China
Prior art keywords
cable
truss
bridge
bridge floor
anchoring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120300650.3U
Other languages
Chinese (zh)
Inventor
杨常生
荆刚毅
杜洪池
马建勇
马志青
刘勋
蒋能世
王海海
李华清
陈爱民
张永丽
柳莹
刘志霄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHEC Second Engineering Co Ltd
Original Assignee
CCCC SHEC Second Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHEC Second Engineering Co Ltd filed Critical CCCC SHEC Second Engineering Co Ltd
Priority to CN202120300650.3U priority Critical patent/CN214783345U/en
Application granted granted Critical
Publication of CN214783345U publication Critical patent/CN214783345U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a two cable face cable-stay bridge floor hoist and mount systems of central authorities, including main truss and bridge floor loop wheel machine, there is the track roof beam bridge floor loop wheel machine below, and main truss one end is connected with the bridge floor loop wheel machine and the below supports before being connected through the pole setting, and the main truss other end supports before passing through the down tube connection, and the bridge floor loop wheel machine is two kinds including the first subsection hoisting structure and the crossbeam transform structure of conversion of each other, and first subsection hoisting structure's afterbody width is greater than crossbeam transform structure. The utility model discloses an go up the cross-linking truss, cross-linking truss and back anchor system unified mutual cooperation down, make bridge floor crane afterbody widen to realize that the first section hoist and mount of bridge floor crane dodge the column tower, accomplish the first section hoist and mount afterbody of bridge floor crane and cross the tower. The utility model discloses hoist and mount system guarantees under the prerequisite that bridge floor crane hoist and mount in-process atress is reasonable, satisfy the requirement, and bridge floor crane afterbody crosses the tower when having solved first festival beam segment hoist and mount. Meanwhile, low-risk conversion of the conversion process of the bridge deck crane is realized, and the operation is simple and convenient.

Description

Bridge deck hoisting system of central double-cable-plane cable-stayed bridge
Technical Field
The utility model belongs to the technical field of cable-stay bridge superstructure girder construction and installation, concretely relates to two cable face cable-stay bridge floor hoist and mount system of central authorities.
Background
Along with the continuous development of bridge construction engineering in China, a bridge with a large-span central double-cable-surface structure is applied more, when the bridge superstructure of the large-span central double-cable-surface structure is installed and constructed, when a bridge deck crane is used for hoisting a first section of cantilever, due to the influence of a cable tower, the problem of tower avoidance at the tail part needs to be solved when the bridge deck crane is used for hoisting the first section of cantilever, and before the bridge deck crane is used for hoisting a subsequent beam section of cantilever, the system conversion of the bridge deck crane is completed so as to adapt to the cantilever hoisting of a subsequent standard beam section.
The existing upper structure beam section of the cable-stayed bridge at home and abroad is hoisted by adopting a hoisting mode of two bridge deck cranes, and the method has the following problems: because the dead weight of the beam section is large, the construction mode of lifting and hanging by two bridge deck cranes is adopted, so that the deviation between the stress state of the beam section and the stress state of the post-bridge-forming beam section is large, the tension data of the stay cable is difficult to control, and the line type of the post-bridge-forming beam is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a two cable face cable-stay bridge floor hoist and mount systems of central authorities overcome the above-mentioned technical problem that exists among the prior art.
Therefore, the utility model provides a technical scheme as follows:
the utility model provides a two cable face cable-stay bridge deck hoist and mount systems of central authorities, includes main truss and bridge floor loop wheel machine, there is the track roof beam bridge floor loop wheel machine below, main truss one end is connected and the below supports before being connected through the pole setting with the bridge floor loop wheel machine, the main truss other end supports before passing through the down tube connection, the bridge floor loop wheel machine is including two kinds of first festival section hoisting structure and the crossbeam transform structure of mutual conversion, first festival section hoisting structure's afterbody width is greater than crossbeam transform structure.
The first-section hoisting structure comprises an upper cross truss, a lower cross truss and a rear anchoring system, one end of the upper cross truss is connected with the main truss, the other end of the upper cross truss is connected with a first rear pull rod, the first rear pull rod is connected with the rear anchoring system, the rear anchoring system is connected with the connecting structure, and the rear anchoring system and the connecting structure are embedded on the track beam through a left-hand fastener;
one end of the lower cross-linked truss is connected with the rear anchoring system, the other end of the lower cross-linked truss is connected with a first lower chord, and the other end of the first lower chord is connected with the front support.
The crossbeam transform structure comprises a first extension bar, a first rear pull rod, a second rear anchoring system, a second extension bar and a first lower chord, one end of the first extension bar is connected with the main truss, the other end of the first extension bar is connected with the first rear pull rod to form a second rear pull rod, the other end of the first rear pull rod is connected with the second rear anchoring system, one end of the first lower chord is connected with the front support, the other end of the first lower chord is connected with the second extension bar to form a second lower chord, the second lower chord is connected with the second rear anchoring system through the second extension bar, the second rear anchoring system is connected with a connecting structure, and the second rear anchoring system and the connecting structure are all embedded on the track beam through a left-hand fastener device.
The rear anchoring system I comprises a connecting plate and a rear anchor point, the connecting plate is vertically arranged, the bottom end of the connecting plate is connected with the rear anchor point, and the top end of the connecting plate is connected with the connecting structure.
The rear anchoring system II comprises a rear anchoring cross beam, connecting plates and a rear anchor point, the two connecting plates are arranged vertically, the rear anchoring cross beam is arranged between the two connecting plates, a first connecting lug is arranged on the rear anchoring cross beam, the bottom end of each connecting plate is connected with the rear anchor point, and the top end of each connecting plate is connected with the connecting structure.
Connection structure includes back anchor box, second engaging lug, third engaging lug and tie point, back anchor box forms through the steel sheet welding, and second engaging lug, third engaging lug and tie point all weld on back anchor box, back anchor box one side is located to the second engaging lug, back anchor box middle part is located to the third engaging lug, back anchor box opposite side is located to the tie point, second engaging lug and tie point place position all are less than the third engaging lug.
The utility model has the advantages that:
the utility model provides a two cable face cable-stay bridge floor hoist and mount systems of central authorities, through last cross-linked truss, lower cross-linked truss and the unified mutual cooperation of back anchor system, make bridge floor crane afterbody widen to realize that bridge floor crane first segment hoists dodging to the column, accomplish bridge floor crane first segment hoists the afterbody and cross the tower.
The bridge deck crane is connected with the rear anchoring system through the connecting structure, and the stability of the bridge deck crane during working is guaranteed.
When the bridge deck crane is switched, at least one rail pressing beam is arranged on the rail beam, and a main truss support is arranged below the main truss, so that the stability of the bridge deck crane in the switching process can be ensured.
The utility model discloses hoist and mount system guarantees under the prerequisite that bridge floor crane hoist and mount in-process atress is reasonable, satisfy the requirement, and bridge floor crane afterbody crosses the tower when having solved first festival beam segment hoist and mount. Meanwhile, low-risk conversion of the conversion process of the bridge deck crane is realized, and the operation is simple and convenient.
The following will be described in further detail with reference to the accompanying drawings.
Drawings
FIG. 1 is a schematic elevational view of one embodiment of the system of the present invention prior to conversion;
FIG. 2 is a schematic plan view of one embodiment of the system of the present invention prior to conversion;
FIG. 3 is a schematic elevation view of an alternate embodiment of the system of the present invention;
FIG. 4 is a schematic plan view of a converted embodiment of the system of the present invention;
FIG. 5 is a schematic plan view of one embodiment of a rail compression beam;
FIG. 6 is a schematic diagram of an elevation of one embodiment of a connection structure;
fig. 7 is an elevation view of an embodiment of a second posterior anchoring system.
In the figure: 1. a main truss; 2. the rear anchoring system is uniform; 3. a second lower chord; 4. a second extension bar; 5. a first lower chord; 6. a second rear pull rod; 7. a first extension bar; 8. a first rear pull rod; 9. a track beam; 10. an upper cross truss; 11. a lower cross truss; 12. a rear anchoring beam; 13. a connecting plate; 14. anchoring the anchor point; 15. a connecting structure; 16. a first rail pressing beam; 17. a second rail pressing beam; 18. a third rail pressing beam; 19. supporting a main truss; 20. a left-hand thread device; 21. a traveling system; 22. a tower column; 23. a bridge deck crane; 24. a first connecting lug; 25. a second engaging lug; 26. a third engaging lug; 27. a connection point; 28. a steel plate; 29. a second rear anchoring system; 30. and then anchoring the box body.
Detailed Description
The following description is provided for illustrative embodiments of the present invention, and other advantages and effects of the present invention will be readily apparent to those skilled in the art from the disclosure herein.
The exemplary embodiments of the present invention will now be described with reference to the accompanying drawings, which, however, may be embodied in many different forms and are not limited to the embodiments described herein, which are provided for complete and complete disclosure of the present invention and to fully convey the scope of the invention to those skilled in the art. The terminology used in the exemplary embodiments presented in the accompanying drawings is not intended to be limiting of the invention. In the drawings, the same units/elements are denoted by the same reference numerals.
Unless otherwise defined, terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. Further, it will be understood that terms, such as those defined in commonly used dictionaries, should be interpreted as having a meaning that is consistent with their meaning in the context of the relevant art and will not be interpreted in an idealized or overly formal sense.
Example 1:
the embodiment provides a two cable face cable-stay bridge floor hoist and mount systems of central authorities, including main truss 1 and bridge floor hoist 23, there is track roof beam 9 bridge floor hoist 23 below, 1 one end of main truss is connected and the below supports before being connected through the pole setting with bridge floor hoist 23, support before the 1 other end of main truss passes through the down tube connection, bridge floor hoist 23 is including two kinds of first festival section hoisting structure and crossbeam transform structure that convert each other, first festival section hoisting structure's afterbody width is greater than crossbeam transform structure.
The utility model discloses a 23 implementation roof beam sections hoists of single bridge floor loop wheel machine, be applicable to the installation of central two cable face cable-stay bridge superstructure beam sections, the afterbody need keep away the problem of tower when carrying out first subsection cantilever hoist and mount in order to solve bridge floor loop wheel machine 23 in the beam section installation, sets up the first subsection hoisting structure that can change mutually and two kinds of structures of crossbeam transform structure, has filled the internal outer first subsection of the two cable face bridge superstructure construction of central authorities and has crossed the technical blank of tower.
Example 2:
on the basis of embodiment 1, the embodiment provides a bridge deck hoisting system of a central double-cable-plane cable-stayed bridge,
the first-section hoisting structure comprises an upper cross-linked truss 10, a lower cross-linked truss 11 and a rear anchoring system 2, one end of the upper cross-linked truss 10 is connected with a main truss 1, the other end of the upper cross-linked truss 10 is connected with a first rear pull rod 8, the first rear pull rod 8 is connected with the rear anchoring system 2, the rear anchoring system 2 is connected with a connecting structure 15, and the rear anchoring system 2 and the connecting structure 15 are embedded on a track beam 9 through a left-hand thread device 20;
one end of the lower cross truss 11 is connected with the rear anchoring system 22, the other end of the lower cross truss is connected with the first lower chord 5, and the other end of the first lower chord 5 is connected with the front support.
The composition and structure of the left-hand thread device are disclosed in patent application No. 202010724740.5, and the patent name is 'a bridge deck crane walking left-hand thread device, system and method'.
As shown in fig. 1 and 2, when the bridge deck crane 23 hoists the first section, the tail of the bridge deck crane 23 is widened through the upper cross girder 10, the lower cross girder 11, the connecting system and the rear anchoring system 2, so that the first section of the bridge deck crane 23 is hoisted to avoid the tower column 22.
Example 3:
on the basis of embodiment 1, the embodiment provides a bridge deck hoisting system of a central double-cable-plane cable-stayed bridge,
the crossbeam conversion structure comprises a first extension bar 7, a first rear pull rod 8, a rear anchoring system II 29, a second extension bar 4 and a first lower chord 5, one end of the first extension bar 7 is connected with the main truss 1, the other end of the first extension bar is connected with the first rear pull rod 8 to form a second rear pull rod 6, the other end of the first rear pull rod 8 is connected with the rear anchoring system II 29, one end of the first lower chord 5 is connected with the front support, the other end of the first lower chord is connected with the second extension bar 4 to form a second lower chord, the second lower chord is connected with the rear anchoring system II 29 through the second extension bar 4, the rear anchoring system II 29 is connected with a connecting structure 15, and the rear anchoring system II 29 and the connecting structure 15 are embedded on the track beam 9 through a back-buckling device 20.
After the hoisting of the first section of the bridge crane 23 is completed, the bridge crane 23 is converted into a beam conversion structure from the first section hoisting structure. As shown in fig. 3 and 4, the upper cross-linked truss 10 is replaced by a first extension bar 7, one end of the first extension bar 7 is connected with the main truss 1, the other end of the first extension bar is connected with a first rear pull rod 8 to form a second rear pull rod 6, the second rear pull rod 6 is connected with a connecting structure 15 through the first rear pull rod 8, and the connecting structure 15 is connected with a second rear anchoring system 29; and replacing the lower cross-linked truss 11 with a second extension bar 4, connecting one end of the second extension bar 4 with the first lower chord 5 to form a second lower chord, wherein one end of the second lower chord is connected with the front support through the first lower chord 5, the other end of the second lower chord is connected with a connecting structure 15, and the connecting structure 15 is connected with a rear anchoring system II 29.
Example 4:
on the basis of embodiment 2, the embodiment provides a bridge deck hoisting system of a central double-cable-plane cable-stayed bridge,
the rear anchoring system 2 comprises a connecting plate 13 and a rear anchoring point 14, the connecting plate 13 is vertically arranged, the bottom end of the connecting plate 13 is connected with the rear anchoring point 14, and the top end of the connecting plate 13 is connected with a connecting structure 15.
As shown in fig. 1, before the system is converted (when the first section is hoisted), the hoisting tail of the first section of the bridge deck crane 23 avoids the tower column 22 by the way that the rear anchoring system 2 is not provided with the rear anchoring beam 12.
The top end of the connecting plate 13 is connected with a connecting structure 15, and the connecting structure 15 is connected with the lower cross-linked truss 11 and the first rear pull rod 8. The second rear anchoring system 2 is identical to the second rear anchoring system 29 in fig. 7 except for the rear anchoring beam 12.
Example 5:
on the basis of embodiment 3, this embodiment provides a two cable face cable-stayed bridge deck hoist and mount system of central authorities, as shown in fig. 7, back anchor system two 29 includes back anchor crossbeam 12, connecting plate 13 and back anchor point 14, connecting plate 13 is two equal vertical settings, back anchor crossbeam 12 is located between two connecting plates 13, be equipped with first engaging lug 24 on the back anchor crossbeam 12, the connecting plate 13 bottom is connected with back anchor point 14, the connecting plate 13 top is connected with connection structure 15.
After the system is converted, the connecting structure 15 is connected with the first connecting lug 24 on the rear anchoring beam 12 of the second rear anchoring system 29.
Example 6:
on the basis of embodiment 2 or 3, this embodiment provides a two cable-side cable-stayed bridge deck hoist and mount system of central authorities, as shown in fig. 5, connection structure 15 includes back anchor box 30, second engaging lug 25, third engaging lug 26 and tie point 27, back anchor box 30 forms through the welding of steel sheet 28, and second engaging lug 25, third engaging lug 26 and tie point 27 all weld on back anchor box 30, back anchor box 30 one side is located to second engaging lug 25, back anchor box 30 middle part is located to third engaging lug 26, back anchor box 30 opposite side is located to tie point 27, second engaging lug 25 and tie point 27 all are less than third engaging lug 26 in position.
Before the system is converted, the connecting plate 13 of the rear anchoring system 2 is connected with the second connecting lug 25 of the connecting structure 15, the third connecting lug 26 is connected with the first rear pull rod 8, and the connecting point 27 is connected with the lower cross truss 11. After the system is converted, the first connecting lug 24 of the second rear anchoring system 29 is connected with the second connecting lug 25 of the connecting structure 15, the third connecting lug 26 is connected with the first rear pull rod 8, and the connecting point 27 is connected with the second extension rod in the second extension rod 4.
Example 7:
the embodiment provides a method for hoisting a bridge deck of a central double-cable-plane cable-stayed bridge, which adopts a central double-cable-plane cable-stayed bridge deck hoisting system and comprises the following steps:
step 1) hoisting the upper structural beam section of the cable-stayed bridge by using a bridge deck crane 23, and firstly hoisting the first section of the bridge deck by using a first section hoisting structure;
step 2), after the first section of the bridge deck is hoisted, converting the hoisting structure of the first section into a beam conversion structure to realize the conversion of the bridge deck crane 23;
and 3) operating the traveling system 21 to enable the bridge deck crane 23 to travel to the next operation position after the bridge deck crane 23 is converted, and sequentially hoisting the rest sections by adopting a beam conversion structure.
The method has reasonable stress in the hoisting process, simple system conversion process and convenient operation.
Example 8:
on the basis of embodiment 7, this embodiment provides a method for hoisting a bridge deck of a central double-cable-plane cable-stayed bridge, and the conversion process of the bridge deck crane 23 is as follows:
(1) the restraint between the upper cross-linked truss 10 and the main truss 1 and between the upper cross-linked truss and the first rear pull rod 8 is removed, the upper crossbeam truss is dismantled, one end of the first extension bar 7 is connected with the main truss 1, and the other end of the first extension bar keeps free;
(2) the constraint between the lower cross truss 11 and the first lower chord 5 and the connecting structure 15 is removed, the lower cross truss 11 is removed, one end of the second extension bar 4 is connected with the first lower chord 5 to form a second lower chord, and the other end is connected with the connecting structure 15, so that the width conversion of the tail part of the bridge deck crane 23 is completed;
(3) one end of the first extension bar 7 is connected with the first rear pull rod 8 to form a second rear pull rod 6, a rear anchoring cross beam 12 is installed, and the second rear pull rod 6 is connected with the anchoring cross beam through a connecting structure 15.
Example 9:
on the basis of embodiment 7, the embodiment provides a bridge deck hoisting method of a central double-cable-plane cable-stayed bridge,
before the bridge deck crane 23 is switched, the rail pressing beam acts on the rail beam 9, the acting reverse buckling device 20 removes the restraint between the rear anchoring system 2 of the bridge deck crane 23 and the rail beam 9, the walking system 21 is controlled to enable the bridge deck crane 23 to move forwards to the next anchoring point, and the main truss support 19 acts below the main truss 1.
The main truss support 19 and the track pressing beam are arranged when the bridge deck crane 23 is switched, so that the stability of the bridge deck crane 23 during system switching is ensured.
Example 10:
on the basis of embodiment 9, this embodiment provides a method for hoisting a bridge deck of a central dual-cable-plane cable-stayed bridge, where the rail compression beam is perpendicular to the rail beam 9, and the rail compression beam includes three first rail compression beams 16, a second rail compression beam 17, and a third rail compression beam 18, which are arranged in parallel. As shown in fig. 6.
When the bridge deck crane 23 is switched, at least one rail pressing beam is arranged on the rail beam 9, a triangular support is arranged below the main truss 1, the upper cross-linked truss 10 is removed, the first extension bar 7 is connected with the first rear pull rod 8 to form a second rear pull rod 6, and the connection between the main truss 1 and the second rear anchoring system 29 is completed; and the lower cross-linked truss 11 is dismantled, the second extension bar 4 is connected with the first lower chord 5 to form a second lower chord, and the connection between the second lower chord and the rear anchoring system II 29 is completed.
The utility model discloses filled the technique blank of the first section tower of two cable face bridge superstructure construction of internal and external central authorities, widened 23 afterbody bridge floor hoist through last cross-linked truss 10, lower cross-linked truss 11, realized that the hoist and mount of 23 first sections of bridge floor hoist avoid the column tower 22. When the system is converted, the stability of the bridge deck crane 23 is kept through at least one track pressing beam and the main truss support 19, the upper cross beam truss and the lower cross truss 11 are removed, the upper cross truss 10 and the lower cross truss 11 are replaced in a mode that the first extension bar 7 and the second extension bar 4 extend the first rear pull rod 8 and the first lower chord 5, and the connection between the components after the conversion of the bridge deck crane 23 is completed. The utility model is suitable for a two cable face cable-stay bridge floor hoists in central authorities, has system conversion process safety, easy operation's advantage.
The above illustration is merely an illustration of the present invention, and does not limit the scope of the present invention, and all designs identical or similar to the present invention are within the scope of the present invention.

Claims (6)

1. The utility model provides a two cable face cable-stay bridge deck hoist and mount systems of central authorities which characterized in that: including main truss and bridge floor loop wheel machine, there is the track roof beam bridge floor loop wheel machine below, main truss one end is connected and the below supports before being connected through the pole setting with the bridge floor loop wheel machine, the main truss other end passes through the down tube and connects the fore-stock, the bridge floor loop wheel machine is including the first subsection hoisting structure and the crossbeam transform structure two kinds of that convert each other, first subsection hoisting structure's afterbody width is greater than crossbeam transform structure.
2. The bridge deck hoisting system of the central double-cable-plane cable-stayed bridge according to claim 1, which is characterized in that: the first-section hoisting structure comprises an upper cross truss, a lower cross truss and a rear anchoring system, one end of the upper cross truss is connected with the main truss, the other end of the upper cross truss is connected with a first rear pull rod, the first rear pull rod is connected with the rear anchoring system, the rear anchoring system is connected with the connecting structure, and the rear anchoring system and the connecting structure are embedded on the track beam through a left-hand fastener;
one end of the lower cross-linked truss is connected with the rear anchoring system, the other end of the lower cross-linked truss is connected with a first lower chord, and the other end of the first lower chord is connected with the front support.
3. The bridge deck hoisting system of the central double-cable-plane cable-stayed bridge according to claim 1, which is characterized in that: the crossbeam transform structure comprises a first extension bar, a first rear pull rod, a second rear anchoring system, a second extension bar and a first lower chord, one end of the first extension bar is connected with the main truss, the other end of the first extension bar is connected with the first rear pull rod to form a second rear pull rod, the other end of the first rear pull rod is connected with the second rear anchoring system, one end of the first lower chord is connected with the front support, the other end of the first lower chord is connected with the second extension bar to form a second lower chord, the second lower chord is connected with the second rear anchoring system through the second extension bar, the second rear anchoring system is connected with a connecting structure, and the second rear anchoring system and the connecting structure are all embedded on the track beam through a left-hand fastener device.
4. The bridge deck hoisting system of the central double-cable-plane cable-stayed bridge according to claim 2, which is characterized in that: the rear anchoring system I comprises a connecting plate and a rear anchor point, the connecting plate is vertically arranged, the bottom end of the connecting plate is connected with the rear anchor point, and the top end of the connecting plate is connected with the connecting structure.
5. The bridge deck hoisting system of the central double-cable-plane cable-stayed bridge according to claim 3, which is characterized in that: the rear anchoring system II comprises a rear anchoring cross beam, connecting plates and a rear anchor point, the two connecting plates are arranged vertically, the rear anchoring cross beam is arranged between the two connecting plates, a first connecting lug is arranged on the rear anchoring cross beam, the bottom end of each connecting plate is connected with the rear anchor point, and the top end of each connecting plate is connected with the connecting structure.
6. The system for hoisting the bridge deck of the central double-cable-plane cable-stayed bridge according to claim 2 or 3, wherein: connection structure includes back anchor box, second engaging lug, third engaging lug and tie point, back anchor box forms through the steel sheet welding, and second engaging lug, third engaging lug and tie point all weld on back anchor box, back anchor box one side is located to the second engaging lug, back anchor box middle part is located to the third engaging lug, back anchor box opposite side is located to the tie point, second engaging lug and tie point place position all are less than the third engaging lug.
CN202120300650.3U 2021-02-03 2021-02-03 Bridge deck hoisting system of central double-cable-plane cable-stayed bridge Active CN214783345U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120300650.3U CN214783345U (en) 2021-02-03 2021-02-03 Bridge deck hoisting system of central double-cable-plane cable-stayed bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120300650.3U CN214783345U (en) 2021-02-03 2021-02-03 Bridge deck hoisting system of central double-cable-plane cable-stayed bridge

Publications (1)

Publication Number Publication Date
CN214783345U true CN214783345U (en) 2021-11-19

Family

ID=78751843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120300650.3U Active CN214783345U (en) 2021-02-03 2021-02-03 Bridge deck hoisting system of central double-cable-plane cable-stayed bridge

Country Status (1)

Country Link
CN (1) CN214783345U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832142A (en) * 2021-02-03 2021-05-25 中交二公局第二工程有限公司 Bridge deck hoisting system and method for central double-cable-plane cable-stayed bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832142A (en) * 2021-02-03 2021-05-25 中交二公局第二工程有限公司 Bridge deck hoisting system and method for central double-cable-plane cable-stayed bridge

Similar Documents

Publication Publication Date Title
CN101220580B (en) Portrait multi-point continuously dragging construction method for trussed steel beam
CN103572708B (en) Large-span concrete continuous girder bridge side span folding device and method
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN201506952U (en) Temporary cable matched hanging basket building concrete cable stayed bridge without supporting frame
CN102134832B (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN107059637A (en) Long span self-anchoring type suspension bridge system conversion method
CN214783345U (en) Bridge deck hoisting system of central double-cable-plane cable-stayed bridge
CN103147405B (en) Method for erecting steel girder of cable-stayed bridge with diagonal main trusses
CN105088970A (en) Construction method of corrugated steel web PC box girder cable-stayed bridge
CN207987749U (en) Ride cable-styled erection crane
CN110512521B (en) Butt joint device and butt joint method for large-section steel truss girder
CN109138272B (en) Super high-rise steel bar group connection fixing device and method
CN112832142A (en) Bridge deck hoisting system and method for central double-cable-plane cable-stayed bridge
CN203530864U (en) Large-span concrete continuous beam bridge side span folding device
CN202744960U (en) Large-span steel truss suspension bridge closure device
CN214831983U (en) Novel asynchronous basket construction structures of hanging
CN205857004U (en) A kind of construction beam
CN212224677U (en) Temporary fixing adjusting system for drop position of section steel beam
CN212077660U (en) Large-span wide width bridge girder rhombus hanging basket construction structure
CN114592633A (en) European style truss integral structure system installation structure and European style truss system installation method
CN113502743A (en) Method for mounting arch rib and main beam of steel truss arch bridge
CN202247660U (en) Steel truss piece unit and steel truss structure
CN214993124U (en) Lifting mechanism of through tied arch bridge
CN220353094U (en) Y shaped steel roof beam construction connection structure
CN205346600U (en) Big plate -girder hoist and mount specialized tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant