CN214937071U - System for handle abandonment fan blade in rotary kiln - Google Patents

System for handle abandonment fan blade in rotary kiln Download PDF

Info

Publication number
CN214937071U
CN214937071U CN202121134634.8U CN202121134634U CN214937071U CN 214937071 U CN214937071 U CN 214937071U CN 202121134634 U CN202121134634 U CN 202121134634U CN 214937071 U CN214937071 U CN 214937071U
Authority
CN
China
Prior art keywords
pipe
kiln
coal
rotary kiln
raw material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121134634.8U
Other languages
Chinese (zh)
Inventor
林伟荣
蔡安民
李力森
蔺雪峰
张林伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Clean Energy Research Institute
Original Assignee
Huaneng Clean Energy Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Clean Energy Research Institute filed Critical Huaneng Clean Energy Research Institute
Priority to CN202121134634.8U priority Critical patent/CN214937071U/en
Application granted granted Critical
Publication of CN214937071U publication Critical patent/CN214937071U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P40/00Technologies relating to the processing of minerals
    • Y02P40/10Production of cement, e.g. improving or optimising the production methods; Cement grinding

Landscapes

  • Muffle Furnaces And Rotary Kilns (AREA)
  • Furnace Details (AREA)

Abstract

The utility model discloses a system for handle abandonment fan blade in rotary kiln belongs to resource recovery technical field. The device comprises a blade crushing and smashing system, a raw material feeding system, a flue gas treatment system, a suspension preheater, a decomposing furnace, a rotary kiln, a clinker cooling device and a fan coal mill. The crushed waste fan blade particles are merged into a pneumatic conveying pipeline at the downstream of a fan coal mill and are conveyed into a rotary kiln together for pyrolysis and combustion, the heat value of the blade is utilized, most of glass fibers directly fall into raw materials to be burnt to form clinker, a few of glass fibers which are carried by smoke are finally separated by a multi-stage cyclone cylinder of a suspension preheater and are returned into a cement kiln, and the utilization rate of the glass fibers is extremely high. The system can realize larger processing amount of the waste blades on the premise of not influencing the normal operation of the cement kiln system, and has high flexibility in adjustment; can smoothly realize the harmless and resource treatment of the waste blades of the fan, and generates good environmental protection and economic benefits.

Description

System for handle abandonment fan blade in rotary kiln
Technical Field
The utility model belongs to the technical field of the resource recovery, concretely relates to system for handle abandonment fan blade in rotary kiln.
Background
The wind power generation industry presents a rapid development trend, the quantity of newly-added devices is continuously increased every year, on the other hand, due to the design life and other reasons, a large number of fans face elimination every year, and blade breakage caused by abnormal operation of a wind turbine generator and corner waste and defective products of blade enterprises jointly form a large number of waste/used blades (collectively called used blades) which are increasingly required to be comprehensively disposed every year.
From the material composition, the fan blade mainly comprises a composite material (epoxy resin and the like), a fiber reinforced material (such as glass fiber and the like), an adhesive (such as epoxy adhesive, polyurethane adhesive and the like), a coating and the like. The weight ratio of the organic composite material in the blade is high, and the rest is mainly glass fiber. The composite material of epoxy resin and adhesive is thermosetting plastic, and can be decomposed at high temperature to produce pyrolysis gas/oil, i.e. the pyrolysis product is flammable, at the same time, the waste and old blades contain 10% of glass fibre (calcium oxide, aluminium oxide and silicon oxide, etc.), and after extraction, it can be used for cement production.
The waste leaves are effectively recycled, so that the expectation of building an environment-friendly society is met, and the harmless recycling treatment of the waste leaves is worthy of deep exploration.
Disclosure of Invention
In order to solve the defect that exists among the above-mentioned prior art, the utility model aims to provide a system for handle abandonment fan blade in the rotary kiln has realized the innoxious and resourceful treatment of fan abandonment blade, has good environmental protection benefit and economic benefits.
The utility model discloses a following technical scheme realizes:
the utility model discloses a system for disposing waste fan blades in a rotary kiln, which comprises a blade crushing and smashing system, a raw material feeding system, a flue gas treatment system, a suspension preheater, a decomposing furnace, a rotary kiln, a clinker cooling device and a fan coal mill;
the decomposing furnace comprises a decomposing furnace barrel, and a material returning pipe, a plurality of tertiary air nozzles and a plurality of coal as fired nozzles are respectively arranged on the decomposing furnace barrel; the upper part of the decomposition furnace cylinder is connected with a flue gas pipeline, the lower part of the decomposition furnace cylinder is connected with a gradually expanding connecting flue, a swirler is arranged in the gradually expanding connecting flue and comprises a plurality of circumferentially and uniformly distributed swirl plates;
one end of the rotary kiln is connected with a smoke chamber, the other end of the rotary kiln is provided with a kiln head end plate, a kiln coal inlet nozzle is arranged on the kiln head end plate and is connected with a fan coal mill through a kiln coal inlet conveying pipe, and a third draught fan is arranged on the kiln coal inlet conveying pipe; the fan coal mill is connected with an air inlet pipe and is connected with the clinker cooling device through a coal milling exhaust pipe, and a second air feeder is arranged on the air inlet pipe; the blade crushing and crushing system is connected with a kiln coal conveying pipe;
the smoke chamber is connected with the gradually-expanded connecting flue through a rotary kiln gas flue; a clinker outlet of the rotary kiln is connected with a clinker cooling device through a clinker discharge pipe; the clinker cooling device is connected with a clinker discharge port;
the flue gas entry and the flue gas pipeline of suspension preheater are connected, go into kiln raw material exit linkage and go into kiln raw material conveyer pipe, go into kiln raw material conveyer pipe and be connected with the smoke chamber, and the returning charge export is connected with the returning charge pipe, and the raw material inlet pipe is connected with raw material feed system, and the exhanst gas outlet is connected with flue gas processing system.
Preferably, the clinker cooling device comprises a cooling chamber, the inlet end of the cooling chamber is connected with a clinker discharge pipe, the outlet end of the cooling chamber is connected with a clinker discharge port, one side of the cooling chamber is provided with a plurality of first blowers, and the other side of the cooling chamber is respectively connected with a tertiary air pipe, a secondary air pipe, a coal grinding exhaust pipe, an exhaust gas pipe and a clinker discharge port; the tertiary air pipe is connected with the tertiary air nozzle, the secondary air pipe is connected with a secondary air port of the rotary kiln, and the coal grinding pumping pipe is connected with the fan coal mill.
Further preferably, the secondary air pipe, the tertiary air pipe, the coal grinding exhaust pipe and the exhaust gas pipe are sequentially arranged from the inlet end to the outlet end of the cooling chamber respectively.
Preferably, the suspension preheater comprises a multi-stage cyclone, a flue gas inlet of the last stage cyclone is connected with a flue gas pipeline, a kiln raw material conveying pipe is connected with an outlet at the bottom of the last stage cyclone, and the kiln raw material conveying pipe is connected with the smoke chamber; the bottom outlet of the penultimate cyclone is connected with a material returning pipe; the air inlet pipe of the primary cyclone is communicated with the exhaust pipe of the secondary cyclone, the raw material feeding pipe is arranged at the joint of the air inlet pipe and the exhaust pipe, and the raw material feeding pipe is connected with the raw material feeding system; the central cylinder of the primary cyclone cylinder is connected with a flue gas treatment system.
Preferably, the blade crushing and smashing system comprises a crusher, an iron remover, a belt conveyor and a smashing machine which are connected in sequence, and the smashing machine is connected with the kiln coal conveying pipe through a third discharging auger.
Preferably, the raw material feeding system comprises a material homogenizing bin, a first packing auger, a bucket elevator and a second packing auger which are connected in sequence, wherein a feeding port is formed in the material homogenizing bin, and the second packing auger is connected with the raw material feeding pipe.
Preferably, the flue gas treatment system comprises a humidifying tower, a dust remover and a chimney which are connected in sequence, a first induced draft fan is arranged on a connecting pipeline between the humidifying tower and the dust remover, and a second induced draft fan is arranged on a connecting pipeline between the dust remover and the chimney.
Preferably, a plurality of coal as fired nozzles and a plurality of tertiary air nozzles are sequentially arranged along the decomposing furnace cylinder from top to bottom; the plurality of coal as fired nozzles and the plurality of tertiary air nozzles are respectively arranged along the outer wall of the decomposing furnace cylinder in a beveling way.
Further preferably, the plurality of coal as fired nozzles and the plurality of tertiary air nozzles are circumferentially and uniformly distributed at the same height position of the decomposition furnace cylinder respectively, and form an included angle of 45-60 degrees with the radial direction of the decomposition furnace cylinder.
Compared with the prior art, the utility model discloses following profitable technological effect has:
the utility model discloses a system for handle abandonment fan blade in rotary kiln, accomplish the pneumatic conveying pipeline that broken abandonment fan blade granule merges into fan coal pulverizer low reaches, carry pyrolysis and burning in the rotary kiln in the lump, the blade calorific value is utilized, most glass fiber is directly got into in the raw meal and is burned formation grog, a small number of glass fiber that is wrapped up in by the flue gas and is carried the area and also finally separated and loopback to the cement kiln by the multistage cyclone of suspension preheater, the glass fiber utilization ratio is high, the resource utilization of abandonment fan blade has been realized. The cyclone arranged at the bottom of the decomposing furnace ensures that the pulverized coal and the return materials can be fully pyrolyzed and combusted; on one hand, the fan coal mill can efficiently realize the sufficient crushing of raw coal, so that the formed coal powder can be sufficiently mixed in the coal conveying pipe entering the kiln; meanwhile, the fan coal mill can provide certain pressure, and the power consumption of pneumatic transmission is reduced. In addition, the hot air of the coal grinding exhaust pipe and the normal-temperature air provided by the second air feeder are mixed and then enter the fan coal mill, so that the crushing and drying of the raw coal entering the kiln in the fan coal mill are facilitated, the waste heat of the high-temperature clinker is fully utilized, and the thermal efficiency of the system is improved. The energy consumption of the system is reduced. The blade composite material is pyrolyzed and combusted in the rotary kiln environment with the temperature exceeding 1300 ℃, the generation amount of special smoke pollutants (such as dioxin and the like) is very little, and the smoke can be discharged up to the standard without adding extra smoke treatment equipment. The system can realize larger processing amount of the waste blades on the premise of not influencing the normal operation of the cement kiln system, and has high flexibility in adjustment; can smoothly realize the harmless and resource treatment of the waste blades of the fan, and generate good environmental protection benefit and economic benefit.
Furthermore, the gas in the clinker cooling device is respectively used as tertiary air of the decomposing furnace, secondary air of the rotary kiln, coal grinding air of the coal grinding system and gas of the blade particle pneumatic conveying system, so that energy in the system is fully utilized, and the energy consumption of the system is reduced.
Furthermore, the secondary air pipe, the tertiary air pipe, the coal grinding exhaust pipe and the exhaust gas pipe are sequentially arranged from the inlet end to the outlet end of the cooling chamber respectively and are sequentially arranged according to the temperature requirements, and the energy is fully and gradiently utilized.
Furthermore, the blade crushing and smashing system processes the blades into particles with smaller diameters step by step through the crusher and the smashing machine, so that full pyrolysis is facilitated; meanwhile, metal parts (such as small bolts and the like) carried in the raw materials are removed from the iron remover, so that the metal parts are prevented from flowing into the pyrolyzer and causing adverse effects on a boiler system. The belt conveyor can lift the primarily crushed blade particles to a proper height, so that the subsequent treatment of the blade particles is facilitated and the blade particles are connected into a kiln gas power conveying system.
Furthermore, the raw materials can be uniformly mixed in the homogenizing silo, which is beneficial to the subsequent preheating.
Furthermore, the flue gas is evaporated after being atomized in the humidifying tower, so that the water content of the flue gas can be improved, the temperature of part of the flue gas can be reduced, and the dust removal efficiency of the dust remover can be improved.
Furthermore, materials in the coal as fired nozzle and the tertiary air nozzle are obliquely sprayed into the decomposing furnace along the outer wall of the decomposing furnace cylinder body, so that the heat exchange strength of particles in the decomposing furnace is improved, the retention time is prolonged, the pulverized coal combustion, the pyrolysis and combustion of blade particles and the decomposition of most of carbonate in raw materials are facilitated, and the performance of the decomposing furnace is improved.
Furthermore, the coal as fired nozzles and the tertiary air nozzles are uniformly distributed in the annular direction and sprayed at an angle of 45-60 degrees, so that the coal as fired nozzles and the tertiary air nozzles are favorably and fully mixed with the rotational flow of the flue gas.
Drawings
FIG. 1 is a schematic view of the overall configuration of the system for disposing of waste fan blades in a rotary kiln according to the present invention;
FIG. 2 is a schematic structural diagram of a multistage suspension preheater according to the present invention;
FIG. 3 is a schematic structural view of the decomposing furnace of the present invention;
FIG. 4 is a schematic view of the structure and connection of a fan coal mill;
fig. 5 is a schematic view of the structure and connection of the overfire air crushing and separating device.
In the figure: 1. a material homogenizing bin; 2. a first auger; 3. a bucket elevator; 4. a second auger; 5. a suspension preheater; 6. a conveying pipe for raw materials entering the kiln; 7. a decomposing furnace; 8. a flue gas duct; 9. a material returning pipe; 10. feeding into a coal pipe of a decomposing furnace; 11. feeding the mixture into a decomposition furnace air pipe; 12. a tertiary air pipe; 13. a rotary kiln gas flue; 14. a smoking chamber; 15. a rotary kiln; 16. a clinker discharge pipe; 17. a clinker cooling device; 18. a secondary air duct; 19. a second stop valve; 20. a kiln coal conveying pipe; 21. a coal grinding air pumping pipe; 22. an exhaust gas pipe; 23. a first blower; 24. a clinker discharge port; 25. a humidifying tower; 26. a first induced draft fan; 27. a dust remover; 28. a second induced draft fan; 29. a chimney; 30. a C1 class cyclone; 31. a C2 class cyclone; 32. a C3 class cyclone; 33. a C4 class cyclone; 34. a C5 class cyclone; 35. a first shut-off valve; 36. a tertiary air nozzle; 37. a coal as fired nozzle; 38. a swirler; 39. a kiln coal injection nozzle; 40. a spinning disk; 41. a decomposing furnace cylinder; 44. a kiln head end plate; 45. a coal bunker; 46. a crusher; 47. a de-ironing separator; 48. a belt conveyor; 49. a pulverizer; 50. a third discharging auger; 51. a second blower; 52. a fan coal mill; 53. a third induced draft fan; 54. a third stop valve; 55. a fourth stop valve; 56. an air inlet pipe; 57. an exhaust pipe; 58. a discharge pipe; 59. a central barrel; 60. the connecting flue is gradually expanded; 61. a fourth discharging auger; 62. a striking wheel; 63. an over-wind crushing and separating device.
Detailed Description
The invention will be described in further detail with reference to the following drawings and specific examples, which are intended to illustrate and not to limit the invention:
referring to fig. 1, the system for disposing the waste fan blade in the rotary kiln of the present invention relies on the dry cement rotary production process, and the raw materials such as clay and limestone are crushed and then conveyed to the homogenizing silo 1 in a certain proportion for homogenizing and mixing treatment to form raw materials. The bottom of the equalizing bin 1 is provided with a discharge hole, the equalizing bin is conveyed to a bucket elevator 3 through a first auger 2, the equalizing bin is lifted to a suspension preheater 5 by the bucket elevator 3 at a certain height, and raw materials are conveyed and conveyed into the suspension preheater 5 by a second auger 4 after the bucket elevator 3 discharges the materials. By controlling the speed of the second packing auger 4 and the opening degree of the first stop valve 35, the raw material entering amount can be effectively controlled, and the smoke is prevented from being reversely mixed.
As shown in fig. 2, in an embodiment of the present invention, the suspension preheater 5 is composed of a C1-class cyclone 30, a C2-class cyclone 31, a C3-class cyclone 32, a C4-class cyclone 33 and a C5-class cyclone 34, each of the cyclones is designed as a cyclone structure with an offset central cylinder, and the cyclones are connected in series with each other, as shown in the figure, an air inlet pipe 56 of the C1-class cyclone 30 is connected to an air outlet pipe 57 of the C2-class cyclone 31, and a discharge pipe 58 of the C1-class cyclone 30 is connected to an air inlet pipe 56 of the C2-class cyclone 31; raw materials are conveyed to a proper position between an air inlet pipe 56 of the C1-level cyclone cylinder 30 and an air outlet pipe 57 of the C2-level cyclone cylinder 31 by the second packing auger 4, a raw material inlet pipe is connected, and a first stop valve 35 is arranged on the raw material inlet pipe; the separated raw material of the C4 grade cyclone cylinder 33 enters the decomposing furnace 7 through the return pipe 9, and the separated raw material of the C5 grade cyclone cylinder 34 is sent into the rotary kiln 15 through the kiln raw material conveying pipe 6 for burning.
The suspension preheater 5 preheats the raw materials by using high-temperature flue gas (1050-1300 ℃) formed by burning coal powder in the decomposing furnace 7, the flue gas is guided to flow through each cyclone cylinder by the gas guide pipe and the gas guide flue from bottom to top, the temperature of the flue gas is gradually reduced, and the temperature of the flue gas at the outlet of the C1-level cyclone cylinder 30 is 250 ℃. After entering the suspension preheater 5, raw materials are firstly contacted with lower-temperature flue gas and exchange heat, the particle size of raw materials is small, the specific surface area is large, heat exchange can be fully carried out under the high-speed airflow environment, the gravity of large particles is greater than the air drag force, the large particles directly fall into the next-stage cyclone cylinder (C2-stage cyclone cylinder 31) through the exhaust pipe 57, small particles are carried by the flue gas to enter the previous-stage cyclone cylinder (C1-stage cyclone cylinder 30), and the small particles enter the next-stage cyclone cylinder (C3-stage cyclone separator 32) through the discharge pipe after high-efficiency gas-solid separation of the cyclone cylinder, so that the raw materials are heated by the higher-temperature flue gas. The raw meal particles are heated and the processes of clay dehydration and partial decomposition of carbonate occur in the suspension preheater 5. The above steps are repeated, the temperature of the raw materials entering the kiln, which are separated by the C5 stage cyclone 34 at the tail end of the suspension preheater 5, is 1020 ℃, the dehydration and the carbonate decomposition are fully completed, the main components of the raw materials are silicon dioxide, aluminum oxide, calcium oxide and oxides of Mg and Fe, and the raw materials can be used for firing clinker.
The high-temperature heating flue gas of the suspension preheater 5 comes from the decomposing furnace 7, a coal-as-fired nozzle 37 and a tertiary air nozzle 36 are respectively connected to the decomposing furnace 7, a rotary kiln gas flue 13 is connected to the bottom, and the high-temperature flue gas (minus 1020 ℃) generated by burning clinker, waste blade particles and coal powder in the rotary kiln 15 enters the decomposing furnace 7 through a smoke chamber 14 at the kiln tail of the rotary kiln 15 and the rotary kiln gas flue 13. The coal powder injected through the coal as fired nozzle 37 is heated and combusted to release heat in an aerobic environment, and the temperature of the upper middle area of the decomposing furnace (7) is greatly improved. The raw meal delivered to the decomposing furnace 7 through the return pipe 9 of the C4 grade cyclone 33 will complete most of carbonate (CaCO) in high temperature environment3Etc.) and is carried by high-temperature flue gas to enter a suspension preheater 5 through a flue gas pipeline 8 at the front end of a C5-level cyclone 34, and finally raw materials which are dehydrated and decomposed by carbonate enter a rotary kiln 15 through a kiln raw material conveying pipe 6.
A rotary kiln 15 for firing clinker arranged obliquely at an angle, the kiln tail position passing through the smoke chamber 14 for receiving raw material entering the kiln and discharging smoke; the kiln head is provided with a kiln coal inlet nozzle 39 and a clinker discharge pipe 16. The coal entering the kiln is transported by the coal entering the kiln in a pneumatic conveying mode, the coal entering the kiln, the crushed blade particles and the coal entering the kiln are sprayed into the rotary kiln 15 under the action of the coal entering the kiln nozzle 39, meanwhile, air used for cooling clinker in the clinker cooling device 17 is extracted at a high-temperature section and is returned to the rotary kiln 15 to be used as secondary air for combustion, and the temperature of the secondary air is as high as 1100 ℃. After the coal entering the kiln is conveyed in the coal conveying pipe 20 and other parts by the coal entering the kiln for a long time, the temperature of the coal entering the kiln can reach 150-250 ℃, namely the coal entering the kiln can be rapidly heated, ignited and released heat under the high-temperature secondary air environment, and a high-temperature environment exceeding 1500 ℃ is formed in the whole rotary kiln 15 area, so that the physical and chemical reactions in the cement clinker forming process are facilitated, such as kaolin dehydration, calcium carbonate decomposition, magnesium carbonate decomposition, and the formation of important substances such as C2S, C3A, C4AF, C3S and the like.
The temperature of the clinker discharged from the clinker discharge pipe 16 exceeds 1400 ℃, the clinker enters the clinker cooling device 17 for cooling, and the first air blowers 23 with different numbers are arranged on the side part of the clinker cooling device 17 to provide large-flow air for carrying out heat convection with the clinker. The cooled clinker temperature can be reduced to about 230 ℃, and the clinker is discharged from a clinker discharge pipe 24 and made into a cement finished product by a downstream cement preparation device.
And the side part of the clinker cooling device 17 is sequentially provided with an air extraction opening, and cooling air with different temperature ranges is extracted and utilized. And a secondary air pipe 18, a tertiary air pipe 12, a coal grinding exhaust pipe 21 and an exhaust gas pipe 22 are sequentially arranged along the clinker inlet to the clinker outlet of the clinker cooling device 17. The temperature of the secondary air is 1100 ℃, the temperature of the tertiary air is 930 ℃, the temperature of the coal grinding air is 340 ℃, and the temperature of the waste gas is 240 ℃, so that the method can be used for meeting the utilization requirements of the whole rotary cement kiln system.
The waste gas of the rotary cement kiln system is led out from the central cylinder 59 of the C1-grade cyclone cylinder 30 in the suspension preheater 5 through the main exhaust pipe, the smoke temperature at the outlet of the main exhaust pipe is about 350 ℃, the smoke is pumped to the humidifying tower 25 under the action of the first induced draft fan 26, water is sprayed, atomized and evaporated, the water content of the smoke is improved, the partial smoke temperature is reduced, and the dust removal efficiency is improved. The humidified flue gas enters a downstream dust remover 27 for efficient dust removal and is introduced into a chimney 29 by a second induced draft fan 28 for emission.
In order to effectively promote the performance of the suspension preheater 5 and the decomposing furnace 7 of the rotary cement kiln system, the utility model particularly designs the decomposing furnace 7, as shown in figure 3, the main part of the decomposing furnace is a circular decomposing furnace cylinder 41, and the bottom of the decomposing furnace is connected with a rotary kiln gas flue 13. The high temperature flue gas (1020 ℃) formed in the rotary kiln 15 enters the decomposing furnace 7 through the rotary kiln gas flue 13 and the gradually expanding connecting flue 60. The cyclones 38 are arranged in the gradually-expanding connecting flue 60, and the cyclones 38 are formed by uniformly distributing 4-6 cyclone sheets 40 twisted into a certain shape. The flue gas will form a rotary upward flow in the decomposition furnace cylinder 41 by the guiding action of the cyclone sheet 40.
The decomposing furnace cylinder 41 is sequentially provided with a tertiary air nozzle 36 and a coal as fired nozzle 37 from bottom to top. The coal as fired nozzle 37 is respectively connected with the coal as fired pipe 10 and the air pipe 11 of the decomposing furnace. As shown in fig. 4, the nozzles are uniformly distributed along the circumferential direction of the decomposition furnace cylinder 41, and the nozzles should be arranged at a certain angle (45-60 °) to the radial direction, so that the pulverized coal or the air flow is obliquely sprayed into the decomposition furnace 7, is fully fused with the rotary kiln gas flowing in a rotating manner, and flows upwards in a rotating manner along the decomposition furnace cylinder 41. The number and the arrangement height of the tertiary air nozzles 36 and the coal as fired nozzles 37 need to be combined with the specific design of the decomposition furnace cylinder 41, so that the coal powder can stay for 2-3 seconds and complete the full combustion.
The coal entering the kiln is crushed by a fan coal mill 52. The hot air required by the fan coal mill 52 mainly comes from the coal-milling air extraction pipe 21 of the clinker cooling device 17, the outlet temperature of the hot air is about 340 ℃, the hot air needs to be mixed with normal-temperature air (25 ℃) provided by the second blower 51, and the flow and the temperature of the mixed air meet the operation requirement of the fan coal mill 52 through the opening control of the third stop valve 54 and the fourth stop valve 55, wherein the temperature of the mixed air can be controlled to be 150-200 ℃. As shown in fig. 4 and 5, the fan coal mill 52 is mainly composed of main components such as a side flue gas and raw coal inlet, an overfire air crushing and separating device 63, a striking wheel 62 and a driving motor. The mixed air is fed from the side flue, and a temporary storage and conveying device for coal entering the kiln is arranged above the flue. Raw coal is temporarily stored in the coal bunker 45, is conveyed by the fourth discharging auger 61 and falls into the flue, is brought into the over-wind crushing and separating device 63 by the mixed gas, and the motor drives the beating wheel 62 to realize preliminary crushing through rapid collision between blades of the beating wheel 62 and coal particles. The mixed air carries the pulverized coal particles to flow downstream, under the action of a separator at the rear end of the striking wheel 62, large-particle pulverized coal is separated and falls into the striking wheel 62 to be crushed again, and the operation is repeated, and finally the mixed air carries the pulverized coal with the particle size meeting the combustion requirement to enter the kiln coal conveying pipe 20. The diameter of the coal conveying pipe 20 entering the kiln is about 300mm, the temperature of internal airflow is 150-200 ℃, the airflow speed is 20-25 m/s, and long-distance conveying is achieved under the conveying power provided by a third induced draft fan 53. The coal powder is delivered to the kiln head area of the rotary kiln 15 and is sprayed into the rotary kiln 15 through the action of a plurality of kiln coal inlet nozzles 39 arranged on the kiln head end surface 44, so that the rapid combustion is realized and the burning of clinker is participated.
The waste blades are divided into sections 2-3 meters long in length in a wind power plant/blade enterprise and then are intensively transported to the site of a cement plant for temporary storage. When the rotary cement kiln system operates, the sectional blades are sent into the crusher 46, the blades are primarily crushed into massive raw materials with the length of 2-3 cm through a mechanical structure formed by mutually meshing and cutting in the crusher 46, the massive raw materials are discharged from an outlet of the crusher 46 after being crushed and directly fall into the downstream iron remover 47, an electromagnetic adsorption system is arranged in the iron remover 47, metal pieces (such as small bolts and the like) carried in the raw materials can be adsorbed, and the situation that metal devices flow into the downstream system to influence the normal operation of the system is avoided. A belt conveyer 48 is arranged below the outlet of the iron remover 47, and the purpose of the belt conveyer is to lift the primarily crushed blade particles to a proper height, so as to facilitate the subsequent treatment of the blade particles and connect the blade particles into a kiln gas power conveying system. A crusher 49 is connected downstream of the belt conveyor 48, and the crusher 49 can further crush the lump raw material into leaf particles having an average particle size of-2 mm. The particles are discharged from the crusher 49 by a third discharge auger 50.
A connecting pipe is arranged at a proper position of the coal conveying pipe 20 entering the kiln, which is close to the fan coal mill 52, and is directly connected to the outlet of the third discharging auger 50, and the blade particle treatment capacity is controlled by adjusting the opening degree of the second stop valve 19 and the operation of the third discharging auger 50. After falling into the kiln, the blade particles are also pneumatically conveyed under the action of high-speed airflow in the kiln coal conveying pipe 20, can be relatively uniformly mixed with pulverized coal in the whole conveying process, and finally enter the rotary kiln 15 through the kiln coal inlet nozzle 39.
The sprayed vane particles are heated rapidly due to the high temperature environment generated by the heat release of the fuel in the rotary kiln 15, the organic composite material contained in the particles is heated and decomposed, and the cracking products are ignited, so that the vane particles are ignited like coal powder until being burnt out. I.e. the organic composite material in the blade particles forms smoke and releases heat. After the combustible is cracked/combusted, the residual glass fiber, the combusted coal powder and ash slag formed by the combustion of the coal powder fall into raw materials together, or flow through the decomposing furnace 7 and the suspension preheater 5, are separated and returned to the rotary kiln 15, are burnt into clinker together and are discharged through a clinker discharge pipe 16.
It should be noted that the above description is only a part of the embodiments of the present invention, and equivalent changes made by the system described in the present invention are all included in the protection scope of the present invention. The technical field of the present invention can be replaced by other embodiments described in a similar manner, without departing from the structure of the present invention or exceeding the scope defined by the claims, which belong to the protection scope of the present invention.

Claims (9)

1. A system for disposing waste fan blades in a rotary kiln is characterized by comprising a blade crushing and smashing system, a raw material feeding system, a flue gas treatment system, a suspension preheater (5), a decomposing furnace (7), a rotary kiln (15), a clinker cooling device (17) and a fan coal mill (52);
the decomposing furnace (7) comprises a decomposing furnace cylinder body (41), and a material return pipe (9), a plurality of tertiary air nozzles (36) and a plurality of coal as fired nozzles (37) are respectively arranged on the decomposing furnace cylinder body (41); the upper part of the decomposition furnace cylinder body (41) is connected with a flue gas pipeline (8), the lower part of the decomposition furnace cylinder body is connected with a gradually expanding connecting flue (60), a swirler (38) is arranged in the gradually expanding connecting flue (60), and the swirler (38) comprises a plurality of circumferentially and uniformly distributed swirl plates (40);
one end of the rotary kiln (15) is connected with a smoke chamber (14), the other end of the rotary kiln is provided with a kiln head end plate (44), a kiln coal inlet nozzle (39) is arranged on the kiln head end plate (44), the kiln coal inlet nozzle (39) is connected with a fan coal mill (52) through a kiln coal inlet conveying pipe (20), and a third induced draft fan (53) is arranged on the kiln coal inlet conveying pipe (20); the fan coal mill (52) is connected with an air inlet pipe and is connected with the clinker cooling device (17) through a coal milling exhaust pipe (21), and a second blower (51) is arranged on the air inlet pipe; the blade crushing and smashing system is connected with a kiln coal conveying pipe (20);
the smoke chamber (14) is connected with the gradually expanding connecting flue (60) through a rotary kiln gas flue (13); a clinker outlet of the rotary kiln (15) is connected with a clinker cooling device (17) through a clinker discharge pipe (16); the clinker cooling device (17) is connected with a clinker discharge port (24);
the flue gas entry and the flue gas pipeline (8) of suspension preheater (5) are connected, go into kiln raw material exit linkage and go into kiln raw material conveyer pipe (6), go into kiln raw material conveyer pipe (6) and be connected with smoke chamber (14), and the returning charge export is connected with returning charge pipe (9), and the raw material inlet pipe is connected with raw material feed system, and the exhanst gas outlet is connected with flue gas treatment system.
2. The system for disposing waste fan blades in a rotary kiln as claimed in claim 1, wherein the clinker cooling device (17) comprises a cooling chamber, the inlet end of the cooling chamber is connected with a clinker discharge pipe (16), the outlet end of the cooling chamber is connected with a clinker discharge port (24), one side of the cooling chamber is provided with a plurality of first blowers (23), and the other side is respectively connected with a tertiary air pipe (12), a secondary air pipe (18), a coal grinding exhaust pipe (21), an exhaust gas pipe (22) and the clinker discharge port (24); the tertiary air pipe (12) is connected with the tertiary air nozzle (36), the secondary air pipe (18) is connected with a secondary air port of the rotary kiln (15), and the coal grinding extraction pipe (21) is connected with a fan coal mill (52).
3. The system for disposing waste fan blades in a rotary kiln as claimed in claim 2, wherein the secondary air duct (18), the tertiary air duct (12), the pulverized coal extraction duct (21) and the exhaust air duct (22) are sequentially provided along an inlet end to an outlet end of the cooling chamber, respectively.
4. The system for disposing of waste fan blades in a rotary kiln as claimed in claim 1, wherein the suspension preheater (5) comprises a multi-stage cyclone, the flue gas inlet of the last stage cyclone is connected to the flue gas duct (8), the outlet at the bottom of the last stage cyclone is connected to the kiln raw material feeding pipe (6), and the kiln raw material feeding pipe (6) is connected to the smoke chamber (14); the bottom outlet of the penultimate cyclone cylinder is connected with a material return pipe (9); the air inlet pipe (56) of the primary cyclone is communicated with the exhaust pipe (57) of the secondary cyclone, the raw material feeding pipe is arranged at the joint of the air inlet pipe (56) and the exhaust pipe (57), and the raw material feeding pipe is connected with a raw material feeding system; the central cylinder (59) of the primary cyclone cylinder is connected with the flue gas treatment system.
5. The system for disposing the waste fan blade in the rotary kiln as claimed in claim 1, wherein the blade crushing and pulverizing system comprises a crusher (46), an iron remover (47), a belt conveyor (48) and a pulverizer (49) which are connected in sequence, and the pulverizer (49) is connected with the kiln coal conveying pipe (20) through a third discharging auger (50).
6. The system for disposing the waste fan blade in the rotary kiln according to claim 1, wherein the raw material feeding system comprises a material homogenizing bin (1), a first packing auger (2), a bucket elevator (3) and a second packing auger (4) which are connected in sequence, a feeding port is arranged on the material homogenizing bin (1), and the second packing auger (4) is connected with the raw material feeding pipe.
7. The system for disposing the waste fan blade in the rotary kiln according to claim 1, wherein the flue gas treatment system comprises a humidifying tower (25), a dust remover (27) and a chimney (29) which are connected in sequence, a first induced draft fan (26) is arranged on a connecting pipeline between the humidifying tower (25) and the dust remover (27), and a second induced draft fan (28) is arranged on a connecting pipeline between the dust remover (27) and the chimney (29).
8. The system for disposing waste fan blades in a rotary kiln as claimed in claim 1, wherein a plurality of coal-as-fired nozzles (37) and a plurality of tertiary air nozzles (36) are arranged in sequence from top to bottom along the decomposing furnace cylinder (41); the plurality of coal as fired nozzles (37) and the plurality of tertiary air nozzles (36) are respectively arranged along the outer wall of the decomposition furnace cylinder body (41) in a beveling direction.
9. The system for disposing waste fan blades in a rotary kiln as claimed in claim 8, wherein the plurality of coal-as-fired nozzles (37) and the plurality of tertiary air nozzles (36) are circumferentially and uniformly distributed at the same height position of the decomposing furnace cylinder (41) and form an angle of 45-60 ° with the radial direction of the decomposing furnace cylinder (41).
CN202121134634.8U 2021-05-25 2021-05-25 System for handle abandonment fan blade in rotary kiln Active CN214937071U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121134634.8U CN214937071U (en) 2021-05-25 2021-05-25 System for handle abandonment fan blade in rotary kiln

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121134634.8U CN214937071U (en) 2021-05-25 2021-05-25 System for handle abandonment fan blade in rotary kiln

Publications (1)

Publication Number Publication Date
CN214937071U true CN214937071U (en) 2021-11-30

Family

ID=79059384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121134634.8U Active CN214937071U (en) 2021-05-25 2021-05-25 System for handle abandonment fan blade in rotary kiln

Country Status (1)

Country Link
CN (1) CN214937071U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113149482A (en) * 2021-05-25 2021-07-23 中国华能集团清洁能源技术研究院有限公司 System for treating waste fan blade in rotary kiln and working method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113149482A (en) * 2021-05-25 2021-07-23 中国华能集团清洁能源技术研究院有限公司 System for treating waste fan blade in rotary kiln and working method thereof

Similar Documents

Publication Publication Date Title
CN113217936A (en) System for treating waste fan blade in decomposing furnace and working method thereof
CN113046107B (en) Waste fan blade pyrolysis recovery system and working method thereof
CN113294784A (en) Rotary cement kiln system for disposing waste fan blades and working method thereof
CN113020215B (en) System for extracting glass fibers and pyrolysis oil from fan blade and working method thereof
CN101870897B (en) Process for carrying out strengthening circulation, stage grinding and quality improvement on lignite by utilizing superheated steam and system thereof
CN112268284A (en) Circulating fluidized bed boiler system for incinerating waste blades and working method thereof
CN113149482A (en) System for treating waste fan blade in rotary kiln and working method thereof
CN212408675U (en) Novel sludge drying and incinerating system
CN214937071U (en) System for handle abandonment fan blade in rotary kiln
CN111649334A (en) Novel sludge drying and incinerating system and method
CN214937072U (en) System for resource utilization of waste blades in rotary kiln
JP2008260647A (en) Method of utilization of waste oil-based waste
CN113121135A (en) System for resource utilization of waste blades in rotary kiln and working method thereof
CN109812830A (en) A kind of biologic grain and coal-fired coupled electricity-generation system and method
CN214840937U (en) System for handle abandonment fan blade in dore furnace
CN102330972B (en) Powder body combustion system of industrial kiln
CN218811426U (en) Municipal mummification mud device is dealt with in coordination to cement kiln
CN201753345U (en) Superheated steam reinforced circulation graded crushing upgrading system for lignite
CN102721041A (en) Online low-nitrogen oxygen-rich combined combustion energy-saving system
CN102889584A (en) Biomass particle and powder dual-purpose burner
CN212293283U (en) Efficient anti-blocking entrained flow bed sludge drying and incinerating system
CN213746753U (en) Circulating fluidized bed boiler system for burning waste blades
CN112624637B (en) High-activity steel slag micro powder preparation system
CN212284042U (en) Quick entrained flow sludge drying burns simple and easy device
CN102654283B (en) Cyclone combustion system for coal slag powder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant