CN214780230U - Universal hanging bracket for prefabricated laminated slab - Google Patents

Universal hanging bracket for prefabricated laminated slab Download PDF

Info

Publication number
CN214780230U
CN214780230U CN202022332349.9U CN202022332349U CN214780230U CN 214780230 U CN214780230 U CN 214780230U CN 202022332349 U CN202022332349 U CN 202022332349U CN 214780230 U CN214780230 U CN 214780230U
Authority
CN
China
Prior art keywords
wire rope
steel wire
lifting lugs
fixed
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022332349.9U
Other languages
Chinese (zh)
Inventor
彭阳阳
万继锋
冀士彬
魏贺巍
郭威洋
张峻岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyuan Jiangang Building Technology Co ltd
Original Assignee
Zhongyuan Jiangang Building Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyuan Jiangang Building Technology Co ltd filed Critical Zhongyuan Jiangang Building Technology Co ltd
Priority to CN202022332349.9U priority Critical patent/CN214780230U/en
Application granted granted Critical
Publication of CN214780230U publication Critical patent/CN214780230U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a general gallows of prefabricated superimposed sheet, including the frame, be fixed with a plurality of lug on the frame, the interval is provided with a plurality of fixed pulley on the frame between the adjacent lug, is provided with wire rope between the adjacent lug, and wire rope passes the upper end of fixed pulley, and the tip links to each other with the lug that corresponds is fixed, is provided with a plurality of lifting hook on the wire rope. The utility model discloses a demand, reduce cost and intensity of labour that not unidimensional superimposed sheet hoisted are satisfied in the cooperation of lug, fixed pulley, wire rope and lifting hook.

Description

Universal hanging bracket for prefabricated laminated slab
Technical Field
The utility model relates to a construction equipment technical field especially indicates a general gallows of prefabricated superimposed sheet.
Background
Prefabricated superimposed sheet of building industry, because the difference of building house type, the size of superimposed sheet split is also different, various specification and dimension's superimposed sheet hoisting point position is also different, when prefabricated component factory used traditional fixed gallows hoist and mount superimposed sheet, need weld a large amount of lugs on the gallows according to the hoisting point position of different size superimposed sheets, need be equipped with the wire rope and the chain sling of various specifications, model simultaneously, on the one hand, the size of gallows preparation has obviously been increased, preparation and hoist and mount cost have been increased. On the other hand, when the staffs hoist the laminated slab, the steel wire ropes and the hanging chains need to be frequently replaced according to the positions of the hanging points of the laminated slab with different sizes, so that the labor intensity of the staffs is increased, the production efficiency is reduced, and the production benefit of a prefabricated part factory is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model provides a general gallows of prefabricated superimposed sheet, through the cooperation of lug, fixed pulley, wire rope and lifting hook, satisfy the demand that not unidimensional superimposed sheet hoisted, reduce cost and intensity of labour.
The technical scheme of the utility model is realized like this: the utility model provides a general gallows of prefabricated superimposed sheet, includes the frame, is fixed with a plurality of lug on the frame, and the interval is provided with a plurality of fixed pulley on the frame between the adjacent lug, is provided with wire rope between the adjacent lug, and wire rope passes the upper end of fixed pulley, and the tip links to each other with the lug that corresponds, is provided with a plurality of lifting hook on the wire rope.
Furthermore, the frame comprises two parallel I-shaped beams, the two I-shaped beams are connected through a square pipe, lifting lugs are fixed at two ends of the lower side of the I-shaped beam, a plurality of fixed pulleys are arranged on the I-shaped beam between the two lifting lugs at intervals, the steel wire rope penetrates through the fixed pulleys, the end portions of the steel wire rope are fixedly connected with the corresponding lifting lugs, the lifting lugs and the fixed pulleys divide the steel wire rope into a plurality of sections, and each section of the steel wire rope is provided with a lifting hook.
Further, the length of the steel wire rope is larger than the distance between the two lifting lugs.
The utility model has the advantages that:
1. the utility model can meet the hoisting requirements of the laminated slabs with different sizes of all projects through the matching of the lifting lugs, the fixed pulleys, the steel wire ropes and the lifting hooks, thereby truly realizing the universality of the laminated slab hanging bracket;
2. when the composite slab is hoisted by staff, steel wire ropes and hanging chains of different specifications and models do not need to be frequently replaced, hoisting can be carried out only by hooking the lifting hooks on the steel wire ropes on the hoisting points of the composite slab, the hoisting efficiency is improved by 10 times, the labor intensity of the staff is obviously reduced, and hoisting errors cannot occur;
3. the gallows need not to weld too many lugs and be equipped with the wire rope and the chain sling of various specifications, model, and the whole size of gallows obviously reduces, saves about 5000 yuan/annually of accessory cost for preparation gallows and hoist and mount, and the gallows size reduces simultaneously, has reduced hoisting equipment's operation burden.
4. The utility model discloses the preparation of gallows, use very convenient, popularization nature is stronger.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a top view of FIG. 1;
fig. 3 is a left side view of fig. 1.
The device comprises an I-shaped beam 1, a square tube 2, a lifting lug 3, a fixed pulley 4, a steel wire rope 5 and a lifting hook 6.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
As shown in figure 1, the universal hanging bracket for the prefabricated laminated slab comprises a frame, wherein the frame comprises two I-shaped beams 1 which are parallel, the two I-shaped beams 1 are fixedly connected through a square tube 2, lifting lugs 3 are fixed at two ends of the lower side of each I-shaped beam 1, two fixed pulleys 4 are installed on the I-shaped beams 1 between the two lifting lugs 3 at intervals, and supporting seats of the fixed pulleys 4 are fixedly connected with the lower sides of the I-shaped beams 1 through bolts. Connecting holes are formed in the positions, corresponding to the bolts, of the two sides of the lower end of the I-shaped beam, strip-shaped holes can be formed in the two sides of the lower end of the I-shaped beam along the length direction, and the supporting seat of the fixed pulley 4 is fixedly connected with the strip-shaped holes through the bolts, so that the position of the fixed pulley 4 can be adjusted conveniently as required.
A steel wire rope 5 is arranged between the two lifting lugs 3, and a plurality of lifting hooks 6 are installed on the steel wire rope 5. Wire rope 5 passes the upper end of fixed pulley 4, and the end fixing has the couple, links to each other with lug 3 that corresponds through the couple, is convenient for carry out wire rope's change as required, and lug 3 and fixed pulley 4 have divided into 3 sections with wire rope 5, all installs lifting hook 6 on every section wire rope 5. The length of the steel wire rope (5) is larger than or equal to the distance between the two lifting lugs (3), the length of the steel wire rope (5) is determined according to the maximum and minimum lifting point distances and angles of the prefabricated laminated slab, and the required length of the steel wire rope can be freely adjusted according to the difference of the positions and the number of the lifting points of the prefabricated laminated slab.
The application method of the embodiment comprises the following steps: through the mode that lug 3 and fixed pulley 4 combined together, weld four lugs 3 at gallows both ends, through calculating the biggest and minimum interval of different superimposed sheet hoisting points to and the angle of will seeking out the rigging when hoist and mount, confirm the mounted position of fixed pulley 4. The interval between two lugs 3 is 3 meters, and wire rope 5's length is 9 meters, passes wire rope 5 fixed pulley 4, and wire rope 5's both ends are fixed at lug 3, and during the hoist and mount superimposed sheet component, through the wire rope 5 length of the required section of 4 automatic adjustment of fixed pulley, can satisfy the hoist and mount demand of different size components.
The hanger of the embodiment can meet the requirements of lifting of laminated slabs of different sizes of all projects only by being provided with the four lifting lugs 3, the four pulley blocks, the two steel wire ropes 5 and the six lifting hooks 6, and the universality of the laminated slab hanger is really realized. When a worker hoists the laminated slab, the laminated slab can be hoisted only by hooking the lifting hook 6 on the steel wire rope 5 on a hoisting point.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (2)

1. The utility model provides a general gallows of prefabricated superimposed sheet, includes the frame, its characterized in that: a plurality of lifting lugs (3) are fixed on the frame, a plurality of fixed pulleys (4) are arranged on the frame between every two adjacent lifting lugs (3) at intervals, a steel wire rope (5) is arranged between every two adjacent lifting lugs (3), the steel wire rope (5) penetrates through the upper ends of the fixed pulleys (4), the end parts of the steel wire rope are connected with the corresponding lifting lugs (3), and a plurality of lifting hooks (6) are arranged on the steel wire rope (5);
the frame comprises two parallel I-shaped beams (1), the two I-shaped beams (1) are connected through a square tube (2), lifting lugs (3) are fixed at two ends of the lower side of each I-shaped beam (1), a plurality of fixed pulleys (4) are arranged on the I-shaped beam (1) between the two lifting lugs (3) at intervals, a steel wire rope (5) penetrates through the fixed pulleys (4), the end parts of the steel wire rope are fixedly connected with the corresponding lifting lugs (3), the lifting lugs (3) and the fixed pulleys (4) divide the steel wire rope (5) into a plurality of sections, and a lifting hook (6) is arranged on each section of the steel wire rope (5);
strip-shaped holes are formed in the two sides of the lower end of the I-shaped beam (1) along the length direction, and the supporting seat of the fixed pulley (4) is fixedly connected with the strip-shaped holes through bolts.
2. The universal hanger for prefabricated composite slabs according to claim 1, wherein: the length of the steel wire rope (5) is larger than the distance between the two lifting lugs (3).
CN202022332349.9U 2020-10-19 2020-10-19 Universal hanging bracket for prefabricated laminated slab Active CN214780230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022332349.9U CN214780230U (en) 2020-10-19 2020-10-19 Universal hanging bracket for prefabricated laminated slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022332349.9U CN214780230U (en) 2020-10-19 2020-10-19 Universal hanging bracket for prefabricated laminated slab

Publications (1)

Publication Number Publication Date
CN214780230U true CN214780230U (en) 2021-11-19

Family

ID=78663011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022332349.9U Active CN214780230U (en) 2020-10-19 2020-10-19 Universal hanging bracket for prefabricated laminated slab

Country Status (1)

Country Link
CN (1) CN214780230U (en)

Similar Documents

Publication Publication Date Title
CN110230262B (en) Half-integral hoisting structure and butt joint method for main arch rib of basket type steel pipe arch bridge
CN205387439U (en) Mast hoisting accessory
CN109095343A (en) Assembled hanger
CN210103312U (en) Adjustable balance hanger
CN214780230U (en) Universal hanging bracket for prefabricated laminated slab
CN110080083B (en) Method for installing basket type steel truss arch main chord member
CN201809032U (en) Self-adjusting stay device with combinable hanger
CN205802757U (en) A kind of hanging tubular mother's integral hoisting device for rapid
CN215755931U (en) Large transformer hoisting equipment in factory building
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN212609006U (en) Hoisting tool for cooling pipeline of flexible direct-current converter valve
CN208948679U (en) Assembled hanger
CN210914945U (en) Hoisting device for upper structure of aluminum electrolytic cell
CN210002233U (en) Hoisting system suitable for suspension bridge steel structure bridge deck system
CN103556574B (en) The using method of fast hoisting steel girder member bar
CN219971633U (en) Hoisting device for installing light steel structure
CN213356663U (en) Portable hoisting moving platform
CN219469421U (en) Prefabricated component lifting device
CN218665026U (en) Steel structure factory building roof tile hoisting combined steel carrying pole
CN219429514U (en) Climbing frame dismantling support
CN216038140U (en) Assembly type house PC hoisting stair structure
CN218174378U (en) Hoist is transported to prefabricated superimposed sheet of building concrete
CN104671057A (en) Major diameter steel bar integral vertical hoisting apparatus in high pier construction
CN220201125U (en) Beam lifting device
CN216235766U (en) High-rise building steel vestibule hoisting device