CN114592633A - European style truss integral structure system installation structure and European style truss system installation method - Google Patents
European style truss integral structure system installation structure and European style truss system installation method Download PDFInfo
- Publication number
- CN114592633A CN114592633A CN202210266224.1A CN202210266224A CN114592633A CN 114592633 A CN114592633 A CN 114592633A CN 202210266224 A CN202210266224 A CN 202210266224A CN 114592633 A CN114592633 A CN 114592633A
- Authority
- CN
- China
- Prior art keywords
- mounting plate
- mounting
- truss
- european
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/04—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/04—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
- E04C2003/0404—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects
- E04C2003/0443—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by substantial shape of the cross-section
- E04C2003/0452—H- or I-shaped
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
The utility model discloses an integral structural system mounting structure of an Olympic truss, which comprises a first mounting plate and a second mounting plate, wherein the first mounting plate and the second mounting plate are fixedly mounted at the ends of an H-shaped main body steel beam and the Olympic truss respectively, a first connecting structure is arranged on the first mounting plate, a second connecting structure matched with the first connecting structure is arranged on the second mounting plate, and an auxiliary connecting mechanism is arranged between the first mounting plate and the second mounting plate. Through the novel structural design that the first connecting structure and the second connecting structure are matched with the auxiliary connecting mechanism in a matched mode, the connecting hook portion on the second mounting plate is matched with the connecting groove on the first mounting plate, the connecting hook portion and the connecting groove are locked and fixed through the mounting body, and finally the whole mounting and fixing effect is achieved through adjusting the auxiliary connecting mechanism.
Description
Technical Field
The utility model belongs to the field of building roof engineering, and particularly relates to an European truss integral structure system installation structure and an European truss system installation method.
Background
In the construction of a traditional steel structure engineering roof support system, the tie bar component needs to be installed independently, and the requirements on the quality, the constitution and the technology of high-altitude operation personnel are high. In actual production, the European truss structure is produced in an industrial prefabrication mode, batch and standardization are facilitated, the construction period is effectively shortened, and multiple choices are provided for the detailed optimization direction research of large-scale structure construction.
The existing European style truss has high welding requirement between the upper end and the upper end of a roof beam due to the fact that the existing European style truss is heavy, accidents are easy to occur, and the seismic performance is poor. For example, the patent technology that the inventor previously applied for discloses a mounting structure of an European truss and a beam, belongs to the field of installation of European trusses, and comprises the European truss and a house beam, wherein the house beam is an I-beam, first connecting plates are arranged on two sides of the lower end of the European truss, the first connecting plates are fixedly connected with the European truss, a fixing piece and an attaching piece are arranged on the house beam, the fixing piece is fixedly connected with the house beam, an attaching piece is arranged on the fixing piece, and the attaching piece is arranged on one side of the fixing piece, which is opposite to the European truss; a middle column is installed on one side, opposite to the house beam, of the attaching piece, one end of the middle column is fixedly connected with the attaching piece, a second connecting plate is arranged at the other end of the middle column, a first installing hole and an installing assembly are respectively formed in the attaching piece, and the installing assembly is suitable for being fixedly connected with one end of the European truss; the utility model solves the technical problems that the welding requirements of the upper ends of the European truss are higher, and the lower end of the European truss does not have the bearing capacity of bearing bending resistance. The technical structure is slightly complex, the steps are complex during installation, quick position centering can not be guaranteed, and reliable installation can be carried out only by repeatedly adjusting the position of the lifting device.
Disclosure of Invention
In order to solve the technical problems, the inventor obtains the technical scheme of the utility model through practice and summary, and the utility model discloses an integral structural system mounting structure of an Olympic truss, which comprises a first mounting plate and a second mounting plate, wherein the first mounting plate and the second mounting plate are fixedly mounted at the end parts of an H-shaped main body steel beam and the Olympic truss respectively, the first mounting plate is provided with a first connecting structure, the second mounting plate is provided with a second connecting structure matched with the first connecting structure, and an auxiliary connecting mechanism is arranged between the first mounting plate and the second mounting plate.
Further, the first connecting structure is a connecting groove arranged on the first mounting plate.
Furthermore, the opening of the connecting groove is provided with a slope structure inclined to the inner side of the groove.
Furthermore, the second connecting structure comprises a connecting body rotatably mounted on the second mounting plate, and a connecting hook part matched with the connecting groove is arranged on the connecting body.
Furthermore, a positioning body filled outside the area of the connecting hook part is movably arranged in the connecting groove, and the positioning body is fixedly arranged in the connecting groove through a screw.
Furthermore, supplementary coupling mechanism is including installing the guide bar on mounting panel one and installing the threaded rod on mounting panel two, movable mounting has the thread bush with threaded rod screw-thread fit on the guide bar.
The installation method of the European truss integral structure system adopts the installation structure, and the installation steps are as follows:
firstly, carrying out fixed-point installation on the H-shaped main body steel beam provided with the first installation plate through hoisting equipment;
then, the European truss provided with the mounting plate II is installed at a fixed point through hoisting equipment, and during fixed-point installation, the hoisting equipment is controlled to incline the mounting end by a certain angle, so that the connecting hook part on the European truss can be completely matched with the inner side of the connecting groove, the positioning body is filled in the inner side of the connecting groove of the rest part, and locking and fixing are carried out through screws;
then, slowly lowering the other end of the European style end head, and repeating the working steps of adapting the first connecting structure and the second connecting structure;
and finally, matching with hoisting equipment, and adjusting the thread sleeves to enable the screw rods to be matched and installed with the corresponding threaded rods, so that the installation step of the European truss can be completed.
Compared with the prior art, the utility model can obtain the following technical effects:
compared with the prior art, the technical scheme of the utility model adopts a novel structural design that the first connecting structure and the second connecting structure are matched with the auxiliary connecting mechanism in a matching way, the connecting hook part on the second mounting plate is matched with the connecting groove on the first mounting plate, the connecting hook part and the connecting groove are locked and fixed through the mounting body, and finally the integral mounting and fixing effect is realized by adjusting the auxiliary connecting mechanism, so that the mounting operation is simple and easy.
Drawings
In order to more clearly illustrate the embodiments or technical solutions in the prior art of the present invention, the drawings used in the description of the embodiments or prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
FIG. 1 is a schematic view of the installation structure of the overall structure system of the European truss of the present invention;
FIG. 2 is an enlarged view of a portion of FIG. 1 at A;
fig. 3 is a connection relationship diagram of a first connection structure and a second connection structure according to the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
The application of the principles of the present invention will be further described with reference to the accompanying drawings and specific embodiments.
Examples
As shown in fig. 1 to 3, an overall structure system installation structure of an european truss comprises a first installation plate 10 and a second installation plate 20, wherein the first installation plate 10 and the second installation plate 20 are fixedly installed at the ends of an H-shaped main steel beam 30 and an european truss 40 respectively, the first installation plate 10 is provided with a first connection structure, the first connection structure is a first connection groove 11 formed in the first installation plate 10, an opening of the first connection groove 11 is provided with a slope structure inclined to the inner side of the first connection groove, and the inner side of the first connection groove 11 is provided with a positioning area.
The second mounting plate 20 is provided with a second connecting structure matched with the first connecting structure, the second connecting structure comprises a connecting body 21 rotatably mounted on the second mounting plate 20, the connecting body 21 is provided with a connecting hook portion 22 matched with the connecting groove 11, and after the first connecting structure and the second connecting structure are matched, the connecting hook portion 22 is matched with the inside of the positioning area.
The positioning body 12 filled outside the area of the connecting hook part 22 is movably arranged in the connecting groove 11, the positioning body 12 is fixedly arranged in the connecting groove 11 through screws, and the connecting hook part 22 can be effectively locked and fixed by the positioning body 12.
An auxiliary connecting mechanism is arranged between the first mounting plate 10 and the second mounting plate 20 and comprises a guide rod 13 mounted on the first mounting plate 10 and a threaded rod 14 mounted on the second mounting plate 20, and a threaded sleeve 15 in threaded fit with the threaded rod 14 is movably mounted on the guide rod 13. After the connecting hook part 22 is matched with the connecting groove 11 and fixed by the positioning body 12, the threaded rod 14 is fixedly installed by adjusting the threaded sleeve 15, so that the installation and fixation of the whole system are realized.
When in use, firstly, the H-shaped main body steel beam 30 is hoisted to a target position through the hoisting equipment, the installation steps of the first installation plate 10 on the H-shaped main body steel beam 30 are carried out on the ground, the second installation plate 20 on the European truss 40 is also carried out on the ground, after the completion, the European truss 40 is hoisted to the target position through the hoisting equipment, at the target position, the end head to be installed is firstly inclined downwards by a certain angle, and is matched with the connecting groove 11 through the connecting hook part 22, and is fixed by the positioning body 12, and then the other end is lowered, so that the coupling hook portion 22 of the end is fitted into the coupling groove 11, the connecting body 21 is fixed through the positioning body 12, finally, the threaded rod 14 on the European truss 40 and the threaded sleeve 15 on the guide rod 13 are adjusted to be overlapped, and adjusting the threaded connection between the threaded sleeve 15 and the threaded rod 14 to complete the installation step of the section of the euro-truss 40.
A method for installing an integral structural system of an Olympic truss adopts the installation structure of the embodiment, and the installation steps are as follows:
firstly, the H-shaped main body steel beam 30 provided with the mounting plate I10 is mounted at a fixed point through a hoisting device;
subsequently, the European book truss 40 provided with the second mounting plate 20 is mounted at a fixed point through a hoisting device, and during fixed-point mounting, the mounting end is inclined by a certain angle through controlling the hoisting device, so that the connecting hook part 22 on the mounting end can be completely matched with the inner side of the connecting groove 11, the positioning body 12 is filled in the inner side of the connecting groove 11 of the raw rest part, and locking and fixing are carried out through screws;
then, slowly lowering the other end of the European style end head, and repeating the working steps of adapting the first connecting structure and the second connecting structure;
finally, the step of mounting the european truss 40 is completed by adjusting the threaded sleeves 15 thereof so as to be fittingly mounted with the corresponding threaded rods 14.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (7)
1. The mounting structure is characterized by comprising a first mounting plate and a second mounting plate, wherein the first mounting plate and the second mounting plate are fixedly mounted at the end parts of an H-shaped main body steel beam and the European truss respectively, a first connecting structure is arranged on the first mounting plate, a second connecting structure matched with the first connecting structure is mounted on the second mounting plate, and an auxiliary connecting mechanism is arranged between the first mounting plate and the second mounting plate.
2. The mounting structure of the integral structural system of the european truss according to claim 1, wherein the first connecting structure is a connecting groove formed on the first mounting plate.
3. The mounting structure of the integral structural system of the european truss according to claim 1, wherein the opening of the coupling groove is provided with a slope structure inclined to the inner side of the groove.
4. The mounting structure of the overall structural system of the european truss according to claim 1, wherein the second connecting structure comprises a second connecting body rotatably mounted on the second mounting plate, and the second connecting body is provided with a connecting hook portion adapted to the connecting groove.
5. The mounting structure of the integral structural system of the european truss according to claim 1, wherein a positioning member filled outside the region of the coupling hook is movably disposed inside the coupling groove, and the positioning member is fixedly mounted inside the coupling groove by means of a screw.
6. The mounting structure of claim 1, wherein the auxiliary connecting means comprises a guide bar mounted on the first mounting plate and a threaded bar mounted on the second mounting plate, and a threaded sleeve is movably mounted on the guide bar and is in threaded engagement with the threaded bar.
7. A method for installing an integral structural system of an Olympic truss, which is characterized in that the installation structure according to any one of claims 1 to 6 is adopted, and the installation steps are as follows:
firstly, the H-shaped main body steel beam provided with the first mounting plate is mounted at a fixed point through hoisting equipment;
then, the European truss provided with the mounting plate II is mounted at a fixed point through hoisting equipment, and during fixed-point mounting, the mounting end is inclined by a certain angle through controlling the hoisting equipment, so that the connecting hook part on the mounting end can be completely matched with the inner side of the connecting groove, the positioning body is filled in the inner side of the connecting groove of the raw rest part, and locking and fixing are carried out through screws;
then, slowly lowering the other end of the European style end head, and repeating the working steps of adapting the first connecting structure and the second connecting structure;
and finally, matching with hoisting equipment, and adjusting the thread sleeves to enable the screw rods to be matched and installed with the corresponding threaded rods, so that the installation step of the European truss can be completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210266224.1A CN114592633A (en) | 2022-03-17 | 2022-03-17 | European style truss integral structure system installation structure and European style truss system installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210266224.1A CN114592633A (en) | 2022-03-17 | 2022-03-17 | European style truss integral structure system installation structure and European style truss system installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114592633A true CN114592633A (en) | 2022-06-07 |
Family
ID=81820401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210266224.1A Pending CN114592633A (en) | 2022-03-17 | 2022-03-17 | European style truss integral structure system installation structure and European style truss system installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114592633A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115822077A (en) * | 2023-01-09 | 2023-03-21 | 中建五局第三建设有限公司 | Quick construction connection structure based on buckle formula girder steel and truss |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6243996B1 (en) * | 1998-11-05 | 2001-06-12 | James Oliver | Adjustable truss for mating seam of multi-section manufactured home |
CN205243296U (en) * | 2015-11-20 | 2016-05-18 | 上海森利建筑装饰有限公司 | Novel mounting structure of external grid of chinese style door and window |
CN105604242A (en) * | 2015-12-24 | 2016-05-25 | 天津大学 | Truss supporting beam for plate tower |
CN209167911U (en) * | 2019-01-09 | 2019-07-26 | 安徽仕联电气有限公司 | A kind of electrical instrument temperature controller convenient for suspension installation |
CN111734036A (en) * | 2020-07-13 | 2020-10-02 | 中国十七冶集团有限公司 | Steel construction factory building roofing truss lower carriage mounting structure |
CN212129669U (en) * | 2019-12-27 | 2020-12-11 | 广东威洋实业有限公司 | Artificial stone wallboard |
CN112814384A (en) * | 2021-02-05 | 2021-05-18 | 中建七局第一建筑有限公司 | Floor slab reverse supporting system based on steel pipe bundle combined structure and construction method |
CN113175147A (en) * | 2021-03-30 | 2021-07-27 | 中国十七冶集团有限公司 | Hyperbolic arc-shaped metal roof produced based on BIM technology and construction method |
CN113293990A (en) * | 2021-05-19 | 2021-08-24 | 中建七局(上海)有限公司 | Steel bar truss floor support plate supporting structure and construction method of steel structure cast-in-place floor slab |
CN215563831U (en) * | 2021-07-20 | 2022-01-18 | 中国十七冶集团有限公司 | European book truss and beam mounting structure |
-
2022
- 2022-03-17 CN CN202210266224.1A patent/CN114592633A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6243996B1 (en) * | 1998-11-05 | 2001-06-12 | James Oliver | Adjustable truss for mating seam of multi-section manufactured home |
CN205243296U (en) * | 2015-11-20 | 2016-05-18 | 上海森利建筑装饰有限公司 | Novel mounting structure of external grid of chinese style door and window |
CN105604242A (en) * | 2015-12-24 | 2016-05-25 | 天津大学 | Truss supporting beam for plate tower |
CN209167911U (en) * | 2019-01-09 | 2019-07-26 | 安徽仕联电气有限公司 | A kind of electrical instrument temperature controller convenient for suspension installation |
CN212129669U (en) * | 2019-12-27 | 2020-12-11 | 广东威洋实业有限公司 | Artificial stone wallboard |
CN111734036A (en) * | 2020-07-13 | 2020-10-02 | 中国十七冶集团有限公司 | Steel construction factory building roofing truss lower carriage mounting structure |
CN112814384A (en) * | 2021-02-05 | 2021-05-18 | 中建七局第一建筑有限公司 | Floor slab reverse supporting system based on steel pipe bundle combined structure and construction method |
CN113175147A (en) * | 2021-03-30 | 2021-07-27 | 中国十七冶集团有限公司 | Hyperbolic arc-shaped metal roof produced based on BIM technology and construction method |
CN113293990A (en) * | 2021-05-19 | 2021-08-24 | 中建七局(上海)有限公司 | Steel bar truss floor support plate supporting structure and construction method of steel structure cast-in-place floor slab |
CN215563831U (en) * | 2021-07-20 | 2022-01-18 | 中国十七冶集团有限公司 | European book truss and beam mounting structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115822077A (en) * | 2023-01-09 | 2023-03-21 | 中建五局第三建设有限公司 | Quick construction connection structure based on buckle formula girder steel and truss |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111608268B (en) | Steel construction assembled beam column tie point structure | |
CN114592633A (en) | European style truss integral structure system installation structure and European style truss system installation method | |
CN111075015A (en) | Socket joint type prefabricated steel-concrete joint | |
CN212453611U (en) | Slope roofing template reinforcing apparatus | |
CN211173175U (en) | Guide device for rapid positioning of assembled wallboard | |
CN210086491U (en) | Supporting device is strengthened in building jacking control | |
CN108265826B (en) | Steel plate reinforced type square steel pipe column and K-shaped steel support connecting node | |
CN217461536U (en) | Large-span steel beam sliding jig frame | |
CN217079771U (en) | Truss interval positioning device | |
CN214783345U (en) | Bridge deck hoisting system of central double-cable-plane cable-stayed bridge | |
CN202744960U (en) | Large-span steel truss suspension bridge closure device | |
CN105804418A (en) | Prefabricated wallboard fixed supporting system and construction method | |
CN113235733B (en) | Inter-column support and steel column connection node structure and method | |
CN207314905U (en) | Roofing steel purlin bar ruggedized construction for portal frame house | |
CN214615029U (en) | Bolting assembled lattice type steel support for electrified railway | |
CN213389673U (en) | Cable-stayed bridge with modular structure | |
CN212358012U (en) | Widening platform device of hydraulic creeping formwork for quickly constructing double-limb cable tower | |
CN212224677U (en) | Temporary fixing adjusting system for drop position of section steel beam | |
CN220266829U (en) | Steel beam assembly connecting piece capable of being positioned | |
CN218990658U (en) | Steel truss construction connecting device | |
CN219219792U (en) | Frame post template reinforced structure | |
CN212019827U (en) | Steel construction welding operation platform | |
CN217782814U (en) | Lifting rope fixing assembly | |
CN220451498U (en) | Factory building girder steel reinforced structure | |
CN220318368U (en) | Guide beam structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |