CN215055528U - Box body support of recyclable fixing wire box - Google Patents
Box body support of recyclable fixing wire box Download PDFInfo
- Publication number
- CN215055528U CN215055528U CN202121213307.1U CN202121213307U CN215055528U CN 215055528 U CN215055528 U CN 215055528U CN 202121213307 U CN202121213307 U CN 202121213307U CN 215055528 U CN215055528 U CN 215055528U
- Authority
- CN
- China
- Prior art keywords
- wall
- box
- loop bar
- pole portion
- fixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 claims description 11
- 238000003466 welding Methods 0.000 claims description 9
- 230000000694 effects Effects 0.000 claims description 8
- 230000007547 defect Effects 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 abstract description 4
- 238000000034 method Methods 0.000 abstract description 3
- 230000008569 process Effects 0.000 abstract description 3
- 239000011505 plaster Substances 0.000 abstract description 2
- 230000008439 repair process Effects 0.000 abstract description 2
- 239000003566 sealing material Substances 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 7
- 230000005611 electricity Effects 0.000 description 5
- 238000013473 artificial intelligence Methods 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 238000005034 decoration Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 230000001788 irregular Effects 0.000 description 2
- 230000001960 triggered effect Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a box support of circulated use anchor box, including pole portion, loop bar and flexible cover, the disconnect-type top is installed to the top outer wall of pole portion, the outer wall at disconnect-type top is run through there is fixing bolt. The box body support of a kind of fixed line box that can recycle that is used at present, in the masonry engineering work progress, the traditional pipeline imbedding mode mainly is that the masonry is finished and then fluting is imbedded on the masonry, adopt traditional spool imbedding mode often can cause the large tracts of land to damage to the wall body because the operation is improper, and repair the degree of difficulty big, the technology is complicated or because the manual operation fluting is too shallow, pipeline after pre-buried because the pipe wall surface is smooth, difficult to combine with the sealing material, cause seal defects such as tight, not compact, etc., later stage plaster also appear defects such as hollowing, fracture easily, not only the process is various, the technology is complicated, not convenient to operate.
Description
Technical Field
The utility model is suitable for a there is pipeline, line box, box to reserve pre-buried brick brickwork engineering, specifically is a box support of circulated use's fixed line box.
Background
The pre-buried project of water and electricity pipeline reservation in the masonry project is an organic component of the building project, the quality of the construction quality directly influences the quality level of the building project, and the quality management of the water and electricity pre-buried project is timely, completely and orderly grasped. In each water and electricity installation project, the problems of wire tube pre-embedding, box installation, hole reservation and the like are not negligible, the continuous development and transformation upgrading of the real estate industry are realized, the quality requirements of houses after owners purchase the houses are also continuously improved, and the construction quality is irregular due to irregular operation. If the pre-buried quality of the water and electricity reservation is insufficient, the generated result is not imaginable.
The box body support of a kind of fixed line box that can recycle that is used at present, in the masonry engineering work progress, the traditional pipeline imbedding mode mainly is that the masonry is finished and then fluting is imbedded on the masonry, adopt traditional spool imbedding mode often can cause the large tracts of land to damage to the wall body because the operation is improper, and repair the degree of difficulty big, the technology is complicated or because the manual operation fluting is too shallow, pipeline after pre-buried because the pipe wall surface is smooth, difficult to combine with the sealing material, cause seal defects such as tight, not compact, etc., later stage plaster also appear defects such as hollowing, fracture easily, not only the process is various, the technology is complicated, not convenient to operate.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a box support of circulated use anchor box to solve the technical problem who provides among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a box support of circulated use line box, includes pole portion, loop bar and flexible cover, the disconnect-type top is installed to the top outer wall of pole portion, the outer wall at disconnect-type top has run through fixing bolt, the loop bar is installed to the below outer wall of pole portion, the outer wall one side of loop bar has run through the stopper, the outer wall opposite side welding of loop bar has flexible cover, the outer wall one side of flexible cover has run through the locating piece, the inside cover of flexible cover is equipped with the telescopic link, the one end welding of telescopic link has the box, the outer wall below welding of loop bar has the sill bar, the below of sill bar is provided with the nut, the internally mounted of nut has assorted screw rod with it.
Preferably, the split top is in threaded connection with fixing bolts, and the fixing bolts are provided with two groups.
Preferably, the inner wall of the sleeve rod is matched with the outer wall of the rod part, and the length of the rod part is greater than that of the sleeve rod.
Preferably, the loop bar is connected with the bar part in a clamping manner through a limiting block, and the limiting block has a fixing effect on the bar part.
Preferably, the telescopic sleeve is connected with the telescopic rod in a clamping mode through the positioning block, and the positioning block has a fixing effect on the telescopic rod.
Preferably, the inner wall of the telescopic sleeve is matched with the outer wall of the telescopic rod, and the diameter of the telescopic sleeve is larger than that of the telescopic rod.
Preferably, the nut is in threaded connection with a screw, and the screw is of a cylindrical structure.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model provides a box support of fixed line box of circulated use, adjustable fixed pipeline, line box, box support that can have enough to meet need the circulation and use mainly include pole portion, disconnect-type top, box part to and set up the artificial intelligence monitored control system information acquisition equipment on the activity adjusting member. The adjustable fixed pipeline, the wire box, the rod part used by the box body bracket, the separated top part and the box part can be recycled, the pipeline, the wire box, the box body and the like are temporarily fixed by utilizing the bracket before the masonry construction, a technician remotely adjusts the height and the position of the bracket in an on-site real-time model through a BIM system, an artificial intelligent monitoring system is synchronously started to monitor the deviation of the installation position, the protection effect of a finished product and other safety or quality problems input into a system server in advance, automatically identify and analyze and judge, useful key information is extracted from the information, and an alarm signal is automatically triggered by a specific image source, so that the remote operation of the technician and the remote supervision of managers are realized, no groove is formed after the pipeline installation and the wall body building, the integrity and the integrity of the wall surface are ensured, and the quality problems caused by the later-stage decoration construction such as groove and the like are avoided, the work efficiency capability is improved.
Drawings
Fig. 1 is a schematic view of the front cross-sectional structure of the present invention;
fig. 2 is a schematic view of the rod structure of the present invention;
fig. 3 is a schematic view of the structure of the separable top of the present invention.
In the figure: 1. a rod portion; 2. a split top; 3. fixing the bolt; 4. a loop bar; 5. a limiting block; 6. a telescopic sleeve; 7. positioning blocks; 8. a telescopic rod; 9. a box; 10. a bottom bar; 11. a nut; 12. a screw.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a box support of circulated use line box, including pole portion 1, loop bar 4 and flexible cover 6, disconnect-type top 2 is installed to the top outer wall of pole portion 1, disconnect-type top 2's outer wall runs through there is fixing bolt 3, loop bar 4 is installed to the below outer wall of pole portion 1, the outer wall one side of loop bar 4 runs through there is stopper 5, the outer wall opposite side welding of loop bar 4 has flexible cover 6, the outer wall one side of flexible cover 6 runs through there is locating piece 7, the inside cover of flexible cover 6 is equipped with telescopic link 8, the one end welding of telescopic link 8 has box 9, the outer wall below welding of loop bar 4 has sill bar 10, the below of sill bar 10 is provided with nut 11, the internally mounted of nut 11 has assorted screw rod 12 with it.
Furthermore, an artificial intelligence monitoring system information acquisition device is arranged on the movable adjusting component, the adjustable fixed pipeline, the wire box, the rod part used by the box body support, the separated top part and the box part which can be recycled can be repeatedly used for a plurality of times, the pipeline, the wire box, the box body and the like are temporarily fixed in advance by using the support before the brickwork construction, technicians remotely adjust the height and the position of the support in a field real-time model through a BIM system, the artificial intelligence monitoring system is synchronously started to monitor, automatically identify and analyze and judge the deviation of the installation position, the protection effect of finished products and other safety or quality problems which are input into a system server in advance, useful key information is extracted from the support, an alarm signal is automatically triggered by a specific image source, thereby realizing the remote operation of the technicians, the remote supervision of managers, the pipeline installation and the building of the wall body without grooving, the integrity and integrity of the wall surface are guaranteed, the quality problem caused by later-stage decoration construction such as grooving is avoided, and the work efficiency capability is improved.
Preferably, disconnect- type top 2 and 3 threaded connection of fixing bolt, fixing bolt 3 are provided with two sets ofly, through fixing bolt 3's setting, can effectively dismantle the installation to disconnect-type top 2 when using.
Preferably, the inner wall of loop bar 4 and the outer wall cooperation installation of pole portion 1, the length of pole portion 1 is greater than the length of loop bar 4, and through the setting of loop bar 4, pole portion 1 can be effectual in the inside regulation from top to bottom of loop bar 4 when using.
Preferably, loop bar 4 is connected with 1 block in pole portion through stopper 5, and stopper 5 plays the fixed action to pole portion 1, through stopper 5's setting, can fix a position pole portion 1 when using.
Preferably, the telescopic sleeve 6 is connected with the telescopic rod 8 through the positioning block 7 in a clamping manner, the positioning block 7 plays a role in fixing the telescopic rod 8, and the telescopic rod 8 can be effectively fixed through the arrangement of the positioning block 7 when the telescopic sleeve is used.
Preferably, the inner wall of the telescopic sleeve 6 is matched with the outer wall of the telescopic rod 8, the diameter of the telescopic sleeve 6 is larger than that of the telescopic rod 8, and the telescopic adjusting effect on the box 9 can be effectively achieved through the arrangement of the telescopic rod 8 when the telescopic box is used.
Preferably, the nut 11 is in threaded connection with the screw 12, the screw 12 is in a cylindrical structure, and the screw 12 and the nut 11 are matched with each other, so that the quick disassembly and assembly can be realized.
The working principle is as follows: construction preparation → manufacture of the recyclable adjustable fixed pipeline, the recyclable box support → civil engineering wall laying → distribution box, the recyclable box and the recyclable adjustable fixed pipeline, the recyclable box support → vertical positioning of the water supply pipe wall outlet point → erection of the recyclable adjustable fixed pipeline, the recyclable box support → front end equipment installation → terminal equipment installation → RNSS server integrated software installation → water and electricity piping → distribution box, the recyclable box and the recyclable water supply pipe elevation fine tuning → masonry wall → support dismantling, and thus the whole using process of the recyclable box support for the fixed box is completed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a box support of circulated use anchor box, includes pole portion (1), loop bar (4) and flexible cover (6), its characterized in that: disconnect-type top (2) are installed to the top outer wall of pole portion (1), the outer wall of disconnect-type top (2) runs through there are fixing bolt (3), loop bar (4) are installed to the below outer wall of pole portion (1), outer wall one side of loop bar (4) runs through has stopper (5), the outer wall opposite side welding of loop bar (4) has flexible cover (6), outer wall one side of flexible cover (6) runs through has locating piece (7), the inside cover of flexible cover (6) is equipped with telescopic link (8), the one end welding of telescopic link (8) has box (9), the outer wall below welding of loop bar (4) has sill bar (10), the below of sill bar (10) is provided with nut (11), the internally mounted of nut (11) has assorted screw rod (12) with it.
2. The box body support of the fixing line box capable of being recycled according to claim 1, characterized in that: the split type top (2) is in threaded connection with the fixing bolts (3), and the fixing bolts (3) are provided with two groups.
3. The box body support of the fixing line box capable of being recycled according to claim 1, characterized in that: the inner wall of loop bar (4) and the outer wall cooperation installation of pole portion (1), the length of pole portion (1) is greater than the length of loop bar (4).
4. The box body support of the fixing line box capable of being recycled according to claim 1, characterized in that: the loop bar (4) is connected with the bar part (1) in a clamping mode through a limiting block (5), and the limiting block (5) has a fixing effect on the bar part (1).
5. The box body support of the fixing line box capable of being recycled according to claim 1, characterized in that: the telescopic sleeve (6) is connected with the telescopic rod (8) in a clamping mode through the positioning block (7), and the positioning block (7) has a fixing effect on the telescopic rod (8).
6. The box body bracket for fixing the wire box, which can be recycled according to claim 5, wherein: the inner wall of the telescopic sleeve (6) is matched with the outer wall of the telescopic rod (8), and the diameter of the telescopic sleeve (6) is larger than that of the telescopic rod (8).
7. The box body support of the fixing line box capable of being recycled according to claim 1, characterized in that: the nut (11) is in threaded connection with the screw (12), and the screw (12) is of a cylindrical structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121213307.1U CN215055528U (en) | 2021-06-01 | 2021-06-01 | Box body support of recyclable fixing wire box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121213307.1U CN215055528U (en) | 2021-06-01 | 2021-06-01 | Box body support of recyclable fixing wire box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215055528U true CN215055528U (en) | 2021-12-07 |
Family
ID=79209500
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121213307.1U Expired - Fee Related CN215055528U (en) | 2021-06-01 | 2021-06-01 | Box body support of recyclable fixing wire box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215055528U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115288460A (en) * | 2022-08-22 | 2022-11-04 | 重庆建工第三建设有限责任公司 | Construction method for auxiliary detachable support of concealed-assembly electronic box of prefabricated building |
-
2021
- 2021-06-01 CN CN202121213307.1U patent/CN215055528U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115288460A (en) * | 2022-08-22 | 2022-11-04 | 重庆建工第三建设有限责任公司 | Construction method for auxiliary detachable support of concealed-assembly electronic box of prefabricated building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061504B (en) | Concrete slab Pipe installing hole to be provided construction mould and construction method | |
CN215055528U (en) | Box body support of recyclable fixing wire box | |
CN202913682U (en) | Embedded wall connecting piece | |
CN107178210A (en) | The accurate pre-embedded construction method of many line box of China Democratic National Construction Association's wall | |
CN214942417U (en) | Prefabricated PC concrete fire hydrant case entrance to a cave structure | |
CN104264883A (en) | Concrete slab reserved hole structure and construction method thereof | |
CN110863644A (en) | Novel turnover tool type beam side connecting wall piece fixing device and method | |
CN203050108U (en) | Concrete slab pipe installation reserved hole construction mold | |
CN211640390U (en) | Supporting and maintaining system for precast box girder | |
CN211279058U (en) | Prefabricated assembled concrete structure fast-assembling sleeve built-in fitting | |
CN203160693U (en) | Detachable water stopping screw | |
CN107476443A (en) | Cast-in-place concrete floor hanging built-in fitting and technique | |
CN217913741U (en) | Regularization sleeve pipe mold processing | |
CN203559586U (en) | PVC (Polyvinyl chloride) electric wire pipe embedded direct connector for concrete | |
CN205400065U (en) | Precast concrete component template | |
CN209990123U (en) | Adjustable wall connecting piece device | |
CN204174910U (en) | A kind of wall-connecting device of scaffold | |
CN210067479U (en) | Building piping erection equipment | |
CN212715939U (en) | Avoid aluminum alloy template because of climbing fixing device that frame embedded bushing trompil destroyed | |
CN210563409U (en) | Face wall and hang hole construction structures | |
CN204284655U (en) | Direct-burried underground spigot and socket type concrete pressure pipeline pushing installation machine | |
CN220042862U (en) | Bridge embedded connecting device | |
CN218541392U (en) | Simple tool for efficiently fixing ceiling screw | |
CN211775933U (en) | Novel energy-concerving and environment-protective construction apparatus | |
CN220474126U (en) | Deformation monitoring and early warning device for deep foundation pit support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211207 |