CN202391107U - Concrete construction joint baffle - Google Patents

Concrete construction joint baffle Download PDF

Info

Publication number
CN202391107U
CN202391107U CN2012200065411U CN201220006541U CN202391107U CN 202391107 U CN202391107 U CN 202391107U CN 2012200065411 U CN2012200065411 U CN 2012200065411U CN 201220006541 U CN201220006541 U CN 201220006541U CN 202391107 U CN202391107 U CN 202391107U
Authority
CN
China
Prior art keywords
baffle plate
baffle
construction joint
concrete construction
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200065411U
Other languages
Chinese (zh)
Inventor
袁俊青
曹会芹
白希胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Guizhou Municipal Engineering Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN2012200065411U priority Critical patent/CN202391107U/en
Application granted granted Critical
Publication of CN202391107U publication Critical patent/CN202391107U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a concrete construction joint baffle which comprises multiple baffle strips with grooves on one sides and slots on the other sides, wherein the grooves are matched with the slots in shape; the baffle strips are connected in parallel; and the baffle strips are hollow plastic plates with width of 20-30mm. When the concrete construction joint baffle is used in construction joint pouring, only the position not shielded by the baffle strips is subjected to dabbing under the action of the baffle, thus the workload is reduced, the difficulty of waterproofing operation at the construction joint is also reduced, the leakage risk is lowered, and the construction efficiency and the construction quality are improved.

Description

A kind of concrete construction joint baffle plate
Technical field
The utility model relates to a kind of construction formwork, especially a kind of concrete construction joint baffle plate.
Background technology
The current processing mode of sole plate concrete construction joint (like ater-casting place) mostly for the clad steel silk screen be fixed in about on the reinforcing bar, during concreting, realize stopping to the concrete lateral flow through blocking concrete aggregate.Before constuction joint is built, should pick the chisel steel silk netting earlier,, increase workload, reduce construction speed to realize combining closely between back pouring concrete and the first pouring concrete; And in the process of practical operation,, pick very difficulty of cutter because the existence of gauze wire cloth (being generally multilayer) is arranged; The effect of cutter hair is often difficult like people's will; Cause combining leakiness between back pouring concrete and the first pouring concrete, thereby the formation hidden leakage defect exerts a certain influence to construction quality.
The utility model content
The technical problem that the utility model will solve provides a kind of concrete construction joint baffle plate, characteristics such as the cost cost is low, easy to install, raising efficiency of construction, saving construction cost, raising construction quality that it has.
For solving the problems of the technologies described above, the technical scheme that the utility model is taked is: it comprises the baffle plate bar of a side band groove one side band draw-in groove more than two, and groove and draw-in groove shape are complementary, and the baffle plate bar also connects mutually.
The utility model further improves and is: the baffle plate bar is the plastic hollow plate, and its width is 20mm-30mm.
Adopt the beneficial effect that technique scheme produced to be: when constuction joint is built; Because the barrier effect of baffle plate; Only need cut a hole mao position that the baffle plate bar does not block, thereby reduce workload, also reduce the difficulty of constuction joint place waterproofing process; Reduce risk of leakage, thereby improved efficiency of construction and construction quality.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the vertical view of baffle plate bar in the utility model;
Fig. 3 is the connection sketch map of the utility model;
Fig. 4 is the use sketch map of the utility model.
In the accompanying drawings: 1, baffle plate bar; 2, groove; 3, draw-in groove; 4, steel mesh reinforcement; 5, reinforcing bar.
The specific embodiment
Embodiment by shown in Fig. 1-4 can know that it comprises the baffle plate bar 1 of a side band groove 2 one side band draw-in grooves 3 more than two, and groove 2 is complementary with draw-in groove 3 shapes, and baffle plate bar 1 also connects mutually; Baffle plate bar 1 is a plastic plate, and its width is 20mm-30mm, and thickness is 15-25mm, highly is 300-400mm, and baffle plate bar 1 is a hollowcore slab.
Method for using:
Baffle plate is stood up in the edge of preset ater-casting, press down the baffle plate bar then, the baffle plate bar that is not blocked by reinforcing bar can be down to the bottom of steel mesh reinforcement.So just formed one at a distance from retaining, during concreting, concrete lateral flow will be restricted.The place, slit of baffle plate can stop concrete outflow because of effects such as extruding between coarse aggregate (like d >=20) obstruction or aggregate.

Claims (3)

1. concrete construction joint baffle plate, it is characterized in that: it comprises the baffle plate bar (1) of a side band groove (2) one side band draw-in grooves (3) more than two, and said groove (2) and draw-in groove (3) shape are complementary, said baffle plate bar (1) is mutually and connect.
2. a kind of concrete construction joint baffle plate according to claim 1 is characterized in that said baffle plate bar (1) is a plastic plate, and its width is 20mm-30mm.
3. a kind of concrete construction joint baffle plate according to claim 2 is characterized in that said baffle plate bar (1) is a hollowcore slab.
CN2012200065411U 2012-01-09 2012-01-09 Concrete construction joint baffle Expired - Fee Related CN202391107U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200065411U CN202391107U (en) 2012-01-09 2012-01-09 Concrete construction joint baffle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200065411U CN202391107U (en) 2012-01-09 2012-01-09 Concrete construction joint baffle

Publications (1)

Publication Number Publication Date
CN202391107U true CN202391107U (en) 2012-08-22

Family

ID=46666041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200065411U Expired - Fee Related CN202391107U (en) 2012-01-09 2012-01-09 Concrete construction joint baffle

Country Status (1)

Country Link
CN (1) CN202391107U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106337530A (en) * 2016-09-21 2017-01-18 中建六局土木工程有限公司 Construction method for plugging construction joint of frame beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106337530A (en) * 2016-09-21 2017-01-18 中建六局土木工程有限公司 Construction method for plugging construction joint of frame beam

Similar Documents

Publication Publication Date Title
CN204509976U (en) A kind of shear connector of steel-concrete combination beam
CN205153527U (en) End part plugging plate for shaped steel formwork
CN203846458U (en) Formwork system special for concrete construction
CN204126226U (en) Tile laying lattice plate
CN202194394U (en) Rapid hoisting, positioning and adjusting piece for prefabricated wall board
CN202391107U (en) Concrete construction joint baffle
CN102367735B (en) Back-to-back waterstop installation equipment for tunnel construction joint
CN202299144U (en) Concrete cover cushion block
CN202247961U (en) Basement back strip assembled side mold device
CN207553505U (en) Assembled wall anchoring assembly
CN103541443B (en) Post-cast strip structure and construction method thereof
CN205777527U (en) A kind of assembly of reserved split bolt eye
CN204309082U (en) Hogging moment stretching notch combed template
CN201176551Y (en) Precast slab for roads
CN207348280U (en) A kind of novel precast floor slab
CN207469549U (en) A kind of T-shaped floor with partition wall bar connecting hole
CN205171382U (en) Hyperboloid case beam side combination structure support device
CN204898909U (en) Prefabricated composite insulation board and cast in situ concrete wall structure thereof
CN205314269U (en) One -way superimposed sheet of concrete side inter -plate seam construction
CN204199509U (en) Thin-walled square chest float Structure
CN104631675B (en) A kind of two-sided prefabricated superimposed sheet
CN203603460U (en) Structure capable of preventing thick liquid leakage of gap between floor formwork and precast beam component
CN207582745U (en) Build double steel plate concrete structure double steel plate connecting elements
CN207775725U (en) A kind of special disposable light filling composite core mould of bridge
CN203569693U (en) Pre-buried iron part with steel ties arranged on concrete structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161229

Address after: 550025 Guizhou new security zone, Qishan resettlement points

Patentee after: China Railway (Guizhou) Municipal Engineering Co., Ltd.

Address before: 050081 Zhongshan West Road Hebei city of Shijiazhuang province (Village) No. 979

Patentee before: CR17 Bureau No.3 Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120822

Termination date: 20190109

CF01 Termination of patent right due to non-payment of annual fee