CN213927391U - Strutting arrangement for construction - Google Patents
Strutting arrangement for construction Download PDFInfo
- Publication number
- CN213927391U CN213927391U CN202022792924.3U CN202022792924U CN213927391U CN 213927391 U CN213927391 U CN 213927391U CN 202022792924 U CN202022792924 U CN 202022792924U CN 213927391 U CN213927391 U CN 213927391U
- Authority
- CN
- China
- Prior art keywords
- guardrail frame
- upper portion
- supporting
- construction
- strutting arrangement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 241000282326 Felis catus Species 0.000 claims abstract description 11
- 238000009435 building construction Methods 0.000 claims description 9
- 238000000034 method Methods 0.000 description 3
- 230000009194 climbing Effects 0.000 description 2
- 229910003460 diamond Inorganic materials 0.000 description 2
- 239000010432 diamond Substances 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000009193 crawling Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a strutting arrangement for construction, it is including supporting the base and setting up the guardrail frame on supporting base upper portion, support base upper portion fixedly connected with mount, mount upper portion is provided with the folding rod that a plurality of rhombuses distribute, the folding rod is provided with first loose axle and second loose axle from bottom to top, first spout has been seted up on the mount surface, the inside sliding connection of first spout has first slider, first loose axle is connected with the mount. The utility model discloses a folding pole can realize the height control to strutting arrangement's height control, satisfies the demand to different support heights in the building work progress, and the guardrail frame that sets up, makes things convenient for the security that the operator stood, and sets up the folding cat ladder on guardrail frame upper portion, neither can cause the influence to whole strutting arrangement's structure, also can make things convenient for the operator to scramble simultaneously, increases the security that the operator was using strutting arrangement.
Description
Technical Field
The utility model belongs to the technical field of building engineering, a strutting arrangement for construction is related to.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite.
In the work progress, often need utilize strutting arrangement to carry out auxiliary stay, but current strutting arrangement is mostly simple structure, and strutting arrangement lacks fine stability, and the operator lacks stability when standing on strutting arrangement, and the operator is after the strutting arrangement upper portion of standing, and is inconvenient to get off, brings inconvenience for strutting arrangement's in-service use.
Therefore, it is necessary to design a supporting device for building construction to solve the technical problems in the prior art.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the partial technical problem that exists among the prior art to a certain extent at least, the utility model provides a supporting device for construction, its is rational in infrastructure, can realize the height control to supporting device, satisfy the demand to different support heights in the building work progress, make things convenient for the security that the operator stood, neither can cause the influence to whole supporting device's structure, also can make things convenient for the operator to scramble simultaneously, increase the security that the operator was using supporting device.
In order to solve the technical problem, the utility model provides a supporting device for building construction, which comprises a supporting base and a guardrail frame arranged on the upper part of the supporting base, the upper part of the supporting base is fixedly connected with a fixing frame, the upper part of the fixing frame is provided with a plurality of folding rods distributed in a diamond shape, the folding rod is provided with a first movable shaft and a second movable shaft from bottom to top, the surface of the fixed frame is provided with a first chute, a first sliding block is connected in the first sliding groove in a sliding manner, the first movable shaft is connected with the fixed frame, the second movable shaft is connected with the first slide block, the upper part of the supporting base is also provided with an electric telescopic rod, the upper end of the electric telescopic rod is connected with the first sliding block, the upper end of the folding rod is fixedly connected with a guardrail frame, the folding rod is connected with the guardrail frame through a supporting rod in a supporting mode, and a crawling ladder is embedded in one side of the surface of the guardrail frame.
As a preferred embodiment, the lower end of the support rod is movably connected with the folding rod, the bottom of the guardrail frame is provided with a second sliding groove, a second sliding block is movably embedded in the second sliding groove, and the upper end of the support rod is movably connected with the second sliding block.
In a preferred embodiment, the lower end of the ladder stand is hinged with the guardrail frame through a connecting shaft.
As a preferred embodiment, the two sides of the surface of the guardrail frame are movably connected with positioning fasteners, the surface of the ladder stand is fixedly connected with a positioning rod, and the positioning fasteners are fastened at the upper part of the positioning rod.
In a preferred embodiment, the ladder stands are connected in a folding mode through folding hinges.
In a preferred embodiment, the lower part of the supporting base is fixedly connected with a locking universal wheel.
As a preferred embodiment, the height of the guardrail frame is 0.8m-1.2 m.
In a preferred embodiment, the area of the guardrail frame is smaller than the area of the support base.
The utility model discloses beneficial effect:
the utility model provides a pair of strutting arrangement for construction, it is rational in infrastructure, adopt folding pole to strutting arrangement's height control, can realize the height control to strutting arrangement, satisfy the demand to different support heights in the building work progress, and the guardrail frame that sets up, make things convenient for the security that the operator stood, and set up the folding cat ladder on guardrail frame upper portion, neither can cause the influence to whole strutting arrangement's structure, also can make things convenient for the operator to scramble simultaneously, increase the security that the operator is using strutting arrangement.
Drawings
The above advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are given by way of illustration only and do not limit the present invention, and in which:
fig. 1 is a schematic structural view of a support device for building construction according to the present invention;
FIG. 2 is a corresponding enlarged view of a portion of FIG. 1;
fig. 3 is a schematic side view of the climbing frame of the present invention;
fig. 4 is a schematic bottom structure view of the guardrail frame of the present invention.
In the drawings, the reference numerals denote the following components:
1. a support base; 2. a fixed mount; 3. a folding bar; 4. an electric telescopic rod; 5. a first movable shaft; 6. a second movable shaft; 7. a first chute; 8. a first slider; 9. a support bar; 10. a guardrail frame; 11. climbing a ladder; 12. locking the universal wheel; 13. positioning the fastener; 14. positioning a rod; 15. a connecting shaft; 16. a folding hinge; 17. a second slider; 18. a second runner.
Detailed Description
Fig. 1 to 4 are related schematic views of a supporting device for building construction according to the present application, and the present invention will be described in detail below with reference to specific embodiments and accompanying drawings.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of the respective portions and the mutual relationships thereof. It should be noted that for the sake of clarity in showing the structures of the various components of the embodiments of the present invention, the drawings are not drawn to the same scale. Like reference numerals are used to denote like parts.
A strutting arrangement's for construction structural schematic diagram, as shown in figure 1. The supporting device for building construction comprises a supporting base 1 and a guardrail frame 10 arranged on the upper part of the supporting base 1, wherein a locking universal wheel 12 is fixedly connected to the lower end of the supporting base 1 for facilitating the movement of the supporting device;
further, in order to adjust the height of the supporting device, a fixed frame 2 is fixedly connected to the upper portion of a supporting base 1, a plurality of folding rods 3 distributed in a diamond shape are arranged on the upper portion of the fixed frame 2 to form a structure shown in fig. 1, four movable shafts are formed between the folding rods 3, a first movable shaft 5, a second movable shaft 6 and other two movable shafts are arranged from bottom to top, a first sliding groove 7 is formed in the surface of the fixed frame 2, a first sliding block 8 is connected to the inside of the first sliding groove 7 in a sliding manner, the first movable shaft 5 is connected with the fixed frame 2, the second movable shaft 6 is connected with the first sliding block 8, an electric telescopic rod 4 is further erected on the upper portion of the supporting base 1, and the upper end of the electric telescopic rod 4 is connected with the first sliding block 8;
the electric telescopic rod 4 drives the first sliding block 8 to move upwards along the first sliding groove 7, the second movable shaft 6 moves upwards along with the movement of the first sliding block 8, and the first movable shaft 5 is connected with the fixed frame 2, so that the folding rod 3 is supported, and the height of the supporting device is adjusted;
in order to ensure the stability of the guardrail frame 10 arranged on the upper part of the support device, a support bar 9 is also arranged. It should be further noted that the lower end of the support rod 9 is movably connected with the folding rod 3, the bottom of the guardrail frame 10 is provided with a second sliding groove 18, as shown in fig. 4, a second sliding block 17 is movably embedded in the second sliding groove 18, and the upper end of the support rod 9 is movably connected with the second sliding block 17;
along with the support of the folding rod 3, the upper end of the support rod 9 moves along the second sliding groove 18 through the second sliding block 17, so as to support the guardrail frame 10 and further ensure the stability of the guardrail frame 10 in use;
in order to facilitate the passengers on the upper part of the guardrail frame 10 to go up and down, a ladder stand 11 is embedded on one side of the surface of the guardrail frame 10;
the ladder stand 11 is a folding structure, and the ladder stand 11 is connected in a folding manner through a folding hinge 16, as shown in fig. 3. In this embodiment, there are two kinds of states cat ladder 11, firstly fold the structure that flushes each other after packing up, secondly strut back cat ladder 11 and be the horizontality structure.
In the embodiment, the lower end of the ladder stand 11 is hinged with the guardrail frame 10 through a connecting shaft 15;
in order to ensure the stability of the ladder stand 11 embedded on the surface of the guardrail frame 10, positioning fasteners 13 are movably connected to two sides of the surface of the guardrail frame 10, as shown in fig. 2, positioning rods 14 are fixedly connected to the surface of the ladder stand 11, and the positioning fasteners 13 are fastened on the upper portions of the positioning rods 14, so that the stability of the ladder stand 11 after being folded is ensured, and the practical convenience of the ladder stand 11 is improved.
The utility model discloses a theory of operation and use flow: can promote strutting arrangement appointed position department through locking universal wheel 12, the operator stands inside guardrail frame 10, external switch control electric telescopic handle 4 work, electric telescopic handle 4 drives first slider 8 along first spout 7 rebound, second loose axle 6 shifts up along with first slider 8's removal along with it, again because of first loose axle 5 is connected with mount 2, so cause the jack-up of folding rod 3, and then realize the height adjustment to strutting arrangement, guardrail frame 10 height adjustment thereupon, in the use, when the operator needs down, take off locating lever 14 from location fastener 13, promote cat ladder 11 downwards, cat ladder 11 opens along connecting axle 15, and strut through folding hinge 16 between cat ladder 11, cat ladder 11 lower extreme contact ground, the operator can follow cat ladder 11 and climb down, increase the convenience of strutting arrangement use.
Compare in prior art's shortcoming and not enough, the utility model provides a pair of strutting arrangement for construction, it is rational in infrastructure, adopt folding pole to strutting arrangement's altitude mixture control, can realize the altitude mixture control to strutting arrangement, satisfy the demand to different support heights in the building work progress, and the guardrail frame that sets up, make things convenient for the security that the operator stood, and set up the folding cat ladder on guardrail frame upper portion, neither can cause the influence to whole strutting arrangement's structure, also can make things convenient for the operator to scramble simultaneously, increase the security that the operator is using strutting arrangement.
The present invention is not limited to the above embodiments, and any person can obtain other products in various forms without departing from the scope of the present invention, but any change in shape or structure is included in the technical solution that is the same as or similar to the present invention.
Claims (8)
1. The utility model provides a strutting arrangement for construction, its characterized in that, is including supporting the base and setting up the guardrail frame on supporting base upper portion, support base upper portion fixedly connected with mount, mount upper portion is provided with the folding rod that a plurality of rhombuses distribute, the folding rod is provided with first loose axle and second loose axle from bottom to top, first spout has been seted up on the mount surface, the inside sliding connection of first spout has first slider, first loose axle is connected with the mount, the second loose axle is connected with first slider, it still erects electric telescopic handle to support base upper portion, electric telescopic handle upper end is connected with first slider, folding rod upper end fixedly connected with guardrail frame, still support through the bracing piece between folding rod and the guardrail frame and be connected, it is equipped with the cat ladder to inlay on one side of guardrail frame surface.
2. The supporting device for building construction according to claim 1, wherein the lower end of the supporting rod is movably connected with the folding rod, a second sliding groove is formed at the bottom of the guardrail frame, a second sliding block is movably embedded in the second sliding groove, and the upper end of the supporting rod is movably connected with the second sliding block.
3. The supporting device for construction according to claim 1, wherein the lower end of the ladder stand is hinged to the guard rail frame by a connecting shaft.
4. The supporting device for building construction as claimed in claim 1, wherein positioning fasteners are movably connected to both sides of the surface of the guardrail frame, the positioning rod is fixedly connected to the surface of the ladder stand, and the positioning fasteners are fastened to the upper portion of the positioning rod.
5. The construction supporting device as claimed in claim 1, wherein the ladder stands are connected to each other by folding hinges.
6. The supporting device for building construction according to claim 1, wherein a locking universal wheel is fixedly connected to a lower portion of the supporting base.
7. The construction supporting device according to claim 1, wherein the height of the fence frame is 0.8m to 1.2 m.
8. The construction supporting device according to claim 7, wherein the guardrail frame has an area smaller than that of the supporting base.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022792924.3U CN213927391U (en) | 2020-11-27 | 2020-11-27 | Strutting arrangement for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022792924.3U CN213927391U (en) | 2020-11-27 | 2020-11-27 | Strutting arrangement for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213927391U true CN213927391U (en) | 2021-08-10 |
Family
ID=77144874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022792924.3U Expired - Fee Related CN213927391U (en) | 2020-11-27 | 2020-11-27 | Strutting arrangement for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213927391U (en) |
-
2020
- 2020-11-27 CN CN202022792924.3U patent/CN213927391U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110616885A (en) | Movable overhanging working frame | |
CN201943421U (en) | Simple foldable tent | |
CN112900858A (en) | Adjustable beam bottom template supporting device | |
CN113622660B (en) | Integral hoisting type formwork structure for vertical hole and concrete construction method | |
CN213927391U (en) | Strutting arrangement for construction | |
CN213268815U (en) | Scaffold for building construction | |
CN114319823A (en) | Turnover type template operating platform | |
CN214656453U (en) | Bridge girder erection machine convenient to altitude mixture control | |
CN213356740U (en) | Simple adjustable portal frame | |
CN205935460U (en) | Folding full -automatic flexible canopy of truss -like | |
CN221372887U (en) | Platform canopy intelligence building platform truck | |
CN109537868B (en) | Portable operation platform for hoisting assembled main beams | |
CN206971699U (en) | Combination hanging basket for the construction of wet seam | |
CN211547279U (en) | Simulator boarding bridge | |
CN209891347U (en) | Pipe ditch inner formwork support device | |
CN214462389U (en) | Scaffold for building engineering | |
CN221321686U (en) | Mobile operation platform for building construction | |
CN112681712B (en) | Adjustable built on stilts building base | |
CN218438496U (en) | Metal stand is removed to guidingtype | |
CN219653539U (en) | Support frame is used in construction of multi-functional bridge of convenient regulation | |
CN219604806U (en) | Portable scaffold for house building | |
CN214118194U (en) | Supporting platform convenient to move | |
CN219909863U (en) | Scaffold based on building engineering | |
CN211775557U (en) | Folding cantilever operation platform | |
CN215632698U (en) | Supporting device convenient to fold and unfold and used for decoration transformation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210810 |