CN215036954U - Pipeline embedded structure for water conservancy and hydropower construction - Google Patents

Pipeline embedded structure for water conservancy and hydropower construction Download PDF

Info

Publication number
CN215036954U
CN215036954U CN202121223311.6U CN202121223311U CN215036954U CN 215036954 U CN215036954 U CN 215036954U CN 202121223311 U CN202121223311 U CN 202121223311U CN 215036954 U CN215036954 U CN 215036954U
Authority
CN
China
Prior art keywords
fixed mounting
pipeline
water conservancy
pipelines
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121223311.6U
Other languages
Chinese (zh)
Inventor
李静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121223311.6U priority Critical patent/CN215036954U/en
Application granted granted Critical
Publication of CN215036954U publication Critical patent/CN215036954U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of water conservancy water and electricity construction, especially, be a pipeline embedded structure for water conservancy water and electricity construction, the power distribution box comprises a box body, the top fixed mounting of box has two fixed plates, and one side fixed mounting that two fixed plates are close to each other has same guide bar, two sliding sleeves have been cup jointed in the outside slip of guide bar. The utility model has the advantages of reasonable design, through the guide bar, the draw-in groove, the sliding sleeve, the cardboard, the sleeve, montant and reset spring's cooperation, conveniently adjust the position of two backup pads, can adjust according to the pipeline of two different length, through upper fixed ring, lower fixed ring, the cooperation of connecting plate and bolt, conveniently carry out spacing fixed to two pipelines, through the screwed pipe, the screw rod, the gag lever post, splint and the cooperation of placing the board, the convenience is fixed the junction of two pipelines, two pipelines take place the skew and lead to two pipelines not on a plane when avoiding the pouring.

Description

Pipeline embedded structure for water conservancy and hydropower construction
Technical Field
The utility model relates to a water conservancy water and electricity construction technical field especially relates to a pipeline embedded structure is used in water conservancy water and electricity construction.
Background
The pre-buried pipeline is used for subsequent structure and process construction in the construction of water conservancy and hydropower building engineering. The pipeline can be used as both a wire pipe and a water pipe, most of the existing building structures are cast-in-place structures, the pipeline is fixed on a mould or a steel bar before pouring, and the pipeline is in concrete after pouring.
However, the connection part of two pipelines is inconvenient to fix by the existing pipeline embedded structure, and during pouring, the two pipelines are easy to deviate, so that the two pipelines are not on a plane, and the later use of the pipelines is influenced, so that the pipeline embedded structure for water conservancy and hydropower construction is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the inconvenient junction to two pipelines of current pipeline embedded structure and fixing, during the pouring, two pipelines easily take place the skew, lead to two pipelines not on a plane to influence the shortcoming that the later stage of pipeline used, and the pipeline embedded structure for the water conservancy water and electricity construction that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a pipeline pre-buried structure for water conservancy and hydropower construction comprises a box body, wherein two fixed plates are fixedly mounted at the top of the box body, one side, close to each other, of each fixed plate is fixedly provided with the same guide rod, the outer side of each guide rod is slidably sleeved with two sliding sleeves, the outer sides of the two sliding sleeves are fixedly sleeved with a supporting plate, the top of each guide rod is provided with a clamping groove, each sliding sleeve is fixedly provided with a sleeve, each sleeve is slidably sleeved with a clamping plate, the two clamping plates are movably clamped in the corresponding clamping grooves respectively, the top of each clamping plate is fixedly provided with a reset spring and a vertical rod, one end, far away from the clamping plates, of each reset spring is fixedly mounted on the inner wall of the top of each sleeve, the top of each supporting plate is fixedly provided with a lower fixing ring, the rear side of each lower fixing ring is rotatably mounted with an upper fixing ring, the top of the box body is fixedly mounted with a portal frame, the top of the portal frame is rotatably mounted with a threaded pipe, the threaded pipe internal thread has cup jointed the screw rod, the bottom fixed mounting of screw rod has splint, fixed mounting has the same board of placing on the front and back side inner wall of portal frame.
Preferably, the top of splint fixed mounting has two gag lever posts, two spacing holes have been seted up at the top of portal frame, and two gag lever posts slide respectively to cup joint in the spacing hole that corresponds, the top fixed mounting of screwed pipe has the hand wheel.
Preferably, the top of montant extends to telescopic top and fixed mounting has the limiting plate, the top fixed mounting of limiting plate has the handle, reset spring cup joints in the outside of montant.
Preferably, the front sides of the upper fixing ring and the lower fixing ring are fixedly provided with connecting plates, and the two connecting plates are provided with the same bolt through threads.
Preferably, two guide holes are formed in the top of the box body, and the two support plates are respectively sleeved in the corresponding guide holes in a sliding manner.
Preferably, fixed mounting has the slide rail on the top inner wall of box, the bottom of backup pad is rotated and is installed and remove the wheel, and two remove the equal roll connection of wheel in the slide rail.
In the utility model, the pipeline embedded structure for water conservancy and hydropower construction is convenient for adjusting the positions of the two supporting plates through the matching of the guide rod, the clamping groove, the sliding sleeve, the clamping plate, the sleeve, the vertical rod and the reset spring, can be adjusted according to two pipelines with different lengths, and is convenient for preliminary limiting and fixing the two pipelines through the matching of the upper fixing ring, the lower fixing ring, the connecting plate and the bolt;
in the utility model, the pipeline embedded structure for water conservancy and hydropower construction is convenient for fixing the joint of two pipelines by matching the threaded pipe, the screw rod, the limiting rod, the clamping plate and the placing plate, and the two pipelines are prevented from deviating to cause that the two pipelines are not on the same plane when in pouring, thereby ensuring that the two pipelines are connected more parallel and level;
the utility model has the advantages of reasonable design, through the guide bar, the draw-in groove, the sliding sleeve, the cardboard, the sleeve, montant and reset spring's cooperation, conveniently adjust the position of two backup pads, can adjust according to the pipeline of two different length, through upper fixed ring, lower fixed ring, the cooperation of connecting plate and bolt, conveniently carry out spacing fixed to two pipelines, through the screwed pipe, the screw rod, the gag lever post, splint and the cooperation of placing the board, the convenience is fixed the junction of two pipelines, two pipelines take place the skew and lead to two pipelines not on a plane when avoiding the pouring.
Drawings
Fig. 1 is a schematic structural view of a pipe pre-buried structure for water conservancy and hydropower construction provided by the utility model;
fig. 2 is a cross-sectional view of a pipe embedded structure for water conservancy and hydropower construction provided by the utility model;
fig. 3 is a schematic structural view of a part a of a pipe pre-buried structure for water conservancy and hydropower construction provided by the utility model;
fig. 4 is a schematic structural view of a part B of a pipe pre-buried structure for water conservancy and hydropower construction provided by the utility model;
fig. 5 is the utility model provides a water conservancy is schematic structure of pipeline embedded structure's for water and electricity construction C part.
In the figure: 1. a box body; 2. a support plate; 3. a fixing plate; 4. a guide bar; 5. a card slot; 6. a lower fixing ring; 7. an upper fixing ring; 8. a connecting plate; 9. a bolt; 10. a gantry; 11. placing the plate; 12. a guide hole; 13. a slide rail; 14. a moving wheel; 15. a splint; 16. a hand wheel; 17. a threaded pipe; 18. a limiting rod; 19. a screw; 20. a sliding sleeve; 21. a sleeve; 22. a vertical rod; 23. a limiting plate; 24. clamping a plate; 25. a return spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-5, a pipeline pre-embedded structure for water conservancy and hydropower construction comprises a box body 1, two fixed plates 3 are fixedly installed at the top of the box body 1, one side of each of the two fixed plates 3, which is close to each other, is fixedly installed with a same guide rod 4, two sliding sleeves 20 are slidably sleeved on the outer sides of the guide rods 4, supporting plates 2 are fixedly sleeved on the outer sides of the two sliding sleeves 20, a clamping groove 5 is formed in the top of each guide rod 4, a sleeve 21 is fixedly arranged on each sliding sleeve 20, clamping plates 24 are slidably sleeved in the sleeve 21, the two clamping plates 24 are respectively and movably clamped in the corresponding clamping grooves 5, a reset spring 25 and a vertical rod 22 are fixedly installed at the top of each clamping plate 24, one end of each reset spring 25, which is far away from each clamping plate 24, is fixedly installed on the inner wall of the top of each sleeve 21, the vertical rod 22 is pulled upwards, the vertical rod 22 drives the clamping plates 24 to ascend and separate from the clamping grooves 5, so that the sliding sleeves 20 are not fixed, the positions of the supporting plates 2 can be adjusted leftwards and rightwards, so that the positions of the two supporting plates 2 can be adjusted, pipelines with different lengths can be conveniently fixed, after the positions of the two supporting plates 2 are adjusted, the vertical rod 22 is loosened, the clamping plate 24 is reset downwards and clamped in the corresponding clamping groove 5 under the action of the reset spring 25, so that the supporting plates 2 are fixed, the top of each supporting plate 2 is fixedly provided with the lower fixing ring 6, the rear side of the lower fixing ring 6 is rotatably provided with the upper fixing ring 7, the top of the box body 1 is fixedly provided with the portal frame 10, the top of the portal frame 10 is rotatably provided with the threaded pipe 17, the threaded pipe 17 is sleeved with the screw rod 19 in the threaded pipe 17, the bottom end of the screw rod 19 is fixedly provided with the clamping plate 15, the same placing plate 11 is fixedly arranged on the inner wall of the front side and the rear side of the portal frame 10, the threaded pipe 17 is rotated to drive the screw rod 19 to move downwards, the screw rod 19 drives the clamping plate 15 to move downwards, under splint 15 and the cooperation of placing board 11, can fix the junction of two pipelines, two pipelines take place the skew and lead to two pipelines not on a plane when avoiding the pouring, make things convenient for the use in later stage.
The utility model discloses in, splint 15's top fixed mounting has two gag lever posts 18, and two spacing holes have been seted up at portal frame 10's top, and two gag lever posts 18 slide respectively and cup joint in the spacing hole that corresponds, and screwed pipe 17's top fixed mounting has hand wheel 16, conveniently carries on spacingly to splint 15, makes it not rotatory together with screw rod 19, conveniently rotates screwed pipe 17 simultaneously.
The utility model discloses in, the top of montant 22 extends to sleeve 21's top and fixed mounting has limiting plate 23, and the top fixed mounting of limiting plate 23 has the handle, and reset spring 25 cup joints in montant 22's the outside, and the side is through the handle, just stimulates montant 22, through limiting plate 23, and the convenience is spacing to montant 22.
The utility model discloses in, the equal fixed mounting in front side of upper fixed ring 7 and lower fixed ring 6 has connecting plate 8, and the screw thread is provided with same bolt 9 on two connecting plates 8, conveniently fixes upper fixed ring 7 on lower fixed ring 6 to the convenience is fixed to the pipeline.
The utility model discloses in, two guiding holes 12 have been seted up at the top of box 1, and two backup pads 2 slide respectively and cup joint in the guiding hole 12 that corresponds, conveniently lead backup pad 2, make more stable of its motion.
The utility model discloses in, fixed mounting has slide rail 13 on the top inner wall of box 1, and the bottom of backup pad 2 is rotated and is installed and remove wheel 14, and two remove the equal roll connection of wheel 14 and in slide rail 13, the convenience is led to backup pad 2 and is supported, makes the more level and smooth and easy that it removed.
In the utility model, when in use, the handle is pulled, the handle drives the limiting plate 23 and the vertical rod 22 to rise, the vertical rod 22 drives the clamping plate 24 to rise and separate from the clamping groove 5, thereby not fixing the sliding sleeve 20, the position of the supporting plate 2 can be adjusted left and right, the supporting plate 2 can be guided through the matching of the guide hole 12, the slide rail 13 and the moving wheel 14, so that the movement is more stable, thereby the positions of the two supporting plates 2 can be adjusted, the pipelines with different lengths can be conveniently fixed, after the positions of the two supporting plates 2 are adjusted, the handle is loosened, at the moment, under the action of the reset spring 25, the clamping plate 24 is reset downwards and clamped in the corresponding clamping groove 5, thereby the supporting plates 2 and the sliding sleeve 20 are fixed, then the two pipelines are placed in the lower fixing ring 6, the joint of the two pipelines is placed on the placing plate 11, the fixing ring 7 is closed, then fix lower fixing ring 6 and upper fixing ring 7 through bolt 9, thereby can carry out preliminary fixed to two pipelines, then at rotation hand wheel 16, hand wheel 16 has driven the rotation of screwed pipe 17, under the spacing of gag lever post 18, screwed pipe 17 has driven the lapse of screw rod 19, screw rod 19 has driven the lapse of splint 15, thereby can fix the junction of two pipelines, two pipelines take place the skew and lead to two pipelines not on a plane when avoiding the pouring, thereby guarantee two pipe connection more parallel and level, make things convenient for the use in later stage.

Claims (6)

1. The utility model provides a pre-buried structure of pipeline for water conservancy water and electricity construction, includes box (1), its characterized in that, the top fixed mounting of box (1) has two fixed plates (3), and one side fixed mounting that two fixed plates (3) are close to each other has same guide bar (4), two sliding sleeves (20) have been cup jointed in the outside slip of guide bar (4), and backup pad (2) have all been fixedly cup jointed in the outside of two sliding sleeves (20), draw-in groove (5) have been seted up at the top of guide bar (4), sliding sleeve (20) are gone up to fixedly be provided with sleeve (21), slip in sleeve (21) and have been cup jointed cardboard (24), and two cardboard (24) activity joint respectively is in corresponding draw-in groove (5), the top fixed mounting of cardboard (24) has reset spring (25) and montant (22), the one end fixed mounting that cardboard (24) were kept away from in reset spring (25) is on the top inner wall of sleeve (21), the top fixed mounting of backup pad (2) has lower fixed ring (6), the rear side of lower fixed ring (6) rotates and installs upper fixed ring (7), the top fixed mounting of box (1) has portal frame (10), the top of portal frame (10) rotates and installs screwed pipe (17), screwed pipe (17) internal thread has cup jointed screw rod (19), the bottom fixed mounting of screw rod (19) has splint (15), fixed mounting has same board (11) of placing on the side inner wall of the front and back of portal frame (10).
2. The water conservancy water and electricity construction is with pre-buried structure of pipeline of claim 1, characterized in that, the top fixed mounting of splint (15) has two gag lever post (18), two spacing holes have been seted up at the top of portal frame (10), and two gag lever posts (18) slide respectively to cup joint in the spacing hole that corresponds, the top fixed mounting of screwed pipe (17) has hand wheel (16).
3. The water conservancy water and electricity construction is with pre-buried structure of pipeline of claim 1, characterized in that, the top of montant (22) extends to the top of sleeve (21) and fixed mounting has limiting plate (23), the top fixed mounting of limiting plate (23) has the handle, reset spring (25) cup joints in the outside of montant (22).
4. The water conservancy water and electricity construction is with pre-buried structure of pipeline of claim 1, characterized in that, the front side of upper fixed ring (7) and lower fixed ring (6) is all fixed mounting has connecting plate (8), and the screw thread is provided with same bolt (9) on two connecting plates (8).
5. The water conservancy water and electricity construction is with pre-buried structure of pipeline of claim 1, characterized in that, two guiding holes (12) have been seted up at the top of box (1), two backup pads (2) slip respectively and cup joint in corresponding guiding hole (12).
6. The water conservancy and hydropower construction pipeline embedded structure as claimed in claim 1, wherein a sliding rail (13) is fixedly mounted on the inner wall of the top of the box body (1), a moving wheel (14) is rotatably mounted at the bottom of the supporting plate (2), and the two moving wheels (14) are connected in the sliding rail (13) in a rolling manner.
CN202121223311.6U 2021-06-02 2021-06-02 Pipeline embedded structure for water conservancy and hydropower construction Expired - Fee Related CN215036954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121223311.6U CN215036954U (en) 2021-06-02 2021-06-02 Pipeline embedded structure for water conservancy and hydropower construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121223311.6U CN215036954U (en) 2021-06-02 2021-06-02 Pipeline embedded structure for water conservancy and hydropower construction

Publications (1)

Publication Number Publication Date
CN215036954U true CN215036954U (en) 2021-12-07

Family

ID=79208358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121223311.6U Expired - Fee Related CN215036954U (en) 2021-06-02 2021-06-02 Pipeline embedded structure for water conservancy and hydropower construction

Country Status (1)

Country Link
CN (1) CN215036954U (en)

Similar Documents

Publication Publication Date Title
CN215829436U (en) Foundation pit supporting structure
CN215036954U (en) Pipeline embedded structure for water conservancy and hydropower construction
CN212743500U (en) Strutting arrangement is used in building engineering construction
CN215467733U (en) Municipal works cable device of flare-outing
CN216007195U (en) Pipeline positioning support for water supply and drainage engineering
CN213173806U (en) General basic of transformer substation GIS equipment buries piece
CN216045790U (en) Auxiliary device for pipeline installation and connection
CN214523419U (en) Electric automobile chassis trades electric installation
CN214743751U (en) Pipeline strutting arrangement is used in water conservancy water and electricity construction
CN216398608U (en) Many specifications pipeline welding set is used in water conservancy construction
CN203212957U (en) Accurate adjustment device for double-block type roadbed bent frame of ballastless track
CN206918414U (en) A kind of glass fibre reinforced plastic pipe lifting mechanism
CN218324205U (en) Electric pole correcting device for power engineering
CN209615860U (en) A kind of fixed device of steel reinforced concrete Well pipe mould
CN211379869U (en) Shoe rack for shoemaking
CN204672712U (en) A kind of cold-drawn clamping trolley
CN212123265U (en) Placing frame of railway line tamping tool
CN217702128U (en) Welding positioning device for water pump connecting pipe
CN216734425U (en) Anti-collision transfer device for processing tempered glass
CN218295012U (en) Quick detach subassembly that power station machinery was used
CN215764243U (en) Device for mounting electromechanical equipment
CN111998136B (en) Mounting structure and mounting method of water diversion steel pipe for tunnel
CN215755637U (en) Water conservancy building construction pipe laying pay-off
CN210388133U (en) Pipe part welding fixture
CN218148345U (en) Do benefit to fixed anchor rod positioner for hydraulic engineering of centre gripping

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211207