Novel building construction is with getting type device Download PDF

Info

Publication number
CN214739666U
CN214739666U CN202023252060.2U CN202023252060U CN214739666U CN 214739666 U CN214739666 U CN 214739666U CN 202023252060 U CN202023252060 U CN 202023252060U CN 214739666 U CN214739666 U CN 214739666U
Authority
CN
China
Prior art keywords
type
getting
magnet
cavity
iron sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023252060.2U
Other languages
Chinese (zh)
Inventor
刘玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Perfect Construction Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202023252060.2U priority Critical patent/CN214739666U/en
Application granted granted Critical
Publication of CN214739666U publication Critical patent/CN214739666U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Instructional Devices (AREA)

Abstract

The utility model discloses a novel building construction is with getting type device, including getting the type frame, the inside central authorities of getting the type frame are equipped with the cavity, all are equipped with square through hole on the type frame lateral wall of getting of cavity both sides. Get the gliding in-process of type at getting the type pole, the iron sheet is laminating the first magnet of both sides and is sliding, can effectually play the guide effect, and the appeal between the first magnet of iron sheet and both sides, can effectually play the positioning action and reduce the effect of getting the friction between the type pole to getting the type pole, avoided current device because the live time is of a specified duration, after leading and getting wearing and tearing each other between the type pole, make the gap between the type pole great, the in-process of taking the type pole of moving rocks, lead to getting the type and appear the deviation and cause building material's waste or the secondary to get the type again, increase work load's problem, the setting of iron sheet and first magnet simultaneously, can effectually play the supporting role, and then the effectual phenomenon of getting the type pole of having avoided appearing rocking.

Description

Novel building construction is with getting type device
Technical Field
The utility model relates to a building engineering technical field, concretely relates to novel construction is with getting type device.
Background
In the process of building construction, firstly, the shape of a building corner or an irregular object is taken to cut the specific shape of a building material for building construction. And current type ware of getting produces wearing and tearing easily in the use, after getting between the type pole wearing and tearing each other for a long time, gets that the gap is great between the type pole, gets the type back in the use, and the in-process of taking rocks easily and gets the type pole for get the type and appear the deviation and cause building material's waste or secondary operation, need get the type again, increase work load.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem of the existence, the utility model provides a novel construction is with getting type device.
The utility model discloses a realize through following technical scheme:
a novel type taking device for building construction comprises a type taking frame, wherein a cavity is arranged in the center of the interior of the type taking frame, square through holes are formed in the side walls of the type taking frame on two sides of the cavity, the two square through holes are oppositely arranged, a plurality of type taking rods are arranged in the cavity in a one-to-one fit mode, two ends of each of the plurality of type taking rods penetrate through the two through holes respectively and are in fit sliding connection with the through holes, iron sheets are alternately and fixedly connected to the top surfaces and the bottom surfaces of every two adjacent type taking rods, one end of each iron sheet is in fit connection with the inner side wall of the cavity, first magnets are in fit connection with the top surfaces or the bottom surfaces of the type taking rods on the opposite sides of the iron sheets, each first magnet is fixedly connected with the inner side wall of the cavity, second magnets are fixedly connected to two sides of the cavity, the two second magnets are respectively fixed to the top surfaces and the bottom surfaces of the two sides, the two second magnets are respectively in fit sliding connection with the two iron sheets on the edge, each iron sheet is in fit sliding connection with the adjacent first magnet.
The shaping frame and the first magnet are fixed through welding.
The length of the first magnet is greater than the length of the iron sheet by 5 cm-10 cm.
Compared with the prior art, the beneficial effects of the utility model are that: get the gliding in-process of type at getting the type pole, the iron sheet is laminating the first magnet of both sides and is sliding, can effectually play the guide effect, and the appeal between the first magnet of iron sheet and both sides, can effectually play the positioning action and reduce the effect of getting the friction between the type pole to getting the type pole, avoided current device because the live time is of a specified duration, after leading and getting wearing and tearing each other between the type pole, make the gap between the type pole great, the in-process of taking the type pole of moving rocks, lead to getting the type and appear the deviation and cause building material's waste or the secondary to get the type again, increase work load's problem, the setting of iron sheet and first magnet simultaneously, can effectually play the supporting role, and then the effectual phenomenon of getting the type pole of having avoided appearing rocking.
Drawings
FIG. 1 is a schematic view of the structure of the present invention;
fig. 2 is a partial cross-sectional view of the structure of fig. 1 in accordance with the present invention;
FIG. 3 is a cross-sectional view of the structure of FIG. 1 in the cross-section B-B of the present invention
FIG. 4 is a partial top sectional view of the structure of FIG. 1 according to the present invention
Fig. 5 is a schematic view of the structure of the present invention.
In the figure: the shaping frame comprises a shaping frame 1, a cavity 2, a first magnet 3, an iron sheet 4, a shaping rod 5, a second magnet 6 and a square through hole 7.
Detailed Description
The invention will be described in further detail with reference to the following detailed description and accompanying drawings:
as shown in fig. 1, 2, 3, 4 and 5, a novel type taking device for building construction comprises a type taking frame 1, wherein a cavity 2 is arranged in the center of the inside of the type taking frame 1, square through holes 7 are formed in the side walls of the type taking frame 1 on the two sides of the cavity 2, the two square through holes 7 are arranged oppositely, a plurality of type taking rods 5 are arranged in the cavity 2, the plurality of type taking rods 5 are arranged in a one-to-one fit manner, two ends of each plurality of type taking rods 5 penetrate through the two through holes 7 respectively and are in fit sliding connection with the through holes 7, iron sheets 4 are alternately and fixedly connected to the top surfaces and the bottom surfaces of every two adjacent type taking rods 5, one end of each iron sheet 4 is in fit connection with the inner side wall of the cavity 2, the top surface or the bottom surface of the type taking rod 5 on the opposite side of the iron sheet 4 is in fit connection with a first magnet 3, each first magnet 3 is fixedly connected with the inner side wall of the cavity 2, second magnets 6 are fixedly connected to the two sides of the cavity 2, two second magnets 6 are fixed respectively on the top and the bottom surface of both sides, and two second magnets 6 are laminated sliding connection with two iron sheets 4 at the most marginal respectively, and every iron sheet 4 is laminated sliding connection with its adjacent first magnet 3.
The shaping frame 1 and the first magnet 3 are fixed through welding.
The length of the first magnet 3 is greater than the length of the iron sheet 4 by 5 cm-10 cm.
The working principle is as follows: as shown in fig. 3, when taking the model, the model taking frame 1 is attached to the ground, then the model taking frame 1 is pushed to make the plurality of model taking rods 5 attached to the model taking cavity, at this time, the irregular cavity pushes the plurality of model taking rods 5 to form a pattern matched with the model taking rods, at this time, as shown in the state of fig. 5, then the plurality of model taking rods 5 arranged on the model taking frame 1 are taken away synchronously, then the cutting of the same shape of the floor tile or the model taking cutting of other buildings is carried out according to the shape on the model taking device, and in the process of the model taking sliding of the model taking rods 5, the iron sheets 4 fixedly connected on the model taking rods 5 are driven to slide synchronously, at this time, the iron sheets 4 are attached to the first magnets 3 on both sides to slide, the guiding function can be effectively played, and the attractive force between the iron sheets 4 and the first magnets 3 on both sides can effectively position the model taking rods 5, so as to avoid the long service time and after the model taking rods 5 are worn mutually, make and get between the type pole 5 the gap great, take the in-process of moving and get the type pole and rock, lead to making and getting the type and appearing the deviation and cause building material's waste or the type is got again to the secondary, increase work load, iron sheet 4 and first magnet 3's setting simultaneously can effectually reduce the friction between getting the type pole 5, can play the supporting role again, effectually avoided getting the phenomenon that type pole 5 appears rocking.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (3)

1. The utility model provides a novel building construction is with getting type device, is including getting type frame (1), its characterized in that: the central part of the interior of the shaping frame (1) is provided with a cavity (2), the side walls of the shaping frame (1) at the two sides of the cavity (2) are respectively provided with a square through hole (7), the two square through holes (7) are oppositely arranged, a plurality of shaping rods (5) are arranged in the cavity (2), the shaping rods (5) are laminated and arranged one by one, two ends of each shaping rod (5) penetrate through the two through holes (7) respectively and are in sliding connection with the through holes in a laminating manner, the top surface and the bottom surface of each two adjacent shaping rods (5) are alternately and fixedly connected with iron sheets (4), one end of each iron sheet (4) is laminated and connected with the inner side wall of the cavity (2), the top surface or the bottom surface of each shaping rod (5) at the opposite side of the iron sheet (4) is fixedly connected with a first magnet (3), each first magnet (3) is fixedly connected with the inner side wall of the cavity (2), the two sides of the cavity (2) are fixedly connected with second magnets (6), two second magnet (6) are fixed respectively on the top and the bottom surface of both sides, and two second magnet (6) are laminated sliding connection with two iron sheets (4) at most marginal respectively, and every iron sheet (4) is rather than adjacent first magnet (3) laminating sliding connection.
2. The novel shape taking device for building construction according to claim 1, characterized in that: the shaping frame (1) and the first magnet (3) are fixed through welding.
3. The novel shape taking device for building construction according to claim 1, characterized in that: the length of the first magnet (3) is greater than the length of the iron sheet (4) by 5 cm-10 cm.
CN202023252060.2U 2020-12-29 2020-12-29 Novel building construction is with getting type device Active CN214739666U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023252060.2U CN214739666U (en) 2020-12-29 2020-12-29 Novel building construction is with getting type device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023252060.2U CN214739666U (en) 2020-12-29 2020-12-29 Novel building construction is with getting type device

Publications (1)

Publication Number Publication Date
CN214739666U true CN214739666U (en) 2021-11-16

Family

ID=78635640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023252060.2U Active CN214739666U (en) 2020-12-29 2020-12-29 Novel building construction is with getting type device

Country Status (1)

Country Link
CN (1) CN214739666U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114737778A (en) * 2022-04-27 2022-07-12 宁波阳明工业技术研究院有限公司 Movable type mold taking device, mold taking method and application thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114737778A (en) * 2022-04-27 2022-07-12 宁波阳明工业技术研究院有限公司 Movable type mold taking device, mold taking method and application thereof

Similar Documents

Publication Publication Date Title
CN214739666U (en) Novel building construction is with getting type device
CN105799049B (en) It is incubated panel cutting system
CN212002314U (en) Initial bearing cushion block of assembled building material
CN214739228U (en) Assembled three-dimensional interior wallboard structure convenient to it is clean
CN1994601A (en) Splitting roller for rolling rod
CN112681588A (en) Aluminum veneer curtain wall convenient to installation
CN203174668U (en) Novel well body side wall structure
CN211898494U (en) Building foundation pile
CN207260090U (en) A kind of hydraulic engineering ecological block
CN206735195U (en) Quick fall arrest conveying device
CN213013750U (en) Assembled cement brick
CN210880128U (en) Processing equipment with adjustable be applicable to building wallboard
CN202391107U (en) Concrete construction joint baffle
CN211172668U (en) Energy-saving environment-friendly sintered shale perforated brick
CN214169305U (en) Assembled mobile environment-friendly toilet with module system
CN216587293U (en) Hollow brick processed by solid waste and easy to build
CN217573561U (en) Automatic change decoration construction equipment
CN210969398U (en) A mixer for construction
CN212641883U (en) Prefabricated formula PC superimposed sheet
CN221502744U (en) Novel grid structure for special-shaped wall construction
CN211817345U (en) High-strength building brick
CN211466206U (en) Material folding mechanism
CN204456609U (en) A kind of arc array porous brick
CN210907887U (en) Reinforced concrete door leaf reinforcing mesh weaving equipment
CN202985746U (en) Modular side form of prefabricated superimposed slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220307

Address after: 226200 No. 23, group 3, Miaoji village, Haifu Town, Qidong City, Nantong City, Jiangsu Province

Patentee after: Wang Hui

Address before: 463000 Li Wenshan, Shaogang village committee, Chunshui Town, Biyang County, Zhumadian City, Henan Province

Patentee before: Liu Yu

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220322

Address after: 226200 room 708, building 6, Qidong financial center, Nantong City, Jiangsu Province

Patentee after: Jiangsu perfect construction development Co.,Ltd.

Address before: 226200 No. 23, group 3, Miaoji village, Haifu Town, Qidong City, Nantong City, Jiangsu Province

Patentee before: Wang Hui