CN215097601U - Bearing type driver-controlled turnout installation device - Google Patents

Bearing type driver-controlled turnout installation device Download PDF

Info

Publication number
CN215097601U
CN215097601U CN202121309573.4U CN202121309573U CN215097601U CN 215097601 U CN215097601 U CN 215097601U CN 202121309573 U CN202121309573 U CN 202121309573U CN 215097601 U CN215097601 U CN 215097601U
Authority
CN
China
Prior art keywords
switch
connecting rod
installation device
backup pad
bear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202121309573.4U
Other languages
Chinese (zh)
Inventor
蒋建增
衡长生
邓剑
张奋龙
赵宝成
陶鸿飞
章海伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huating Coal Group Co Ltd
Original Assignee
Huating Coal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huating Coal Group Co Ltd filed Critical Huating Coal Group Co Ltd
Priority to CN202121309573.4U priority Critical patent/CN215097601U/en
Application granted granted Critical
Publication of CN215097601U publication Critical patent/CN215097601U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model discloses a bear formula department accuse switch installation device, include switch goat body, switch backup pad, ground fixed plate, switch connecting rod and bear the frame, the switch backup pad is connected on switch goat body top outer wall, bear the frame including three steel sheet connecting piece and bolt fastening hole, and the vertical welding between the steel sheet connecting piece. The utility model discloses a be provided with switch goat body, the switch backup pad, the bolt fastening hole, the ground fixed plate, locating hole and switch connecting rod, cooperation fixing bolt's effect, it is little to make this formula switch installation device that bears use space, it is convenient to maintain, the processing cost is lower, the utilization ratio in tunnel space has been improved to a certain extent, and perfect mine rail transport system, the practicality of switch has been increased, the security performance in the transportation has been improved, for the mounting means of department's accuse switch in the past, the installation and the service problem of department's accuse switch have been solved.

Description

Bearing type driver-controlled turnout installation device
Technical Field
The utility model relates to a mine transportation technical field especially relates to a bear formula department accuse switch installation device.
Background
Mine auxiliary transportation is an important component of a production system, and rail transportation is generally adopted as auxiliary transportation. With the increase of the mining depth of the mine, newly excavated underground roadways are gradually increased, and drainage ditches need to be arranged at two sides of the roadway for discharging production water and mine water burst when the transportation condition of the roadway track is met (when double channels are laid in the roadway).
And the setting of escape canal can lead to changing the department's accuse switch point machine installation space of direction of transportation less, can not normally install, and the tunnel width is unsatisfied to change the department's accuse switch installation condition of direction of transportation to lead to adopting the mounting means of department's accuse switch in the past to have rail transport system imperfect, change the difficult scheduling problem of direction of transportation, consequently, need to design a load-bearing formula department accuse switch installation device and solve installation, the use problem of department's accuse switch urgently.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a bearing type driver-controlled turnout installation device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a bear formula department accuse switch installation device, includes switch goat body, switch backup pad, ground fixed plate, switch connecting rod and bears the frame, the switch backup pad is connected on switch goat body top outer wall, bear the frame and include three steel sheet connecting piece and bolt fastening hole, and the vertical welding between the steel sheet connecting piece.
As a further scheme of the utility model, the switch backup pad is trompil according to department's accuse switch base pitch-row, and the locating hole that the equidistance distributes is seted up to ground fixed plate top outer wall.
As a further scheme of the utility model, the switch connecting rod is L type structure, and this body coupling of switch connecting rod top and switch goat, switch connecting rod bottom and ground fixed plate are connected.
The utility model has the advantages that:
the utility model discloses, through being provided with switch goat body, the switch backup pad, the bolt fastening hole, the ground fixed plate, locating hole and switch connecting rod, cooperation fixing bolt's effect, it is little to make this formula switch installation device that bears use space, it is convenient to maintain, the processing cost is lower, the utilization ratio in tunnel space has been improved to a certain extent, and perfect mine rail transport system, the practicality of switch has been increased, the security performance in the transportation has been improved, for the mounting means of department accuse switch in the past, the installation and the use problem of department accuse switch have been solved.
Drawings
Fig. 1 is the utility model provides a bear formula department accuse switch installation device's spatial structure sketch map.
In the figure: 1 switch machine body, 2 switch backup pads, 3 bolt fastening holes, 4 ground fixed plates, 5 locating holes, 6 switch connecting rods.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example one
Referring to fig. 1, a bear formula department accuse switch installation device, including switch goat body 1, switch backup pad 2, ground fixing plate 4, switch connecting rod 6 and bear the frame, switch backup pad 2 is connected on switch goat body 1 top outer wall, it includes three steel sheet connecting piece and bolt fastening hole 3 to bear the frame, and vertical welding between the steel sheet connecting piece, switch backup pad 2 is trompil according to department accuse switch base hole distance, and 4 top outer walls of ground fixing plate set up the locating hole 5 that the equidistance distributes, be used for fixed with the tunnel bottom plate, switch connecting rod 6 processes and repacks according to the working distance of switch point, switch connecting rod 6 is L type structure, and 6 tops of switch connecting rod and switch goat body 1 connect, 6 bottoms of switch connecting rod and 4 connections of ground fixing plate.
The working principle is as follows: the during operation, switch machine body 1 through setting up, switch backup pad 2, bolt fastening hole 3, ground fixed plate 4, locating hole 5 and switch connecting rod 6, cooperation fixing bolt's effect, simultaneously appropriate processing and repacking to switch connecting rod 6, make the working distance that can be applicable to the switch point, thereby it is little to make this formula switch installation device that bears usage space, easy maintenance, the processing cost is lower, the utilization ratio in tunnel space has been improved to a certain extent, and the mine rail transport system has been perfected, the practicality of switch has been increased, the security performance in the transportation has been improved, for the mounting means of department accuse switch in the past, the installation and the service problem of department accuse switch have been solved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (3)

1. The utility model provides a bear formula department accuse switch installation device, includes switch goat body (1), switch backup pad (2), ground fixed plate (4), switch connecting rod (6) and bears the frame, its characterized in that, switch backup pad (2) are connected on switch goat body (1) top outer wall, bear and include three steel sheet connecting piece and bolt fastening hole (3), and perpendicular welding between the steel sheet connecting piece.
2. A load-bearing type switch installation device according to claim 1, wherein the switch support plate (2) is provided with holes according to the pitch of the switch base, and the outer wall of the top of the ground fixing plate (4) is provided with positioning holes (5) distributed at equal intervals.
3. A load-bearing type switch operating installation device according to claim 2, wherein the switch connecting rod (6) is of an L-shaped structure, the top end of the switch connecting rod (6) is connected with the switch machine body (1), and the bottom end of the switch connecting rod (6) is connected with the ground fixing plate (4).
CN202121309573.4U 2021-06-11 2021-06-11 Bearing type driver-controlled turnout installation device Withdrawn - After Issue CN215097601U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121309573.4U CN215097601U (en) 2021-06-11 2021-06-11 Bearing type driver-controlled turnout installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121309573.4U CN215097601U (en) 2021-06-11 2021-06-11 Bearing type driver-controlled turnout installation device

Publications (1)

Publication Number Publication Date
CN215097601U true CN215097601U (en) 2021-12-10

Family

ID=79305990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121309573.4U Withdrawn - After Issue CN215097601U (en) 2021-06-11 2021-06-11 Bearing type driver-controlled turnout installation device

Country Status (1)

Country Link
CN (1) CN215097601U (en)

Similar Documents

Publication Publication Date Title
CN207363606U (en) A kind of drilling machine sliding system
CN207047613U (en) A kind of railway roadbed changeover portion support meanss and railway roadbed changeover portion support system
CN214660232U (en) Corrugated plate connecting structure for tunnel toughness support
CN201330609Y (en) Inside-tunnel steel support mechanical lifting device of shallow-tunneling cavern
CN215097601U (en) Bearing type driver-controlled turnout installation device
CN214362569U (en) Prefabricated ballast bed structure of built-in pump house department for urban rail transit
CN214362655U (en) Can have enough to meet need assembled road system
CN113832947A (en) Device and method for reinforcing multiple-track railway with small space passing under shield tunnel
CN211950516U (en) Rock pillar structure and system for replacing high-ground-stress soft rock large-deformation ultra-small-clear-distance tunnel
CN211422666U (en) Supporting structure for excavation of side slope at inlet and outlet of diversion water delivery tunnel
CN217421213U (en) Reinforced structure for subway transfer shallow-buried underground tunnel to closely pass through rainwater and sewage pipeline
CN212958649U (en) Shield tunnel construction section of jurisdiction connection structure
CN211364328U (en) A adjustment type base for installation of contact net channel in tunnel
CN112502188B (en) Power communication comprehensive pipe rack in easy-to-slide area and construction method thereof
CN210482379U (en) Highway underpass pipe gallery structure
CN211172073U (en) Semi-covered subway station gantry crane foundation and muck pit retaining wall combined construction structure
CN210068239U (en) There is tiny fragments of stone, coal, etc. tunnel center ditch maintenance system
CN108560341B (en) Movable line-to-line physical isolation protection construction method for maintenance of operation railway line
CN112796189A (en) Can have enough to meet need assembled road system
CN211285563U (en) Wall guiding and supporting device for underground continuous wall engineering
CN216275719U (en) Fastening device for temporary beam of multi-track railway
CN205770049U (en) A kind of boring floating operation platform
CN211420734U (en) Support system for water supply pipeline to pass through railway
CN215164542U (en) Steel trestle structure for filling missing sidewalks of high and steep rock excavation slope
CN219508588U (en) In-pit supporting structure at edge position of deep foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20211210

Effective date of abandoning: 20231227

AV01 Patent right actively abandoned

Granted publication date: 20211210

Effective date of abandoning: 20231227

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned