1, characterized in that: the bottom surface of the base (1) is provided with a self-locking universal roller (11).
CN202120447127.3U 2021-03-02 2021-03-02 Material lifting device for building engineering Active CN215101719U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120447127.3U CN215101719U (en) 2021-03-02 2021-03-02 Material lifting device for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120447127.3U CN215101719U (en) 2021-03-02 2021-03-02 Material lifting device for building engineering

Publications (1)

Publication Number Publication Date
CN215101719U true CN215101719U (en) 2021-12-10

Family

ID=79336641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120447127.3U Active CN215101719U (en) 2021-03-02 2021-03-02 Material lifting device for building engineering

Country Status (1)

Country Link
CN (1) CN215101719U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114923078A (en) * 2022-06-07 2022-08-19 安徽宝信信息科技有限公司 Comprehensive display device for temporary meeting and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114923078A (en) * 2022-06-07 2022-08-19 安徽宝信信息科技有限公司 Comprehensive display device for temporary meeting and use method thereof

Similar Documents

Publication Publication Date Title
CN212738193U (en) Material transporting device for building
CN215101719U (en) Material lifting device for building engineering
CN205952814U (en) On -vehicle upper assembling type compresses dustbin
CN212685623U (en) Concrete handling system
CN212096911U (en) Feeding device for concrete mixer
CN211104733U (en) Efficient building agitating unit
CN114352020B (en) BIM-based distribution device for high-rise building
CN214293757U (en) Concrete mixing device
CN213649669U (en) Automatic handcart for building of unloading
CN214399532U (en) Anti-swing grab bucket
CN205370474U (en) Rack and pinion formula drilling tool transporting device
CN109099712A (en) A kind of induction heater automatic charging machine
CN211846953U (en) Hoisting device erected on building wall
CN217478878U (en) Feeding device capable of reducing labor intensity
CN210973732U (en) Liftable platform car of catching up with pigs
CN211337615U (en) Loading attachment for concrete mixing transport vechicle
CN208103725U (en) A kind of damage prevention type hoisting steel plate pincers with automatic oil feed function
CN207177298U (en) A kind of appts. for transferring ready-mixed concrete
CN217461508U (en) Cement hanging flower basket device for building engineering construction
CN219174058U (en) Anti-swing device for grab bucket of portal crane
CN215043943U (en) Small-size prefabricated component packing auxiliary assembly
CN220519545U (en) Tunnel dregs cleaning device
CN216840886U (en) Novel clean raw materials for production pond of ready-mixed concrete
CN217201616U (en) Self-discharging formula fill
CN215854732U (en) Novel building engineering material lifting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant