CN214942358U - Triangular form hangs mould strutting arrangement - Google Patents

Triangular form hangs mould strutting arrangement Download PDF

Info

Publication number
CN214942358U
CN214942358U CN202120606309.0U CN202120606309U CN214942358U CN 214942358 U CN214942358 U CN 214942358U CN 202120606309 U CN202120606309 U CN 202120606309U CN 214942358 U CN214942358 U CN 214942358U
Authority
CN
China
Prior art keywords
hanging
rod
pole
fixed
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120606309.0U
Other languages
Chinese (zh)
Inventor
刘延奇
刘沁桃
闵少飞
王国元
宗廷博
王冬
姚永辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Third Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202120606309.0U priority Critical patent/CN214942358U/en
Application granted granted Critical
Publication of CN214942358U publication Critical patent/CN214942358U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a mould strutting arrangement is hung to three angies types, including hanging mould standing groove and fixed tripod, hang the top that the mould standing groove is located fixed tripod, hang the mould standing groove and be U type groove, fixed tripod includes vertical support bar, horizontal fixing pole and diagonal bracing piece, vertical support bar's bottom is connected with horizontal fixing pole's middle part, vertical support bar's top and the side of hanging the mould standing groove are connected, diagonal bracing piece's top and the base of hanging the mould standing groove are connected, horizontal fixing pole's both ends and diagonal bracing piece's bottom all are connected with the stationary blade. The utility model discloses a design hanging die standing groove has improved traditional fixed mode of hanging die, and it is fixed more firm to force the effect to make the hanging die fixed through the wedge, designs vertical support pole and diagonal bracing pole, has realized that the three horn types are fixed, and through the horizontal fixing pole of vertical support pole bottom, fixed improvement for both feet with vertical support pole's single foot is fixed, and is fixed more firm.

Description

Triangular form hangs mould strutting arrangement
Technical Field
The utility model belongs to the technical field of the construction technique and specifically relates to a mould strutting arrangement is hung to three angies types.
Background
With the high-speed development of the construction industry, the building design is more and more exquisite, the building structure is more and more complicated, and the building type is more and more diversified, and under the background, the requirements of a third party and an owner unit on the quality of the construction project are continuously improved, so that the construction difficulty and the control difficulty are continuously increased. In the current high-rise residential project, the toilet plate descending generally needs to descend by 300mm, the traditional plate descending area support and mould hanging mode adopts the combination of a wood template, battens and steel pipes, and the plate descending area support and mould hanging mode is disassembled and assembled on an operation layer, so that the structure is easy to cause the following problems:
the batten suspended formwork absorbs a large amount of moisture due to long-time contact with concrete in the construction process, so that the bending strength and the rigidity of battens are reduced, the overall stability of the suspended formwork device is poor, the battens are damaged if the suspended formwork device is repeated for too many times, the battens and the concrete are easy to bond, the quality problems of pitted surfaces, holes, slurry leakage, unfilled edges and corner falling, overlarge size deviation and the like are easy to occur after the formwork is removed, the cast-in-place structure is attractive and poor in quality, the construction cost is increased due to the fact that repairing is carried out in the subsequent construction process, when the concrete is poured in place, the suspended formwork is easily deviated by vibration, and the size of the suspended formwork cannot be guaranteed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a triangular suspended mould supporting device, which can improve the overall structural stability of the existing suspended mould supporting device by a plurality of triangular structures, and has more stable support, a suspended mould placing groove is designed to prevent the suspended mould from falling off, and the bottom end and the fixed surface are fixed by screws, so that the suspended mould supporting device can be used once and can also be repeatedly used after being disassembled;
the utility model provides a mould strutting arrangement is hung to three angies types, including hanging mould standing groove and fixed tripod, it is located to hang the mould standing groove the top of fixed tripod, it is U type groove to hang the mould standing groove, fixed tripod includes vertical support bar, horizontal fixing pole and diagonal bracing piece, vertical support bar's bottom with the middle part of horizontal fixing pole is connected, vertical support bar's top with it connects to hang a side of mould standing groove, diagonal bracing piece's top with it connects to hang the base of mould standing groove, the both ends of horizontal fixing pole with diagonal bracing piece's bottom all is provided with the stationary blade.
Furthermore, a hanging die is placed in the hanging die placing groove, and a wedge-shaped fastening block is embedded between the hanging die and the side edge of the hanging die placing groove.
Further, hang the U-shaped groove that the mould standing groove is constituteed for a horizontal pole and two montants, vertical support pole the diagonal bracing pole with hang the mould standing groove and be located same vertical plane.
Further, the vertical support rod and the vertical rod connected with the hanging die placing groove are integrally formed, and the inclined support rod and the transverse rod of the hanging die placing groove are integrally formed.
Further, the stationary blade is high strength fiber fixed cap, high strength fiber fixed cap includes adapter sleeve and solid fixed ring, horizontal fixed pole or the tip of diagonal bracing pole inserts inside the adapter sleeve, gu fixed ring with adapter sleeve's outside integrated into one piece is connected, gu fixed ring with hang the base of mould standing groove parallel.
Furthermore, the support device also comprises a first connecting rod, wherein two ends of the first connecting rod are respectively fixed in the middle of the oblique supporting rod and the middle of the vertical supporting rod.
And the two ends of the second connecting rod are respectively fixed in the middle of the vertical supporting rod and the middle of the bottom edge of the hanging die placing groove.
The bottom ends of the third connecting rod and the fourth connecting rod are connected with the bottom edge of the hanging die placing groove, and the top ends of the third connecting rod and the fourth connecting rod are respectively connected with two side edges of the hanging die placing groove.
Furthermore, the top end of the vertical supporting rod is connected with the two ends of the horizontal fixing rod through a fifth connecting rod and a sixth connecting rod respectively.
Further, the tops of the two side edges of the hanging die placing groove are turned outwards to form bending parts.
The technical scheme of the utility model hang the mould standing groove through the design, traditional fixed mode of hanging the mould has been improved, it is fixed more firm to force the effect to make to hang the mould through the wedge, design vertical support pole and diagonal bracing piece, it is fixed to have realized the three horn types, horizontal fixing pole through the vertical support pole bottom, it is fixed for both feet to improve vertical support pole's single-legged fixed improvement, it is fixed more firm, through first connecting rod and second connecting rod, make fixed tripod higher to the support intensity who hangs the mould standing groove, the intensity of hanging the mould standing groove has been consolidated through third connecting rod and fourth connecting rod, prevent to hang mould and wedge and rise broken hanging mould standing groove, through fifth connecting rod and sixth connecting rod, the framework that makes the fixed tripod of bottom is more stable, bending on hanging mould standing groove side top can be used for steel wire winding fixed etc.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of embodiment 1 of the present invention;
fig. 2 is a schematic view of an integrally formed structure of the vertical support rod and the diagonal support rod of the present invention;
fig. 3 is a schematic structural view of the hanging mold and the wedge of the present invention;
fig. 4 is a schematic structural diagram of embodiment 2 of the present invention;
fig. 5 is a schematic structural diagram of embodiment 3 of the present invention;
fig. 6 is a schematic structural diagram of embodiment 4 of the present invention;
fig. 7 is a schematic structural diagram of embodiment 5 of the present invention;
fig. 8 is a schematic structural view of embodiment 6 of the present invention;
description of reference numerals:
the bending method comprises the following steps of 1-hanging a mould placing groove, 2-fixing a tripod, 3-vertical supporting rods, 4-horizontal fixing rods, 5-inclined supporting rods, 6-high-strength fiber fixing caps, 601-sleeves, 602-fixing rings, 7-hanging moulds, 8-wedge-shaped fastening blocks, 9-cross rods, 10-vertical rods, 11-first connecting rods, 12-second connecting rods, 13-third connecting rods, 14-fourth connecting rods, 15-fifth connecting rods, 16-sixth connecting rods and 17-bending parts.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", may explicitly or implicitly include one or more of the described features. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise. Furthermore, the terms "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example 1
As shown in fig. 1, the utility model provides a mould strutting arrangement is hung to three horn types, including hanging mould standing groove 1 and fixed tripod 2, hang mould standing groove 1 and be located the top of fixed tripod 2, it is U type groove to hang mould standing groove 1, fixed tripod 2 includes vertical support rod 3, horizontal fixing rod 4 and diagonal bracing pole 5, vertical support rod 3's bottom is connected with horizontal fixing rod 4's middle part, vertical support rod 3's top and the side that hangs mould standing groove 1 are connected, diagonal bracing rod 5's top and the base that hangs mould standing groove 1 are connected, horizontal fixing rod 4's both ends and diagonal bracing pole 5's bottom all are provided with the stationary blade.
The hanging mould placing groove 1 is a device for placing and fixing the hanging mould 7, the hanging mould placing groove 1 can be a groove body with a certain length, namely the bottom edge and the side edge of the hanging mould placing groove 1 are planes, or the bottom edge and the side edge of the hanging mould placing groove 1 are directly steel bars, namely the hanging mould placing groove 1 is a U-shaped groove formed by bending 17 one steel bar, when in use, the hanging mould 7 is clamped and fixed by two side edges of the U-shaped hanging mould placing groove 1, the fixing tripod 2 is used for supporting the hanging mould placing groove 1, the whole device is fixed on the ground or a construction platform, when in use or vertical state, an inverted T-shaped supporting piece is formed between the vertical supporting rod 3 and the horizontal supporting rod 4, one of two sides of the hanging mould placing groove 1 is parallel to and welded with the vertical supporting rod 3, namely the groove body of the hanging mould placing groove 1 is positioned on one side of the oblique supporting rod 5, after the top end of the oblique supporting rod 5 is welded and fixed with the top end of the vertical supporting rod 3, three stationary blades are cooperated, namely a triangular fixed support frame is formed at the bottom end.
As shown in fig. 3, a hanging die 7 is placed in the hanging die placing groove 1, and a wedge-shaped fastening block 8 is embedded between the hanging die 7 and the side edge of the hanging die placing groove 1. Certainly, hang and certainly have certain clearance between mould 7 and the mould standing groove 1 of hanging, make the centre gripping of hanging mould 7 not very tight, under the normal conditions, can correspond in hanging mould 7 and hang the side position of mould standing groove 1 and punch, downthehole wire rope that passes, will hang mould 7 through the steel wire and fix on hanging mould standing groove 1's both sides, but this kind of mode is loaded down with trivial details when not only fixing, and also loaded down with trivial details when demolising, wedge fastening block 8 is used in the design here, make the plane part of wedge fastening block 8 and hang mould 7 plane contact, make the inclined plane part of wedge fastening block 8 and the side contact of hanging mould standing groove 1, slowly strike wedge fastening block 8 and can realize hanging mould 7's the clamp tightly, and when demolising, only need to strike wedge fastening block 8 in reverse and can realize loosening, and easy operation.
As shown in fig. 1 or fig. 2, the die hanging placement groove 1 is a U-shaped groove formed by a cross rod 9 and two vertical rods 10, and the vertical support rod 3, the diagonal support rod 5 and the die hanging placement groove 1 are located on the same vertical plane. Specifically, the U-shaped mould standing groove 1 that hangs wholly constitutes for three quarter butt, certainly, three quarter butt also can be integrated into one piece, for example adopt a reinforcing bar to bend 17 direct formation, and the triangle-shaped that vertical support rod 3 and diagonal bracing pole 5 are constituteed and the U-shaped mould standing groove 1 coplane that hangs more is favorable to diagonal bracing pole 5 atress.
As shown in fig. 2, the vertical support bar 3 and one vertical bar 10 of the mold hanging placement groove 1 are integrally formed, and the diagonal support bar 5 and the cross bar 9 of the mold hanging placement groove 1 are integrally formed. Furthermore, the oblique supporting rod 5, the bottom side cross rod 9 of the supporting groove of the hanging mold 7 and the outer side rod are integrally formed, that is, formed by bending a steel bar 17 twice, and the vertical supporting rod 3 and the inner side rod of the supporting groove of the hanging mold 7 are integrally formed, that is, a vertical steel bar, it should be easily understood that the U-shaped hanging mold placing groove 1 is formed by bending a part of the oblique supporting rod 5 to form a bent 17 steel bar and a part of the vertical steel bar to which the vertical supporting rod belongs.
The stationary blade is high strength fibre locking cap 6, and high strength fibre locking cap 6 includes adapter sleeve 601 and solid fixed ring 602, and inside horizontal fixation pole 4 or the tip of diagonal bracing pole 5 inserted adapter sleeve 601, solid fixed ring 602 was connected with adapter sleeve 601's outside integrated into one piece, and solid fixed ring 602 is parallel with the base that hangs mould standing groove 1. The stationary blade can be with the horizontal fixation pole 4 or the tip looks welded gasket class part of diagonal bracing piece 5, squeeze into screw or steel nail from the centre bore and fix, or adopt the high strength fibre locking cap 6 of opening the dismantlement, this high strength fibre locking cap 6 comprises sleeve 601 and solid fixed ring 602, sleeve 601 one end opening one end is closed, gu fixed ring 602 and closed end an organic whole are connected, in use, the end of horizontal fixation pole 4 or diagonal bracing piece 5 inserts the open end of sleeve 601, inject powerful glue in the gap, then use the mode of squeezing into screw or steel nail in solid fixed ring 602 and fix, in the dismantlement, only need to heat the sleeve 601 position and rise in temperature, glue is heated and is lost efficacy, then can take off high strength fibre locking cap 6, whole device can reuse.
Example 2
As shown in fig. 4, the difference between the present embodiment and the previous embodiments is that a first connecting rod 11 is additionally disposed between the diagonal support rod 5 and the vertical support rod 3, so that the triangular support is more stable.
Two ends of the first connecting rod 11 are respectively fixed in the middle of the oblique supporting rod 5 and the middle of the vertical supporting rod 3. Simple stress analysis is performed on the structure in the foregoing embodiment, it should be understood that when the weight of the hanging mold 7 is too large or the number of the supporting devices used is small, the shearing force borne by the vertical supporting rod 3 and the oblique supporting rod 5 exceeds a critical value, which may cause bending of the vertical supporting rod 3 or the oblique supporting rod 5, and further cause unbalance and turnover of the center of gravity of the whole hanging mold 7, so that a third connecting rod is additionally arranged between the vertical supporting rod 3 and the oblique supporting rod 5, which can better bear the shearing force, and it should be understood that the first connecting rod 11 is not limited to one.
Example 3
As shown in fig. 5, the present embodiment is different from the previous embodiments in that a second connecting rod 12 is additionally arranged between the vertical supporting rod 3 and the bottom side cross rod 9 of the die hanging and placing groove 1, so that the triangular support is more stable.
Two ends of the second connecting rod 12 are respectively fixed in the middle of the vertical supporting rod 3 and the middle of the bottom side of the hanging die placing groove 1. Simple stress analysis is carried out on the structure in the foregoing embodiment, it should be understood that when the weight of the hanging die 7 is too large, obviously, the bottom side of the U-shaped hanging die placing groove 1 bears all gravity, which may cause disconnection with the vertical supporting rod 3, and further cause the gravity center of the whole hanging die 7 to be unbalanced and overturned, so that the second connecting rod 12 is additionally arranged between the vertical supporting rod 3 and the bottom side cross rod 9 of the hanging die placing groove 1, so that the hanging die placing groove 1 can be better supported, and it should be understood that the second connecting rod 12 is not limited to one.
Example 4
As shown in fig. 6, the present embodiment is different from the previous embodiments in that a third connecting rod 13 and a fourth connecting rod 14 are additionally arranged between the bottom side cross rod 9 and the side vertical rod 10 of the die hanging and placing groove 1, so that the side of the die hanging and placing groove 1 is more stable.
The bottom ends of the third connecting rod 13 and the fourth connecting rod 14 are connected with the bottom edge of the mould hanging placing groove 1, and the top ends of the third connecting rod 13 and the fourth connecting rod 14 are respectively connected with two side edges of the mould hanging placing groove 1. After the hanging die 7 is fixed, concrete and the like may be poured into the hanging die 7 for solidification, and simple stress analysis is performed on the structure in the foregoing embodiment, it should be understood that after the concrete is poured, the body of the hanging die 7 is forced to expand outwards, at this time, the hanging die 7 presses the side vertical rod 10 of the hanging die placing groove 1, and after the critical value is exceeded, the side vertical rod 10 may be bent 17 outwards or broken, so that the third connecting rod 13 and the fourth connecting rod 14 are provided, a pulling force can be given to the side vertical rod 10, and the bending 17 or the breaking is avoided.
Example 5
As shown in fig. 7, the present embodiment is different from the previous embodiments in that a fifth connecting rod 15 and a sixth connecting rod 16 are respectively connected between both ends of the horizontal fixing rod 4 and the top end of the vertical supporting rod 3.
The top end of the vertical supporting rod 3 is connected with the two ends of the horizontal fixing rod 4 through a fifth connecting rod 15 and a sixth connecting rod 16 respectively. As for the simple stress analysis of the structure in the foregoing embodiment, it should be understood that the vertical support rod 3 provides the maximum vertical support force to the hanging die placing groove 1, and when the weight of the hanging die 7 is too large, the vertical support rod 3 may be bent 17 or broken, so that the fifth connecting rod 15 and the sixth connecting rod 16 are respectively disposed at two sides of the vertical support rod 3 to form a triangular support, so as to disperse the weight of the hanging die 7 obliquely downward, and make the bottom support strength higher.
Example 6
As shown in fig. 8, the present embodiment is different from the previous embodiments in that the top ends of the side vertical bars 10 of the hanging die accommodating groove 1 are bent outward, and the bent portions can be used for fixing the hanging die 7 by hooking a steel wire or the like.
The tops of the two side edges of the hanging die placing groove 1 are turned outwards to form bending parts 17. Specifically, the angle of the turning is not less than 90 degrees, the angle of the formed bending part 17 is necessarily less than 90 degrees, when the hanging die 7 is fixed, a steel wire is taken, one end of the steel wire is wound in the bending part 17 on one side, the body is tied on the surface of the hanging die 7, the other end of the steel wire is wound in the bending part 17 on the other side, and the hanging die 7 is tightly pressed in a fixing groove of the hanging die 7.
When the device is used, a fixed point is determined firstly, the fixed sheet is fixed by an iron nail, the hanging die 7 is built in the hanging die placing groove 1, and the hanging die 7 is built after being fixed by a wood wedge. When the mold is disassembled, the wood wedge is only needed to be taken out, the hanging mold 7 can be quickly dropped off, the whole device can be immediately put into next use after being taken out, the reusability is high, and the device is energy-saving and environment-friendly.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (10)

1. The utility model provides a mould strutting arrangement is hung to three angies types, its characterized in that, is including hanging mould standing groove and fixed tripod, it is located to hang the mould standing groove the top of fixed tripod, it is U type groove to hang the mould standing groove, fixed tripod includes vertical support pole, horizontal fixing pole and diagonal bracing pole, vertical support pole's bottom with the middle part of horizontal fixing pole is connected, vertical support pole's top with it connects to hang a side of mould standing groove, diagonal bracing pole's top with it connects to hang the base of mould standing groove, the both ends of horizontal fixing pole with diagonal bracing's bottom all is connected with the stationary blade.
2. The triangular form hoisting die supporting device according to claim 1, wherein a hoisting die is placed in the hoisting die placing groove, and wedge-shaped fastening blocks are embedded between the hoisting die and the side edges of the hoisting die placing groove.
3. The triangular form hoisting die supporting device according to claim 1, wherein the hoisting die placing groove is a U-shaped groove formed by a cross rod and two vertical rods, and the vertical supporting rod, the oblique supporting rod and the hoisting die placing groove are located on the same vertical plane.
4. The triangular form hanging die supporting device according to claim 3, wherein the vertical rods connecting the vertical supporting rod and the form hanging placing groove are integrally formed, and the inclined supporting rod and the cross rod of the form hanging placing groove are integrally formed.
5. The triangular form hoisting die supporting device according to claim 1, wherein the fixing piece is a high-strength fiber fixing cap, the high-strength fiber fixing cap comprises a connecting sleeve and a fixing ring, the end of the horizontal fixing rod or the inclined supporting rod is inserted into the connecting sleeve, the fixing ring is integrally connected with the outside of the connecting sleeve, and the fixing ring is parallel to the bottom edge of the hoisting die placing groove.
6. The triangular form hanging support device as claimed in claim 5, further comprising a first connecting rod, both ends of which are fixed to the middle of the diagonal support rod and the middle of the vertical support rod, respectively.
7. The triangular form hoisting die supporting device according to claim 6, further comprising a second connecting rod, wherein two ends of the second connecting rod are respectively fixed at the middle part of the vertical supporting rod and the middle part of the bottom edge of the hoisting die placing groove.
8. The triangular form hoisting die supporting device according to claim 7, further comprising a third connecting rod and a fourth connecting rod, wherein the bottom ends of the third connecting rod and the fourth connecting rod are connected with the bottom edge of the hoisting die placing groove, and the top ends of the third connecting rod and the fourth connecting rod are respectively connected with two side edges of the hoisting die placing groove.
9. The triangular form hanging support device as claimed in claim 8, wherein the top ends of the vertical support rods are connected to the two ends of the horizontal fixing rod by a fifth connecting rod and a sixth connecting rod, respectively.
10. The triangular die hanging support device according to claim 9, wherein the tops of the two side edges of the die hanging placement groove are folded outwards to form bent portions.
CN202120606309.0U 2021-03-25 2021-03-25 Triangular form hangs mould strutting arrangement Active CN214942358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120606309.0U CN214942358U (en) 2021-03-25 2021-03-25 Triangular form hangs mould strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120606309.0U CN214942358U (en) 2021-03-25 2021-03-25 Triangular form hangs mould strutting arrangement

Publications (1)

Publication Number Publication Date
CN214942358U true CN214942358U (en) 2021-11-30

Family

ID=79038652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120606309.0U Active CN214942358U (en) 2021-03-25 2021-03-25 Triangular form hangs mould strutting arrangement

Country Status (1)

Country Link
CN (1) CN214942358U (en)

Similar Documents

Publication Publication Date Title
CN211313477U (en) Post-cast cantilever plate's triangular supports template structure
CN209723016U (en) A foundation structure for tower crane
CN216587710U (en) Modular anti-bank reinforced structure of aluminum alloy template
CN208396714U (en) Supporting construction is adjusted in a kind of hollow concrete well unilateral side inner wall form
CN209261237U (en) A kind of prefabricated panel clamping device
CN214942358U (en) Triangular form hangs mould strutting arrangement
CN212246007U (en) Be used for tower crane bracket welded portable platform
CN212406134U (en) Cornice plate pouring support frame for building construction
CN215631623U (en) Flexible template structure for casting concrete cylinder
CN206090567U (en) Cantilever type reservoir dam template
CN206680963U (en) Truss-like heavy type dam template
CN210857752U (en) Structure falls board and hangs split heads muscle for mould
CN210763910U (en) Auxiliary force application structure for hoisting steel structure
CN210636660U (en) Bottom die assembly structure based on steel bar truss floor support plate
CN213391206U (en) Concrete form strutting arrangement for building engineering
CN111997383A (en) Construction is with platform of unloading
CN206681336U (en) The operating platform of encorbelmenting poured for detached column top concrete
CN209990148U (en) Construction is with platform of unloading
CN205894662U (en) Modular triangle steel truss template
CN217500968U (en) Civil engineering is with scaffold frame of dismouting of being convenient for to make up
CN214884815U (en) Building concrete precast slab
CN220978805U (en) Upright post steel mould fixing structure
CN211572509U (en) Upper hanging mechanism and hanging device of scaffold
CN216007855U (en) But height-adjusting is discharge table for construction
CN215407403U (en) Building engineering construction is with hanging mould device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant