CN211817345U - High-strength building brick - Google Patents

High-strength building brick Download PDF

Info

Publication number
CN211817345U
CN211817345U CN201922213082.9U CN201922213082U CN211817345U CN 211817345 U CN211817345 U CN 211817345U CN 201922213082 U CN201922213082 U CN 201922213082U CN 211817345 U CN211817345 U CN 211817345U
Authority
CN
China
Prior art keywords
brick
fragment
recess
fixedly connected
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922213082.9U
Other languages
Chinese (zh)
Inventor
刘平利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Anlang Construction Engineering Co ltd
Original Assignee
Sichuan Qiyibiao Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Qiyibiao Information Technology Co Ltd filed Critical Sichuan Qiyibiao Information Technology Co Ltd
Priority to CN201922213082.9U priority Critical patent/CN211817345U/en
Application granted granted Critical
Publication of CN211817345U publication Critical patent/CN211817345U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The utility model discloses a building brick that intensity is high, including the fragment of brick, first recess and second recess have been seted up respectively to the bottom and the top of fragment of brick, the left side fixedly connected with locating piece of fragment of brick, the constant head tank has been seted up on the right side of fragment of brick, the inner chamber of fragment of brick runs through fixedly connected with additional strengthening, additional strengthening includes the frame, the horizontal fixedly connected with horizontal pole of inner chamber of frame, the equal fixedly connected with bracing piece in both sides around the horizontal pole, the bracing piece is kept away from the one side of horizontal pole and the inner wall fixed connection of frame, the quantity of bracing piece is a plurality of. The utility model discloses a cooperation that sets up fragment of brick, first recess, constant head tank, second recess, locating piece, frame, horizontal pole and bracing piece is used, has solved the relatively poor problem of stability when current partial brick for building intensity is relatively poor and pile, and this brick for building possesses the strong advantage of stability when intensity height and pile, is worth promoting.

Description

High-strength building brick
Technical Field
The utility model relates to a building material technical field specifically is a high building brick of intensity.
Background
The building is a general term of buildings and structures, and is an artificial environment created by people by using the grasped material technical means and applying certain scientific laws, geomantic omen concepts and aesthetic rules to meet the needs of social life.
The brick blocks are required to be used in the aspect of building of part of special buildings, the strength of the brick blocks for the existing buildings is low, the brick blocks are easy to break, the outer surfaces of the existing brick blocks are mostly planes, and the friction force between the existing brick blocks and cement for connection is small, so that the stability of the brick blocks during stacking is poor, and inconvenience is brought to users in use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building brick that intensity is high possesses the strong advantage of stability when intensity is high and pile, has solved the relatively poor problem of stability when current partial building brick intensity is relatively poor and pile.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building brick that intensity is high, includes the fragment of brick, first recess and second recess have been seted up respectively to the bottom and the top of fragment of brick, the left side fixedly connected with locating piece of fragment of brick, the constant head tank has been seted up on the right side of fragment of brick, the inner chamber of fragment of brick runs through fixedly connected with additional strengthening.
Preferably, the additional strengthening includes the frame, the horizontal fixedly connected with horizontal pole of inner chamber of frame, the equal fixedly connected with bracing piece in both sides around the horizontal pole, the bracing piece is kept away from one side of horizontal pole and the inner wall fixed connection of frame, the quantity of bracing piece is a plurality of, the additional strengthening is made by the reinforcing bar.
Preferably, the positioning block and the positioning groove are matched with each other for use, and the positioning block and the brick are of an integrally formed structure.
Preferably, the number of the first grooves and the number of the second grooves are a plurality of, the first grooves and the second grooves are uniformly distributed at the bottom of the brick and the top of the brick respectively.
Preferably, the cross-sectional areas of the front sides of the first groove and the second groove are both trapezoidal, and the tops of the first groove and the second groove are both circular.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a cooperation that sets up fragment of brick, first recess, constant head tank, second recess, locating piece, frame, horizontal pole and bracing piece is used, has solved the relatively poor problem of stability when current partial brick for building intensity is relatively poor and pile, and this brick for building possesses the strong advantage of stability when intensity height and pile, is worth promoting.
2. The utility model increases the intensity of the brick by arranging the reinforcing structure, increases the intensity of the frame by using the cross rods and the supporting rods, and simultaneously the clearance of the reinforcing structure can facilitate the forming of the materials of the brick;
by arranging the positioning block and the positioning groove, the stability of the two bricks in connection can be improved by the mutual matching of the positioning grooves and the positioning blocks of two groups of adjacent bricks;
through setting up first recess and second recess, when cement is paintd to the top and the bottom of fragment of brick, the inner chamber of first recess and second recess can be got into to the cement of connection usefulness, and when the dry back of cement, for the plane of traditional fragment of brick, the stability of this fragment of brick when piling up is stronger.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a top view of the reinforcing structure of the present invention;
fig. 3 is a top view of the brick of the present invention.
In the figure: 1 fragment of brick, 2 first recesses, 3 additional strengthening, 4 constant head tanks, 5 second recesses, 6 locating pieces, 7 frames, 8 horizontal poles, 9 bracing pieces.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model provides a parts such as fragment of brick 1, first recess 2, constant head tank 4, second recess 5, locating piece 6, frame 7, horizontal pole 8 and bracing piece 9 are general standard or the part that technical staff in the field knows, and its structure and principle all can learn through the technical manual or learn through conventional experimental method for technical staff in the field.
Referring to fig. 1-3, a high-strength building brick comprises a brick 1, wherein the bottom and the top of the brick 1 are respectively provided with a first groove 2 and a second groove 5, the left side of the brick 1 is fixedly connected with a positioning block 6, the right side of the brick 1 is provided with a positioning groove 4, and the inner cavity of the brick 1 is fixedly connected with a reinforcing structure 3 in a penetrating manner;
the reinforcing structure 3 comprises a frame 7, a cross rod 8 is transversely and fixedly connected to the inner cavity of the frame 7, supporting rods 9 are fixedly connected to the front side and the rear side of the cross rod 8, one side, away from the cross rod 8, of each supporting rod 9 is fixedly connected with the inner wall of the frame 7, the number of the supporting rods 9 is multiple, and the reinforcing structure 3 is made of steel bars;
the positioning block 6 and the positioning groove 4 are matched with each other, and the positioning block 6 and the brick 1 are of an integrally formed structure;
the number of the first grooves 2 and the number of the second grooves 5 are the same, and the first grooves 2 and the second grooves 5 are uniformly distributed at the bottom of the brick 1 and the top of the brick 1 respectively;
the cross sectional areas of the front sides of the first groove 2 and the second groove 5 are both trapezoidal, and the tops of the first groove 2 and the second groove 5 are both circular;
when the brick forming machine is used, the strength of the brick 1 is increased by arranging the reinforcing structures 3, the strength of the frame 7 is increased by using the cross rods 8 and the supporting rods 9, and meanwhile, the gaps of the reinforcing structures 3 can facilitate the forming of the component materials of the brick 1;
by arranging the positioning block 6 and the positioning groove 4, the positioning grooves 4 and the positioning blocks 6 of two groups of adjacent bricks 1 are matched with each other, so that the stability of the two bricks 1 in connection can be improved;
through setting up first recess 2 and second recess 5, when the top of fragment of brick 1 and bottom daub cement, the cement of connection usefulness can get into the inner chamber of first recess 2 and second recess 5, and when the cement is dry back, for traditional fragment of brick 1's plane, the stability of this fragment of brick 1 when piling up is stronger.
In summary, the following steps: this high-strength building brick uses through the cooperation that sets up fragment of brick 1, first recess 2, constant head tank 4, second recess 5, locating piece 6, frame 7, horizontal pole 8 and bracing piece 9, has solved the current relatively poor problem of stability when part brick for building intensity is relatively poor and is piled up.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a building brick that intensity is high, includes fragment of brick (1), its characterized in that: first recess (2) and second recess (5) have been seted up respectively to the bottom and the top of fragment of brick (1), the left side fixedly connected with locating piece (6) of fragment of brick (1), constant head tank (4) have been seted up on the right side of fragment of brick (1), fixedly connected with additional strengthening (3) runs through to the inner chamber of fragment of brick (1).
2. The high-strength building brick as claimed in claim 1, wherein: additional strengthening (3) are including frame (7), the horizontal fixedly connected with horizontal pole (8) of inner chamber of frame (7), the equal fixedly connected with bracing piece (9) in both sides around horizontal pole (8), the inner wall fixed connection of one side and frame (7) of horizontal pole (8) is kept away from in bracing piece (9), the quantity of bracing piece (9) is a plurality of, additional strengthening (3) are made by the reinforcing bar.
3. The high-strength building brick as claimed in claim 1, wherein: the positioning block (6) and the positioning groove (4) are matched with each other for use, and the positioning block (6) and the brick (1) are of an integrally formed structure.
4. The high-strength building brick as claimed in claim 1, wherein: the quantity of first recess (2) and second recess (5) is a plurality of, and quantity is the same, first recess (2) and second recess (5) evenly distributed respectively in the bottom of fragment of brick (1) and the top of fragment of brick (1).
5. The high-strength building brick as claimed in claim 1, wherein: the cross-sectional areas of the front sides of the first groove (2) and the second groove (5) are trapezoidal, and the tops of the first groove (2) and the second groove (5) are circular.
CN201922213082.9U 2019-12-11 2019-12-11 High-strength building brick Expired - Fee Related CN211817345U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922213082.9U CN211817345U (en) 2019-12-11 2019-12-11 High-strength building brick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922213082.9U CN211817345U (en) 2019-12-11 2019-12-11 High-strength building brick

Publications (1)

Publication Number Publication Date
CN211817345U true CN211817345U (en) 2020-10-30

Family

ID=73140946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922213082.9U Expired - Fee Related CN211817345U (en) 2019-12-11 2019-12-11 High-strength building brick

Country Status (1)

Country Link
CN (1) CN211817345U (en)

Similar Documents

Publication Publication Date Title
CN104264862B (en) 3D printing reinforcement masonry shear wall structure and construction method thereof
CN211817345U (en) High-strength building brick
CN212224404U (en) Assembled concrete self preservation temperature building block
CN214329452U (en) Show wallboard connecting device
CN215630849U (en) Withstand voltage type composite insulation evaporates presses aerated brick
CN213927035U (en) Sandwich reinforced concrete masonry for high-grade anti-seismic area
CN212052833U (en) Building foundation structure
CN213233813U (en) Assembly type building structure
CN205243041U (en) Stride building structure hydraulic pressure greatly and pass construction equipment that takes one's place
CN210685049U (en) Assembled building board mixes formula wallboard
CN213448435U (en) Reinforcing pile for building foundation
CN204691048U (en) Building block brick
CN216810589U (en) Hollow brick and wall with new structure
CN206844646U (en) A kind of high flexible assembly type elevator its support reinforcement mechanism of applicability
CN215519449U (en) Hollow brick for building engineering
CN213868917U (en) Concrete building template for mountain wind power civil engineering
CN216840185U (en) Aerated concrete building is brick for outer wall
CN214883797U (en) Novel civil construction foundation pile structure
CN213234371U (en) Wall reinforcing mechanism for house building construction
CN211922961U (en) A structure tied in a bundle for high-rise building
CN217027480U (en) Steel concrete shear force wall is pieced together structure assembly type building in advance
CN220889617U (en) Building column base reinforced structure convenient to splice fast
CN211898494U (en) Building foundation pile
CN207130954U (en) Can reinforcement and the brick structure of reinforcing connection
CN213741868U (en) Concrete perforated brick for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201125

Address after: Office No.4, 1st floor, No.43, Zhuzhuang Xinyuan, Zhuzhuang village, Chengxi street, Hailing District, Taizhou City, Jiangsu Province 225300

Patentee after: Jiangsu Anlang Construction Engineering Co.,Ltd.

Address before: 610000 room 1406, floor 14, unit 1, building 5, No. 366, South Ronghua Road, hi tech Zone, Chengdu, Sichuan Province

Patentee before: Sichuan qiyibiao Information Technology Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030

Termination date: 20211211

CF01 Termination of patent right due to non-payment of annual fee