CN214785837U - Hydraulic self-climbing operating frame for building construction - Google Patents
Hydraulic self-climbing operating frame for building construction Download PDFInfo
- Publication number
- CN214785837U CN214785837U CN202120303618.0U CN202120303618U CN214785837U CN 214785837 U CN214785837 U CN 214785837U CN 202120303618 U CN202120303618 U CN 202120303618U CN 214785837 U CN214785837 U CN 214785837U
- Authority
- CN
- China
- Prior art keywords
- guide rail
- climbing
- wall
- frame
- hydraulic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a hydraulic pressure is from climbing formula handling frame for construction, including following part: the operation frame is used for the operation of workers; the hydraulic lifting guide rail comprises a crawling guide rail and a hydraulic lifting mechanism, and the hydraulic lifting mechanism is used for pulling the crawling guide rail and the operating frame to move directionally; the wall-attached support group is at least provided with 3 wall-attached supports which are longitudinally arranged and connected on a wall body and are used for being in sliding connection with the crawling guide rail; when the climbing guide rail is lifted, the climbing guide rail takes the wall-attached support as a climbing point, and the operation frame is detachably connected with the wall-attached support. The utility model has the advantages of simple structure, low in preparation cost, be convenient for installation and dismantlement, the handling frame can promote the height through hydraulic lifting guide rail and the cooperation of attaching wall support group, and operation mode is simple, can greatly reduce the degree of difficulty and construction cost, improves the efficiency of construction, and can be applicable to the constrictive construction environment needs in space, and the staff need not to increase according to the height and constantly builds higher scaffold frame.
Description
Technical Field
The utility model belongs to building construction equipment field relates to a hydraulic pressure is from climbing formula handling frame for construction.
Background
The open China is reformed, the economy is rapidly developed, the huge building quantity of cities is brought along, and one of the characteristics is that the buildings are more and more tall and scattered in large, medium and small cities. In recent years, China not only builds a large number of high-rise buildings, but also raises a hot tide for building a super-third-rise landmark building. The construction of superelevation floor means that the height of construction also constantly promotes, and traditional construction methods mainly is building the scaffold frame in the higher place that can't directly be under construction of outer wall, interior decoration or floor height, and constructor is under construction on the scaffold frame. However, the scaffold is complex to set up, and needs to consume a lot of manpower, material resources and time, and the higher the height is, the greater the difficulty of setting up is. Moreover, for concrete pouring construction of elevator shafts, shear walls, columns, beams and the like, a large number of templates need to be installed, the construction space is limited, the number of floors is higher, the number of consumables of the scaffold is more, and the building difficulty and the construction cost are also high.
SUMMERY OF THE UTILITY MODEL
The utility model provides a problem to above-mentioned prior art exists provides a hydraulic pressure is from climbing formula handling frame for construction.
In order to achieve the purpose, the utility model adopts the following technical measures:
a hydraulic self-climbing operation frame for building construction comprises the following components: the operation frame is used for the operation of workers; the hydraulic lifting guide rail comprises a crawling guide rail and a hydraulic lifting mechanism, and the hydraulic lifting mechanism is used for pulling the crawling guide rail and the operating frame to move directionally; the wall-attached support group is at least provided with 3 wall-attached supports which are longitudinally arranged and connected on a wall body and are used for being in sliding connection with the crawling guide rail; when the climbing guide rail is lifted, the wall-attached support is used as a climbing point of the climbing guide rail, and the operation frame is detachably connected with the wall-attached support.
Preferably, the handling frame includes two piece at least pole settings, be connected with the construction platform board between pole setting and the pole setting perpendicularly, the outside of pole setting be connected with be used for with creep guide rail sliding connection's connecting seat, the connecting seat with attach the detachable connection of wall support.
Preferably, the hydraulic lifting mechanism comprises a hydraulic cylinder, two ends of the hydraulic cylinder are connected with limiting sliding seats, the limiting sliding seats are connected with the crawling guide rail in a sliding mode, and one of the limiting sliding seats is fixedly connected with the operating frame.
Preferably, the crawling guide rail comprises two channel steel guide rails and a limiting cross rod which is horizontally connected between the two channel steel guide rails, and the limiting cross rod is provided with at least 10.
Preferably, the hydraulic lifting mechanism and/or the connecting seat are/is provided with a spring bolt mechanism, the spring bolt mechanism comprises a top block mounting groove, two sides of the top block mounting groove are provided with sliding chutes in sliding fit with the channel steel guide rail, and the top block mounting groove is internally hinged with a bidirectional top block used for being matched with the crawling guide rail.
Preferably, one side of the bidirectional top block is provided with a limiting insertion rod, and the rotation angle of the bidirectional top block is 0-90 degrees.
Preferably, the wall-attached support comprises a support body, wherein the front side of the support body is provided with a through groove matched with the crawling guide rail in a sliding manner, and the top of the support body is hinged with a limiting cover plate for preventing the crawling guide rail from sliding downwards.
Preferably, the crawling guide rail further comprises a limiting top block arranged at the top, and the limiting top block is matched with the limiting cover plate to prevent the crawling guide rail from sliding downwards.
Preferably, the connecting seat outside is equipped with the cooperation groove, be equipped with in the cooperation groove with creep guide rail sliding fit's cooperation spout, the cooperation groove passes through the detachable connection of bolt attach the wall support.
Preferably, an inner frame is connected between the vertical rods.
The beneficial effects of utility model reside in that:
compared with the prior art, the utility model discloses a hydraulic pressure is from climbing formula handling frame for construction's simple structure, the preparation cost is low, the installation and the dismantlement of being convenient for, the handling frame can promote the height through hydraulic lifting guide rail and the cooperation that attaches wall support group, and operation mode is simple, can greatly reduce the degree of difficulty and construction cost, improves the efficiency of construction, and can be applicable to the constrictive construction environment needs in space, and the staff need not to increase according to the height and constantly builds higher scaffold frame.
Drawings
FIG. 1 is the utility model discloses a structure chart of hydraulic pressure is from climbing formula handling frame for construction
Fig. 2 is a schematic diagram of the connection between the hydraulic lifting guide rail and the connecting seat of the hydraulic self-climbing operation frame for building construction of the present invention;
FIG. 3 is a structural diagram of a creeping guide rail of the hydraulic self-creeping type operation frame for building construction;
fig. 4 is a structural diagram of a hydraulic lifting mechanism of the hydraulic self-climbing operation frame for building construction of the utility model;
FIG. 5 is a structural diagram of a connecting seat of the hydraulic self-climbing operation frame for building construction of the present invention;
fig. 6 is a structural diagram of a wall-attached support of the hydraulic self-climbing operation frame for building construction of the utility model;
fig. 7 is a schematic diagram of the creeping principle of the creeping guide rail of the hydraulic self-creeping type operation frame for building construction of the present invention;
fig. 8 is the utility model relates to a principle schematic diagram that crawls of handling frame of hydraulic pressure self-climbing formula handling frame for construction.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-8, a hydraulic self-climbing operation frame for building construction comprises an operation frame 1, a hydraulic lifting rail 2 and a wall-attached support group, wherein the operation frame 1 is used for being operated by an operator, the hydraulic lifting rail 2 comprises a crawling rail 21 and a hydraulic lifting mechanism 22, the hydraulic lifting mechanism 22 is used for pulling the crawling rail 21 and the operation frame 1 to move upwards, the wall-attached support group comprises at least 3 wall-attached supports 3 longitudinally arranged on a wall, and the wall-attached supports 3 are used for being connected with the crawling rail 21 in a sliding manner; during lifting, the operation frame 1 is firstly connected with the wall-attached support 3 on one side of the operation frame, the hydraulic lifting mechanism 22 pushes the crawling guide rail 21 to move upwards to the next wall-attached support 3, after the crawling guide rail 21 is fixed by taking the wall-attached support 3 as a climbing point, the operation frame 1 is separated from the wall-attached support 3 connected with the crawling guide rail, and then the hydraulic lifting mechanism 22 pushes the operation frame 1 to move upwards to the wall-attached support 3 connected with the crawling guide rail 21.
Specifically, in this embodiment, handling frame 1 includes four pole settings 11, four pole settings 11 are connected perpendicularly on 12 both sides limits of construction platform board or four sides, and four be connected with two piece at least parallel arrangement between the pole setting 11 construction platform board 12, the outside of pole setting 11 be connected with be used for with creep guide rail 21 sliding connection's connecting seat 13, the connecting seat 13 outside is equipped with cooperation groove 131, be equipped with in the cooperation groove 131 with creep guide rail 21 sliding connection's cooperation spout 132, cooperation groove 131 with attach 3 phase-matchs of wall support, through the detachable connection of bolt attach wall support 3.
In addition, the structure of the handling frame 1 can be adjusted according to actual construction requirements, and the number of the vertical rods 11 can be adjusted according to construction weighing capacity and the size of the construction platform plate 12, that is, in other embodiments, the vertical rods 11 connected to the sides of the construction platform plate 12 can be set to be two, three, four, five or more, and each vertical rod 11 is connected to at least one side of the construction platform plate 12.
In addition, the hydraulic lifting mechanism 22 includes a hydraulic cylinder 221, two ends of the hydraulic cylinder 221 are connected with limiting sliders 222, one side of each of the two limiting sliders 222 is slidably connected to the crawling guide rail 21, and one of the limiting sliders 222 is fixedly connected to the connecting seat 13 of the operation frame 1. In this application, crawling guide rail 21 is cat ladder structure, including two channel-section steel guide rails 211 and horizontal connection two spacing horizontal pole 212 between the channel-section steel guide rails 211, spacing horizontal pole 212 is equipped with and is no less than 10, and the distance between spacing horizontal pole 212 and the spacing horizontal pole 212 is 5cm ~ 20 cm. The hydraulic lifting mechanism 22 and the connecting seat 13 are provided with a spring bolt mechanism, the spring bolt mechanism comprises a top block mounting groove arranged on one side of the limiting slide seat 222 and the connecting seat 13, sliding grooves 225 in sliding fit with the channel steel guide rails 211 are formed in two sides of the top block mounting groove, a bidirectional top block 223 matched with the limiting cross rod 212 is hinged in the top block mounting groove, a limiting insertion rod 224 is arranged on one side of the bidirectional top block 223, the limiting insertion rod 224 is detachably mounted in the top block mounting groove, the rotating angle of the bidirectional top block 223 ranges from 0 degree to 90 degrees, the spring bolt mechanism is matched with the crawling guide rail 21, the crawling guide rail 21 and the operating frame 1 can be prevented from sliding downwards in the climbing process, and the crawling guide rail 21 and the safe lifting of the operating frame 1 can be ensured.
In detail, when the crawling guide rail 21 crawls upwards, the connecting seat 13 of the operating frame 1 is connected with the wall-attached support 3 on one side of the operating frame through a pin, the outer side of the bidirectional top block 223 inclines upwards, the telescopic rod of the hydraulic cylinder 221 extends, the limit cross bar 212 does not affect the swinging direction of the bidirectional top block 223 below the hydraulic cylinder 221, the bidirectional top block 223 above the hydraulic cylinder 221 is transversely clamped between the two limit cross bars 212, so that the crawling guide rail 21 cannot slide downwards when the telescopic rod of the hydraulic cylinder 221 extends, when the telescopic rod of the hydraulic cylinder 221 retracts, the bidirectional top block 223 below the hydraulic cylinder 221 is transversely clamped between the two limit cross bars 212, the outer side of the bidirectional top block 223 above the hydraulic cylinder 221 inclines upwards, and the crawling guide rail 21 ascends along with the retraction of the telescopic rod of the hydraulic cylinder 221; when the operation frame 3 climbs upwards, the operation frame 1 is separated from the wall-attached support 3 connected with the operation frame, the direction of the bidirectional top block 223 is adjusted to be inclined downwards and outwards, the limiting insertion rod 224 is inserted into the top block installation groove, the telescopic rod of the hydraulic cylinder 221 extends, the limiting cross rod 212 does not affect the swinging direction of the bidirectional top block 223 above the hydraulic cylinder 221, the bidirectional top block 223 below the hydraulic cylinder 221 is transversely clamped between the two limiting cross rods 212, the telescopic rod of the hydraulic cylinder 221 extends to push the operation frame 1 to move upwards, when the telescopic rod of the hydraulic cylinder 221 retracts, the bidirectional top block 223 above the hydraulic cylinder 221 can be transversely clamped between the two limiting cross rods 212, the outer side of the bidirectional top block below the hydraulic cylinder 221 inclines downwards, and the lower end of the hydraulic cylinder 221 climbs upwards along the crawling guide rail 21.
More in detail, attach wall support 3 and include support body 31, support body 31 front side be equipped with be used for with creep guide rail 21 sliding fit's logical groove 32, support body 31's top is articulated to have and is prevented the spacing apron 33 of creep guide rail 21 gliding, creep guide rail 21 is still including setting up the spacing kicking block 213 at the top, spacing kicking block 213 with spacing apron 33 cooperation is in order to prevent creep guide rail 21 gliding.
The working principle is as follows: the wall body is provided with at least one group of the wall-attached support groups, each wall-attached support group comprises at least 3 wall-attached supports 3, the wall-attached supports 3 of the wall-attached support group are arranged in a vertical line, when the crawling guide rail 21 crawls upwards, the connecting seat 13 of the operating frame 1 is connected with the wall-attached support 3 on one side of the operating frame through a bolt, the hydraulic lifting mechanism 22 pushes the crawling guide rail 21 to move upwards to the next wall-attached support 3, the limiting top block 213 props open the limiting cover plate 33 and then passes through the through groove 32, the limiting cover plate 33 resets, and the limiting top block 213 is buckled on the limiting cover plate 33 to prevent the crawling guide rail 21 from sliding downwards; when the operation frame 3 climbs upwards, the direction of the bidirectional ejecting block 223 is adjusted, the hydraulic cylinder 221 separates the operation frame 1 from the wall-attached support 3 connected with the operation frame, the hydraulic lifting mechanism 22 pushes the operation frame 1 to move upwards to the wall-attached support 3 connected with the limiting ejecting block 213, the connecting seat 13 is connected with the wall-attached support 3 through the plug pin, and the operation is repeated, so that the operation frame 1 can be lifted upwards step by step.
To sum up, the utility model discloses a hydraulic pressure is from climbing formula handling frame for construction's simple structure, the preparation cost is low, is convenient for install and dismantles, and the handling frame can promote the height through hydraulic lifting guide rail and the cooperation that attaches wall support group, and operation mode is simple, can greatly reduce the degree of difficulty and construction cost, improves the efficiency of construction, and can be applicable to the constrictive construction environment needs in space, and the staff need not to constantly build higher scaffold according to the increase of height.
The foregoing is a more detailed description of the invention, taken in conjunction with the specific preferred embodiments thereof, and it is not intended that the invention be limited to the specific embodiments disclosed herein. To those skilled in the art to which the utility model belongs, a plurality of simple deductions or replacements can be made without departing from the concept of the utility model, and all the deductions or replacements should be regarded as belonging to the protection scope of the utility model.
Claims (10)
1. The utility model provides a hydraulic pressure is from climbing formula handling frame for construction which characterized in that includes following part: the operation frame (1) is used for the operation of constructors; the hydraulic lifting guide rail (2) comprises a crawling guide rail (21) and a hydraulic lifting mechanism (22), and the hydraulic lifting mechanism (22) is used for pulling the crawling guide rail (21) and the operating frame (1) to move directionally; the wall-attached support group is at least provided with 3 wall-attached supports (3) which are longitudinally arranged and connected on a wall body and are used for being in sliding connection with the crawling guide rail (21); when the climbing guide rail is lifted, the climbing guide rail (21) takes the wall-attached support (3) as a climbing point, and the operation frame (1) is detachably connected with the wall-attached support (3).
2. The hydraulic self-climbing operation frame for building construction according to claim 1 is characterized in that the operation frame (1) comprises at least two vertical rods (11), a construction platform plate (12) is vertically connected between the vertical rods (11) and the vertical rods (11), a connecting seat (13) for slidably connecting with the climbing guide rail (21) is connected to the outer side of each vertical rod (11), and the connecting seat (13) is detachably connected with the wall-attached support (3).
3. The hydraulic self-climbing operation frame for building construction according to claim 1, wherein the hydraulic lifting mechanism (22) comprises a hydraulic cylinder (221), two ends of the hydraulic cylinder (221) are connected with limit sliding bases (222), the limit sliding bases (222) are slidably connected with the crawling guide rail (21), and one of the limit sliding bases (222) is fixedly connected with the operation frame (1).
4. The hydraulic self-climbing operation frame for building construction according to claim 3 is characterized in that the climbing guide rail (21) comprises two channel steel guide rails (211) and a limiting cross bar (212) horizontally connected between the two channel steel guide rails (211), and not less than 10 limiting cross bars (212) are arranged.
5. The hydraulic self-climbing operation frame for building construction according to claim 4 is characterized in that a bolt mechanism is arranged on the hydraulic lifting mechanism (22) and/or the connecting seat (13), the bolt mechanism comprises a top block mounting groove, sliding grooves (225) in sliding fit with the channel steel guide rail (211) are formed in two sides of the top block mounting groove, and a bidirectional top block (223) used for being matched with the crawling guide rail (21) is hinged in the top block mounting groove.
6. The hydraulic self-climbing operation frame for building construction according to claim 5, wherein a limit insertion rod (224) is arranged on one side of the bidirectional top block (223), and the rotation angle of the bidirectional top block (223) is 0-90 degrees.
7. The hydraulic self-climbing operation frame for building construction according to claim 1 is characterized in that the wall-attached support (3) comprises a support body (31), a through groove (32) for sliding fit with the crawling guide rail (21) is arranged on the front side of the support body (31), and a limiting cover plate (33) for preventing the crawling guide rail (21) from sliding downwards is hinged to the top of the support body (31).
8. The hydraulic self-climbing operation frame for building construction according to claim 7, wherein the crawling guide rail (21) further comprises a limiting top block (213) arranged at the top, and the limiting top block (213) is matched with the limiting cover plate (33) to prevent the crawling guide rail (21) from sliding downwards.
9. The hydraulic self-climbing operation frame for building construction according to claim 2, wherein a matching groove (131) is formed on the outer side of the connecting seat (13), a matching sliding groove (132) which is in sliding fit with the crawling guide rail (21) is formed in the matching groove (131), and the matching groove (131) is detachably connected with the wall-attached support (3) through a bolt.
10. The hydraulic self-climbing operation frame for building construction according to claim 2, wherein an inner frame (14) is further connected between the vertical rods (11) and the vertical rods (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120303618.0U CN214785837U (en) | 2021-02-03 | 2021-02-03 | Hydraulic self-climbing operating frame for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120303618.0U CN214785837U (en) | 2021-02-03 | 2021-02-03 | Hydraulic self-climbing operating frame for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214785837U true CN214785837U (en) | 2021-11-19 |
Family
ID=78751894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120303618.0U Active CN214785837U (en) | 2021-02-03 | 2021-02-03 | Hydraulic self-climbing operating frame for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214785837U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114109010A (en) * | 2021-11-25 | 2022-03-01 | 中交第二航务工程局有限公司 | Hydraulic adjustable lifting structure based on steel pipe scaffold |
-
2021
- 2021-02-03 CN CN202120303618.0U patent/CN214785837U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114109010A (en) * | 2021-11-25 | 2022-03-01 | 中交第二航务工程局有限公司 | Hydraulic adjustable lifting structure based on steel pipe scaffold |
CN114109010B (en) * | 2021-11-25 | 2022-11-15 | 中交第二航务工程局有限公司 | Hydraulic adjustable lifting structure based on steel pipe scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202023360U (en) | Hydraulic climbing die plate for building construction | |
CN206636155U (en) | A kind of construction Lifting scaffold | |
CN214785837U (en) | Hydraulic self-climbing operating frame for building construction | |
CN209244217U (en) | A kind of height-adjustable building construction scaffold | |
CN109205455A (en) | Integral hoisting platform of air conditioning unit and construction method thereof | |
CN207647205U (en) | Adjustable electric stair shaft protective frame | |
CN201339311Y (en) | Turning plate device of hanging rack | |
CN215948858U (en) | Attached lifting scaffold protection platform | |
CN111997345B (en) | Lifting scaffold hangs hoist system upside down | |
CN110067207B (en) | Reinforcing steel bar binding protection frame for high pier turnover formwork construction | |
CN221778997U (en) | Wind-resistant hydraulic climbing formwork device | |
CN209799408U (en) | rail-mounted vertical transportation mechanism for unit plate | |
CN206487128U (en) | A kind of Guiding Support Elevating Scaffold | |
CN208456101U (en) | A kind of housing construction scaffold | |
CN208203101U (en) | A kind of quarry tipper step ladder | |
CN206319572U (en) | A kind of adjustable extended plate | |
CN216740605U (en) | Safety work protection platform for construction | |
CN211949473U (en) | Novel elevator shaft regularization operation platform | |
CN215484533U (en) | Telescopic tower crane escape way | |
CN220265089U (en) | Heavy pipeline mechanical lifting device | |
CN214062298U (en) | Hanging basket for constructional engineering | |
CN221298662U (en) | Protection fixing device with adjustable elevator shaft door opening height | |
CN214786046U (en) | Template aerial installation device for creeping formwork machining | |
CN220223339U (en) | Tower crane support structure for building hoisting machinery | |
CN215212258U (en) | Safe and reliable elevator shaft protection operation platform convenient to layer-by-layer turnover use |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |