CN214786373U CN202120433470.2U CN202120433470U CN214786373U CN 214786373 U CN214786373 U CN 214786373U CN 202120433470 U CN202120433470 U CN 202120433470U CN 214786373 U CN214786373 U CN 214786373U
Authority
CN
China
Prior art keywords
factory building
support column
steel structure
supporting column
wallboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120433470.2U
Other languages
Chinese (zh)
Inventor
王宽
郭琪君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Yiyu Steel Structure Engineering Co ltd
Original Assignee
Sichuan Yiyu Steel Structure Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Yiyu Steel Structure Engineering Co ltd filed Critical Sichuan Yiyu Steel Structure Engineering Co ltd
Priority to CN202120433470.2U priority Critical patent/CN214786373U/en
Application granted granted Critical
Publication of CN214786373U publication Critical patent/CN214786373U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a temporary steel structure factory building applied to uneven terrain, which comprises a plurality of wallboards which can be spliced in sequence and a supporting unit; the supporting unit comprises a first supporting column, a second supporting column and a cross rod, the first supporting column and the second supporting column are respectively arranged on two sides of the wallboard, the cross rod sequentially penetrates through the first supporting column, the wallboard and the second supporting column, and the first supporting column and the second supporting column are both hydraulic telescopic rods. This scheme of adoption, promptly dare when making interim steel construction factory building, can be according to the roughness of relief, finely tune the height of wallboard, improve the stability of steel construction factory building, and can also carry out the outrigger to the wallboard both sides.

Description

Be applied to interim steel construction factory building of uneven relief
Technical Field
The utility model relates to a building engineering technical field, concretely relates to be applied to interim steel construction factory building of uneven relief.
Background
As the steel yield of China is increased, steel structure plants are mostly adopted, and particularly, the steel structure plants can be divided into light steel structure plants and heavy steel structure plants. Industrial and civil building facilities constructed from steel are known as steel structures. The steel structure factory building has the characteristics of light weight, high strength, large span and short construction period of the steel structure building, and correspondingly reduces the investment cost. The steel structure building has high fire resistance and strong corrosion resistance, is convenient to move and is recycled without pollution. The steel structure factory building has a plurality of advantages, so the steel structure factory building is widely constructed and used. And when need construct interim steel construction factory building under the condition of urgent overtime limit for a project on external building site, often can build the concatenation on the spot, it is less to the selectivity of relief, when building on the spot, the stability of steel construction factory building has been influenced to the unevenness of relief is very big.
SUMMERY OF THE UTILITY MODEL
The utility model provides a solve above-mentioned problem, provide a be applied to interim steel construction factory building of uneven relief, this scheme of adoption can be according to the roughness of relief, finely tune the height of wallboard when promptly dare to make interim steel construction factory building, improves the stability of steel construction factory building, and can also carry out the outrigger to the wallboard both sides.
The utility model adopts the technical proposal that: a temporary steel structure factory building applied to uneven terrain comprises a plurality of wall plates which can be spliced in sequence and also comprises a supporting unit;
the supporting unit comprises a first supporting column, a second supporting column and a cross rod, the first supporting column and the second supporting column are respectively arranged on two sides of the wallboard, the cross rod sequentially penetrates through the first supporting column, the wallboard and the second supporting column, and the first supporting column and the second supporting column are both hydraulic telescopic rods.
When the scheme is operated, a plurality of wallboards are hoisted and sequentially spliced end to form a temporary workshop, a supporting unit is further arranged at each wallboard and can stably support the wallboards, wherein each supporting unit comprises a first supporting column, a second supporting column and a cross rod, the first supporting column and the second supporting column are respectively positioned at two sides of the wallboard, the cross rods are arranged at the upper ends of the first supporting column and the second supporting column and sequentially penetrate through the first supporting column, the wallboard and the second supporting column, so that the first supporting column, the wallboard and the second supporting column are connected, two sides of the wallboard are stably supported, and collapse is prevented; the lower relief of unsmooth degree is selected earlier when selecting the relief, and wherein first support column and second support column are hydraulic telescoping rod, and hydraulic telescoping rod bottom is preferred to be set up in relief ground, through adjustment hydraulic telescoping rod's hydrovalve, can finely tune hydraulic telescoping rod's height, makes the wallboard can not take place the slope, when being on a parallel with the horizon, can carry out the outrigger.
Further optimizing, the bottom size of first support column and second support column all is greater than the upper end size.
When this scheme specifically operates, for further improvement support stability, the bottom size of first support column and second support column all is greater than the upper end size, according to the relief condition, can select disc or triangle to support, and wherein disc or triangle accessible bolt anchor are in ground.
Further optimize, for improving the support stability, set up to: each wallboard is provided with a plurality of supporting units.
Further optimize, the horizontal pole is a plurality of, and the top the horizontal pole passes two of relative setting in proper order the wallboard.
When this scheme specifically functions, wherein the horizontal pole is a plurality of, and a plurality of horizontal poles set gradually along wallboard direction of height, can more stable support wallboard left and right sides, and the horizontal pole length of the top is longer, can pass two wallboards of relative setting in proper order, makes two relative wallboards form the split, further improves the stability of whole factory building.
Further optimize, the horizontal pole all can be dismantled and connect in first support column and second support column.
When this scheme specifically operates, for the installation and dismantlement, wherein the connection can be dismantled to horizontal pole and first support column, and the connection can be dismantled to horizontal pole and second support column, and wherein can dismantle the preferred threaded connection of connection.
Further optimize, the spout and the bead concatenation that the wallboard gomphosis mutually on the side through integrated into one piece formed.
When this scheme specifically functions, one of the wallboard has integrated into one piece's spout, has integrated into one piece's bead at the wallboard other end, and two adjacent wallboards pass through spout and bead and reach the effect of splicing fast.
Further preferably, a plurality of long round through holes are formed in the sliding groove and are arranged along the length direction of the sliding groove, a plurality of screw holes are formed in the convex edge and are arranged along the length direction of the convex edge, and the long round through holes and the screw holes are matched with each other through bolts.
When the scheme is in operation, the sliding groove is provided with a plurality of long round through holes which are arranged along the length direction of the sliding groove, the convex edge is also provided with a plurality of screw holes which are arranged along the length direction of the convex edge; when beginning the concatenation wallboard, because the unevenness of relief leads to appearing the dislocation between two adjacent wallboards, when using the bolt to pass long round through-hole and screw and fix, use long round through-hole can be convenient for finely tune the wallboard, when finely tuning the back that targets in place through hydraulic telescoping rod, make fixed connection between bolt and the long round hole, modes such as accessible welding avoid the wallboard unstable.
Further optimize, for sealing the wall body top, set up as: still include the roof, the roof passes through the fixed brace of pillar and connects at the wallboard top.
Further optimize, for preventing that roof ponding is too much, lead to leaking, set up to: the roof both sides have the diversion channel, have a plurality of small openings in the diversion channel.
Further optimization, for convenient transportation and installation, the device is provided with: the wall plate is made of light steel materials.
The utility model discloses following beneficial effect has:
this scheme provides a be applied to interim steel construction factory building of uneven relief, and this scheme of adoption can be according to the roughness of relief, finely tune the height of wallboard when promptly dare to make interim steel construction factory building, improves the stability of steel construction factory building, and can also carry out the outrigger to the wallboard both sides.
Drawings
FIG. 1 is a schematic structural view of a temporary steel structure factory building applied to uneven terrain according to the present invention;
fig. 2 is the utility model provides a pair of be applied to interim steel construction factory building local schematic diagram of uneven relief.
The reference numbers in the figures are: the building structure comprises the following components, by weight, 1-a wallboard, 11-a sliding groove, 12-a convex edge, 13-a long round through hole, 2-a first supporting column, 3-a second supporting column, 4-a cross bar, 5-a roof, 51-a water diversion groove, 52-a leakage hole and 6-a supporting column.
Detailed Description
The present invention will be described in further detail with reference to examples.
Example (b): as shown in fig. 1 and 2, a temporary steel structure factory building applied to uneven terrain comprises a plurality of wall panels 1 which can be spliced in sequence and also comprises a supporting unit;
the supporting unit comprises a first supporting column 2, a second supporting column 3 and a cross rod 4, the first supporting column 2 and the second supporting column 3 are respectively arranged on two sides of the wallboard, the cross rod 4 sequentially penetrates the first supporting column 2, the wallboard 1 and the second supporting column 3, and the first supporting column 2 and the second supporting column 3 are both hydraulic telescopic rods.
In the embodiment, a plurality of wall boards 1 are sequentially spliced end to enclose a temporary workshop, a supporting unit is further arranged at each wall board 1 and can stably support the wall board 1, wherein each supporting unit comprises a first supporting column 2, a second supporting column 3 and a cross rod 4, the first supporting column 2 and the second supporting column 3 are respectively positioned at two sides of the wall board 1, the cross rods 4 are arranged at the upper ends of the first supporting column 2 and the second supporting column 3, and the cross rods 4 sequentially penetrate through the first supporting column 2, the wall board 1 and the second supporting column 3, so that the first supporting column 2, the wall board 1 and the second supporting column 3 are connected to stably support two sides of the wall board 1 and prevent collapse; the lower relief of unsmooth degree is selected earlier when selecting the relief, and wherein first support column 2 and second support column 3 are hydraulic telescoping rod, and hydraulic telescoping rod bottom is preferred to be set up in relief ground, through adjustment hydraulic telescoping rod's hydrovalve, can finely tune hydraulic telescoping rod's height, makes wallboard 1 can not take place the slope, when being on a parallel with the horizon, can carry out the outrigger.
In this embodiment, in order to further improve the support stability, the bottom size of first support column 2 and second support column 3 all is greater than the upper end size, according to the relief situation, can select disc or triangle to support, and wherein disc or triangle accessible bolt fastening are in ground.
In this embodiment, for improving the support stability, set up to: each wallboard 1 is provided with a plurality of supporting units.
In this embodiment, wherein horizontal pole 4 is a plurality of, and a plurality of horizontal poles 4 set gradually along 1 direction of height of wallboard, can more stable support wallboard 1 left and right sides, and 4 length of the horizontal pole of the top are longer, can pass two relative wallboards 1 that set up in proper order, make two relative wallboard 1 form the counter-pull, further improve the stability of whole factory building.
In this embodiment, for the convenience of installation and disassembly, the cross rod 4 and the first support column 2 are detachably connected, and the cross rod 4 and the second support column 3 are detachably connected, wherein the detachable connection is preferably a threaded connection.
In this embodiment, have integrated into one piece's spout 11 on wallboard 1 one end, have integrated into one piece's bead 12 at wallboard 1 other end, two adjacent wallboards 1 reach the effect of splicing fast through spout 11 and bead 12.
In this embodiment, the sliding groove 11 is provided with a plurality of long circular through holes 13, the long circular through holes 13 are arranged along the length direction of the sliding groove 11, the protruding edge 12 is further provided with a plurality of screw holes, and the screw holes are arranged along the length direction of the protruding edge 12; when beginning concatenation wallboard 1, because the unevenness of relief leads to appearing the dislocation between two adjacent wallboards 1, when using the bolt to pass long round through-hole 13 and screw and fix, use long round through-hole 13 can be convenient for finely tune wallboard 1, when finely tuning the back that targets in place through hydraulic telescoping rod, make fixed connection between bolt and the long round hole, modes such as accessible welding avoid wallboard 1 unstability.
In this embodiment, for sealing the wall body top, set up as: the wall plate is characterized by further comprising a roof 5, wherein the roof 5 is fixedly connected to the top of the wall plate 1 in an supporting mode through a supporting column 6.
In this embodiment, for preventing 5 ponding in roof are too much, lead to leaking, set up to: the roof 5 is provided with water grooves 51 on both sides, and a plurality of weep holes 52 are arranged in the water grooves 51.
In this embodiment, for convenience of transportation and installation, the arrangement is: the wall plate 1 is made of light steel materials.
The above-mentioned embodiments, further detailed description of the objects, technical solutions and advantages of the present invention, it should be understood that the above description is only the embodiments of the present invention, and is not intended to limit the scope of the present invention, and any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (10)

1. A temporary steel structure factory building applied to uneven terrain comprises a plurality of wall plates (1) which can be spliced in sequence, and is characterized by also comprising a supporting unit;
the support unit includes first support column (2), second support column (3) and horizontal pole (4), wallboard (1) both sides are located to first support column (2) and second support column (3) branch, horizontal pole (4) pass first support column (2), wallboard (1) and second support column (3) in proper order, first support column (2) and second support column (3) are hydraulic telescoping rod.
2. Temporary steel structure factory building applied to uneven terrain according to claim 1, characterized in that the bottom dimension of said first support column (2) and second support column (3) are larger than the upper dimension.
3. Temporary steel structure factory building applied to uneven terrain according to claim 1, characterized in that each wall panel (1) is provided with a plurality of supporting units.
4. The temporary steel structure factory building applied to uneven terrain according to claim 1, wherein the number of the cross bars (4) is multiple, and the uppermost cross bar (4) sequentially passes through two opposite wall plates (1).
5. The temporary steel structure factory building applied to uneven terrain according to claim 1, wherein the cross bars (4) are detachably connected to the first supporting columns (2) and the second supporting columns (3).
6. The temporary steel structure factory building applied to uneven terrain according to claim 1, wherein the wall panels (1) are formed by integrally forming and splicing sliding grooves (11) and convex ribs (12) which are embedded on the side edges.
7. The temporary steel structure factory building applied to uneven terrain according to claim 6, wherein a plurality of long round through holes (13) are formed in the sliding groove (11), the long round through holes (13) are formed in the length direction of the sliding groove (11), a plurality of screw holes are formed in the convex edge (12), the screw holes are formed in the length direction of the convex edge (12), and the long round through holes (13) and the screw holes are matched with each other through bolts.
8. The temporary steel structure factory building applied to uneven terrain according to claim 1, characterized by further comprising a roof (5), wherein the roof (5) is fixedly supported on the top of the wall plate (1) through a support column (6).
9. The temporary steel structure factory building applied to uneven terrain according to claim 8, characterized in that the roof (5) is provided with water diversion grooves (51) at both sides, and a plurality of leakage holes (52) are formed in the water diversion grooves (51).
10. Temporary steel structure factory building applied to uneven terrain according to claim 1, characterized in that said wall panels (1) are made of light steel material.
CN202120433470.2U 2021-02-26 2021-02-26 Be applied to interim steel construction factory building of uneven relief Active CN214786373U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120433470.2U CN214786373U (en) 2021-02-26 2021-02-26 Be applied to interim steel construction factory building of uneven relief

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120433470.2U CN214786373U (en) 2021-02-26 2021-02-26 Be applied to interim steel construction factory building of uneven relief

Publications (1)

Publication Number Publication Date
CN214786373U true CN214786373U (en) 2021-11-19

Family

ID=78754832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120433470.2U Active CN214786373U (en) 2021-02-26 2021-02-26 Be applied to interim steel construction factory building of uneven relief

Country Status (1)

Country Link
CN (1) CN214786373U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115263048A (en) * 2022-06-30 2022-11-01 上海易农钢结构有限公司 Steel structure factory building with good shock resistance and installation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115263048A (en) * 2022-06-30 2022-11-01 上海易农钢结构有限公司 Steel structure factory building with good shock resistance and installation method thereof

Similar Documents

Publication Publication Date Title
CN103590491A (en) Novel detachable foldable container type prefabricated house
CN203475608U (en) Novel container-type portable house capable of being folded and detached
CN214786373U (en) Be applied to interim steel construction factory building of uneven relief
WO2017178971A1 (en) Supporting structure for basement formwork
CN111042328A (en) Distributed modular anti-side K-support type unit multi-layer frame structure
CN105155686A (en) House beam column and profile connection structure and sleeper integration house
CN204080843U (en) Movable plank house foundation structure
CN111809726A (en) Truss structure and building structure
CN208167484U (en) The steel construction overline bridge being easily installed
CN205444451U (en) An H-shaped steel combined base for light house
CN208950124U (en) A kind of large-span steel truss
CN210828248U (en) Assembly beam structure for assembly building
CN104846734A (en) Unit-assembly type steel trestle
CN218522336U (en) Telescopic beam support
RU2611663C1 (en) Metal frame of monolithic reinforced concrete columns
CN219431452U (en) Combined steel lattice column for supporting
CN217300059U (en) Assembled steel structure for high seismic region
CN216196862U (en) Constructional engineering steel structure support
CN214220865U (en) A assembled encloses fender for construction site
CN213806748U (en) Be applied to antidetonation support of steel construction
CN220747221U (en) Steel frame spliced structure
CN203247699U (en) Modular building structure
CN209817547U (en) No bottom plate modularization useless thick liquid pond structure
CN215290986U (en) Novel assembled building element foundation column
CN219118366U (en) Large-span assembled steel bar support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant