CN215085808U - Environmental protection engineering construction is with pressing down dirt equipment - Google Patents

Environmental protection engineering construction is with pressing down dirt equipment Download PDF

Info

Publication number
CN215085808U
CN215085808U CN202121258938.5U CN202121258938U CN215085808U CN 215085808 U CN215085808 U CN 215085808U CN 202121258938 U CN202121258938 U CN 202121258938U CN 215085808 U CN215085808 U CN 215085808U
Authority
CN
China
Prior art keywords
voltage tube
spiral ring
construction
environmental protection
pressure pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121258938.5U
Other languages
Chinese (zh)
Inventor
罗华杰
罗游游
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hongfu Environmental Protection Co ltd
Original Assignee
Zhejiang Hongfu Environmental Protection Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hongfu Environmental Protection Co ltd filed Critical Zhejiang Hongfu Environmental Protection Co ltd
Priority to CN202121258938.5U priority Critical patent/CN215085808U/en
Application granted granted Critical
Publication of CN215085808U publication Critical patent/CN215085808U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an environmental protection engineering construction is with pressing down dirt equipment, including a high-voltage tube, No. two high-voltage tubes and No. three high-voltage tubes, a high-voltage tube, No. two high-voltage tubes and the equal fixedly connected with in surface of No. three high-voltage tubes shunts the pipeline, a high-voltage tube, No. two high-voltage tubes and No. three high-voltage tubes have control flap with the equal fixed mounting in junction of shunting the pipeline. A environmental protection engineering construction is with pressing down dirt equipment, can save the electric power energy that a large amount of water resources and motor power consumed, and short-range spraying dust fall makes the pedestrian that construction division wall opposite side was passed through can not receive fog always and gets wet hair and clothes, thereby do benefit to the pedestrian's trip of pedestrian's passageway, and can make and spray the direction steerable, thereby spray to the position that the dust is many, do benefit to better dust fall, whole dust suppression equipment can the segmentation dismantlement in addition, thereby convenient to detach or carry, and it is also very convenient to dismantle the maintenance.

Description

Environmental protection engineering construction is with pressing down dirt equipment
Technical Field
The utility model relates to a press down dirt equipment field, in particular to environmental protection engineering construction is with pressing down dirt equipment.
Background
The dust suppression equipment is used for suppressing the emission of dust to pollute the environment, reduces the dust in the air by spraying sewage in use, has better suppression effect and lower power consumption, and is widely applied to various fields; however, the existing dust suppression equipment for engineering construction has certain disadvantages when in use, and when in use, the spray heads on the partition walls around the whole construction point can be opened after the equipment is opened, but the position of the construction type work is smaller, and the fog is sprayed at the position where the construction is not carried out or the position where the construction process does not reach, so that the water resource is wasted, the electric energy consumption of a booster pump is increased, and the whole partition section is sprayed when some municipal pavements are carried out, so that the equipment is not beneficial to walking of pedestrians at the other side of the partition belt, the pedestrians can easily get wet on the body or the head of the pedestrians, and the whole structure is not easy to maintain, disassemble and store.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides an environmental protection engineering construction is with pressing down dirt equipment can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an environmental protection engineering construction is with pressing down dirt equipment, includes a high-voltage tube, No. two high-voltage tubes and No. three high-voltage tubes, a high-voltage tube, No. two high-voltage tubes and the equal fixedly connected with reposition of redundant personnel pipeline in surface of No. three high-voltage tubes, a high-voltage tube, No. two high-voltage tubes and the equal fixed mounting in junction of No. three high-voltage tubes and reposition of redundant personnel pipeline has control flap, and all connects and breaks off through opening and shutting of control flap, the one end fixedly connected with booster pump of a high-voltage tube, the sealing plug is installed to the other end connection of No. three high-voltage tubes.
Preferably, the first high-pressure pipe, the second high-pressure pipe and the third high-pressure pipe are fixedly connected with a connecting spiral ring at one end, a sealing gasket is fixedly mounted at the port of the connecting spiral ring, a butt joint spiral ring is fixedly mounted at the other end of the first high-pressure pipe, the second high-pressure pipe and the third high-pressure pipe, and the other end of the third high-pressure pipe is connected with the sealing plug through the butt joint spiral ring.
Preferably, the fixed surface of booster pump is connected with the discharge connector, the fixed position that the discharge connector was kept away from on the surface of booster pump is connected with the input connector, the upper surface connection of booster pump is equipped with motor power.
Preferably, one end of the first high-pressure pipe is communicated with the booster pump through a connecting spiral ring and a discharge connector, and the connecting spiral ring is in sealing butt joint with the discharge connector through a sealing gasket.
Preferably, the second high-pressure pipe is in sealing butt joint with the butt joint spiral ring of the first high-pressure pipe through the connecting spiral ring and the sealing gasket, and the third high-pressure pipe is in sealing butt joint with the butt joint spiral ring of the second high-pressure pipe through the connecting spiral ring and the sealing gasket.
Preferably, the surface of the shunt pipeline is connected with and provided with a universal pipe, and the other end of the universal pipe is connected with and provided with a sprinkler head.
Compared with the prior art, the utility model discloses following beneficial effect has:
in the utility model, in the work, the staff can selectively open the control valve to make the spray head on the surface of the shunt pipeline corresponding to the position spray for dust fall, thus the spraying can be unnecessary at the position without construction, and the opening and closing can be selectively carried out according to the construction stroke at the position with construction, thereby saving a large amount of water resource and electric energy consumed by the power motor, and the short-distance spray dust fall makes the passerby passing by the other side of the construction isolation wall not wet the hair and clothes by the fog all the time, thereby being beneficial to the passerby going out of the passerby passage, and through the shunt pipeline, when in use, the staff can adjust the universal pipe according to the spraying requirement, thereby adjusting the spraying direction of the spray head, thus the spraying direction can be controlled, thereby spraying at the position with much dust, do benefit to better dust fall, whole dust suppression equipment can be dismantled in sections in addition to convenient to detach or carry, and after one section broke down, it is also very convenient to dismantle the maintenance, only need to dismantle to the trouble highway section and change new alright, from not needing whole dismantlement to get off the maintenance and delaying the use.
Drawings
FIG. 1 is a schematic view of the overall structure of a dust suppression device for environmental engineering construction of the present invention;
FIG. 2 is a partial view of the dust suppressing apparatus for environmental engineering construction of the present invention;
FIG. 3 is a partial sectional view of a first high-pressure pipe and a shunt pipe of the dust suppression device for environmental engineering construction of the present invention;
fig. 4 is the utility model relates to an environmental protection engineering construction is with control flap, a high-pressure pipe and the local section view of reposition of redundant personnel pipeline of pressing down dirt equipment.
In the figure: 1. a first high pressure tube; 101. connecting the spiral ring; 102. sealing gaskets; 103. butting spiral rings; 2. a second high-pressure tube; 3. a third high pressure pipe; 4. a diversion pipeline; 401. a universal tube; 402. a sprinkler head; 5. a control valve; 6. a booster pump; 601. a discharge connector; 602. an input connector; 603. a power motor; 7. and (4) sealing the plug.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-4, a dust suppression device for environmental engineering construction includes a first high-pressure pipe 1, a second high-pressure pipe 2, and a third high-pressure pipe 3, wherein the surfaces of the first high-pressure pipe 1, the second high-pressure pipe 2, and the third high-pressure pipe 3 are all fixedly connected with a shunt pipe 4, the joints of the first high-pressure pipe 1, the second high-pressure pipe 2, and the third high-pressure pipe 3 and the shunt pipe 4 are all fixedly installed with a control valve 5, and are all connected and disconnected through the opening and closing of the control valve 5, one end of the first high-pressure pipe 1 is fixedly connected with a booster pump 6, the other end of the third high-pressure pipe 3 is connected with a sealing plug 7, during operation, an operator can selectively open the control valve 5 to enable a sprinkler head 402 on the surface of the shunt pipe 4 at a corresponding position to perform spray dust suppression, so that no spraying is needed at a position where no spraying is performed, and can be selectively opened and closed according to a stroke of the construction at a position where the operator is performed, therefore, a large amount of water resources and electric energy consumed by the power motor 603 can be saved, and the short-distance spraying dust reduction enables pedestrians passing by the other side of the construction partition wall not to be wetted with fog water all the time, so that the pedestrians in a pedestrian passage can go out conveniently;
one ends of the first high-pressure pipe 1, the second high-pressure pipe 2 and the third high-pressure pipe 3 are fixedly connected with connecting spiral rings 101, ports of the connecting spiral rings 101 are fixedly provided with sealing gaskets 102, the other ends of the first high-pressure pipe 1, the second high-pressure pipe 2 and the third high-pressure pipe 3 are fixedly provided with butt joint spiral rings 103, and the other end of the third high-pressure pipe 3 is connected with a sealing plug 7 through the butt joint spiral rings 103; a discharge connector 601 is fixedly connected to the surface of the booster pump 6, an input connector 602 is fixedly connected to the position, far away from the discharge connector 601, of the surface of the booster pump 6, and a power motor 603 is connected to the upper surface of the booster pump 6; one end of the first high-pressure pipe 1 is communicated with the booster pump 6 through a connecting spiral ring 101 and a discharge connector 601, and the connecting spiral ring 101 is in sealing butt joint with the discharge connector 601 through a sealing gasket 102; the second high-pressure pipe 2 is in sealing butt joint with the butt joint spiral ring 103 of the first high-pressure pipe 1 through the connecting spiral ring 101 and the sealing gasket 102, and the third high-pressure pipe 3 is in sealing butt joint with the butt joint spiral ring 103 of the second high-pressure pipe 2 through the connecting spiral ring 101 and the sealing gasket 102; the surface connection of reposition of redundant personnel pipeline 4 installs universal pipe 401, and the other end of universal pipe 401 is connected and is installed sprinkler head 402, and during the use, the staff accessible is sprayed needs and is adjusted universal pipe 401 to the direction that adjustment sprinkler head 402 sprayed, alright make like this spray the direction steerable, thereby spray to the position that the dust is many, do benefit to better carrying out the dust fall.
It should be noted that, the utility model relates to a dust suppression equipment for environmental engineering construction, when using, first high-pressure pipe 1, second high-pressure pipe 2 and third high-pressure pipe 3 all carry out the ending sealing butt joint through connecting spiral ring 101, sealing gasket 102 and butt joint spiral ring 103, and butt joint spiral ring 103 at the most end of third high-pressure pipe 3 seals and plugs it through sealing plug 7, wherein, when connecting, set up a plurality of second high-pressure pipes 2 according to the length requirement, after setting up, carry out the sealing connection with discharge connector 601 through sealing gasket 102 and connecting spiral ring 101 at one end of the first high-pressure pipe 1, after connecting, can all fix first high-pressure pipe 1, second high-pressure pipe 2 and third high-pressure pipe 3 to a side construction of construction isolation wall near the top position, after fixing, the staff can adjust universal pipe 401 through the needs of spraying, thereby adjusting the spraying direction of the spraying head 402, thus the spraying direction can be controlled, thereby spraying at the position with much dust, and being beneficial to better dust fall, when the spraying direction is adjusted, municipal tap water is connected into the input connector 602, then the booster pump 6 is driven by the power motor 603 to boost, at the moment, the working power of the power motor 603 is controlled according to the requirement of pressure, in the work, a worker can selectively open the control valve 5 to enable the spraying head 402 on the surface of the shunt pipeline 4 at the corresponding position to spray and fall dust, thus the spraying is not needed at the position without construction, the opening and closing can be selectively carried out at the position with construction according to the stroke of construction, thereby a large amount of water resources and the power energy consumed by the power motor 603 can be saved, and the short-distance spraying and dust fall can prevent the pedestrians passing by the other side of the construction partition wall from being wetted by the fog and clothes all the time, thereby being beneficial to the travel of the pedestrians in the pedestrian passage.
In the utility model, in the work, the staff can selectively open the control valve 5 to make the spray head 402 on the surface of the shunt pipe 4 corresponding to the position spray for dust fall, thus the spraying can be unnecessary at the position without construction, and the opening and closing can be selectively performed at the position without construction according to the construction stroke, thereby saving a large amount of water resource and electric energy consumed by the power motor 603, and the short-distance spray dust fall makes the passerby passing by the other side of the construction isolation wall not wet the hair and clothes by the fog, thereby being beneficial to the passerby going out of the passerby passage, and through the shunt pipe 4, when in use, the staff can adjust the universal pipe 401 according to the spraying requirement, thereby adjusting the spraying direction of the spray head 402, thus the spraying direction can be controlled, thereby spraying is performed at the position with much dust, do benefit to better dust fall, whole dust suppression equipment can be dismantled in sections in addition to convenient to detach or carry, and after one section broke down, it is also very convenient to dismantle the maintenance, only need to dismantle to the trouble highway section and change new alright, from not needing whole dismantlement to get off the maintenance and delaying the use.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides an environmental protection engineering construction is with pressing down dirt equipment which characterized in that: including a high-voltage tube (1), No. two high-voltage tube (2) and No. three high-voltage tube (3), a high-voltage tube (1), No. two high-voltage tube (2) and the equal fixedly connected with reposition of redundant personnel pipeline (4) in surface of No. three high-voltage tube (3), a high-voltage tube (1), No. two high-voltage tube (2) and No. three high-voltage tube (3) have control flap (5) with the equal fixed mounting in junction of reposition of redundant personnel pipeline (4), and all connect and break off through opening and shutting of control flap (5), the one end fixedly connected with booster pump (6) of a high-voltage tube (1), sealing plug (7) are installed in the other end connection of No. three high-voltage tube (3).
2. The dust suppression device for the construction of the environmental protection project according to claim 1, characterized in that: the sealing plug is characterized in that the high-voltage tube (1), the high-voltage tube (2) and the high-voltage tube (3) are connected through a connection spiral ring (101) through the equal fixedly connected with of one end, a sealing gasket (102) is fixedly mounted on a port of the connection spiral ring (101), the high-voltage tube (1), the high-voltage tube (2) and the high-voltage tube (3) are fixedly connected through a butt joint spiral ring (103) at the other end, and the other end of the high-voltage tube (3) is connected with the sealing plug (7) through the butt joint spiral ring (103).
3. The dust suppression device for the construction of the environmental protection project as claimed in claim 2, wherein: the fixed surface of booster pump (6) is connected with discharge connector (601), the fixed position that discharge connector (601) was kept away from on the surface of booster pump (6) is connected with input connector (602), the upper surface connection of booster pump (6) is equipped with motor power (603).
4. The dust suppression device for the construction of the environmental protection project as claimed in claim 3, wherein: one end of the first high-pressure pipe (1) is communicated with the booster pump (6) through a connecting spiral ring (101) and a discharge connector (601), and the connecting spiral ring (101) is in sealed butt joint with the discharge connector (601) through a sealing gasket (102).
5. The dust suppression device for the construction of the environmental protection project as claimed in claim 4, wherein: the second high-pressure pipe (2) is in sealing butt joint with the butt joint spiral ring (103) of the first high-pressure pipe (1) through the connecting spiral ring (101) and the sealing gasket (102), and the third high-pressure pipe (3) is in sealing butt joint with the butt joint spiral ring (103) of the second high-pressure pipe (2) through the connecting spiral ring (101) and the sealing gasket (102).
6. The dust suppression device for the construction of the environmental protection project according to claim 5, characterized in that: the surface connection of reposition of redundant personnel pipeline (4) installs universal pipe (401), the other end connection of universal pipe (401) installs sprinkler head (402).
CN202121258938.5U 2021-06-07 2021-06-07 Environmental protection engineering construction is with pressing down dirt equipment Active CN215085808U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121258938.5U CN215085808U (en) 2021-06-07 2021-06-07 Environmental protection engineering construction is with pressing down dirt equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121258938.5U CN215085808U (en) 2021-06-07 2021-06-07 Environmental protection engineering construction is with pressing down dirt equipment

Publications (1)

Publication Number Publication Date
CN215085808U true CN215085808U (en) 2021-12-10

Family

ID=79304223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121258938.5U Active CN215085808U (en) 2021-06-07 2021-06-07 Environmental protection engineering construction is with pressing down dirt equipment

Country Status (1)

Country Link
CN (1) CN215085808U (en)

Similar Documents

Publication Publication Date Title
CN205570620U (en) Special washing gun of wall plastering maintenance
CN203695315U (en) Sealant spear
CN215085808U (en) Environmental protection engineering construction is with pressing down dirt equipment
CN103598069B (en) The dual-purpose unit of a kind of small-sized portable spray drip irrigation
CN217139773U (en) Dust removal and spray device for labor safety engineering
CN208214629U (en) Cooling device is used in a kind of construction welding
CN205977264U (en) Mining geomantic omen coordinated type atomizer
CN206346145U (en) The environmental sanitation sweeper additional flusher of detachable
CN210831439U (en) Water supply switch mechanism for push bench
CN107806053A (en) Flusher, dust suppression equipment and environmental sanitation vehicles
CN209438271U (en) Metro station excavation construction sprinkling dust-removing device
CN211590645U (en) Hidden spray precast beam pedestal
CN209449394U (en) A kind of orchard automatic irrigation device based on Internet of Things
CN209354863U (en) Hydraulic pipeline with anti-tear protective device
CN207775992U (en) A kind of rotatable outdoor fire hydrant
CN205024634U (en) Civil construction dust fall spraying system
CN206190312U (en) Air -water linkage spraying device
CN205669405U (en) Mining without external force rotation dustproof atomizer
CN211777412U (en) Dry fog dust collector of development machine
CN214839160U (en) One-to-two connecting equipment for heat supply power station
CN205978893U (en) Tap and water piping connection structure
CN215927448U (en) Wind-water linkage spraying device for driving face
CN213683100U (en) Portable building construction interior wall spraying device
LU502949B1 (en) A Rapid Grouting Joint Capable of Being Recycled by Advance Ductule Grouting
CN203222764U (en) Multifunctional environment-friendly energy-saving road cleaning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant