CN109205455A CN201810797566.XA CN201810797566A CN109205455A CN 109205455 A CN109205455 A CN 109205455A CN 201810797566 A CN201810797566 A CN 201810797566A CN 109205455 A CN109205455 A CN 109205455A
Authority
CN
China
Prior art keywords
air
conditioner set
hoisting platform
longitudinal slide
paralell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810797566.XA
Other languages
Chinese (zh)
Other versions
CN109205455B (en
Inventor
陈守加
王占东
张宏英
齐勇涛
田瑞野
祝迪
何平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201810797566.XA priority Critical patent/CN109205455B/en
Publication of CN109205455A publication Critical patent/CN109205455A/en
Application granted granted Critical
Publication of CN109205455B publication Critical patent/CN109205455B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/16Slings with load-engaging platforms or frameworks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/122Sling or load protectors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/06Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Other Air-Conditioning Systems (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of air-conditioner set integral hoisting platform and its construction method, wherein air-conditioner set integral hoisting platform includes paralell and the main lifting plate for being connected to paralell two sides;The paralell includes the longitudinal slide rail and one group of middle cross beam of two parallel interval arrangements;The end of the paralell is equipped with the end floor beam to tie up wind hawser, and the outside of end floor beam is equipped with secondary lifting plate;The front end of the paralell is connected with the cross bar for lifting between two longitudinal slide rails;Cross bar inside, positioned at the bottom of two longitudinal slide rails be respectively equipped with prevent paralell move forward postive stop baffle;The inside of the postive stop baffle is respectively equipped with the casing to fixed platform frame positioned at the bottom of two longitudinal slide rails;The gag lever post for stopping air-conditioner set that sidesway occurs is respectively arranged at the top of two longitudinal slide rails of the paralell.The present invention solves traditional air-conditioner set and lifts the technical problem that long in time limit, costly and dismantling unit causes working performance unstable.

Description

A kind of air-conditioner set integral hoisting platform and its construction method
Technical field
The present invention relates to technical field of building construction more particularly to a kind of air-conditioner set integral hoisting platforms and its construction party Method.
Background technique
Equipment installation is the most important thing of electromechanical installation, not there is only very big risk in equipment hoisting engineering, And it is also required to a large amount of manpower and material resources.It needs to occupy a large amount of construction time in construction process, so applying in engineering Individual special construction plan to be write to equipment hoisting during work, through unit in charge of construction person in charge of the technology aspect, proprietor and management It could implement after side's examination & approval;Therefore equipment hoisting occupies critically important position in construction.Existing air-conditioner set lifting There is long in time limit, costly, dismantling unit in the construction process and cause working performance unstable in the mode for mostly using dismantling greatly Situations such as.
Summary of the invention
The invention proposes a kind of air-conditioner set integral hoisting platform and its construction methods, to solve traditional air-conditioner set Lift the technical problem that long in time limit, costly and dismantling unit causes working performance unstable.
The present invention adopts the following technical scheme that.
A kind of air-conditioner set integral hoisting platform includes paralell and the main lifting plate for being connected to paralell two sides;Institute State the longitudinal slide rail and one group of middle cross beam being connected between two longitudinal slide rails that paralell includes two parallel interval arrangements; The end of the paralell is equipped with the end floor beam to tie up wind hawser, and the outside of end floor beam is equipped with secondary lifting plate;It is described flat The front end of rack is connected with the cross bar for lifting between two longitudinal slide rails;In the inside of cross bar, positioned at two longitudinal directions The bottom of sliding rail is respectively equipped with the postive stop baffle for preventing paralell from moving forward;The inside of the postive stop baffle is indulged positioned at two The casing to fixed platform frame is respectively equipped with to the bottom of sliding rail;The top of two longitudinal slide rails of the paralell is set respectively It is equipped with the gag lever post for stopping air-conditioner set that sidesway occurs.
Preferably, the top of the longitudinal slide rail, along its length be axially arranged with installation air-conditioner set sliding slot;The gag lever post It is longitudinally spaced to be arranged in sliding slot, at the outer side edges position of sliding slot, and the top of gag lever post exceeds the side of sliding slot Top;The length of side top of the top of the gag lever post beyond sliding slot is not less than 50mm.
Preferably, the longitudinally parallel interval of one group of middle cross beam is connected between two longitudinal slide rail bottoms, and in every The both ends end of crossbeam exceeds the outside of longitudinal slide rail;The end floor beam is connected between the end of two longitudinal slide rails, and And it is located at the bottom of two longitudinal slide rails;Wherein, the both ends end of end floor beam exceeds the outside of longitudinal slide rail.
Preferably, the main lifting plate has one group, respectively corresponds the both ends at both ends and end floor beam that middle cross beam is arranged in, The hole across main lifting rope is offered in the plate face of main lifting plate;Be connected between the main lifting plate at the end floor beam both ends to The stull of auxiliary connection lifting plate;The perforation across secondary lifting rope is offered on the secondary lifting plate, at medium position.
Preferably, the bottom of longitudinal slide rail is arranged in, at front position in the postive stop baffle, and postive stop baffle distance is vertical It is 80mm~120mm to the distance of sliding rail front end;The postive stop baffle cross section is L-shaped, includes horizontal edge and vertical edge;Wherein, The horizontal edge of postive stop baffle is connected horizontally on the bottom of longitudinal slide rail, and the vertical edge of postive stop baffle is connected to the bottom of horizontal edge, close to end Hold side.
Preferably, described sleeve pipe is transversely arranged, and the casing of two longitudinal slide rail bottoms is corresponding;Described sleeve pipe with Spacing between the postive stop baffle of corresponding side is 500mm~600mm.
A kind of construction method of air-conditioner set integral hoisting platform, includes the following steps.
Step 1: the place of selection suspender and suspender lifting.
Step 2 makes hoisting platform.
Hoisting platform is connect by step 3 with lifting machine: being separately connected master on the main lifting plate of hoisting platform two sides and is hung Rope, while the auxiliary connection lifting rope on the secondary lifting plate of hoisting platform end;Then main lifting rope and secondary lifting rope are connect with loop wheel machine.
Step 4 installs electric block in Air Conditioning Facilities: support frame is installed in the front of Equipment Foundations, it then will be electronic Cucurbit connects on the support frame, close to middle position.
Step 5 is lifted by air-conditioner set dropping place on hoisting platform.
Step 6, hoisting platform are lifted at the window's position of Air Conditioning Facilities, and draw air-conditioner set using electric block To Equipment Foundations.
Preferably, in step 5 after air-conditioner set dropping place is on hoisting platform, above air-conditioner set, two sides it is corresponding Support rod is set between main lifting rope;Support rod is being lifted after setting completed.
Preferably, in step 5 in hoisting process, after the front end of hoisting platform enters Air Conditioning Facilities, by hoisting platform bottom The postive stop baffle in portion withstands angle in Equipment Foundations, and tie string is then worn in casing, by Equipment Foundations and is hung by tie string Assembling platform links together, and prevents swaying forwards and backwards for hoisting platform.
Preferably, when drawing on air-conditioner set to Equipment Foundations in step 6, tense secondary lifting rope upwards, make hoisting platform with There are 5 °~10 ° of tilt angles between horizontal plane, to reduce the frictional resistance between air-conditioner set and longitudinal slide rail;Meanwhile Pad sets flitch between hoisting platform and structural floor.
Compared with prior art the invention has the characteristics that and beneficial effect.
1, hoisting platform of the invention is by paralell, main lifting plate, secondary lifting plate, cross bar, postive stop baffle and gag lever post etc. Component is constituted;Wherein, triangular structure is constituted between two corresponding main lifting plates and secondary lifting plate, is hanging hoisting platform It is steady when dress;And the two sides of paralell are arranged in gag lever post, block air-conditioner set and sidesway occurs;The present invention has structure letter Single, construction is reasonable, the high feature of safety coefficient.
2, method of the invention is transported using the transition that the exterior window of Air Conditioning Facilities carries out air-conditioner set, solves site space Narrow, air-conditioner set transit route is long and the technical problems such as difficulty are turned in direction;Meanwhile the present invention is directly by hoisting platform from window Mouth protrudes into Air Conditioning Facilities, rides upon in Equipment Foundations, and air-conditioner set is pulled to Equipment Foundations from hoisting platform, shortens The period is transported, air-conditioner set disintegration is eliminated and re-assemblies the time of carrying, and reduces the expense of lifting.
3, method of the invention is divided when lifting to air-conditioner set without the core part to air-conditioner set Solution ensure that units' installation is in optimal operating condition after the completion, effectively prevent working performance caused by dismantling unit not Situations such as stablizing.
4, in method of the invention, after the front end of hoisting platform enters Air Conditioning Facilities, by the limit of hoisting platform bottom Baffle withstands angle in Equipment Foundations, and tie string is then worn in casing, is connected Equipment Foundations and hoisting platform by tie string It is connected together, prevents swaying forwards and backwards for hoisting platform, effectively raise the safety of construction.
Detailed description of the invention
Fig. 1 is the schematic perspective view of hoisting platform in the present invention.
Fig. 2 is the side structure schematic diagram of hoisting platform in the present invention.
Fig. 3 is the schematic view of facade structure of Air Conditioning Facilities in the present invention.
Fig. 4 is the planar structure schematic diagram of Air Conditioning Facilities in the present invention.
Fig. 5 is structural schematic diagram of the air-conditioner set dropping place on paralell in the present invention.
Fig. 6 is that air-conditioner set is pulled to the schematic diagram in Equipment Foundations by electric block from hoisting platform in the present invention.
Fig. 7 is that the position baffle of paralell limit in the present invention is against the structural schematic diagram in Equipment Foundations.
Appended drawing reference: the main lifting plate of 1- paralell, 1.1- longitudinal slide rail, 1.2- middle cross beam, 1.3- end floor beam, 2-, 3- pair lifts plate, 4- cross bar, 5- postive stop baffle, 6- casing, 7- air-conditioner set, 8- gag lever post, 9- sliding slot, 10- master Lifting rope, 11- hole, 12- stull, 13- pair lifting rope, 14- perforation, 15- Air Conditioning Facilities, 16- electric block, 17- equipment Basis, 18- support frame, 19- window, 20- tie string, 21- flitch, 22- support rod.
Specific embodiment
As shown in figs. 1-7, this air-conditioner set integral hoisting platform includes paralell 1 and is connected to 1 two sides of paralell Main lifting plate 2;It is characterized by: the paralell 1 includes the longitudinal slide rail 1.1 and one group of company that two parallel intervals are arranged Connect the middle cross beam 1.2 between two longitudinal slide rails 1.1;The end of the paralell 1 is equipped with the end cross to tie up wind hawser Beam 1.3, and the outside of end floor beam 1.3 is equipped with secondary lifting plate 3;The front end of the paralell 1, be located at two longitudinal slide rails 1.1 it Between be connected with cross bar 4 for lifting;In the inside of cross bar 4, positioned at the bottom of two longitudinal slide rails 1.1 to be respectively equipped with prevention flat The postive stop baffle 5 that rack 1 moves forward;The inside of the postive stop baffle 5 is set respectively positioned at the bottom of two longitudinal slide rails 1.1 There is the casing 6 to fixed platform frame 1;The top of two longitudinal slide rails 1.1 of the paralell 1 is respectively arranged with blocking air-conditioning The gag lever post 8 of the generation sidesway of unit 7.
In the present embodiment, the side close to 1 center of paralell is inside.
In the present embodiment, the top of the longitudinal slide rail 1.1, the sliding slot 9 that installation air-conditioner set 7 is axially arranged with along its length; The gag lever post 8 is longitudinally spaced to be arranged in sliding slot 9, at the outer side edges position of sliding slot 9, and the top of gag lever post 8 Side top beyond sliding slot 9;The length of side top of the top of the gag lever post 8 beyond sliding slot 9 is to prevent not less than 50mm The only sidesway on platform of air-conditioner set 7.
In the present embodiment, the longitudinally parallel interval of one group of middle cross beam 1.2 is connected between two 1.1 bottoms of longitudinal slide rail, And the both ends end of every middle cross beam 1.2 exceeds the outside of longitudinal slide rail 1.1;The end floor beam 1.3 is connected to two and indulges To between the end of sliding rail 1.1, and it is located at the bottom of two longitudinal slide rails 1.1;Wherein, the both ends end of end floor beam 1.3 is equal Outside beyond longitudinal slide rail 1.1.
In the present embodiment, there are four the main lifting plates 2, respectively corresponds the both ends for being disposed therein a middle cross beam 1.2 With the both ends of end floor beam 1.3, the hole 11 across main lifting rope 10 is offered in the plate face of main lifting plate 2;The end floor beam 1.3 The stull 12 to auxiliary connection lifting plate 3 is connected between the main lifting plate 2 at both ends;On the secondary lifting plate 3, close to middle position The place of setting offers the perforation 14 across secondary lifting rope 13;Four main lifting plates 2 and a secondary lifting plate 3 are set on paralell 1, are used Paralell 1 is steady when ensuring lifting.
In the present embodiment, the bottom of longitudinal slide rail 1.1 is arranged in, at front position in the postive stop baffle 5, limiting block Distance of the plate 5 apart from 1.1 front end of longitudinal slide rail is 100 mm;5 cross section of postive stop baffle is L-shaped, includes horizontal edge and perpendicular Side;Wherein, the horizontal edge of postive stop baffle 5 is connected horizontally on the bottom of longitudinal slide rail 1.1, and the vertical edge of postive stop baffle 5 is connected to horizontal edge Bottom, lean on proximal end side.
Certainly in other embodiments, distance of the postive stop baffle 5 apart from 1.1 front end of longitudinal slide rail can also be in 80mm It is chosen within the scope of~120mm.
In the present embodiment, described sleeve pipe 6 is transversely arranged, and the casing 6 of two 1.1 bottoms of longitudinal slide rail is corresponding; Spacing between described sleeve pipe 6 and the postive stop baffle 5 of corresponding side is 500mm~600mm.
The construction method of this air-conditioner set integral hoisting platform, includes the following steps.
Step 1: the place of selection suspender and suspender lifting: the tonnage and maximum sling height of suspender are the key that selections, In conjunction with the distribution situation of the Air Conditioning Facilities 15 of itself engineering, the boom of suspender should be able to reach the Air Conditioning Facilities 15 and sky of extreme higher position The weight of unit 7 is adjusted, Around road conditions are observed, suitable place is selected to place suspender, avoids repeating movable hanger;It is comprehensive Close the model of environment above factor and engineering practice selection suspender.
Step 2, make hoisting platform: hoisting platform needs high-altitude mobile as the undertaking carrier of air-conditioner set 7, peace Full performance must consolidate, and otherwise be easy to cause safety accident, while hoisting platform must be able to achieve the lateral sliding of air-conditioner set 7 It is dynamic;And according to the edge through site inspection Equipment Foundations 17 at a distance from 15 exterior wall of Air Conditioning Facilities, window opening size is thereby determined that The size of hoisting platform is certain.
Hoisting platform is connect by step 3 with lifting machine: being separately connected master on the main lifting plate 2 of hoisting platform two sides and is hung Rope 10, while the auxiliary connection lifting rope 13 on the secondary lifting plate 3 of hoisting platform end;Then by main lifting rope 10 and secondary lifting rope 13 with hang Machine connection.
Step 4 installs electric block 16 in Air Conditioning Facilities 15: installing support frame 18 in the front of Equipment Foundations 17, so Electric block 16 is connected on support frame 18 afterwards, close to middle position;Electric block 16 is selected according to the weight of air-conditioner set 7 It selects, the effect of electric block 16 is to provide a horizontal pull to air-conditioner set 7, slides air-conditioner set 7 slowly from hoisting platform It moves to Equipment Foundations 17;The speed of electric block 16 cannot be too fast, if speed may cause very much air-conditioner set 7 due to inertia fastly Equipment Foundations 17 are skidded off, jeopardizes personal safety, destroy construction site and causes unnecessary loss.
Step 5 is lifted by 7 dropping place of air-conditioner set on hoisting platform;Hoisting platform is smoothly placed first In on ground, flitch cushion block is placed above hoisting platform;The fresh wind port of air-conditioner set 7 is determined further according to drawing, air outlet The air-conditioner set 7 for needing handling is placed on hoisting platform by direction using fork truck, and determines that the direction of air-conditioner set 7 is correct; Then air-conditioner set 7 is slightly agitated using tools such as crowbars, extract flitch cushion block out, in the longitudinal slide rail 1.1 on hoisting platform Gag lever post 8 should limit the lateral displacement of air-conditioner set 7, and air-conditioner set 7 is stably placed in longitudinal slide rail 1.1;Lifting is flat When platform rises, slowly starts crane, observe the rising situation of hoisting platform;If there is hoisting platform skew, need to stop lifting immediately It rises, slowly puts down hoisting platform, if there is the case where hoisting platform shakes and swings with the wind, main lifting rope 10 is manipulated by ground staff With secondary lifting rope 13, guarantee that it is steady.
Step 6, hoisting platform are lifted at 19 position of window of Air Conditioning Facilities 15, and draw sky using electric block 16 It adjusts on unit 7 to Equipment Foundations 17.
In the present embodiment, in step 5 after 7 dropping place of air-conditioner set is on hoisting platform, above air-conditioner set 7, two sides Support rod 22 is set between corresponding main lifting rope 10;Support rod 22 is being lifted after setting completed, when preventing lifting, main lifting rope 10 tense, and air-conditioner set 7 is locked.
In the present embodiment, in step 5 in hoisting process, after the front end of hoisting platform enters Air Conditioning Facilities 15, it will lift The postive stop baffle 5 of mesa base withstands angle in Equipment Foundations 17, and tie string 20 is then worn in casing 6, passes through tie string 20 Equipment Foundations 17 and hoisting platform are linked together, swaying forwards and backwards for hoisting platform is prevented.
In the present embodiment, when drawing on air-conditioner set 7 to Equipment Foundations 17 in step 6, in Equipment Foundations 17 and discharge The steel pipe of 3 to 4 same specifications is set, the frictional force between air-conditioner set 7 and Equipment Foundations 17 is reduced;Crawl electric block 16, observation The displacement situation of air-conditioner set 7 determines steady rear starting electric block 16;Secondary lifting rope 13 ought be tensed upwards simultaneously, keep lifting flat There are 5 °~10 ° of tilt angles between platform and horizontal plane, to reduce the frictional resistance between air-conditioner set 7 and longitudinal slide rail 1.1; Pad sets flitch 21 between hoisting platform and structural floor;When 3/4 dropping place of air-conditioner set 7 is in Equipment Foundations 17, electricity is closed Dynamic cucurbit 16, prevents from skidding off Equipment Foundations 17 due to inertia air-conditioner set 7.Air-conditioner set 7 is slowly pushed, air-conditioner set 7 is fallen Position in correct position, extracts the steel pipe in Equipment Foundations 17 out, completes the fixed point dropping place work of air-conditioner set 7.
Content described in this specification embodiment is only enumerating to the way of realization of inventive concept, protection of the invention Range should not be construed as being limited to the specific forms stated in the embodiments, and protection scope of the present invention covers those skilled in the art Member according to the present invention design it is conceivable that equivalent technologies mean.

Claims (10)

1. a kind of air-conditioner set integral hoisting platform includes paralell (1) and the main lifting plate for being connected to paralell (1) two sides (2);It is characterized by: the paralell (1) includes that the longitudinal slide rail (1.1) of two parallel intervals arrangement and one group are connected to Middle cross beam (1.2) between two longitudinal slide rails (1.1);The end of the paralell (1) is equipped with the end to tie up wind hawser Crossbeam (1.3), and the outside of end floor beam (1.3) is equipped with secondary lifting plate (3);The front end of the paralell (1) is located at two longitudinal directions The cross bar (4) for lifting is connected between sliding rail (1.1);Cross bar (4) inside, be located at two longitudinal slide rails (1.1) Bottom is respectively equipped with the postive stop baffle (5) for preventing paralell (1) from moving forward;The inside of the postive stop baffle (5) is located at two The bottom of longitudinal slide rail (1.1) is respectively equipped with the casing (6) to fixed platform frame (1);Two longitudinal directions of the paralell (1) The gag lever post (8) for stopping air-conditioner set (7) that sidesway occurs is respectively arranged at the top of sliding rail (1.1).
2. a kind of air-conditioner set integral hoisting platform according to claim 1, it is characterised in that: the longitudinal slide rail (1.1) top, the sliding slot (9) that installation air-conditioner set (7) is axially arranged with along its length;The gag lever post (8) is longitudinally spaced to be set It sets at the outer side edges position in sliding slot (9), close to sliding slot (9), and the top of gag lever post (8) exceeds the side of sliding slot (9) Top;The length of side top of the top of the gag lever post (8) beyond sliding slot (9) is not less than 50mm.
3. a kind of air-conditioner set integral hoisting platform according to claim 1, it is characterised in that: one group of middle cross beam (1.2) Longitudinally parallel interval is connected between two longitudinal slide rail (1.1) bottoms, and the both ends end of every middle cross beam (1.2) is equal Outside beyond longitudinal slide rail (1.1);The end floor beam (1.3) is connected between the end of two longitudinal slide rails (1.1), and Positioned at the bottom of two longitudinal slide rails (1.1);Wherein, the both ends end of end floor beam (1.3) exceeds the outer of longitudinal slide rail (1.1) Side.
4. a kind of air-conditioner set integral hoisting platform according to claim 3, it is characterised in that: the main lifting plate (2) There is one group, respectively corresponds setting at the both ends of middle cross beam (1.2) and the both ends of end floor beam (1.3), in the plate face of main lifting plate (2) On offer hole (11) across main lifting rope (10);It is connected between the main lifting plate (2) at end floor beam (1.3) both ends useful With the stull (12) of auxiliary connection lifting plate (3);It offers on secondary lifting plate (3), at medium position across secondary lifting rope (13) perforation (14).
5. a kind of air-conditioner set integral hoisting platform according to claim 1, it is characterised in that: the postive stop baffle (5) Be arranged in the bottom of longitudinal slide rail (1.1), at the front position, postive stop baffle (5) apart from longitudinal slide rail (1.1) front end away from From for 80mm~120mm;Postive stop baffle (5) cross section is L-shaped, includes horizontal edge and vertical edge;Wherein, postive stop baffle (5) Horizontal edge be connected horizontally on the bottoms of longitudinal slide rail (1.1), the vertical edge of postive stop baffle (5) is connected to the bottom of horizontal edge, close to end Hold side.
6. a kind of air-conditioner set integral hoisting platform according to claim 1, it is characterised in that: described sleeve pipe (6) is along cross To setting, and the casing (6) of two longitudinal slide rail (1.1) bottoms is corresponding;The limiting block of described sleeve pipe (6) and corresponding side Spacing between plate (5) is 500mm~600mm.
7. the construction method of air-conditioner set integral hoisting platform described in a kind of any one of claim 1-6, feature exist In including the following steps:
Step 1: the place of selection suspender and suspender lifting;
Step 2 makes hoisting platform;
Hoisting platform is connect by step 3 with lifting machine: being separately connected main lifting rope on the main lifting plate (2) of hoisting platform two sides (10), while in the secondary of hoisting platform end auxiliary connection lifting rope (13) on plate (3) is lifted;Then by main lifting rope (10) and secondary lifting rope (13) it is connect with loop wheel machine;
Step 4 installs electric block (16) in Air Conditioning Facilities (15): installing support frame in the front of Equipment Foundations (17) (18), then electric block (16) is connected on support frame (18), close to middle position;
Step 5 on hoisting platform, is lifted air-conditioner set (7) dropping place;
Step 6, hoisting platform are lifted at window (19) position of Air Conditioning Facilities (15), and are drawn using electric block (16) On air-conditioner set (7) to Equipment Foundations (17).
8. the construction method of air-conditioner set integral hoisting platform according to any one of claim 7, it is characterised in that: In step 5 after air-conditioner set (7) dropping place is on hoisting platform, above air-conditioner set (7), the corresponding main lifting rope in two sides (10) support rod (22) are set between;Support rod (22) is being lifted after setting completed.
9. the construction method of air-conditioner set integral hoisting platform according to any one of claim 7, it is characterised in that: In step 5 in hoisting process, after the front end of hoisting platform enters Air Conditioning Facilities (15), by the limiting block of hoisting platform bottom Plate (5) withstands angle on Equipment Foundations (17), then wears in casing (6) tie string (20), by tie string (20) by equipment Basic (17) and hoisting platform link together, and prevent swaying forwards and backwards for hoisting platform.
10. the construction method of air-conditioner set integral hoisting platform, feature according to any one of claim 7 exist In: when drawing on air-conditioner set (7) to Equipment Foundations (17) in step 6, tense secondary lifting rope (13) upwards, make hoisting platform with There are 5 °~10 ° of tilt angles between horizontal plane, to reduce the frictional resistance between air-conditioner set (7) and longitudinal slide rail (1.1); Meanwhile pad sets flitch (21) between hoisting platform and structural floor.
CN201810797566.XA 2018-07-19 2018-07-19 Integral hoisting platform of air conditioning unit and construction method thereof Active CN109205455B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810797566.XA CN109205455B (en) 2018-07-19 2018-07-19 Integral hoisting platform of air conditioning unit and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810797566.XA CN109205455B (en) 2018-07-19 2018-07-19 Integral hoisting platform of air conditioning unit and construction method thereof

Publications (2)

Publication Number Publication Date
CN109205455A true CN109205455A (en) 2019-01-15
CN109205455B CN109205455B (en) 2022-06-10

Family

ID=64990044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810797566.XA Active CN109205455B (en) 2018-07-19 2018-07-19 Integral hoisting platform of air conditioning unit and construction method thereof

Country Status (1)

Country Link
CN (1) CN109205455B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110451406A (en) * 2019-06-27 2019-11-15 上海浩泽诺瑞空气净化设备有限公司 A kind of the installation equipment and installation method of multi-variable air conditioning unit

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000204764A (en) * 1999-01-14 2000-07-25 Shimizu Corp Carrying-in hanger
CN104310195A (en) * 2014-09-25 2015-01-28 中建三局第二建设工程有限责任公司 Hoisting cage for hoisting electromechanical device
CN104963496A (en) * 2015-07-10 2015-10-07 北京六建集团有限责任公司 Special super high-rise moving type platform and transporting method thereof
CN105672675A (en) * 2016-03-28 2016-06-15 中国建筑第二工程局有限公司 Size adjustable type material lifting device and construction method of size adjustable type material lifting device
CN105752826A (en) * 2016-04-22 2016-07-13 中建三局集团有限公司 Movable lifting platform and construction method thereof
CN106241607A (en) * 2016-10-13 2016-12-21 霍进铭 Device for discharging

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000204764A (en) * 1999-01-14 2000-07-25 Shimizu Corp Carrying-in hanger
CN104310195A (en) * 2014-09-25 2015-01-28 中建三局第二建设工程有限责任公司 Hoisting cage for hoisting electromechanical device
CN104963496A (en) * 2015-07-10 2015-10-07 北京六建集团有限责任公司 Special super high-rise moving type platform and transporting method thereof
CN105672675A (en) * 2016-03-28 2016-06-15 中国建筑第二工程局有限公司 Size adjustable type material lifting device and construction method of size adjustable type material lifting device
CN105752826A (en) * 2016-04-22 2016-07-13 中建三局集团有限公司 Movable lifting platform and construction method thereof
CN106241607A (en) * 2016-10-13 2016-12-21 霍进铭 Device for discharging

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵志缙: "《高层建筑施工手册(第二版)》", 30 September 1997, 同济大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110451406A (en) * 2019-06-27 2019-11-15 上海浩泽诺瑞空气净化设备有限公司 A kind of the installation equipment and installation method of multi-variable air conditioning unit

Also Published As

Publication number Publication date
CN109205455B (en) 2022-06-10

Similar Documents

Publication Publication Date Title
CN105858435A (en) Technology for hoisting strip-shaped inclined steel structures in place through single crane
CN103669216A (en) Steel box girder scattered-splicing sliding device and installation method
CN205558958U (en) Hoist device of tunnel efflux fan
CN105129602A (en) Sling capable of integrally lifting long and large-diameter vertical steel bars
CN109973112B (en) Super-large-dip-angle narrow-space tunnel anchor cable saddle gantry system and installation method thereof
CN108797597A (en) A kind of steel reinforcement cage mounting platform and its application method
CN204080650U (en) A kind of end bay for road and bridge construction closes up suspension bracket
CN109205455A (en) A kind of air-conditioner set integral hoisting platform and its construction method
CN106144929A (en) One population hoist device and construction method
CN108946542A (en) A kind of small gun carriage and its construction method
CN106276602B (en) A kind of across high ferro Business Line beam body hangs method
CN209702166U (en) A kind of sound barrier plate simply installs equipment
CN207435878U (en) A kind of Liftable type steel trestle structure
CN204642850U (en) A kind of wallboard piling bin
CN208732495U (en) A kind of small gun carriage
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN203959697U (en) The equalizing bar of hoisting platform truss
CN207030735U (en) Prefabricated balcony lifts servicing unit
CN214785837U (en) Hydraulic self-climbing operating frame for building construction
CN105155832B (en) A kind of hanging basket equipment and its moving method
CN204524596U (en) A kind of dismountable self-locking overhead welding operating platform
CN101768925B (en) Mounting equipment of beam falling prevention stopping block and construction method thereof
CN212249126U (en) Sliding platform for large-size cornice aluminum plate construction
CN204643664U (en) A kind of building tower crane
CN210858803U (en) Inclined shaft construction conveyer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant