CN214942153U - Adjustable type construction operation platform - Google Patents
Adjustable type construction operation platform Download PDFInfo
- Publication number
- CN214942153U CN214942153U CN202120773322.5U CN202120773322U CN214942153U CN 214942153 U CN214942153 U CN 214942153U CN 202120773322 U CN202120773322 U CN 202120773322U CN 214942153 U CN214942153 U CN 214942153U
- Authority
- CN
- China
- Prior art keywords
- landing leg
- base
- step board
- operation platform
- operating platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses an adjustable nodal pattern construction operation platform, it is complicated, work load is big to current operation platform installation operation to construction operation platform is difficult to carry out the technical problem who adjusts to the various topography in scene, and it includes step board, rail guard, landing leg and base, and rail guard and landing leg are articulated with the step board respectively, and the landing leg is flexible landing leg, installs the pulley on the base, demountable installation cat ladder on the landing leg. According to the foldable operating platform, the guard rail and the supporting legs are hinged to the pedal respectively, so that the guard rail and the supporting legs can be folded when the operating platform needs to move, the occupied space of the operating platform is reduced, and the operating platform can pass through a narrow space; meanwhile, the operating platform can be rapidly moved through the pulley at the bottom of the base; the detachable crawling ladder is arranged, so that constructors can conveniently enter the operation platform, and can rapidly detach the crawling ladder when not in use, and the occupied space is reduced; has the advantages of simple mounting and dismounting, convenient moving and transportation, telescopic property, folding property and suitability for various space fields.
Description
Technical Field
The utility model relates to a construction equipment's technical field especially relates to an adjustable nodal pattern construction operation platform.
Background
In the construction process of a conventional civil engineering project, a construction operation platform is often required to be built for operation. At present, the common method in the construction process is to build a simple construction operation platform by personnel.
Generally, a construction operation platform comprises a pedal for an operator to stand, protection on the side surface of the pedal and a support at the bottom of the pedal, when the construction operation platform is manufactured, the pedal needs to be fixed on the support through various accessories, meanwhile, the protection on the side surface needs to be connected with the pedal, the installation operation is complex, the workload is large, and the construction operation platform is difficult to adjust according to various terrains on site.
SUMMERY OF THE UTILITY MODEL
The utility model provides an adjustable nodal pattern construction operation platform has ann and tears simple, be convenient for remove the transportation, scalable, the folding advantage that is suitable for various space places open.
The technical problem to be solved is that: the existing operation platform is complex in installation and operation and large in workload, and the construction operation platform is difficult to adjust for various terrains on site.
In order to solve the technical problem, the utility model adopts the following technical scheme:
the utility model relates to an adjustable nodal pattern construction operation platform, including step board, the rail guard of setting on the step board, install the landing leg in step board bottom four corners position and set up the base in step board below and be connected with the landing leg, the landing leg is flexible landing leg, install the pulley on the base.
The utility model relates to an adjustable nodal pattern construction operation platform, it is further, the landing leg includes the sleeve pipe and slides and set up the lower branch in last sleeve pipe, it is connected with the step board to go up sleeve pipe one end, and the other end is connected with the base, it is equipped with a plurality of locating holes to go up the spaced apart on the sleeve pipe, be equipped with the fixed orifices on the lower branch, wear to establish the height of control landing leg in fixed orifices, locating hole through adjusting bolt.
The utility model relates to an adjustable nodal pattern construction operation platform, it is further, it is articulated with the step board to go up sleeve pipe upper end, and the lower extreme can be dismantled with the base and be connected.
The utility model relates to an adjustable nodal pattern construction operation platform, it is further, corresponding bolt hole has been seted up respectively to the side of going up sleeve pipe and base, will go up the sleeve pipe through the bolt and connect with the base.
The utility model relates to an adjustable nodal pattern construction operation platform, it is further, the rail guard includes two rows of protection pole settings that set up on the step board, protection pole setting is articulated with the step board, install the protection breast board in the protection pole setting, install the end plate respectively in the both ends of step board between the twice protection breast board, the end plate can be dismantled with the pole setting and be connected.
The utility model relates to an adjustable nodal pattern construction operation platform, it is further, set up corresponding perforation in end plate and the pole setting, connect end plate and pole setting through the bolt.
The utility model relates to an adjustable nodal pattern construction operation platform, it is further, be close to the cat ladder is installed to the position of footboard wherein one end, the cat ladder can be dismantled with the landing leg and be connected.
Compared with the prior art, the utility model, following beneficial effect has:
according to the foldable operating platform, the guard rail and the supporting legs are hinged to the pedal respectively, so that the guard rail and the supporting legs can be folded when the operating platform needs to move, the occupied space of the operating platform is reduced, and the operating platform can pass through a narrow space; meanwhile, the operating platform can be rapidly moved through the pulley at the bottom of the base; and the cat ladder can be dismantled in the installation, and the constructor of being convenient for gets into operation platform, when not using, can dismantle fast, reduces occupation space. The operation platform is suitable for climbing operation on various terrains such as flat ground, slope and stairs, and can be transported easily according to field requirements.
The present invention will be further explained with reference to the accompanying drawings.
Drawings
FIG. 1 is a schematic structural view of the utility model in use;
fig. 2 is a top view of the guard rail;
FIG. 3 is a schematic structural view of the exercise state of the present invention;
fig. 4 is a schematic structural view of the folded state of the present invention;
fig. 5 is a side view of the present invention.
Reference numerals:
1. a step plate; 2. protecting the fence; 21. a protective vertical rod; 22. a guard rail plate; 23. an end plate; 3. a support leg; 31. sleeving a sleeve; 32. a lower support rod; 33. positioning holes; 34. adjusting the bolt; 4. a base; 5. a pulley; 6. the ladder is climbed.
Detailed Description
As shown in fig. 1, the utility model relates to an adjustable type construction operation platform, including footboard 1, set up on footboard 1 and enclose closed rail guard 2, install the landing leg 3 in footboard 1 bottom four corners position and set up in footboard 1 below and the base 4 of being connected with landing leg 3, install pulley 5 on the base 4. The size of footboard 1 in this application is 2000 × 1000 × 6mm, also can adjust the change according to the job site demand.
Referring to fig. 1 and 2, the guard rail 2 includes two rows of protection upright posts 21 that are parallel to each other and are arranged at the edge of the step board 1, the specification of the protection upright posts 21 is 1200 × 80mm, the protection upright posts 21 are hinged with the step board 1, and the two rows of protection upright posts 21 can be turned over in opposite directions. The protective upright stanchions 21 are provided with protective baffle plates 22, the height of each protective baffle plate 22 is 1m, the thickness of each protective baffle plate 22 is 6mm, end plates 23 are respectively arranged between the two protective baffle plates 22 at the two ends of the pedal 1, the end plates 23 and the upright stanchions close to the end plates 23 are provided with corresponding through holes, and the end plates 23 and the upright stanchions are detachably connected through bolts; the end plate 23 and the protective fence 22 enclose the foot pedal 1, so that the safety of constructors is ensured. The protective vertical rod 21 is hinged to the pedal 1, when the work area moves, the protective fence 2 can be folded on the pedal 1, the occupied space of the operating platform is reduced, the space requirements of various construction sites can be met, and the moving is convenient.
Referring to fig. 1, the leg 3 is a telescopic leg 3, and includes an upper sleeve 31 and a lower support rod 32 slidably disposed in the upper sleeve 31, the specification of the upper sleeve 31 is 80 × 80mm, one end of the upper sleeve 31 is hinged to the footboard 1, and the other end is connected to the base 4, specifically, the upper sleeve 31 is located on the side surface of the base 4, the height of the lower end of the upper sleeve 31 is not lower than the height of the bottom of the pulley 5, corresponding bolt holes are respectively disposed on the side surfaces of the upper sleeve 31 and the base 4, and the upper sleeve 31 is connected to the base 4 through bolts. A plurality of positioning holes 33 are spaced on the upper sleeve 31, fixing holes are arranged on the lower support rod 32, the lower support rod 32 is fixedly connected with the upper sleeve 31 by penetrating the adjusting bolts 34 into the fixing holes and the positioning holes 33, and the length of the lower support rod 32 extending out of the upper sleeve 31 is adjusted.
Referring to fig. 1, 3 and 4, in use, the upper sleeve 31 is turned to be vertical, the upper sleeve 31 is connected with the base 4 through a bolt, and the lower support rod 32 extends out of the upper sleeve 31 and is locked through an adjusting bolt 34, so that the operating platform is erected for use; when the movable pulley moves, the lower support rod 32 retracts into the upper sleeve 31 and is locked through the adjusting bolt 34, and the pulley 5 contacts the ground; simultaneously, the sleeve 31 is contacted with the base 4, the sleeve 31 is folded on the base 4, and the operating platform is moved, so that the device has the advantages of convenience in installation, convenience in movement and small occupied space.
Referring to fig. 5, further, a ladder 6 is installed at a position close to one of the end plates 23, the ladder 6 is detachably connected to the upper casing 31 by a pin passing through the ladder 6 and the upper casing 31, and a constructor enters the step plate 1 through the ladder 6 to perform work, and the ladder 6 can be detached to save space when transporting the operation platform.
According to the foldable operating platform, the guard rail 2 and the supporting legs 3 are hinged to the pedal 1 respectively, so that the guard rail 2 and the supporting legs 3 can be folded when the operating platform needs to move, the occupied space of the operating platform is reduced, and the operating platform can pass through a narrow space; meanwhile, the operating platform can be rapidly moved through the pulley 5 at the bottom of the base 4; and the cat ladder 6 can be dismantled in the installation, and the constructor of being convenient for gets into operation platform, when not using, can dismantle fast, reduces occupation space. The operation platform is suitable for climbing operation on various terrains such as flat ground, slope and stairs, and can be transported easily according to field requirements.
The above-mentioned embodiments are only for describing the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art without departing from the design spirit of the present invention should fall into the protection scope defined by the claims of the present invention.
Claims (7)
1. The utility model provides an adjustable nodal pattern construction operation platform which characterized in that: including step board (1), rail guard (2) of setting on step board (1), install landing leg (3) and setting up in step board (1) bottom four corners position and base (4) of being connected with landing leg (3) in step board (1) below, landing leg (3) are flexible landing leg (3), install pulley (5) on base (4).
2. An adjustable construction work platform according to claim 1, wherein: landing leg (3) include sleeve pipe (31) and slide and set up lower branch (32) in last sleeve pipe (31), it is connected with step board (1) to go up sleeve pipe (31) one end, and the other end is connected with base (4), it is equipped with a plurality of locating holes (33) to go up spaced apart on sleeve pipe (31), be equipped with the fixed orifices on lower branch (32), wear to establish the height of controlling landing leg (3) in fixed orifices, locating hole (33) through adjusting bolt (34).
3. An adjustable construction work platform according to claim 2, wherein: the upper end of the upper sleeve (31) is hinged with the pedal (1), and the lower end of the upper sleeve is detachably connected with the base (4).
4. An adjustable construction work platform according to claim 2, wherein: the side surfaces of the upper sleeve (31) and the base (4) are respectively provided with corresponding bolt holes, and the upper sleeve (31) and the base (4) are connected through bolts.
5. An adjustable construction work platform according to claim 1, wherein: guard rail (2) include two rows of protection pole setting (21) of setting on step board (1), protection pole setting (21) are articulated with step board (1), install protection breast board (2) on protection pole setting (21), install end plate (23) respectively at the both ends of step board (1) between two ways protection breast board (2), end plate (23) can be dismantled with the pole setting and be connected.
6. An adjustable construction work platform according to claim 5, wherein: the end plate (23) and the upright rod are provided with corresponding through holes, and the end plate (23) and the upright rod are connected through a bolt.
7. An adjustable construction work platform according to claim 1, wherein: a ladder stand (6) is installed at a position close to one end of the foot board (1), and the ladder stand (6) is detachably connected with the supporting legs (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120773322.5U CN214942153U (en) | 2021-04-15 | 2021-04-15 | Adjustable type construction operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120773322.5U CN214942153U (en) | 2021-04-15 | 2021-04-15 | Adjustable type construction operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214942153U true CN214942153U (en) | 2021-11-30 |
Family
ID=79046142
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120773322.5U Expired - Fee Related CN214942153U (en) | 2021-04-15 | 2021-04-15 | Adjustable type construction operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214942153U (en) |
-
2021
- 2021-04-15 CN CN202120773322.5U patent/CN214942153U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5588500A (en) | Elevatable work facility | |
JP5394334B2 (en) | Construction method of work floor for work at height | |
KR20180037026A (en) | Pile frame and its installation method | |
US11873196B2 (en) | Mobile crane having a folding walking platform | |
CN112431393A (en) | Portable foldable lifting platform | |
CN204152177U (en) | Operating platform is chosen outside portable | |
KR20190127275A (en) | Smart safety scaffold for the maximize to the ease of movement and storage | |
CN214942153U (en) | Adjustable type construction operation platform | |
CN210460472U (en) | Portable ladder | |
JP3004217U (en) | Stepladder with handrail | |
CN210264006U (en) | Building faces limit structure post construction protection frame | |
CN217812236U (en) | Assembled liftable operation platform on water | |
JPH08100517A (en) | Vertically movable scaffold | |
CN220580484U (en) | Foldable maintenance platform for vibrating screen of asphalt mixing plant | |
CN220408791U (en) | Angle and height-adjustable's general type horizontal transport robot testboard | |
CN213927391U (en) | Strutting arrangement for construction | |
CN220150838U (en) | Folding movable walking board | |
CN211524683U (en) | Elevator construction overhauls with foldable frame of ascending a height | |
CN214785786U (en) | Building support frame for high-rise building | |
CN219691464U (en) | Drawing type stepping ladder for continuous pipe working machine and continuous pipe working machine | |
CN216476255U (en) | Cantilever beam type movable operation platform | |
CN215632698U (en) | Supporting device convenient to fold and unfold and used for decoration transformation | |
CN219297103U (en) | Air cooling tower broadening platform mounting tool | |
JP3152342U (en) | Ladder fixing jig and ladder device | |
CN218758615U (en) | Folding building engineering scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211130 |