CN214832357U - Quick plugging device of dyke breach in hydraulic engineering construction - Google Patents

Quick plugging device of dyke breach in hydraulic engineering construction Download PDF

Info

Publication number
CN214832357U
CN214832357U CN202121644616.4U CN202121644616U CN214832357U CN 214832357 U CN214832357 U CN 214832357U CN 202121644616 U CN202121644616 U CN 202121644616U CN 214832357 U CN214832357 U CN 214832357U
Authority
CN
China
Prior art keywords
sets
groups
slider
sides
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121644616.4U
Other languages
Chinese (zh)
Inventor
赵结
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Qianhe Construction Engineering Co ltd
Original Assignee
Chongqing Qianhe Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Qianhe Construction Engineering Co ltd filed Critical Chongqing Qianhe Construction Engineering Co ltd
Priority to CN202121644616.4U priority Critical patent/CN214832357U/en
Application granted granted Critical
Publication of CN214832357U publication Critical patent/CN214832357U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a rapid plugging device for dike breach in hydraulic engineering construction, which comprises two groups of supporting baffles, wherein the tops of the two groups of supporting baffles are provided with a top plate, the tops of the two groups of supporting baffles, which are away from one end, are provided with fixed components, the two sides of the bottom of the one end, which are away from one end, of the two groups of supporting baffles are provided with balancing weights, the middle part of the bottom inside the two groups of supporting baffles is provided with a through groove, and the two sides of the one end, which are close to one end, of the two groups of supporting baffles are provided with movable components; the utility model discloses a lead to groove, connecting plate, bent type spout, commentaries on classics roller, slide bar, waterwheel, slider three, put mutually supporting between thing platform and the pivot, can be so that the dress can be quick transport plugging material, solved plugging material and transported slow problem, also make plugging material can reach every corner in the river, the inhomogeneous phenomenon that leads to the shutoff failure of shutoff that can not appear the shutoff.

Description

Quick plugging device of dyke breach in hydraulic engineering construction
Technical Field
The utility model relates to a plugging device technical field specifically is a quick plugging device of dyke breach in hydraulic engineering construction.
Background
For the burst dangerous situation of the dike, particularly for the burst of the river dike which is more common in Yangtze river watershed, rapid and effective emergency reinforcement measures must be taken, for example, in the initial stage of the burst, the burst section is blocked in time by throwing and filling plugging materials such as prefabricated blocks, caissons and the like, so that the burst is prevented from further expanding; then carrying out scientific breach monitoring and reinforcing reinforcement on the dike;
however, most of the rapid plugging devices for the breakages of the dikes in the hydraulic engineering construction have many defects:
1. the conventional rapid plugging device for the burst opening of the levee in the hydraulic engineering construction mostly cannot be fixedly installed, so that the device is easy to incline and even collapse when being impacted by water flow, personnel are easy to be injured when the device collapses, the installation danger is greatly improved, people cannot work around or on the device without worry, the plugging working efficiency is influenced, and people at the downstream are more dangerous;
2. the rapid plugging device for the breach of the dike in the existing hydraulic engineering construction can mostly not rapidly transport plugging materials, so that the plugging work is slow in progress, people can not effectively plug the middle position of a river, the plugging work is temporary and permanent, and the breach event can easily occur again.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a quick plugging device of dyke breach in hydraulic engineering construction to solve the problem that provides in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a quick plugging device of dyke breach in hydraulic engineering construction, includes the backplate, the backplate is equipped with two sets ofly, and is two sets ofly the backplate's top is equipped with the roof, and is two sets ofly the top that the backplate kept away from one end each other all is equipped with fixed subassembly, and is two sets ofly the both sides that the backplate kept away from one end bottom each other all are equipped with the balancing weight, and are two sets ofly the centre department of the inside bottom of backplate all is equipped with logical groove, and is two sets ofly the both sides that the backplate is close to one end each other all are equipped with the removal subassembly.
Preferably, the fixed subassembly is including grabbing ground tooth, two-way threaded rod, slider one, slide rail, internal thread sleeve pipe, hinge bar one, slider two and hinge bar two, the slide rail is at the top of supporting baffle one end, the inside slip of slide rail is equipped with two sets of slider one, and is two sets of the bottom of slider one all is equipped with the internal thread sleeve pipe, and is two sets of the inside of internal thread sleeve pipe is equipped with two-way threaded rod, and is two sets of the bottom of internal thread sleeve pipe all articulates there is hinge bar one, four groups the bottom of hinge bar one all articulates there is slider two, and is two sets of the one end of slider two articulates there is hinge bar two, four groups the bottom of hinge bar two all is equipped with grabs ground tooth.
Preferably, the removal subassembly includes connecting plate, bent type spout, commentaries on classics roller, slide bar, waterwheel, slider three, puts thing platform and pivot, the connecting plate is located two sets of support baffles both sides that are close to one end each other, and is two sets of the both ends that the connecting plate is close to one side top each other all are equipped with the slide bar, and one side that two sets of connecting plates are close to each other is equipped with the pivot, the centre department and one side in the pivot outside are equipped with commentaries on classics roller and waterwheel respectively, the outside of commentaries on classics roller is equipped with bent type spout, the inside slip of bent type spout is equipped with slider three, the top of slider three is equipped with puts the thing platform.
Preferably, four groups of fixed blocks are uniformly arranged at the bottom of the ground grabbing teeth, and two sides of the bottom of each fixed block are sharp.
Preferably, one side of the rotary roller, which is far away from the waterwheel, is provided with a bearing, and one side of the bearing, which is far away from the curved chute, is fixedly connected with the middle position of one side of the group of connecting plates, which is close to the curved chute.
Preferably, the two ends of the two sides of the object placing table are provided with limiting through grooves, the sliding rod is located inside the limiting through grooves, and the object placing table and the sliding rod slide mutually.
Compared with the prior art, the beneficial effects of the utility model are that: this quick plugging device of dyke breach in hydraulic engineering construction.
1. Through grabbing ground tooth, two-way threaded rod, slider one, the slide rail, the internal thread sleeve pipe, hinge bar one, mutually supporting between slider two and the hinge bar two, can make the dress can be stable fix the both sides in the river, make the dress can not take place the slope or collapse, thereby make the dangerous greatly reduced of dress, also make people can be relieved around the dress or adorn work, make the efficiency of shutoff work improve greatly, thereby make the completion that the shutoff work can be as early as possible, make the low reaches in river can not receive too much infringement.
2. Through logical groove, connecting plate, bent type spout, commentaries on classics roller, slide bar, waterwheel, slider three, put mutually supporting between thing platform and the pivot, can be so that the dress can be quick transport plugging material, solved plugging material and transported slow problem, also make plugging material can reach every corner in the river, the inhomogeneous phenomenon that leads to the shutoff failure of shutoff that can not appear the shutoff.
Drawings
Fig. 1 is a front sectional view of the present invention;
fig. 2 is a top cross-sectional view of the present invention;
fig. 3 is a front view of the connection plate of the present invention.
In the figure: 1. a support baffle; 2. a through groove; 3. a ground gripping tooth; 4. a bidirectional threaded rod; 5. a first sliding block; 6. a slide rail; 7. a top plate; 8. an internally threaded sleeve; 9. a first hinge rod; 10. a second sliding block; 11. a second hinge rod; 12. a balancing weight; 13. a connecting plate; 14. a curved chute; 15. rotating the roller; 16. a slide bar; 17. water wheel; 18. a third sliding block; 19. a placing table; 20. a rotating shaft.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides an embodiment: the utility model provides a quick plugging device of dyke breach in hydraulic engineering construction, including supporting baffle 1, supporting baffle 1 is equipped with two sets ofly, the top of two sets of supporting baffle 1 is equipped with roof 7, the top of one end all is equipped with fixed subassembly is kept away from each other to two sets of supporting baffle 1, can make supporting baffle 1 fix the both sides in the river, the both sides that one end bottom was kept away from each other to two sets of supporting baffle 1 all are equipped with balancing weight 12, can increase the weight of supporting baffle self, prevent that supporting baffle 1 from being washed down by rivers, the centre department of two sets of supporting baffle 1 inside bottoms all is equipped with logical groove 2, two sets of supporting baffle 1 are close to the both sides of one end each other and all are equipped with the removal subassembly, can make plugging material obtain transporting.
In the implementation, the fixing component comprises ground grabbing teeth 3, a bidirectional threaded rod 4, a first slider 5, a sliding rail 6, an internal threaded sleeve 8, a first hinge rod 9, a second slider 10 and a second hinge rod 11, the sliding rail 6 is arranged on the top of one end of the supporting baffle 1, two groups of first sliders 5 are arranged inside the sliding rail 6 in a sliding manner, the internal threaded sleeves 8 are arranged at the bottoms of the two groups of first sliders 5, the bidirectional threaded rod 4 is arranged inside the two groups of internal threaded sleeves 8, the first hinge rods 9 are hinged to the bottoms of the two groups of internal threaded sleeves 8, the second slider 10 is hinged to the bottoms of the four groups of first hinge rods 9, one ends of the two groups of second sliders 10 are hinged to the second hinge rods 11, the ground grabbing teeth 3 are arranged at the bottoms of the four groups of hinge rods 11, so that the supporting baffle 1 can be fixed, the moving component comprises a connecting plate 13, a curved chute 14, a rotating roller 15, a sliding rod 16, a water wheel 17, a third slider 18, a placing table 19 and a rotating shaft 20, the connecting plates 13 are positioned at two sides of one end of each two groups of supporting baffles 1, two ends of one side of each two groups of connecting plates 13, which are close to each other, are provided with slide bars 16, one side of each two groups of connecting plates 13, which is close to each other, is provided with a rotating shaft 20, the middle part and one side of the outer side of the rotating shaft 20 are respectively provided with a rotating roller 15 and a waterwheel 17, the outer side of the rotating roller 15 is provided with a curved chute 14, the inside of the curved chute 14 is provided with a third sliding block 18 in a sliding manner, the top of the third sliding block 18 is provided with a placing table 19, so that the device can convey plugging materials, the bottom of the ground grabbing teeth 3 is uniformly provided with four groups of fixed blocks, two sides of the bottom of the fixed blocks are sharp, the ground grabbing teeth 3 can be firmer, one side of the rotating roller 15, which is far away from the waterwheel 17, one side of the bearing, which is far away from the curved chute 14, is fixedly connected with the middle position of one group of connecting plates 13, which is close to the curved chute 14, so that the rotating roller 15 can rotate more stably, the two ends of the two sides of the object placing table 19 are provided with limiting through grooves, the sliding rod 16 is located inside the limiting through grooves, the object placing table 19 and the sliding rod 16 slide mutually, and the object placing table 19 can slide on the sliding rod 16.
The working principle is as follows: firstly, erecting the device at two banks of a river, and enabling two groups of internal thread sleeves 8 to drive two groups of first sliding blocks 5 to slide away from each other in a sliding rail 6 by rotating a bidirectional threaded rod 4, so that the two groups of internal thread sleeves 8 drive two groups of first hinge rods 9 to approach each other, the two groups of first hinge rods 9 drive two groups of second sliding blocks 10 to slide in two groups of second hinge rods 11, and further drive the two groups of second hinge rods 11 to be fixed in soil, and finally enabling the device to be stable at the two banks of the river;
then after the dress stabilized in the both sides of river, rivers will enter into the intermediate position department of two sets of support baffle 1 through logical groove 2, because water is mobile, so water will drive waterwheel 17 and rotate, then waterwheel 17 drives pivot 20 and rotates, pivot 20 drives and changes roller 15 and rotate, thereby make three 18 of slider slide from side to side on bent type spout 14, because three 18 of slider and thing platform 19 fixed connection, three 18 of slider will drive and put thing platform 19 and slide on slide bar 16, finally make plugging material transport round trip at the both sides of river, a large amount of time has been saved.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience in describing and simplifying the present invention, and do not indicate or imply that the indicated garment or element must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, e.g., as either a fixed connection or a detachable connection; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.

Claims (6)

1. The utility model provides a quick plugging device of dyke breach in hydraulic engineering construction, includes supporting baffle (1), its characterized in that: support baffle (1) is equipped with two sets ofly, and is two sets of the top of support baffle (1) is equipped with roof (7), and is two sets of the top of keeping away from one end each other of support baffle (1) all is equipped with fixed subassembly, and is two sets of the both sides of keeping away from one end bottom each other of support baffle (1) all are equipped with balancing weight (12), and are two sets of the centre department of support baffle (1) inside bottom all is equipped with logical groove (2), and is two sets of support baffle (1) both sides that are close to one end each other all are equipped with the removal subassembly.
2. The device for rapidly plugging the levee breach in the hydraulic engineering construction according to claim 1, wherein: the fixed component comprises a ground grabbing tooth (3), a bidirectional threaded rod (4), a first sliding block (5), a sliding rail (6), an internal thread sleeve (8), a first hinge rod (9), a second sliding block (10) and a second hinge rod (11), slide rail (6) are at the top of backplate (1) one end, the inside slip of slide rail (6) is equipped with two sets of slider (5), and is two sets of the bottom of slider (5) all is equipped with internal thread sleeve pipe (8), and is two sets of the inside of internal thread sleeve pipe (8) is equipped with two-way threaded rod (4), and is two sets of the bottom of internal thread sleeve pipe (8) all articulates there is hinge bar one (9), four groups the bottom of hinge bar one (9) all articulates there is slider two (10), and is two sets of the one end of slider two (10) articulates there is hinge bar two (11), four groups the bottom of hinge bar two (11) all is equipped with grabs ground tooth (3).
3. The device for rapidly plugging the levee breach in the hydraulic engineering construction according to claim 1, wherein: remove the subassembly and include connecting plate (13), bent type spout (14), change roller (15), slide bar (16), waterwheel (17), slider three (18), put thing platform (19) and pivot (20), connecting plate (13) are located two sets of supporting baffle (1) and are close to the both sides of one end each other, and are two sets of connecting plate (13) are close to the both ends at one side top each other and all are equipped with slide bar (16), and one side that two sets of connecting plate (13) are close to each other is equipped with pivot (20), the centre department and one side in the pivot (20) outside are equipped with respectively changes roller (15) and waterwheel (17), the outside of changeing roller (15) is equipped with bent type spout (14), the inside slip of bent type spout (14) is equipped with slider three (18), the top of slider three (18) is equipped with puts thing platform (19).
4. The device for rapidly plugging the levee breach in the hydraulic engineering construction according to claim 2, wherein: four groups of fixed blocks are uniformly arranged at the bottom of the ground grabbing teeth (3), and two sides of the bottom of each fixed block are sharp.
5. A rapid dam breach plugging device according to claim 3, wherein: and a bearing is arranged on one side of the rotary roller (15) far away from the waterwheel (17), and one side of the bearing far away from the curved sliding chute (14) is fixedly connected with the middle position of one side of the group of connecting plates (13) close to the curved sliding chute (14).
6. A rapid dam breach plugging device according to claim 3, wherein: put the both ends of thing platform (19) both sides and be equipped with spacing logical groove, slide bar (16) are located the inside in spacing logical groove, put thing platform (19) and slide bar (16) and slide each other.
CN202121644616.4U 2021-07-20 2021-07-20 Quick plugging device of dyke breach in hydraulic engineering construction Expired - Fee Related CN214832357U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121644616.4U CN214832357U (en) 2021-07-20 2021-07-20 Quick plugging device of dyke breach in hydraulic engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121644616.4U CN214832357U (en) 2021-07-20 2021-07-20 Quick plugging device of dyke breach in hydraulic engineering construction

Publications (1)

Publication Number Publication Date
CN214832357U true CN214832357U (en) 2021-11-23

Family

ID=78833296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121644616.4U Expired - Fee Related CN214832357U (en) 2021-07-20 2021-07-20 Quick plugging device of dyke breach in hydraulic engineering construction

Country Status (1)

Country Link
CN (1) CN214832357U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115784566A (en) * 2022-11-25 2023-03-14 彩虹(合肥)液晶玻璃有限公司 Quick block structure of red department is leaked to tank furnace brick flue

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115784566A (en) * 2022-11-25 2023-03-14 彩虹(合肥)液晶玻璃有限公司 Quick block structure of red department is leaked to tank furnace brick flue

Similar Documents

Publication Publication Date Title
CN214832357U (en) Quick plugging device of dyke breach in hydraulic engineering construction
CN107059782B (en) The extensible fence of assembled for crevasse quick blocking
CN202945572U (en) Foldable self-balancing water retaining wall
CN111576430A (en) Civil engineering is with construction protector
CN205062771U (en) Hawser pulls herringbone water -stop dam
CN112575739A (en) Hydraulic engineering flood prevention revetment
CN105089016B (en) Hawser draws herringbone check dam
CN208415201U (en) A kind of dam flood and sand discharging lock
CN108505489B (en) Protective dike and protection method thereof
CN108385624B (en) Unlocking device for hydraulic dam support rod and using method
CN213682005U (en) High-strength gate for water conservancy dam
CN214573756U (en) Cover plate for ditch
CN212248077U (en) Side slope protector that hydraulic and hydroelectric engineering used
CN110184996B (en) Dykes and dams protective equipment with multiple spot is supported for hydraulic engineering
CN213328897U (en) Slope protection device for water conservancy construction
CN113338220A (en) Combined movable hydraulic retaining dam
CN211472426U (en) Overhauling system of large-water-depth scoop type stilling pool
CN218622109U (en) A guiding device for hydraulic engineering
CN113756255B (en) Dam flood blocking screen
CN216948080U (en) Dam body is with high-efficient durable flood bank
CN214272094U (en) Mountain area river course cofferdam scour protection structure
CN214363319U (en) Half-moon-shaped water retaining dam for hydraulic engineering
CN221663724U (en) Water conservancy retaining wall
CN118422641B (en) Embankment breach plugging structure based on rocket anchors and tubular piles and construction method
CN215052680U (en) Soil stabilization slope protection with willow-inserted non-woven fabrics

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211123

CF01 Termination of patent right due to non-payment of annual fee