CN214834656U - Pre-buried connecting device of concrete building scaffold - Google Patents

Pre-buried connecting device of concrete building scaffold Download PDF

Info

Publication number
CN214834656U
CN214834656U CN202120110905.XU CN202120110905U CN214834656U CN 214834656 U CN214834656 U CN 214834656U CN 202120110905 U CN202120110905 U CN 202120110905U CN 214834656 U CN214834656 U CN 214834656U
Authority
CN
China
Prior art keywords
connecting device
fixed
concrete building
building scaffold
fly leaf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120110905.XU
Other languages
Chinese (zh)
Inventor
王俊卓
黄坤腾
刘鹏
吴骏冲
李晋权
陈思逸
刘健成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Industrial Construction Group Co Ltd HICC
Original Assignee
Hubei Industrial Construction Group Co Ltd HICC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Industrial Construction Group Co Ltd HICC filed Critical Hubei Industrial Construction Group Co Ltd HICC
Priority to CN202120110905.XU priority Critical patent/CN214834656U/en
Application granted granted Critical
Publication of CN214834656U publication Critical patent/CN214834656U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model provides a pre-buried connecting device of concrete building scaffold, including the connecting device body, the connecting device body includes the base, the welding has the fixed plate on the base, the welding has the bracing piece on the fixed plate, it has the fixed slot to open on the bracing piece, the internally mounted of fixed slot has the fly leaf, the inside at the fixed slot is installed through the dwang to the fly leaf, magnet is installed to fly leaf top one side, the fly leaf passes through the inside that magnet is spacing at the fixed slot, and this pre-buried connecting device of concrete building scaffold when using when needs adjustment height, through upwards lifting up the movable rod, makes draw-in groove and lug phase separation, presses down after the removal adjustment and makes draw-in groove and lug cooperate fixedly, is convenient for adjust the use highly.

Description

Pre-buried connecting device of concrete building scaffold
Technical Field
The utility model relates to a construction scaffolding equipment for connecting field specifically is a concrete building scaffolding pre-buried connecting device.
Background
Scaffold frame refers to the construction site and is used in the outer wall, interior decoration or the higher place that can't directly be under construction of floor height for the workman operation and solve perpendicular and horizontal transportation and set up various supports, the general term of building boundary, it is used in the building site mainly for constructor's upper and lower dry life or peripheral safety net enclosure and high altitude installation component etc. in the building engineering, often need place scaffold frame connecting device in the concrete before fixed, fix the connecting piece after solidifying through the concrete, be convenient for later stage to set up scaffold frame, when current connecting piece is pre-buried, fix through directly placing the steel pipe in the middle of the concrete, need cut through cutting device after scaffold frame demolishs, it is inconvenient to use, in addition, current pre-buried connecting frame can't adjust the height, can't satisfy the needs under the different situation, the function is single.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a pre-buried connecting device of concrete building scaffold to solve the problem that proposes in the above-mentioned background art, the utility model discloses novel structure removes in the inside of dead lever through the movable rod during use, carries out high fixed through draw-in groove and lug, satisfies the adjustment under the co-altitude and uses.
In order to achieve the above purpose, the present invention is realized by the following technical solution: the utility model provides a pre-buried connecting device of concrete building scaffold, includes the connecting device body, the connecting device body includes the base, the welding has the fixed plate on the base, the welding has the bracing piece on the fixed plate, it has the fixed slot to open on the bracing piece, the internally mounted of fixed slot has the fly leaf, the inside at the fixed slot is installed through the dwang to the fly leaf, magnet is installed to fly leaf top one side, the fly leaf passes through the inside that magnet is spacing at the fixed slot, the internally mounted of bracing piece has the screw hole, the internally mounted of screw hole has the spliced pole, the screw thread post is installed to the one end of spliced pole, the screw thread post cooperatees with the screw hole.
As an optimal implementation mode of the utility model, open the bottom of base has the recess, the internally mounted of recess has the fixed axle, install the dead lever on the fixed axle.
As a preferred embodiment of the present invention, the fixed rod has a cavity inside, the cavity has a movable rod inside, and the one end of the movable rod is fixed with the backup pad.
As an optimized embodiment of the utility model, be fixed with the lug on the inner wall of cavity, open one side of movable rod has the draw-in groove, the draw-in groove cooperatees with the lug.
As a preferred embodiment of the present invention, the opening height of the cavity is greater than the height of the movable rod.
As a preferred embodiment of the present invention, the number of the fixing slots and the movable plates is 4.
The utility model has the advantages that: the utility model relates to a pre-buried connecting device of a concrete building scaffold, which comprises a base; a fixing plate; a support bar; fixing grooves; a movable plate; a magnet; a threaded hole; connecting columns; a groove; a fixed shaft; fixing the rod; a movable rod; a support plate; rotating the rod; a cavity; a bump; a clamping groove.
1. This pre-buried connecting device of concrete building scaffold frame when needs height-adjusting when using, through upwards lifting up the movable rod, makes draw-in groove and lug phase separation, presses down to make draw-in groove and lug cooperate and fix after removing the adjustment, is convenient for adjust the use to the height.
2. This pre-buried connecting device of concrete building scaffold puts up is convenient for increase the area of contact with the concrete through emitting the fly leaf from the fixed slot is inside to increase the stationary force, carry on spacingly through magnet when not using, portable removes the use.
3. This pre-buried connecting device spliced pole of concrete building scaffold passes through the screw thread post and installs in the inside of screw hole, seals up through the spliced pole when concreting, and the damage that the screw hole inside caused is avoided entering into to the installation of the later stage scaffold frame of being convenient for, after the use, with spliced pole and bracing piece separation, the dismantlement in the later stage of being convenient for is used.
Drawings
Fig. 1 is a schematic structural view of a concrete building scaffold pre-embedded connecting device of the present invention;
fig. 2 is a schematic structural view of a threaded hole of the concrete building scaffold pre-embedded connecting device of the present invention;
fig. 3 is a schematic view of the internal structure of the groove of the pre-buried connecting device of the concrete building scaffold of the present invention;
fig. 4 is a schematic structural view of a movable plate of the concrete building scaffold pre-embedded connecting device of the present invention;
fig. 5 is a schematic structural view of a movable rod and a fixed rod of the concrete building scaffold pre-embedded connecting device of the present invention;
in the figure: 1. a base; 2. a fixing plate; 3. a support bar; 4. fixing grooves; 5. a movable plate; 6. a magnet; 7. a threaded hole; 8. connecting columns; 9. a groove; 10. a fixed shaft; 11. fixing the rod; 12. a movable rod; 13. a support plate; 14. rotating the rod; 15. a cavity; 16. a bump; 17. a clamping groove.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1 to 5, the present invention provides a technical solution: the utility model provides a pre-buried connecting device of concrete building scaffold, includes the connecting device body, the connecting device body includes base 1, the welding has fixed plate 2 on the base 1, the welding has bracing piece 3 on fixed plate 2, it has fixed slot 4 to open on the bracing piece 3, the internally mounted of fixed slot 4 has fly leaf 5, fly leaf 5 passes through dwang 14 and installs in the inside of fixed slot 4, magnet 6 is installed to fly leaf 5 top one side, fly leaf 5 is spacing in the inside of fixed slot 4 through magnet 6, the internally mounted of bracing piece 3 has screw hole 7, the internally mounted of screw hole 7 has spliced pole 8, the screw thread post is installed to spliced pole 8's one end, the screw thread post cooperatees with screw hole 7.
As a preferred embodiment of the present invention, the bottom of the base 1 is provided with a groove 9, the inside of the groove 9 is provided with a fixing shaft 10, and the fixing shaft 10 is provided with a fixing rod 11.
As a preferred embodiment of the present invention, the inside of the fixing rod 11 is opened with a cavity 15, the inside of the cavity 15 is installed with a movable rod 12, and one end of the movable rod 12 is fixed with a supporting plate 13.
As a preferred embodiment of the present invention, a bump 16 is fixed on the inner wall of the cavity 15, a slot 17 is opened on one side of the movable rod 12, and the slot 17 is matched with the bump 16.
As a preferred embodiment of the present invention, the opening height of the cavity 15 is greater than the height of the movable rod 12.
As a preferred embodiment of the present invention, the number of the fixed slots 4 and the movable plates 5 is 4.
When the device is used, firstly, the height of the support rod 3 is adjusted through the pouring thickness of concrete, the support rod 3 is prevented from being submerged by the concrete, when the height of the base 1 is adjusted, the fixed rod 11 is rotated through the fixed shaft 10, the fixed rod 11 is matched with the inner wall of the groove 9 for fixing after rotating movement, the movable rod 12 is lifted upwards in the cavity 15, the lug 16 is separated from the clamping groove 17 after being lifted, the movable rod 12 horizontally moves in the cavity 15 after being separated, after the height adjustment is completed, the movable rod 12 is pressed, the clamping groove 17 is matched with the lug 16 for limiting and fixing, so that the height adjustment is completed, the support plate 13-position base 1 is supported for use, after the placement is completed, the movable plate 5 is inclined through the rotating rod 14 and is distributed around the support rod 3 after being separated from the fixed groove 4, for bracing piece 3 increase with the area of contact of concrete to increase the stationary force, install spliced pole 8 in the inside of screw hole 7, avoid the concrete to enter into the inside of screw hole 7, after concrete placement solidifies, through rotatory spliced pole 8 and the 7 phase separations of screw hole, the scaffold puts up connecting piece of being convenient for change use uses, after the use is accomplished, through rotatory and bracing piece 3 separation, avoid using the waste that the cutting machine caused operating time, it is convenient to use.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a pre-buried connecting device of concrete building scaffold, includes the connecting device body, its characterized in that: the connecting device body includes base (1), the welding has fixed plate (2) on base (1), the welding has bracing piece (3) on fixed plate (2), it has fixed slot (4) to open on bracing piece (3), the internally mounted of fixed slot (4) has fly leaf (5), the inside at fixed slot (4) is installed through dwang (14) in fly leaf (5), magnet (6) are installed to fly leaf (5) top one side, fly leaf (5) are spacing in the inside of fixed slot (4) through magnet (6), the internally mounted of bracing piece (3) has screw hole (7), the internally mounted of screw hole (7) has spliced pole (8), the screw thread post is installed to the one end of spliced pole (8), the screw thread post cooperatees with screw hole (7).
2. The concrete building scaffold pre-buried connecting device of claim 1, which is characterized in that: the bottom of base (1) is opened flutedly (9), the internally mounted of flutedly (9) has fixed axle (10), install dead lever (11) on fixed axle (10).
3. The concrete building scaffold pre-buried connecting device of claim 2, wherein: the utility model discloses a fixed pole, including dead lever (11), the inside of dead lever (11) is opened there is cavity (15), the internally mounted of cavity (15) has movable rod (12), the one end of movable rod (12) is fixed with backup pad (13).
4. The concrete building scaffold pre-buried connecting device of claim 3, wherein: the inner wall of the cavity (15) is fixedly provided with a convex block (16), one side of the movable rod (12) is provided with a clamping groove (17), and the clamping groove (17) is matched with the convex block (16).
5. The concrete building scaffold pre-buried connecting device of claim 4, wherein: the opening height of the cavity (15) is greater than the height of the movable rod (12).
6. The concrete building scaffold pre-buried connecting device of claim 1, which is characterized in that: the number of the fixed grooves (4) and the number of the movable plates (5) are 4.
CN202120110905.XU 2021-01-15 2021-01-15 Pre-buried connecting device of concrete building scaffold Active CN214834656U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120110905.XU CN214834656U (en) 2021-01-15 2021-01-15 Pre-buried connecting device of concrete building scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120110905.XU CN214834656U (en) 2021-01-15 2021-01-15 Pre-buried connecting device of concrete building scaffold

Publications (1)

Publication Number Publication Date
CN214834656U true CN214834656U (en) 2021-11-23

Family

ID=78954504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120110905.XU Active CN214834656U (en) 2021-01-15 2021-01-15 Pre-buried connecting device of concrete building scaffold

Country Status (1)

Country Link
CN (1) CN214834656U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116163509A (en) * 2023-04-23 2023-05-26 徐州鼎博混凝土制品有限公司 Pre-buried ware of concrete building scaffold frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116163509A (en) * 2023-04-23 2023-05-26 徐州鼎博混凝土制品有限公司 Pre-buried ware of concrete building scaffold frame

Similar Documents

Publication Publication Date Title
CN214834656U (en) Pre-buried connecting device of concrete building scaffold
CN220394299U (en) Novel hydraulic climbing formwork overhanging operation platform
CN214195707U (en) Anti-seismic energy-saving environment-friendly movable board house
CN210508408U (en) Concrete pouring workbench for house construction
CN210947718U (en) Building construction pouring plate supporting device
CN211899627U (en) Construction equipment based on building post-cast strip
CN211967866U (en) Vibrator device for improving qualification rate of dam prefabricated blocks
CN211647357U (en) Tool type chute
CN113914613B (en) Lantern frame capable of guaranteeing verticality of ultrahigh single-column and construction method thereof
CN214364966U (en) Industrial and civil building engineering template fixing device
CN217920996U (en) Bottom die hoisting equipment
CN221682481U (en) Quick dismantlement shear groove pre-buried device
CN220927567U (en) Arc overflow surface bridge deck transformation bracket
CN211736506U (en) Building crossbeam bearing structure strutting arrangement
CN210152253U (en) Plate falling area structure based on aluminum alloy square steel manufacturing template
CN217205193U (en) Building scaffold convenient to adjust
CN214302944U (en) Steel stand straightness adjusting device that hangs down
CN219754047U (en) Plate thickness control device
CN212897641U (en) Concrete axillary angle vibrating device
CN214091357U (en) Prefabricated wall body of detachable fire prevention type
CN213626656U (en) Building engineering construction template device
CN221524206U (en) Engineering construction fixing device
CN214530218U (en) Support uninstallation adjusting device and dismouting device of support for bridge bent cap construction
CN210140989U (en) Construction hydraulic pressure template climbing device
CN212027067U (en) Reusable overhanging scaffold embedded ring