CN214885474U - Construction hydraulic pressure template climbing device - Google Patents

Construction hydraulic pressure template climbing device Download PDF

Info

Publication number
CN214885474U
CN214885474U CN202121470614.8U CN202121470614U CN214885474U CN 214885474 U CN214885474 U CN 214885474U CN 202121470614 U CN202121470614 U CN 202121470614U CN 214885474 U CN214885474 U CN 214885474U
Authority
CN
China
Prior art keywords
plate
mounting plate
template
climbing device
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121470614.8U
Other languages
Chinese (zh)
Inventor
邱玉兴
宁文龙
齐嘉明
王元旭
尹志高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB Sixth Engineering Co Ltd
Original Assignee
CCCC SHB Sixth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB Sixth Engineering Co Ltd filed Critical CCCC SHB Sixth Engineering Co Ltd
Priority to CN202121470614.8U priority Critical patent/CN214885474U/en
Application granted granted Critical
Publication of CN214885474U publication Critical patent/CN214885474U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a building construction hydraulic template climbing device, which relates to the technical field of building construction, comprising a concrete wall body, wherein the right side of the concrete wall body is provided with a climbing guide rail through a wall attaching component, the right side surface of the climbing guide rail is connected with a triangular bracket in a sliding way, the top of the triangular bracket is fixed with a platform plate, the upper end surface of the platform plate is provided with a fixed plate, the upper end surface of the fixed plate is connected with a supporting plate in a sliding way, the left side wall of the supporting plate is fixed with a first mounting plate, the top of the first mounting plate is fixedly connected with a second mounting plate through a connecting plate, and the opposite sides of the second mounting plate and the first mounting plate are provided with template bodies, the utility model has simple structure and reasonable design, can realize the pouring of concrete wall bodies with different thicknesses, has good mold closing effect, and is simple and convenient in mold closing and mold removing processes, and saves a large number of complicated steps, the construction difficulty is reduced, the construction efficiency is improved, and the construction method has high practicability and high safety.

Description

Construction hydraulic pressure template climbing device
Technical Field
The utility model relates to a construction technical field, in particular to construction hydraulic template climbing device.
Background
Climbing formwork (also called as creeping formwork abroad) is an effective formwork system for engineering construction of reinforced concrete structures of shear concrete wall systems and cylinder systems, is often applied to high-rise buildings and high-volume structure construction, and has been widely popularized and applied in various countries in the world.
Present template climbing device is when the construction, when pouring the concrete, most can only carry out the concrete wall body of fixed width and pour, can't effectively deal with the condition that often needs pour the concrete wall body of different thickness among the practical application, the practicality is poor, a plurality of parts of burying are commonly used to the template in addition fixed, the operation process is loaded down with trivial details, and the part of burying can be preserved in the concrete wall, both caused the waste of material, also influence the overall structure intensity of concrete wall, traditional form removal and compound die process need a large amount of manual operation simultaneously, the construction is complicated and inefficiency.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a construction hydraulic pressure template climbing device can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a building construction hydraulic template climbing device comprises a concrete wall body, wherein a climbing guide rail is arranged on the right side of the concrete wall body through a wall attaching assembly, at least two groups of climbing guide rails are arranged and arranged in a front-back parallel mode, an upper reversing box and a lower reversing box are connected to the right side surface of the climbing guide rail in a sliding mode, a hydraulic rod is arranged between the two reversing boxes, a triangular support is connected to the right side surface of the climbing guide rail in a sliding mode through a sliding rail, a platform plate is fixed to the top of the triangular support, a fixing plate is arranged on the upper end face of the platform plate, at least two reversing boxes are arranged and arranged in a front-back parallel mode, a sliding groove is formed in the upper end surface of the fixing plate, two sliding blocks matched with the sliding groove are connected to the inner side of the sliding groove in a sliding mode, a servo motor is arranged on the right side of the fixing plate, and a rotary threaded rod is fixedly connected to an output port of the servo motor, rotatory threaded rod extends to the inboard of spout and with two slider threaded connection, two be fixed with same backup pad between the top of slider, the left side wall of backup pad is fixed with first mounting panel, the right side wall bottom of first mounting panel is connected with the left side outer wall of backup pad, install the stupefied bracing in the back of the body between the right side outer wall upper end of first mounting panel and the up end of backup pad, connecting plate fixedly connected with second mounting panel is passed through at the top of first mounting panel, first mounting panel and second mounting panel are relative setting, the template body is all installed to the relative one side of second mounting panel and first mounting panel, are located the left side install a plurality of hydraulic jack between template body and the second mounting panel, are located the right side the template body bonds on the surface of first mounting panel.
Preferably, the top of the concrete wall body is exposed with a reinforcing steel bar head.
Preferably, reinforcing ribs are welded at the fixed connection positions of the bottom end of the right side wall of the first mounting plate and the support plate.
Preferably, a vibration motor is arranged on the outer wall of the left side of the template body on the left side.
Preferably, the upper surface of the platform plate is carved with anti-skid lines.
Preferably, the slide rail is provided with an upper slide rail and a lower slide rail, and the bottom of the slide rail above the upper slide rail is fixedly connected with the reversing box through a bolt.
Preferably, a guard rail is installed at the edge position of the right side of the upper end face of the platform plate, and a protective net is bolted to the guard rail.
Preferably, the connecting plate comprises a rectangular frame, and a feed opening is formed in the middle of the rectangular frame.
Preferably, the bottom of landing slab installs the hanging flower basket through the gallows, be connected with the steel wire hawser between the other end at hanging flower basket top and the bottom of landing slab.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model can change the distance between the two template bodies through the arranged hydraulic jack, thereby changing the thickness of the poured concrete wall body, and coping with the situation that concrete wall bodies with different thicknesses are often required to be poured in actual situations, thereby improving the practicability of the device;
2. the utility model discloses a connecting plate that sets up can make two template bodies climb simultaneously, has saved the loaded down with trivial details of both sides simultaneous construction operation, and the hydraulic jack and the servo motor of setting can make the fastening between two template bodies, need not to use and bury the piece and fix, both avoid the waste of material, have also guaranteed concrete wall's overall structure intensity, also make the compound die more simple and convenient with the form removal simultaneously, have reduced the degree of difficulty of construction, have improved the efficiency of construction.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a sectional view of the whole structure of the fixing plate of the present invention;
FIG. 3 is a schematic view of the overall structure of the connecting plate of the present invention;
fig. 4 is an enlarged schematic view of the structure of part a of the present invention.
In the figure: 1. a concrete wall; 2. a wall attachment assembly; 3. climbing a guide rail; 301. a slide rail; 4. a triangular bracket; 5. a platform plate; 501. protecting the fence; 502. a protective net; 503. a hanging basket; 504. a hanger; 505. a steel wire cable; 6. a fixing plate; 601. a chute; 602. a slider; 7. a servo motor; 701. rotating the threaded rod; 8. a support plate; 9. a first mounting plate; 901. a dorsal bar diagonal bracing; 902. a connecting plate; 903. a rectangular frame; 904. a feeding port; 10. a template body; 11. a second mounting plate; 12. a reinforcing bar head; 13. a vibration motor; 14. reinforcing ribs; 15. a hydraulic jack; 16. a hydraulic lever; 17. and a reversing box.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-4, a building construction hydraulic formwork climbing device includes a concrete wall 1, a climbing rail 3 is installed on the right side of the concrete wall 1 through a wall attaching assembly 2, at least two sets of climbing rails 3 are arranged and arranged in parallel in the front-rear direction, an upper reversing box 17 and a lower reversing box 17 are connected on the right side surface of the climbing rail 3 in a sliding manner, a hydraulic rod 16 is installed between the two reversing boxes 17, a triangular bracket 4 is connected on the right side surface of the climbing rail 3 in a sliding manner through a sliding rail 301, a platform plate 5 is fixed on the top of the triangular bracket 4, a fixing plate 6 is installed on the upper end surface of the platform plate 5, at least two sets of the fixing plate 6 are arranged in parallel in the front-rear direction, a sliding groove 601 is formed on the upper end surface of the fixing plate 6, two sliding blocks 602 matched with the sliding groove 601 are connected on the inner side of the sliding groove 601 in a sliding manner, and a servo motor 7 is installed on the right side of the fixing plate 6, the output port of the servo motor 7 is fixedly connected with a rotary threaded rod 701, the rotary threaded rod 701 extends to the inner side of the sliding groove 601 and is in threaded connection with the two sliding blocks 602, the same supporting plate 8 is fixed between the tops of the two sliding blocks 602, the left side wall of the supporting plate 8 is fixed with a first mounting plate 9, the bottom end of the right side wall of the first mounting plate 9 is connected with the left side outer wall of the supporting plate 8, a back ridge inclined strut 901 is installed between the upper end of the right side outer wall of the first mounting plate 9 and the upper end face of the supporting plate 8, the top of the first mounting plate 9 is fixedly connected with a second mounting plate 11 through a connecting plate 902, the first mounting plate 9 and the second mounting plate 11 are oppositely arranged, a template body 10 is installed on one opposite side of the second mounting plate 11 and the first mounting plate 9, and a plurality of hydraulic jacks 15 are installed between the template body 10 and the second mounting plate 11 on the left side, the formwork body 10 on the right side is bonded to the surface of the first mounting plate 9.
The top of the concrete wall body 1 is exposed with a reinforcing steel bar head 12, so that reinforcing steel bars can be conveniently bound.
Reinforcing ribs 14 are welded at the fixed connection positions of the bottom end of the right side wall of the first mounting plate 9 and the support plate 8, so that the support plate 8 can stably support the first mounting plate 9, and the die assembly effect is guaranteed.
And a vibrating motor 13 is arranged on the outer wall of the left side of the template body 10, so that poured concrete can be tamped, and a gap is prevented from being left in the concrete wall body 1.
The upper surface of landing slab 5 is carved with anti-skidding line, prevents that constructor from taking place the phenomenon that the sole skidded on landing slab 5, has improved the security performance.
The slide rail 301 is provided with an upper slide rail and a lower slide rail, the bottom of the slide rail 301 above is fixedly connected with the reversing box 17 through a bolt, the lifting effect of the hydraulic rod 16 on the platform plate 5 is realized, and the climbing operation of the template body 10 is realized.
Guard rails 501 are arranged at the edge positions of the right side of the upper end face of the platform plate 5, and protective nets 502 are bolted to the guard rails 501, so that the safety protection performance of constructors is greatly improved.
The connecting plate 902 comprises a rectangular frame 903, and a feed opening 904 is formed in the middle of the rectangular frame 903, so that concrete pouring operation is facilitated.
A hanging basket 503 is installed at the bottom of the platform plate 5 through a hanging bracket 504, and a steel wire cable 505 is connected between the other end of the top of the hanging basket 503 and the bottom of the platform plate 5, so that the wall-attached component 2 is convenient to disassemble, and the turnover use is convenient.
It should be noted that, the utility model relates to a building construction hydraulic template climbing device, when in use, the reversing box 17 above the hydraulic rod 16 is fixedly connected with the slide rail 301 through the bolt, the platform board 5 is made to climb continuously under the action of the hydraulic rod 16 and the reversing box 17, the two template bodies 10 are lifted simultaneously under the action of the connecting plate 902, the traditional mode of climbing operation on both sides is changed, the construction difficulty is reduced, after climbing to a proper height, the servo motor 7 is started, the rotary threaded rod 701 rotates to drive the slide block 602 to move forward, so that the support plate 8 drives the first mounting plate 9 to move, the left outer wall of the first mounting plate 9 is bonded with the template bodies 10 to move left, the left template bodies 10 are moved right under the action of the hydraulic jack 15, the lower ends of the two template bodies 10 are respectively abutted against the upper ends of the outer walls on both sides of the concrete wall 1, the die assembly is completed, the distance between the two die plate bodies 10 can be changed in this way, so that the thickness of the poured concrete wall 1 is changed, the situation that concrete walls 1 with different thicknesses are required to be poured in actual situations is met, the practicability of the device is improved, reinforcing ribs 14 are welded at the fixed connection positions of the bottom ends of the right side walls of the first mounting plates 9 and the supporting plates 8, the supporting plates 8 can stably support the first mounting plates 9, so that the die assembly effect is ensured, reinforcing steel bars are bound after the die assembly is completed, the concrete is poured, reinforcing steel bar heads 12 exposed at the tops of the concrete walls 1 can conveniently bind the reinforcing steel bars, the connecting plate 902 comprises a rectangular frame 903, a feed opening 904 is arranged in the middle of the rectangular frame 903, the concrete pouring operation can be conveniently carried out through the feed opening 904 on the premise that the fixed connection effect of the connecting plate 902 is ensured, and a vibration motor 13 is arranged on the outer wall of the die plate body 10 on the left side, the concrete can be tamped, gaps are prevented from being left in the concrete wall 1, the phenomenon that the formed concrete wall 1 has empty valleys is avoided, workers can carry out construction operation on the platform plate 5, anti-slip lines engraved on the surface of the platform plate 5 can prevent the phenomenon that the bottoms of the feet of the workers slip during construction, safety accidents are avoided, the protective guard 501 is installed at the edge position of the right side of the upper end surface of the platform plate 5, the protective guard 501 is bolted with the protective guard 502, the safety of the device during use can be greatly improved, when the poured concrete reaches the strength, the two formwork bodies 10 move outwards under the action of the hydraulic jack 15 and the servo motor 7 respectively to complete formwork removal, the hydraulic jack 15 and the servo motor 7 arranged in the device enable the steps of formwork closing and removing to be simpler and more convenient, the construction difficulty is greatly reduced, and the construction efficiency is improved, in addition, a large number of embedded parts are not needed to be used for fixing the two template bodies 10 in the die assembling process, material waste is avoided, the influence of the embedded parts left in a concrete wall body on the strength of the whole structure is avoided, after the die is disassembled, guide rails are lifted, then the wall attaching assembly 2 is detached for turnover, the hanging basket 503 installed at the bottom of the platform board 5 through the hanging bracket 504 can be convenient for workers to detach the wall attaching assembly 2, the steel wire cable 505 connected between the other end of the top of the hanging basket 503 and the bottom of the platform board 5 can enable the hanging basket 503 to be stressed evenly, and safety protection performance is improved.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (9)

1. The utility model provides a construction hydraulic template climbing device, includes concrete wall (1), its characterized in that: the climbing guide rail structure is characterized in that climbing guide rails (3) are installed on the right side of the concrete wall body (1) through a wall attaching assembly (2), at least two groups of the climbing guide rails (3) are arranged in parallel in the front and back direction, the right side surface of the climbing guide rail (3) is connected with an upper reversing box and a lower reversing box (17) in a sliding manner, a hydraulic rod (16) is installed between the two reversing boxes (17), the right side surface of the climbing guide rail (3) is connected with a triangular support (4) in a sliding manner through a sliding rail (301), a platform plate (5) is fixed on the top of the triangular support (4), a fixing plate (6) is installed on the upper end surface of the platform plate (5), at least two fixing plates (6) are arranged in parallel in the front and back direction, a sliding groove (601) is formed in the upper end surface of the fixing plate (6), and two sliding blocks (602) matched with the sliding groove (601) are connected to the inner side of the sliding groove (601) in a sliding manner, the servo motor (7) is installed on the right side of the fixing plate (6), a rotary threaded rod (701) is fixedly connected to an output port of the servo motor (7), the rotary threaded rod (701) extends to the inner side of the sliding groove (601) and is in threaded connection with the two sliding blocks (602), a same supporting plate (8) is fixed between the tops of the two sliding blocks (602), a first mounting plate (9) is fixed on the left side wall of the supporting plate (8), the bottom end of the right side wall of the first mounting plate (9) is connected with the left side outer wall of the supporting plate (8), a back ridge inclined strut (901) is installed between the upper end of the right side outer wall of the first mounting plate (9) and the upper end face of the supporting plate (8), a second mounting plate (11) is fixedly connected with the top of the first mounting plate (9) through a connecting plate (902), and the first mounting plate (9) and the second mounting plate (11) are arranged oppositely, template body (10) are all installed to the relative one side of second mounting panel (11) and first mounting panel (9), are located the left side install a plurality of hydraulic jack (15) between template body (10) and second mounting panel (11), are located the right side template body (10) bond on the surface of first mounting panel (9).
2. The building construction hydraulic template climbing device according to claim 1, characterized in that: the top of the concrete wall body (1) is exposed with a reinforcing steel bar head (12).
3. The building construction hydraulic template climbing device according to claim 1, characterized in that: and reinforcing ribs (14) are welded at the fixed connection part of the bottom end of the right side wall of the first mounting plate (9) and the support plate (8).
4. The building construction hydraulic template climbing device according to claim 1, characterized in that: and a vibrating motor (13) is arranged on the outer wall of the left side of the template body (10) on the left side.
5. The building construction hydraulic template climbing device according to claim 1, characterized in that: the upper surface of the platform plate (5) is carved with anti-skid lines.
6. The building construction hydraulic template climbing device according to claim 1, characterized in that: the slide rail (301) is provided with an upper slide rail and a lower slide rail, and the bottom of the slide rail (301) is fixedly connected with the reversing box (17) through a bolt.
7. The building construction hydraulic template climbing device according to claim 1, characterized in that: guard rails (501) are installed at the edge of the right side of the upper end face of the platform plate (5), and a protective net (502) is bolted to the guard rails (501).
8. The building construction hydraulic template climbing device according to claim 1, characterized in that: the connecting plate (902) comprises a rectangular frame (903), and a feed opening (904) is arranged in the middle of the rectangular frame (903).
9. The building construction hydraulic template climbing device according to claim 1, characterized in that: a hanging basket (503) is installed at the bottom of the platform plate (5) through a hanging bracket (504), and a steel wire cable (505) is connected between the other end of the top of the hanging basket (503) and the bottom of the platform plate (5).
CN202121470614.8U 2021-06-30 2021-06-30 Construction hydraulic pressure template climbing device Active CN214885474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121470614.8U CN214885474U (en) 2021-06-30 2021-06-30 Construction hydraulic pressure template climbing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121470614.8U CN214885474U (en) 2021-06-30 2021-06-30 Construction hydraulic pressure template climbing device

Publications (1)

Publication Number Publication Date
CN214885474U true CN214885474U (en) 2021-11-26

Family

ID=78928921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121470614.8U Active CN214885474U (en) 2021-06-30 2021-06-30 Construction hydraulic pressure template climbing device

Country Status (1)

Country Link
CN (1) CN214885474U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673343A (en) * 2022-03-18 2022-06-28 顾建亮 Portable hydraulic self-climbing formwork
CN115929022A (en) * 2023-02-24 2023-04-07 中国十七冶集团有限公司 Building construction creeping formwork device and using method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673343A (en) * 2022-03-18 2022-06-28 顾建亮 Portable hydraulic self-climbing formwork
CN114673343B (en) * 2022-03-18 2024-02-27 顾建亮 Portable hydraulic self-climbing formwork
CN115929022A (en) * 2023-02-24 2023-04-07 中国十七冶集团有限公司 Building construction creeping formwork device and using method

Similar Documents

Publication Publication Date Title
CN214885474U (en) Construction hydraulic pressure template climbing device
CN2773156Y (en) Integrated template of cast-in-situs concrete barrier for bridge
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN103774561A (en) Streamline operation construction method of precast small box girders for highway in assembling mode
CN201106282Y (en) Post-irrigating band, construction joint plate side module
CN111113628B (en) Construction method for spraying prefabricated T-shaped beam
CN110629793A (en) Rapid supporting die frame for pipe gallery and construction method thereof
CN214497202U (en) Strutting arrangement is used in construction of steel-concrete composite beam decking
CN211547809U (en) Pipe gallery is with supporting die carrier fast
CN109457960B (en) Adjustable universal mold for integrally assembling cast-in-situ stair steps
CN107217601A (en) A kind of I beam bridges panel construction method
CN201280693Y (en) Totally enclosed hanging basket
CN201137298Y (en) Post pouring strip, construction joint side steel die
CN205976472U (en) Pour mould of building post -cast strip
CN108798714A (en) A kind of working portable shifting formwork trolley of channel wall body and its construction method
CN114908684A (en) Construction method of suspended casting box girder cradle method
CN210596877U (en) Assembled concrete structural slab of interim road of foundation ditch
CN113931444A (en) Post-cast edge beam integral type formwork structure and construction method thereof
CN210031563U (en) Quick construction equipment of mobilizable modularization box culvert
CN2434378Y (en) Creeping formwork construction appts for column shape building
CN208456117U (en) A kind of post-cast strip overhanging end independent support device
CN206205434U (en) Monoblock type aluminum alloy pattern plate stair continuously poured in one molding structure
CN205875724U (en) Concrete placement formwork support
CN107142961B (en) Concrete pouring integral movable formwork
CN110844768A (en) Culvert pipe overhead hoist for construction