CN215755637U - Water conservancy building construction pipe laying pay-off - Google Patents

Water conservancy building construction pipe laying pay-off Download PDF

Info

Publication number
CN215755637U
CN215755637U CN202023197957.XU CN202023197957U CN215755637U CN 215755637 U CN215755637 U CN 215755637U CN 202023197957 U CN202023197957 U CN 202023197957U CN 215755637 U CN215755637 U CN 215755637U
Authority
CN
China
Prior art keywords
water conservancy
building construction
construction pipe
wire
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023197957.XU
Other languages
Chinese (zh)
Inventor
王凤雪
穆文化
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202023197957.XU priority Critical patent/CN215755637U/en
Application granted granted Critical
Publication of CN215755637U publication Critical patent/CN215755637U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model relates to the technical field of water conservancy construction equipment, and discloses a water conservancy building construction pipe burying and paying off device which comprises a base, wherein a wire frame is installed at the top of the base, one side of the wire frame is connected with a reel, a rotating handle is connected to the middle of one side of the reel, a plurality of fixing holes are formed in the reel, the fixing holes are movably connected with an inserting rod, one end of the bottom of the inserting rod is connected with a pressing plate, the bottom of the pressing plate is connected with a compression spring, a push rod is arranged on one side of a sleeve and penetrates through the inner part of the sleeve to be connected with the pressing plate, a stand column is arranged on one side of the wire frame, a plurality of fixing bolts are arranged on the stand column and movably connected with a wire guide wheel, a shaft seat is installed on one side of the stand column, two ends of the shaft seat are connected with a stroke track, the inside of the stroke track is connected with a wire guide wheel, two ends of the wire guide wheel are connected with clamping pieces, and the clamping pieces are fixedly connected with the stroke track. This water conservancy building construction pipe laying pay-off connects through inserted bar and fixed orifices to the phenomenon that the reel misturned can be avoided appearing.

Description

Water conservancy building construction pipe laying pay-off
Technical Field
The utility model relates to the technical field of water conservancy construction equipment, in particular to a water conservancy building construction pipe laying pay-off device.
Background
In the construction of hydraulic engineering, the construction of hydraulic engineering is carried out according to the requirements of engineering structure, quantity, quality, progress, construction cost and the like proposed by design, in recent years, the construction scale of the hydraulic engineering in China is continuously enlarged, the structural form of a hydraulic building is more and more complex, cables are usually inserted into a buried pipe in the process of the hydraulic construction, and the measurement and paying-off in the construction project directly influence the quality of the whole construction project, so the research and development of the hydraulic construction buried pipe paying-off device are concerned.
The prior water conservancy building construction pipe laying and paying-off device has the following defects:
1. the traditional water conservancy building construction pipe laying pay-off device can not realize the locking of the wire winding wheel when the wire winding wheel stops working, so that the phenomenon of self rotation of the wire winding wheel easily occurs, and the working efficiency is influenced.
2. When a cable is placed on a wire guide wheel of an existing water conservancy building construction pipe burying pay-off device, the cable is easy to bend, so that the cable blocks a pipeline, and a worker can only draw out the cable and lay the cable again.
3. When cutting off after putting the line, the line end was slided inwards along with the line wheel easily to the existing water conservancy building construction buried pipe unwrapping wire device, leads to need twine the tractive again when the unwrapping wire is arranged again to needs, wastes time and energy, hinders water conservancy construction operation.
4. The distance between the wire wheel of the existing water conservancy building construction pipe laying pay-off device can not be adjusted, and when the wire wheel is damaged, the disassembly is troublesome, and the practicability of the device is reduced.
5. When the existing water conservancy building construction pipe laying pay-off device needs to be placed at different positions for paying off, workers are required to move the device, the labor intensity of the workers is increased, and great inconvenience is brought to users.
Therefore, a water conservancy building construction pipe laying and paying-off device is designed.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides a water conservancy building construction pipe laying pay-off device, which solves the problems in the background technology.
In order to achieve the purpose, the utility model adopts the technical scheme that:
a water conservancy building construction pipe laying and paying-off device comprises a base, wherein four ends of the bottom of the base are connected with a fixed plate, a threaded rotating shaft is arranged on the fixed plate, the threaded rotating shaft penetrates through one end of the fixed plate to be connected with a fastening sleeve, the fastening sleeve can be connected with a roller, a wire frame is arranged at the top of the base, one side of the wire frame is connected with a reel, a rotating handle is connected with the middle of one side of the reel, a plurality of fixing holes are formed in the reel, the fixing holes are movably connected with an inserting rod, one end of the bottom of the inserting rod is connected with a pressing plate, the bottom of the pressing plate is connected with a compression spring, the water conservancy building construction pipe laying and paying-off device further comprises a sleeve, a push rod is arranged on one side of the sleeve and penetrates through the inner part of the sleeve to be connected with the pressing plate, a stand column is arranged on one side of the wire frame and is provided with a plurality of fixing bolts, the fixing bolts are movably connected with a wire guide wheel, and a shaft seat is arranged on one side of the stand, and the two ends of the shaft seat are connected with the stroke tracks, the wire passing wheels are connected in the stroke tracks, the two ends of the wire passing wheels are connected with clamping pieces, and the clamping pieces are fixedly connected with the stroke tracks.
When the inserted bar is connected with the fixing hole, the compression spring is in a natural state.
The pressing plate is fixed by the push rod, and the push rod slides in one side of the sleeve.
The fastening sleeve is provided with a cushion pad.
The wire guide wheel is fixed on the upright post through a fixing bolt.
The wire passing wheel moves on the travel rail through the clamping piece.
The utility model has the beneficial effects that:
1. the utility model discloses a, the push rod can drive the clamp plate when moving downwards and remove, the clamp plate compresses compression spring, the clamp plate drives the fixed orifices that the inserted bar breaks away from being equipped with on the reel, can work the wire winding wheel from this, be equipped with a plurality of fixed orificess on the reel, and fixed orifices swing joint inserted bar, clamp plate is connected to inserted bar bottom one end, and clamp plate bottom connection compression spring, compression spring is natural state when inserted bar is connected with the fixed orifices, when inserted bar and fixed orifices are connected, the locking to the wire winding wheel has been realized, so, avoid appearing reel own pivoted phenomenon, influence work efficiency.
2. The utility model discloses a, be equipped with the screw thread pivot on the fixed plate, the screw thread pivot passes fixed plate one end and connects the adapter sleeve, and the adapter sleeve can be connected with the gyro wheel, is equipped with the blotter on the adapter sleeve, when needs carry out different positions and carry out the unwrapping wire, and the accessible gyro wheel removes, when removing required position, adjusts the screw thread pivot for the fixed plate is fixed with the gyro wheel, and this device has reduced staff's intensity of labour, convenient to use.
3. The utility model discloses a, line frame one side is equipped with the stand, and is equipped with a plurality of fixing bolt on the stand, and fixing bolt swing joint wire wheel, and wire wheel accessible fixing bolt fixes on the stand, and the wire wheel is when placing the cable, and accessible fixing bolt adjusts the wire wheel to with reel horizontal position, can make the cable straight, avoids appearing tortuous phenomenon, and accessible fixing bolt changes the wire wheel, and it is convenient to dismantle, improves the practicality of device.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a roller structure;
FIG. 3 is a schematic view showing the construction of the connection part of the insert rod and the fixing hole;
fig. 4 is an enlarged schematic view of a portion a in fig. 1.
In the figure: 1. a base; 2. a wire frame; 3. a reel; 4. turning a handle; 5. a fixing hole; 6. a sleeve; 7. a compression spring; 8. inserting a rod; 9. pressing a plate; 10. a push rod; 11. a column; 12. fixing the bolt; 13. a wire guide wheel; 14. a shaft seat; 15. a travel track; 16. a wire passing wheel; 17. a fastener; 18. a roller; 19. a fixing plate; 20. a threaded shaft; 21. and (7) fastening sleeves.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to FIGS. 1-4: a water conservancy building construction pipe laying and paying-off device comprises a base 1, wherein four ends of the bottom of the base 1 are connected with a fixed plate 19, a thread rotating shaft 20 is arranged on the fixed plate 19, the thread rotating shaft 20 penetrates through one end of the fixed plate 19 to be connected with a fastening sleeve 21, the fastening sleeve 21 can be connected with a roller 18, the top of the base 1 is provided with a wire frame 2, one side of the wire frame 2 is connected with a reel 3, the middle of one side of the reel 3 is connected with a rotating handle 4, the reel 3 is provided with a plurality of fixing holes 5, the fixing holes 5 are movably connected with an inserting rod 8, one end of the bottom of the inserting rod 8 is connected with a pressing plate 9, the bottom of the pressing plate 9 is connected with a compression spring 7, the water conservancy building construction pipe laying and paying-off device also comprises a sleeve 6, one side of the sleeve 6 is provided with a push rod 10, the push rod 10 penetrates through the inside of the sleeve 6 to be connected with the pressing plate 9, one side of the wire frame 2 is provided with a stand 11, the stand 11 is provided with a plurality of fixing bolts 12, the fixing bolt is movably connected with a wire guide wheel 13, a shaft seat 14 is installed on one side of the upright post 11, two ends of the shaft seat 14 are connected with a travel track 15, a wire passing wheel 16 is connected in the travel track 15, two ends of the wire passing wheel 16 are connected with clamping pieces 17, and the clamping pieces 17 are fixedly connected with the travel track 15.
Be equipped with a plurality of fixed orificess 5 on the reel 3, and 5 swing joint inserted bar 8 in fixed orifices, clamp plate 9 is connected to 8 bottom one ends of inserted bar, and clamp plate 9 bottom connection compression spring 7, and compression spring 7 is natural state when inserted bar 8 is connected with fixed orifices 5, and when inserted bar 8 was connected with fixed orifices 5, realized the locking to reel 3, so, avoid appearing reel 3 self pivoted phenomenon, influence work efficiency.
The sleeve 6 one side is equipped with the push rod 10, and the push rod 10 passes sleeve 6 internal connection clamp plate 9, and the push rod 10 is fixed clamp plate 9, and push rod 10 can the nimble motion in sleeve 6 one side, can drive clamp plate 9 when push rod 10 moves down, and clamp plate 9 compresses compression spring 7, and clamp plate 9 drives the inserted bar 8 and breaks away from the fixed orifices 5 that is equipped with on the reel 3, can work to the reel 3 from this.
Be equipped with screw thread pivot 20 on the fixed plate 19, screw thread pivot 20 passes fixed plate 19 one end and connects adapter sleeve 21, and adapter sleeve 21 can be connected with gyro wheel 18, is equipped with the blotter on the adapter sleeve 21, when needs carry out different positions and carry out the unwrapping wire, accessible gyro wheel 18 removes, when removing required position, adjusts screw thread pivot 20 for fixed plate 19 fixes gyro wheel 18, and this device has reduced staff's intensity of labour, convenient to use.
2 one side of line frame is equipped with stand 11, and be equipped with a plurality of fixing bolt 12 on the stand 11, fixing bolt 12 swing joint wire wheel 13, and wire wheel 13 accessible fixing bolt 12 fixes on stand 11, wire wheel 13 is when placing the cable, accessible fixing bolt 12 with wire wheel 13 adjust to with 3 horizontal positions of reel, can make the cable straight, avoid appearing tortuous phenomenon, accessible fixing bolt 12 changes wire wheel 13, it is convenient to dismantle, the practicality of improving the device.
Axle bed 14 is installed to stand 11 one side, and travel track 15 is connected at axle bed 14 both ends, travel track 15 in-connection wire passing wheel 16, and wire passing wheel 16 both ends are connected fastener 17, fastener 17 fixed connection travel track 15, and wire passing wheel 16 accessible fastener 17 moves on travel track 15, when cutting off after putting the line, press from both sides two wire passing wheel 16 to the line tightly, then cut off, this device avoids the line end to sideslip inwards along with reel 3 atress easily, need twine the tractive again when preventing to appear arranging the unwrapping wire, waste time and energy, hinder the problem of water conservancy construction operation.
In summary, when the cable winding device is used, the roller 18 is moved through the roller 18, a required position is moved, the threaded rotating shaft 20 is adjusted, the roller 18 is fixed through the fixing plate 19, a cable is wound on the winding wheel 3 and placed on the wire frame 2, the cable sequentially passes through the wire guiding wheel 13 and the two wire guiding wheels 16, the rotating handle 4 is manually rotated, the winding wheel 3 starts to work, in addition, the wire guiding wheel 13 rolls along with the movement of the cable, the two wire guiding wheels 13 roll the cable, the cable is straightened in the moving process, and the cable is conveniently placed in a pipeline.
The above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (6)

1. The utility model provides a water conservancy building construction pipe laying pay-off, includes base (1), its characterized in that: the water conservancy building construction pipe burying pay-off device comprises a base (1), wherein four ends of the bottom of the base (1) are connected with a fixing plate (19), a thread rotating shaft (20) is arranged on the fixing plate (19), the thread rotating shaft (20) penetrates through one end of the fixing plate (19) to be connected with a fastening sleeve (21), the fastening sleeve (21) can be connected with a roller (18), a wire frame (2) is installed at the top of the base (1), one side of the wire frame (2) is connected with a reel (3), one side of the reel (3) is connected with a rotating handle (4), a plurality of fixing holes (5) are formed in the reel (3), the fixing holes (5) are movably connected with an inserted bar (8), one end of the bottom of the inserted bar (8) is connected with a pressing plate (9), the bottom of the pressing plate (9) is connected with a compression spring (7), the water conservancy building construction pipe burying pay-off device further comprises a sleeve (6), a push rod (10) is arranged on one side of the sleeve (6), and the push rod (10) penetrates through an internal connection pressing plate (9) of the sleeve (6), the wire frame (2) is provided with a stand column (11) on one side, a plurality of fixing bolts (12) are arranged on the stand column (11), the fixing bolts (12) are movably connected with wire guide wheels (13), a shaft seat (14) is installed on one side of the stand column (11), the two ends of the shaft seat (14) are connected with travel tracks (15), wire passing wheels (16) are connected in the travel tracks (15), clamping pieces (17) are connected at the two ends of the wire passing wheels (16), and the clamping pieces (17) are fixedly connected with the travel tracks (15).
2. The water conservancy building construction pipe laying pay-off of claim 1, characterized in that: when the inserted bar (8) is connected with the fixed hole (5), the compression spring (7) is in a natural state.
3. The water conservancy building construction pipe laying pay-off of claim 1, characterized in that: the pressing plate (9) is fixed by the push rod (10), and the push rod (10) slides in one side of the sleeve (6).
4. The water conservancy building construction pipe laying pay-off of claim 1, characterized in that: the fastening sleeve (21) is provided with a buffer pad.
5. The water conservancy building construction pipe laying pay-off of claim 1, characterized in that: the wire guide wheel (13) is fixed on the upright post (11) through a fixing bolt (12).
6. The water conservancy building construction pipe laying pay-off of claim 1, characterized in that: the thread guide wheel (16) moves on the stroke track (15) through the clamping piece (17).
CN202023197957.XU 2020-12-24 2020-12-24 Water conservancy building construction pipe laying pay-off Expired - Fee Related CN215755637U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023197957.XU CN215755637U (en) 2020-12-24 2020-12-24 Water conservancy building construction pipe laying pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023197957.XU CN215755637U (en) 2020-12-24 2020-12-24 Water conservancy building construction pipe laying pay-off

Publications (1)

Publication Number Publication Date
CN215755637U true CN215755637U (en) 2022-02-08

Family

ID=80070861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023197957.XU Expired - Fee Related CN215755637U (en) 2020-12-24 2020-12-24 Water conservancy building construction pipe laying pay-off

Country Status (1)

Country Link
CN (1) CN215755637U (en)

Similar Documents

Publication Publication Date Title
CN215755637U (en) Water conservancy building construction pipe laying pay-off
CN111485728A (en) Installation of super-huge steel construction stand is smoothed and is put
CN111776841B (en) Pay-off device for hard cable
CN111458825B (en) Traction device for optical cable wiring and use method thereof
CN206537894U (en) A kind of Steel Pipe Eddy Detection cutting agency
CN112027821A (en) Power transmission line winding and unwinding device for electric power facility
CN218472627U (en) Auxiliary straightening and laying device for cable
CN204108186U (en) Line of power quick Fabrication assembling device
CN214610931U (en) Simple movable cable support
CN115832956A (en) Single-core cable well-entering laying slideway auxiliary device and method
CN215267574U (en) Cable laying device
CN212225247U (en) Tunnel steel bar laying trolley
CN213461027U (en) Simple cable trench support structure
CN212245642U (en) Cable unwrapping wire support of high stability
CN205283005U (en) Pay -off device
CN209455823U (en) A kind of combined type pay off rack for electric wire
CN221030144U (en) Ground anchor dismantling device for power engineering
CN219576475U (en) Threading equipment for electric power engineering
CN209200533U (en) Pipe frame type paying-off roller
CN214692572U (en) Cable shaft pushing laying tool
CN221116416U (en) Simple wire paying-off device
CN111675015A (en) Cable unwrapping wire support of high stability
CN218988439U (en) Cable take-up rack for electric power construction
CN219123814U (en) Single-core cable well-entering laying slideway auxiliary device
CN110745698B (en) Portable framework hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220208

CF01 Termination of patent right due to non-payment of annual fee