CN215055118U - Integral parallel moving die carrier - Google Patents

Integral parallel moving die carrier Download PDF

Info

Publication number
CN215055118U
CN215055118U CN202121456567.1U CN202121456567U CN215055118U CN 215055118 U CN215055118 U CN 215055118U CN 202121456567 U CN202121456567 U CN 202121456567U CN 215055118 U CN215055118 U CN 215055118U
Authority
CN
China
Prior art keywords
scaffold
fixed
transverse moving
trolleys
die carrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121456567.1U
Other languages
Chinese (zh)
Inventor
隋丰年
安占鑫
李博达
郭向东
牟芳军
宝富
蒋绪鹏
黄鑫
李文雷
赵振启
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
East China Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
East China Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd, East China Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN202121456567.1U priority Critical patent/CN215055118U/en
Application granted granted Critical
Publication of CN215055118U publication Critical patent/CN215055118U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

A whole parallel moving die carrier relates to a whole parallel moving die carrier used in defect treatment construction of business line railway tunnel engineering. The method is mainly designed for solving the problem that a plurality of rows of scaffolds cannot move when the defects of the railway tunnel of the business line are repaired and constructed at present. The steel rail longitudinal travelling device comprises two bottom longitudinal travelling trolleys, wherein the longitudinal travelling trolleys are provided with insulated travelling wheels and are respectively arranged on steel rails; the two transverse moving slideways are connected to two bottom longitudinal walking trolleys through bolts, the movable comprehensive scaffold consists of a fixed scaffold and a movable assembling scaffold, the fixed scaffold and the movable assembling scaffold are fixed together, the walking wheels at the bottom of the fixed scaffold are respectively arranged in the two transverse moving slideways, a steel pipe support jacking is arranged between the transverse moving slideway and the bottom plate concrete below the transverse moving slideway, and the movable comprehensive scaffold is fixed on two concrete-lined wall surfaces and steel rails through a cable rope. The advantage is that it is convenient to move.

Description

Integral parallel moving die carrier
The technical field is as follows:
the utility model relates to a whole parallel translation die carrier that uses in business line railway tunnel engineering defect renovation construction.
Background art:
at present, when the defects of a railway tunnel of a business line are repaired, multiple rows of scaffolds are erected manually, the used materials are more, the manpower is more, the erecting time is long, the labor intensity of workers is high, the scaffolds cannot move, and the dismantling and transferring time is long when the erecting quantity is large.
The invention content is as follows:
the utility model aims to solve the technical problem that a can remove in a flexible way, the installation is convenient, assemble simple, dismantle convenient whole parallel moving die carrier is provided.
The above object is achieved by:
the two bottom longitudinal traveling trolleys are respectively arranged on a business line railway and a downlink steel rail; the two transverse moving slideways are connected to the two bottom longitudinal walking trolleys through bolts, the movable comprehensive scaffold is composed of a fixed scaffold and a movable assembling scaffold, the fixed scaffold is arranged below the movable assembling scaffold, the fixed scaffold and the movable assembling scaffold are fixed together, the walking wheels are arranged at the bottom of the fixed scaffold, the walking wheels at the bottom of the fixed scaffold are respectively arranged in the two transverse moving slideways, a steel pipe support jacking is arranged between the transverse moving slideway and bottom plate concrete below the transverse moving slideway, and the movable comprehensive scaffold is fixed on two concrete-lined wall surfaces and steel rails through a cable wind rope. The device takes down the jacking when moving.
The utility model has the advantages that: when tunnel engineering renovates the construction, adopt the manual work to push away this device and move ahead, the scaffold frame can be horizontal, longitudinal movement. The problems that the fixed scaffold cannot be moved, the construction range is small, the erection quantity is large, and the erection time is long in the prior art are solved. In addition, the device saves materials, shortens the construction time, reduces the labor force, lightens the labor intensity of workers and has high efficiency.
Description of the drawings:
fig. 1 is a schematic structural diagram of the present invention.
The specific implementation mode is as follows:
the present invention will be further explained with reference to fig. 1;
the device comprises two bottom longitudinal traveling trolleys 1, wherein the longitudinal traveling trolleys are provided with traveling wheels 2 with insulation, and are respectively arranged on steel rails 3 of an upper line and a lower line of a business line railway; the two transverse moving slide ways 4 are connected to the two bottom longitudinal walking trolleys through bolts, the movable comprehensive scaffold 5 is composed of fixed scaffolds and movable assembled scaffolds, the fixed scaffolds are arranged below the movable assembled scaffolds, the fixed scaffolds and the movable assembled scaffolds are fixed together, the walking wheels are installed at the bottom of the fixed scaffolds, the walking wheels at the bottom of the fixed scaffolds are respectively arranged in the two transverse moving slide ways, a steel pipe support jacking 6 is arranged between the transverse moving slide ways and the bottom plate concrete 7 below the transverse moving slide ways, and the movable comprehensive scaffold is fixed on the two concrete-lined wall surfaces and the steel rail through a cable wind rope 8. The device takes down the jacking when moving.

Claims (1)

1. The whole parallel moving die carrier is characterized in that: the device comprises two bottom longitudinal traveling trolleys (1), wherein the longitudinal traveling trolleys are provided with insulating traveling wheels (2), and are respectively arranged on steel rails (3) of an upper line and a lower line of a business line railway; two lateral shifting slides (4) are connected on two bottom longitudinal walking dollies through the bolt, the scaffold is assembled by fixed scaffold and activity to portable comprehensive scaffold (5) and is constituteed, fixed scaffold is under, the scaffold is assembled in the activity is last, fixed scaffold and activity are assembled the scaffold and are fixed together, the walking wheel is installed to the bottom of fixed scaffold, the walking wheel of fixed scaffold bottom is arranged in two lateral shifting slides respectively, be equipped with steel pipe support top support (6) between lateral shifting slide and bottom plate concrete (7) of its below, fix portable comprehensive scaffold on two lining concrete wall and rail with cable wind rope (8).
CN202121456567.1U 2021-06-29 2021-06-29 Integral parallel moving die carrier Active CN215055118U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121456567.1U CN215055118U (en) 2021-06-29 2021-06-29 Integral parallel moving die carrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121456567.1U CN215055118U (en) 2021-06-29 2021-06-29 Integral parallel moving die carrier

Publications (1)

Publication Number Publication Date
CN215055118U true CN215055118U (en) 2021-12-07

Family

ID=79229562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121456567.1U Active CN215055118U (en) 2021-06-29 2021-06-29 Integral parallel moving die carrier

Country Status (1)

Country Link
CN (1) CN215055118U (en)

Similar Documents

Publication Publication Date Title
CN204640450U (en) A kind of assembling-type precast box girder integral moving die plate
CN204457802U (en) Formed by integrally casting formula formwork jumbo
CN206092022U (en) Be used for lining cutting rectangular -section or radiation gradual change rectangular -section formula operation car of crawling
CN201417657Y (en) Installation device of indoor transformer
CN109025388B (en) Construction device and construction method of movable expanded openable canopy
CN102230381B (en) Hollow needle beam lining trolley
CN110552709A (en) self-propelled integral station-crossing method and device suitable for large-diameter shield machine
CN201560539U (en) Tool car for long-span net rack roof space plate
CN201835842U (en) Secondary lining integral trolley with pipeline passing through small-section tunnel of mountain body
CN215055118U (en) Integral parallel moving die carrier
CN212000663U (en) Assembly self-supporting horizontal pushing device
CN203321529U (en) Train type rapid lifting and folding work platform for tunnel engineering
CN210912420U (en) Mining self-moving transport vehicle
CN108275579B (en) Quick dismantling device for pipeline in tunnel
CN203383516U (en) Construction device for installing connecting beam on frame type steel structure
CN111877165B (en) Bailey beam translation device in limited space and construction method thereof
CN210152663U (en) Modular rectangle top iron structure
CN210975880U (en) Adjustable open cut tunnel is hydraulic pressure platform truck by oneself
CN102704952A (en) Self-propelled tunnel grouting trolley
CN207376821U (en) A kind of electronic rain shade suitable on Metro station excavation
CN202731933U (en) Full-hydraulic self-propelled trestle trolley
CN113699296B (en) Method and device for in-situ dry dedusting rapid reconstruction of blast furnace wet dedusting
CN211342945U (en) Tunnel trolley
CN203048016U (en) Groove-shaped slideway of full automatic propelling device
CN219752864U (en) Jacking and span-changing device of vehicle-mounted track laying machine