CN214765663U - Environment-friendly construction waste treatment facility - Google Patents

Environment-friendly construction waste treatment facility Download PDF

Info

Publication number
CN214765663U
CN214765663U CN202120410631.6U CN202120410631U CN214765663U CN 214765663 U CN214765663 U CN 214765663U CN 202120410631 U CN202120410631 U CN 202120410631U CN 214765663 U CN214765663 U CN 214765663U
Authority
CN
China
Prior art keywords
fixedly connected
dust cover
jaw crusher
support
construction waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120410631.6U
Other languages
Chinese (zh)
Inventor
马敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Food and Pharmaceutical Science College
Original Assignee
Jiangsu Food and Pharmaceutical Science College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Food and Pharmaceutical Science College filed Critical Jiangsu Food and Pharmaceutical Science College
Priority to CN202120410631.6U priority Critical patent/CN214765663U/en
Application granted granted Critical
Publication of CN214765663U publication Critical patent/CN214765663U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Crushing And Grinding (AREA)

Abstract

本实用新型公开了一种环保型建筑废料处理设备,涉及建筑垃圾技术领域,为解决现有技术中建筑废料在处理过程中容易产生大量的扬尘,污染环境不够环保的问题。所述防尘罩的内部设置有输水管,且输水管与防尘罩通过固定座固定连接,所述输水管的下方分别安装有喷洒头和喷雾头,且喷洒头和喷雾头均与输水管固定连接,所述防尘罩的内部设置有风扇,所述防尘罩的上方安装有支架,且支架与防尘罩固定连接,所述支架的上方安装有电机固定连接,所述电机与风扇通过连接轴固定连接,所述防尘罩与颚式破碎机固定连接,所述颚式破碎机的前端面上安装有第一驱动装置,且第一驱动装置与颚式破碎机通过固定座固定连接,所述颚式破碎机的上方安装有大皮带轮。

Figure 202120410631

The utility model discloses an environment-friendly construction waste treatment equipment, which relates to the technical field of construction waste, and is intended to solve the problems of the prior art that the construction waste is likely to generate a large amount of dust during the treatment process, and the environment is polluted and is not environmentally friendly. The inside of the dust cover is provided with a water delivery pipe, and the water delivery pipe and the dust cover are fixedly connected by a fixing seat, a spray head and a spray head are respectively installed under the water delivery pipe, and both the spray head and the spray head are connected with the water delivery pipe. Fixed connection, a fan is arranged inside the dust cover, a bracket is installed above the dust cover, and the bracket is fixedly connected to the dust cover, a motor is fixedly connected above the bracket, and the motor and the fan are fixedly connected The dust cover is fixedly connected to the jaw crusher through a fixed connection of the connecting shaft. A first driving device is installed on the front end surface of the jaw crusher, and the first driving device and the jaw crusher are fixed by a fixed seat. connected, a large pulley is installed above the jaw crusher.

Figure 202120410631

Description

Environment-friendly construction waste treatment facility
Technical Field
The utility model relates to a construction waste technical field specifically is an environment-friendly construction waste treatment facility.
Background
The construction waste is also called as construction waste, which refers to a general name of dregs, waste concrete, waste bricks and stones and other wastes generated in the production activities of the construction industry such as demolition, construction, decoration, repair and the like, and is classified according to the production source, and the construction waste can be divided into engineering dregs, decoration waste, demolition waste, engineering mud and the like; the construction waste can be classified into slag, concrete blocks, broken stone blocks, broken bricks and tiles, waste mortar, slurry, asphalt blocks, waste plastics, waste metals, waste bamboo and wood and the like according to the composition.
The construction waste needs to be crushed in the treatment process, particularly large stone blocks such as concrete blocks and the like, a large amount of dust can be generated during crushing, the dust is scattered in the air to cause large-scale environment pollution, and the dust can also cause respiratory tract infection of workers, so that the construction waste treatment equipment is not environment-friendly and safe enough to use; therefore, the market is urgently in need of developing an environment-friendly construction waste treatment device to help people to solve the existing problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an environment-friendly construction waste treatment facility to solve the construction waste who proposes in the above-mentioned background art and produce a large amount of raise dusts easily in the processing procedure, the not enough problem of environmental protection of polluted environment.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an environment-friendly construction waste treatment facility, includes dust cover and jaw breaker, the inside of dust cover is provided with the raceway, and the raceway passes through fixing base fixed connection with the dust cover, sprinkler head and atomising head are installed respectively to the below of raceway, and sprinkler head and atomising head all with raceway fixed connection, the inside of dust cover is provided with the fan, the support is installed to the top of dust cover, and support and dust cover fixed connection, motor fixed connection is installed to the top of support, the motor passes through connecting axle fixed connection with the fan, dust cover and jaw breaker fixed connection.
Preferably, install a drive arrangement on jaw crusher's the preceding terminal surface, and a drive arrangement passes through fixing base fixed connection with jaw crusher, big belt pulley is installed to jaw crusher's top, and big belt pulley and jaw crusher rotate to be connected.
Preferably, the inside of jaw crusher is provided with the bracket, and the bracket passes through deflection axle fixed connection with big belt pulley, move the hubei installed to one side of bracket, and move hubei and bracket fixed connection, the internally mounted of jaw crusher has the jaw surely, and decides jaw and jaw crusher fixed connection.
Preferably, jaw crusher's internally mounted has the mount, and mount and jaw crusher fixed connection, the fixed head is installed to the top of mount, and fixed head and mount fixed connection, pull rod and stabilizer bar are installed respectively to one side of bracket, and pull rod and stabilizer bar all rotate with the bracket and be connected, the inboard of mount is provided with pull rod spring and fixed block respectively, fixed block and mount all with pull rod spring fixed connection, fixed block and pull rod fixed connection, the fixed head rotates with the stabilizer bar and is connected.
Preferably, the support is installed to the below of dust cover, and support and dust cover fixed connection, install second drive arrangement on the preceding terminal surface of support, and second drive arrangement passes through fixing base fixed connection with the support, the inboard of support is provided with the conveyer belt, the conveyer belt rotates through changeing the roller with the support and is connected, the landing leg is all installed to the below of support and jaw crusher, and support and jaw crusher all with landing leg fixed connection.
Preferably, one side of the dust cover is provided with a water pump, the water pump is fixedly connected with the dust cover through a fixing seat, the water pump is fixedly connected with the water delivery pipe through a flange, a water suction pipe is arranged below the water pump, and the water suction pipe is fixedly connected with the water pump.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a through the fan, the dust cover, the setting of atomising head and sprinkler head, the building waste material stone of blocking goes up the conveyer belt through the sprinkler head is prewetted, make the stone itself be difficult to when broken and produce the raise dust, and the atomising head is direct to the broken mouth of jaw crusher, when the raise dust is raised, fog and dust mix, make the dust fall down, avoid the dust to raise and form large-scale raise dust, the raise dust that avoids escaping through the dust cover simultaneously flies everywhere, the dust that will escape the raise through the fan at last blows downwards, make the dust mix with the water smoke once more, thereby make the building waste material play the high efficiency at broken in-process and press down dirt, the effect of dust removal, thereby avoid a large amount of raise dust polluted air environment, thereby make this building waste material treatment facility use environmental protection more, safety more.
2. The utility model discloses a through the setting of conveyer belt, the conveyer belt is used for carrying the construction waste stone, with the slow broken mouth of carrying to jaw breaker of waste stone for the stone fully contacts with water at the in-process of carrying, thereby realizes the preliminary treatment to the stone efficient, makes this construction waste treatment facility work efficiency of getting up higher, and the effect that presses down dirt during the breakage is better.
Drawings
FIG. 1 is a front view of an environment-friendly construction waste treatment apparatus of the present invention;
FIG. 2 is a schematic view of the internal structure of an environment-friendly construction waste treatment apparatus of the present invention;
fig. 3 is an enlarged schematic view of a position a in the drawing of the present invention.
In the figure: 1. a dust cover; 2. a jaw crusher; 3. a support; 4. a first driving device; 5. a large belt pulley; 6. a second driving device; 7. a conveyor belt; 8. a support; 9. a motor; 10. a support leg; 11. a toggle plate; 12. moving a jaw; 13. fixing a jaw; 14. a fixed mount; 15. a pull rod; 16. a pull rod spring; 17. a fixed block; 18. a fixed head; 19. a stabilizer bar; 20. a water delivery pipe; 21. a sprinkler head; 22. a fan; 23. a spray head; 24. a water pump; 25. a suction pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, the present invention provides an embodiment: the utility model provides an environment-friendly construction waste treatment facility, including dust cover 1 and jaw crusher 2, the inside of dust cover 1 is provided with raceway 20, raceway 20 passes through fixing base fixed connection with dust cover 1, sprinkler 21 and atomising head 23 are installed respectively to the below of raceway 20, sprinkler 21 and atomising head 23 all with raceway 20 fixed connection, the inside of dust cover 1 is provided with fan 22, support 8 is installed to the top of dust cover 1, support 8 and dust cover 1 fixed connection, motor 9 fixed connection is installed to the top of support 8, motor 9 passes through connecting axle fixed connection with fan 22, dust cover 1 and jaw crusher 2 fixed connection.
Further, install first drive arrangement 4 on the preceding terminal surface of jaw breaker 2, first drive arrangement 4 passes through fixing base fixed connection with jaw breaker 2, and big belt pulley 5 is installed to jaw breaker 2's top, and big belt pulley 5 rotates with jaw breaker 2 to be connected, and first drive arrangement 4 includes driving motor, reduction gear and belt lace wheel, is connected through the belt between belt lace wheel and the big belt pulley 5.
Further, the inside of jaw crusher 2 is provided with toggle plate 11, and toggle plate 11 passes through deflection axle fixed connection with big belt pulley 5, and movable jaw 12 is installed to one side of toggle plate 11, moves jaw 12 and toggle plate 11 fixed connection, and jaw crusher 2's internally mounted has jaw 13 surely, and jaw 13 and jaw crusher 2 fixed connection adopt jaw crusher 2 to carry out crushing treatment to construction waste, and is efficient, and the fault rate is low.
Further, a fixing frame 14 is mounted inside the jaw crusher 2, the fixing frame 14 is fixedly connected with the jaw crusher 2, a fixing head 18 is mounted above the fixing frame 14, the fixing head 18 is fixedly connected with the fixing frame 14, a pull rod 15 and a stabilizer bar 19 are mounted on one side of the toggle plate 11 respectively, the pull rod 15 and the stabilizer bar 19 are both rotatably connected with the toggle plate 11, a pull rod spring 16 and a fixing block 17 are respectively arranged on the inner side of the fixing frame 14, the fixing block 17 and the fixing frame 14 are both fixedly connected with the pull rod spring 16, the fixing block 17 is fixedly connected with the pull rod 15, the fixing head 18 is rotatably connected with the stabilizer bar 19, and bearings are arranged between the pull rod 15 and the toggle plate 11 and between the stabilizer bar 19 and the toggle plate 11.
Further, support 3 is installed to dust cover 1's below, support 3 and dust cover 1 fixed connection, install second drive arrangement 6 on support 3's the preceding terminal surface, second drive arrangement 6 passes through fixing base fixed connection with support 3, support 3's inboard is provided with conveyer belt 7, conveyer belt 7 rotates through changeing the roller with support 3 to be connected, landing leg 10 is all installed to support 3 and jaw crusher 2's below, support 3 and jaw crusher 2 all with landing leg 10 fixed connection, second drive arrangement 6 includes driving motor and reduction gear, the reduction gear passes through even hub connection with 3 inboard changeing rollers of support, changeing the roller and being provided with a plurality of, and all laminate with conveyer belt 7.
Further, one side of dust cover 1 is provided with water pump 24, and water pump 24 passes through fixing base fixed connection with dust cover 1, and water pump 24 passes through flange fixed connection with raceway 20, and the pipe 25 that absorbs water is installed to the below of water pump 24, absorbs water pipe 25 and water pump 24 fixed connection, and water pump 24 adopts the vacuum pump, and pressure is big, and is efficient.
The working principle is as follows: when the device is used, the second driving device 6 is started, the conveying belt 7 is driven to rotate through the second driving device 6, so that waste stones are conveyed to a crushing opening of the jaw crusher 2, meanwhile, circulating water is sucked through the water pump 24 and the water suction pipe 25 and conveyed to the inside of the water conveying pipe 20, the waste stones on the conveying belt 7 are pre-moistened through the spray heads 21, the moistened stones are conveyed to the inside of the crushing opening of the jaw crusher 2, then the large belt pulley 5 is driven to rotate through the first driving device 4, the toggle plate 11 and the movable jaw 12 are driven through the large belt pulley 5, under the pulling of the pull rod 15 and the pull rod spring 16, the toggle plate 11 and the movable jaw 12 continuously swing, so that the gap between the movable jaw 12 and the fixed jaw 13 is neglected to be large or small, the working effect of crushing the waste stones is achieved, and the dust generated during crushing can suppress the water mist sprayed out through the spray heads 23, and motor 9 is started to drive fan 22 to rotate through motor 9, blow towards the raise dust through fan 22, make the dust unable to raise, and make the raise dust more abundant mix with the water smoke, thereby realize high-efficient waste treatment and remove dust and press down the working effect of dirt.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1.一种环保型建筑废料处理设备,包括防尘罩(1)和颚式破碎机(2),其特征在于:所述防尘罩(1)的内部设置有输水管(20),且输水管(20)与防尘罩(1)通过固定座固定连接,所述输水管(20)的下方分别安装有喷洒头(21)和喷雾头(23),且喷洒头(21)和喷雾头(23)均与输水管(20)固定连接,所述防尘罩(1)的内部设置有风扇(22),所述防尘罩(1)的上方安装有支架(8),且支架(8)与防尘罩(1)固定连接,所述支架(8)的上方安装有电机(9)固定连接,所述电机(9)与风扇(22)通过连接轴固定连接,所述防尘罩(1)与颚式破碎机(2)固定连接。1. An environmentally friendly construction waste treatment equipment, comprising a dust cover (1) and a jaw crusher (2), characterized in that: a water pipe (20) is provided inside the dust cover (1), and The water delivery pipe (20) and the dust cover (1) are fixedly connected through a fixing seat, and a spray head (21) and a spray head (23) are respectively installed below the water delivery pipe (20), and the spray head (21) and the spray head The heads (23) are all fixedly connected with the water delivery pipe (20), a fan (22) is arranged inside the dust cover (1), a bracket (8) is installed above the dust cover (1), and the bracket (8) is fixedly connected to the dust cover (1), a motor (9) is fixedly connected above the bracket (8), the motor (9) is fixedly connected to the fan (22) through a connecting shaft, and the The dust cover (1) is fixedly connected with the jaw crusher (2). 2.根据权利要求1所述的一种环保型建筑废料处理设备,其特征在于:所述颚式破碎机(2)的前端面上安装有第一驱动装置(4),且第一驱动装置(4)与颚式破碎机(2)通过固定座固定连接,所述颚式破碎机(2)的上方安装有大皮带轮(5),且大皮带轮(5)与颚式破碎机(2)转动连接。2. An environmentally friendly construction waste treatment equipment according to claim 1, characterized in that: a first drive device (4) is installed on the front end surface of the jaw crusher (2), and the first drive device (4) It is fixedly connected with the jaw crusher (2) through a fixed seat, a large pulley (5) is installed above the jaw crusher (2), and the large pulley (5) is connected to the jaw crusher (2) Turn the connection. 3.根据权利要求2所述的一种环保型建筑废料处理设备,其特征在于:所述颚式破碎机(2)的内部设置有肘板(11),且肘板(11)与大皮带轮(5)通过偏转轴固定连接,所述肘板(11)的一侧安装有动鄂(12),且动鄂(12)与肘板(11)固定连接,所述颚式破碎机(2)的内部安装有定颚(13),且定颚(13)与颚式破碎机(2)固定连接。3. An environmentally friendly construction waste treatment equipment according to claim 2, characterized in that: a toggle plate (11) is provided inside the jaw crusher (2), and the toggle plate (11) is connected to a large pulley (5) Fixed connection through the deflection shaft, a movable jaw (12) is installed on one side of the toggle plate (11), and the movable jaw (12) is fixedly connected with the toggle plate (11), the jaw crusher (2) ) is installed with a fixed jaw (13), and the fixed jaw (13) is fixedly connected with the jaw crusher (2). 4.根据权利要求3所述的一种环保型建筑废料处理设备,其特征在于:所述颚式破碎机(2)的内部安装有固定架(14),且固定架(14)与颚式破碎机(2)固定连接,所述固定架(14)的上方安装有固定头(18),且固定头(18)与固定架(14)固定连接,所述肘板(11)的一侧分别安装有拉杆(15)和稳定杆(19),且拉杆(15)和稳定杆(19)均与肘板(11)转动连接,所述固定架(14)的内侧分别设置有拉杆弹簧(16)和固定块(17),所述固定块(17)和固定架(14)均与拉杆弹簧(16)固定连接,所述固定块(17)与拉杆(15)固定连接,所述固定头(18)与稳定杆(19)转动连接。4. An environmentally friendly construction waste treatment equipment according to claim 3, characterized in that: a fixing frame (14) is installed inside the jaw crusher (2), and the fixing frame (14) is connected to the jaw crusher (2). The crusher (2) is fixedly connected, a fixing head (18) is installed above the fixing frame (14), and the fixing head (18) is fixedly connected with the fixing frame (14), and one side of the bracket (11) A tie rod (15) and a stabilizing rod (19) are respectively installed, and both the tie rod (15) and the stabilizing rod (19) are rotatably connected with the toggle plate (11), and the inner side of the fixing frame (14) is respectively provided with a tie rod spring ( 16) and the fixing block (17), the fixing block (17) and the fixing frame (14) are fixedly connected with the pull rod spring (16), the fixing block (17) is fixedly connected with the pull rod (15), the fixing The head (18) is rotatably connected with the stabilizer bar (19). 5.根据权利要求1所述的一种环保型建筑废料处理设备,其特征在于:所述防尘罩(1)的下方安装有支座(3),且支座(3)与防尘罩(1)固定连接,所述支座(3)的前端面上安装有第二驱动装置(6),且第二驱动装置(6)与支座(3)通过固定座固定连接,所述支座(3)的内侧设置有输送带(7),所述输送带(7)与支座(3)通过转辊转动连接,所述支座(3)和颚式破碎机(2)的下方均安装有支腿(10),且支座(3)和颚式破碎机(2)均与支腿(10)固定连接。5. An environmentally friendly construction waste treatment equipment according to claim 1, characterized in that: a support (3) is installed below the dust cover (1), and the support (3) is connected to the dust cover (1) Fixed connection, a second drive device (6) is installed on the front end surface of the support (3), and the second drive device (6) and the support (3) are fixedly connected through a fixed seat, and the support The inner side of the seat (3) is provided with a conveyor belt (7), the conveyor belt (7) and the support (3) are rotatably connected through a rotating roller, and the support (3) is connected to the lower part of the jaw crusher (2). A support leg (10) is installed on both, and the support (3) and the jaw crusher (2) are fixedly connected with the support leg (10). 6.根据权利要求1所述的一种环保型建筑废料处理设备,其特征在于:所述防尘罩(1)的一侧设置有水泵(24),且水泵(24)与防尘罩(1)通过固定座固定连接,所述水泵(24)与输水管(20)通过法兰固定连接,所述水泵(24)的下方安装有吸水管(25),且吸水管(25)与水泵(24)固定连接。6. An environmentally friendly construction waste treatment equipment according to claim 1, characterized in that: a water pump (24) is provided on one side of the dust cover (1), and the water pump (24) and the dust cover ( 1) The water pump (24) and the water delivery pipe (20) are fixedly connected by a flange, and a water suction pipe (25) is installed under the water pump (24), and the water suction pipe (25) is connected to the water pump (24) Fixed connection.
CN202120410631.6U 2021-02-24 2021-02-24 Environment-friendly construction waste treatment facility Expired - Fee Related CN214765663U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120410631.6U CN214765663U (en) 2021-02-24 2021-02-24 Environment-friendly construction waste treatment facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120410631.6U CN214765663U (en) 2021-02-24 2021-02-24 Environment-friendly construction waste treatment facility

Publications (1)

Publication Number Publication Date
CN214765663U true CN214765663U (en) 2021-11-19

Family

ID=78754326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120410631.6U Expired - Fee Related CN214765663U (en) 2021-02-24 2021-02-24 Environment-friendly construction waste treatment facility

Country Status (1)

Country Link
CN (1) CN214765663U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114749260A (en) * 2022-03-23 2022-07-15 河北天山实业集团建筑工程有限公司 Waste treatment equipment for construction
CN115430683A (en) * 2022-09-18 2022-12-06 临沂市政集团有限公司 Municipal concrete solid waste recycling device
CN117258875A (en) * 2023-11-22 2023-12-22 黑龙江科技大学 Colliery breaker for coal mining

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114749260A (en) * 2022-03-23 2022-07-15 河北天山实业集团建筑工程有限公司 Waste treatment equipment for construction
CN114749260B (en) * 2022-03-23 2023-11-17 河北天山实业集团建筑工程有限公司 A kind of construction waste treatment equipment
CN115430683A (en) * 2022-09-18 2022-12-06 临沂市政集团有限公司 Municipal concrete solid waste recycling device
CN117258875A (en) * 2023-11-22 2023-12-22 黑龙江科技大学 Colliery breaker for coal mining

Similar Documents

Publication Publication Date Title
CN206123354U (en) Flat -bed machine is scraped to panel
CN110385335B (en) A comprehensive treatment device for recycling and utilization of construction waste
CN214642322U (en) Ground renovating and maintaining equipment
CN207736062U (en) A kind of plate face cleaning device and plate face sanding processor
CN212120292U (en) Building concrete reducing mechanism
CN114950631A (en) Construction waste recovery device of environmental protection
CN206717673U (en) A kind of roll special cleaning machine
CN205933017U (en) Electric block's track ash removal device
CN113976579A (en) Reinforcing bar sorting device based on after reinforced concrete is broken
CN205765241U (en) A kind of lathe iron filings automatic cleaning apparatus
CN211134056U (en) Jaw breaker dust recovery device
CN112371257A (en) Solid waste prevents raise dust counterattack formula reducing mechanism
CN211026568U (en) A high-efficiency crushing device for recycled aggregate
CN216063709U (en) Feeding device for crusher
CN205969232U (en) Automatic cutting system
CN107597290A (en) Stone crusher
CN212492097U (en) Building waste dust removal spraying system
CN205253288U (en) Old and useless glass pretreatment system for glass production
CN202225077U (en) Abrasive belt cleaning equipment
CN218459772U (en) Energy-saving mining crushing machine with dust removal function
CN206951747U (en) Glass processing device
CN210453967U (en) Paper extraction point is to gluing coining mill
CN223875170U (en) A concrete recycling device
CN221953109U (en) A miniaturized environmentally friendly rust removal device for anti-corrosion of floating foundation columns of offshore wind power
CN222943636U (en) Waste material processing apparatus for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211119

CF01 Termination of patent right due to non-payment of annual fee