CN214724139U - Pipeline rack for building engineering - Google Patents

Pipeline rack for building engineering Download PDF

Info

Publication number
CN214724139U
CN214724139U CN202120975145.9U CN202120975145U CN214724139U CN 214724139 U CN214724139 U CN 214724139U CN 202120975145 U CN202120975145 U CN 202120975145U CN 214724139 U CN214724139 U CN 214724139U
Authority
CN
China
Prior art keywords
supporting seat
rack
pipeline
rotating shaft
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120975145.9U
Other languages
Chinese (zh)
Inventor
张威
钱龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei University of Technology
Original Assignee
Hubei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei University of Technology filed Critical Hubei University of Technology
Priority to CN202120975145.9U priority Critical patent/CN214724139U/en
Application granted granted Critical
Publication of CN214724139U publication Critical patent/CN214724139U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline rack for building engineering, including the support column, the top of support column is equipped with the supporting seat, and the bottom of support column is equipped with the gyro wheel, first spout has all been seted up to the both sides of supporting seat, the supporting seat is equipped with the slide bar in first spout department, and the one end welding of slide bar has the fixed plate, the second spout has all been seted up to the both sides of supporting seat, the supporting seat is equipped with first rack and second rack respectively in two second spout departments, first cavity has been seted up at the middle part of supporting seat, the supporting seat is equipped with the gear in first cavity department. The utility model discloses a set up first rack, second rack and gear, place the pipeline on the supporting seat, promote the fixed plate again, through the meshing of first rack and second rack and gear, two fixed plate simultaneous motions, two fixed plates are with the pipeline centre gripping, make the pipeline remove the central point of device simultaneously and put, guarantee that the focus of device can not squint, have increased the stability when device removes.

Description

Pipeline rack for building engineering
Technical Field
The utility model relates to a building tool technical field especially relates to a pipeline rack for building engineering.
Background
The pipeline is the building tool who often uses on the building site, but the pipeline is comparatively inconvenient when the transportation on the building site, carries through the manual work generally, and some building sites also can use handling tool to carry, but because the length of pipeline differs, handling tool is comparatively inconvenient when using, because the pipeline slides easily, when going up the downhill path or stopping moving suddenly, makes the pipeline slide away easily simultaneously.
Through the retrieval, chinese patent publication is CN 209905470U's patent, discloses an energy-concerving and environment-protective building pipe fitting rack for civil engineering, the on-line screen storage device comprises a base, four gyro wheels are installed to the bottom of base, two spouts have been seted up at the top of base, and equal slidable mounting has a backup pad in two spouts, and the equal fixed mounting in top of two backup pads has the board of placing, and two equal fixed mounting in top of placing the board have two baffles, one side fixed mounting of base has the fixed plate, has seted up the rotation hole on the fixed plate, rotates downthehole rotation and installs the screw rod, all has seted up the screw hole in two backup pads, and the screw thread of two screw holes is revolved to opposite.
In an energy-concerving and environment-protective building pipe fitting rack for civil engineering places the distance between the board through adjusting two, is convenient for adapt to the pipeline of different length, but can't be fixed completely with the pipeline, causes the pipeline to slide easily.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a pipeline placing rack for construction engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a pipeline rack for building engineering, includes the support column, and the top of support column is equipped with the supporting seat, and the bottom of support column is equipped with the gyro wheel, first spout has all been seted up to the both sides of supporting seat, the supporting seat is equipped with the slide bar in first spout department, and the one end welding of slide bar has the fixed plate, the second spout has all been seted up to the both sides of supporting seat, the supporting seat is equipped with first rack and second rack respectively in two second spout departments, first cavity has been seted up at the middle part of supporting seat, the supporting seat is equipped with the gear in first cavity department, the gear with first rack with the meshing of second rack, the bottom of supporting seat is equipped with fixed establishment.
Further, fixed establishment includes the axis of rotation, and the axis of rotation runs through the supporting seat, the top welding of axis of rotation has the movable plate, and the movable plate is in the top of supporting seat, the bottom welding of supporting seat has fixed box, and the inside sliding connection of fixed box has the inner gearing ratchet, the inner gearing ratchet with the gear all with axis of rotation sliding connection.
Furthermore, a second spring is welded at the bottom end of the rotating shaft.
Further, the outer wall welding of inner gearing ratchet has the carriage release lever, the bar through-hole has been seted up to the inner wall of fixed box, the carriage release lever extends to in bar through-hole department the outside of fixed box, the one end welding of carriage release lever has the shift ring, the outer weld of fixed box has solid fixed ring, and solid fixed ring's top welding has first spring, the top of first spring with the carriage release lever welding.
Further, the outer side of the moving ring is arc-shaped.
Further, the supporting seat is U-shaped, a strip-shaped groove is formed in the top end of the supporting seat, and the supporting seat is rotatably connected with a pulley at the strip-shaped groove.
Furthermore, a supporting plate is welded at the top end of the sliding rod.
Further, the support columns are inclined, and connecting rods are welded between the support columns.
Furthermore, the supporting seat and the top end of the moving plate are both provided with sponges.
The utility model has the advantages that:
1. the pipeline is placed on the supporting seat through the arrangement of the first rack, the second rack and the gear, the fixed plates are pushed, the two fixed plates move simultaneously through the meshing of the first rack and the second rack with the gear, the two fixed plates clamp the pipeline, and the pipeline is moved to the central position of the device, so that the gravity center of the device is prevented from shifting, and the stability of the device during moving is improved;
2. by arranging the rotating shaft and the inner meshing ratchet wheel, the pipeline at the top end of the supporting seat can enable the moving plate to descend, the moving plate drives the rotating shaft to descend, the rotating shaft enters the inner meshing ratchet wheel, the fixed plates drive the gears to rotate through the first rack and the second gear, the gears drive the rotating shaft to rotate, the rotating shaft drives the inner meshing ratchet wheel to rotate, the inner meshing ratchet wheel cannot rotate reversely, the gears can only rotate in one direction, the two fixed plates can only approach to each other, and the two fixed plates clamp and fix the pipeline;
3. by arranging the moving ring and the moving rod, the moving ring is pulled downwards to drive the moving rod to descend, the moving rod drives the inner meshing ratchet wheel to descend, the inner meshing ratchet wheel leaves the rotating shaft, the rotating shaft can rotate freely at the moment, and the fixed plate can move freely, so that the pipeline can be unloaded conveniently;
4. through setting up support column and the connecting rod that is the slope form, the support column that is the slope form can increase the stability of device, avoids the pipeline overlength, causes the perk of device one end, and the connecting rod can strengthen the device steadiness, avoids the support column to buckle because of pipeline gravity
5. Through setting up the sponge, the sponge can effectively avoid pipeline and device collision to damage the device or pipeline warp.
Drawings
Fig. 1 is a schematic cross-sectional structural view of a pipe rack for construction engineering according to embodiment 1;
FIG. 2 is an enlarged view of part A of FIG. 1;
fig. 3 is a schematic front view of a pipe rack for construction engineering according to embodiment 1;
fig. 4 is a top structural sectional view of the pipe rack for construction engineering according to embodiment 1;
fig. 5 is a schematic cross-sectional structural view of the pipe rack for construction engineering in embodiment 2.
In the figure: the device comprises a supporting column 1, a connecting column 2, a fixing plate 3, a supporting plate 4, a first rack 5, a supporting seat 6, a pulley 601, a gear 7, a rotating shaft 8, a moving plate 9, a second rack 10, a moving rod 11, a moving ring 12, a first spring 13, a fixing ring 14, an internal meshing ratchet wheel 15, a second spring 16, a fixing box 17, a sliding rod 18 and a sponge 19.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Example 1
Referring to fig. 1-4, a pipeline placing rack for construction engineering comprises a supporting column 1, a supporting seat 6 is arranged at the top end of the supporting column 1, rollers are arranged at the bottom end of the supporting column 1, first sliding grooves are respectively formed in two sides of the supporting seat 6, a sliding rod 18 is arranged at the first sliding groove of the supporting seat 6, a fixing plate 3 is welded at one end of the sliding rod 18, second sliding grooves are respectively formed in two sides of the supporting seat 6, a first rack 5 and a second rack 10 are respectively arranged at the two second sliding grooves of the supporting seat 6, a first cavity is formed in the middle of the supporting seat 6, a gear 7 is arranged at the first cavity of the supporting seat 6, the gear 7 is meshed with the first rack 5 and the second rack 10, a fixing mechanism is arranged at the bottom end of the supporting seat 6, the fixing plate 3 is pushed again by placing a pipeline on the supporting seat 6, and the two fixing plates 3 move simultaneously by the meshing of the first rack 5 and the second rack 10 with the gear 7, two fixed plates 3 make the pipeline remove the central point of device simultaneously with the pipeline centre gripping, guarantee that the focus of device can not squint, stability when having increased the device and removing, make two fixed plates 3 unable removal through fixed establishment at last, the pipeline is fixed, and the pipeline slides when avoiding transporting.
Wherein, the fixing mechanism comprises a rotating shaft 8, the rotating shaft 8 penetrates through a supporting seat 6, a moving plate 9 is welded at the top end of the rotating shaft 8, the moving plate 9 is positioned at the top end of the supporting seat 6, a fixing box 17 is welded at the bottom end of the supporting seat 6, an inner meshing ratchet wheel 15 is connected inside the fixing box 17 in a sliding manner, both the inner meshing ratchet wheel 15 and a gear 7 are connected with the rotating shaft 8 in a sliding manner, after a pipeline is placed at the top end of the supporting seat 6, the moving plate 9 can be descended by the pipeline, the moving plate 9 drives the rotating shaft 8 to descend, the rotating shaft 8 enters the inner meshing ratchet wheel 15, when the pipe is placed completely, the fixing plate 3 is pushed, the gear 7 is driven to rotate by the fixing plate 3 through a first rack 5 and a second gear 10, the gear 7 drives the rotating shaft 8 to rotate, the rotating shaft 8 drives the inner meshing ratchet wheel 15 to rotate, the inner meshing ratchet wheel 15 can not rotate reversely, so that the gear 7 can only rotate along one direction, so that the two fixing plates 3 can only be close to each other, and the two fixing plates 3 clamp and fix the pipeline.
Wherein, the welding of the bottom of axis of rotation 8 has second spring 16, makes axis of rotation 8 can leave inner gearing ratchet 15 when being convenient for not placing the pipeline, and fixed plate 3 can freely move this moment, is convenient for adjust the position of fixed plate 3, places other types of pipeline.
Wherein, the outer wall welding of interior meshing ratchet 15 has carriage release lever 11, the bar through-hole has been seted up to the inner wall of fixed box 17, carriage release lever 11 extends to the outside of fixed box 17 in bar through-hole department, the welding of the one end of carriage release lever 11 has carriage release ring 12, the outside welding of fixed box 17 has solid fixed ring 14, the welding of the top of solid fixed ring 14 has first spring 13, the top and the carriage release lever 11 welding of first spring 13, when needs uninstallation pipeline, downwards pulling carriage release ring 12, make carriage release ring 12 drive carriage release lever 11 decline, carriage release lever 11 drives interior meshing ratchet 15 and descends, interior meshing ratchet 15 leaves axis of rotation 8, axis of rotation 8 can free rotation this moment, fixed plate 3 can free movement, the pipeline of being convenient for uninstallation.
Wherein, the outer side of the moving ring 12 is arc-shaped, which is convenient for pulling the moving ring 12 to make it descend.
Wherein, supporting seat 6 is the U-shaped, and the bar groove has been seted up on the top of supporting seat 6, and supporting seat 6 rotates in bar groove and is connected with pulley 601, and the supporting seat 6 that is the U-shaped is convenient for place the pipeline, makes the pipeline remove when pulley 601 is convenient for promote fixed plate 3, puts the central point that pushes away the device with the pipeline.
Wherein, the top welding of slide bar 18 has backup pad 4, and backup pad 4 can lift the both ends of pipeline, avoids the pipeline slope to drop.
Wherein, support column 1 is the slope form, and the welding has connecting rod 2 between the support column 1, and support column 1 that is the slope form can increase the stability of device, avoids the pipeline overlength, causes the perk of device one end, and connecting rod 2 can strengthen the device steadiness, avoids support column 1 to buckle because of pipeline gravity.
The working principle is as follows: the pipeline is placed on the supporting seat 6, the fixing plates 3 are pushed, the two fixing plates 3 move simultaneously through the meshing of the first rack 5 and the second rack 10 with the gear 7, the pipeline is clamped by the two fixing plates 3, the pipeline is moved to the central position of the device, the gravity center of the device is ensured not to shift, and the stability of the device during moving is improved;
after the pipeline is placed at the top end of the supporting seat 6, the pipeline can enable the moving plate 9 to descend, the moving plate 9 drives the rotating shaft 8 to descend, the rotating shaft 8 enters the inner meshing ratchet wheel 15, the fixed plate 3 drives the gear 7 to rotate through the first rack 5 and the second gear 10, the gear 7 drives the rotating shaft 8 to rotate, the rotating shaft 8 drives the inner meshing ratchet wheel 15 to rotate, the inner meshing ratchet wheel 15 cannot rotate reversely, the gear 7 can only rotate along one direction, the two fixed plates 3 can only approach to each other, and the two fixed plates 3 clamp and fix the pipeline;
when the pipeline needs to be unloaded, the moving ring 12 is pulled downwards, the moving ring 12 drives the moving rod 11 to descend, the moving rod 11 drives the inner meshing ratchet wheel 15 to descend, the inner meshing ratchet wheel 15 leaves the rotating shaft 8, the rotating shaft 8 can rotate freely at the moment, and the fixing plate 3 can move freely, so that the pipeline is convenient to unload.
Example 2
Referring to fig. 5, compared with embodiment 1, in this embodiment, in order to increase the practicability of the device, the sponge 19 is disposed on the top ends of the supporting seat 6 and the moving plate 9, so as to effectively prevent the pipeline from colliding with the device, thereby damaging the device or deforming the pipeline.
The working principle is as follows: the pipeline is placed on the supporting seat 6, the fixing plates 3 are pushed, the two fixing plates 3 move simultaneously through the meshing of the first rack 5 and the second rack 10 with the gear 7, the pipeline is clamped by the two fixing plates 3, the pipeline is moved to the central position of the device, the gravity center of the device is ensured not to shift, and the stability of the device during moving is improved;
after the pipeline is placed at the top end of the supporting seat 6, the pipeline can enable the moving plate 9 to descend, the moving plate 9 drives the rotating shaft 8 to descend, the rotating shaft 8 enters the inner meshing ratchet wheel 15, the fixed plate 3 drives the gear 7 to rotate through the first rack 5 and the second gear 10, the gear 7 drives the rotating shaft 8 to rotate, the rotating shaft 8 drives the inner meshing ratchet wheel 15 to rotate, the inner meshing ratchet wheel 15 cannot rotate reversely, the gear 7 can only rotate along one direction, the two fixed plates 3 can only approach to each other, and the two fixed plates 3 clamp and fix the pipeline;
when the pipeline needs to be unloaded, the moving ring 12 is pulled downwards, the moving ring 12 drives the moving rod 11 to descend, the moving rod 11 drives the inner meshing ratchet wheel 15 to descend, the inner meshing ratchet wheel 15 leaves the rotating shaft 8, the rotating shaft 8 can freely rotate at the moment, and the fixed plate 3 can freely move, so that the pipeline is convenient to unload;
the sponge 19 is effective to prevent the pipe from colliding with the device and damaging the device or deforming the pipe.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (9)

1. A pipeline placing rack for constructional engineering comprises a supporting column (1), a supporting seat (6) is arranged at the top end of the supporting column (1), rollers are arranged at the bottom end of the supporting column (1), it is characterized in that both sides of the supporting seat (6) are provided with first sliding chutes, the supporting seat (6) is provided with a sliding rod (18) at the first sliding chute, one end of the sliding rod (18) is provided with a fixed plate (3), the two sides of the supporting seat (6) are respectively provided with a second sliding chute, the supporting seat (6) is respectively provided with a first rack (5) and a second rack (10) at the two second sliding chutes, a first cavity is formed in the middle of the supporting seat (6), a gear (7) is arranged at the first cavity of the supporting seat (6), the gear (7) is meshed with the first rack (5) and the second rack (10), and a fixing mechanism is arranged at the bottom end of the supporting seat (6).
2. The pipeline placing rack for the construction engineering according to claim 1, wherein the fixing mechanism comprises a rotating shaft (8), the rotating shaft (8) penetrates through the supporting seat (6), a moving plate (9) is arranged at the top end of the rotating shaft (8), the moving plate (9) is arranged at the top end of the supporting seat (6), a fixing box (17) is arranged at the bottom end of the supporting seat (6), an inner meshing ratchet wheel (15) is arranged inside the fixing box (17), and the inner meshing ratchet wheel (15) and the gear (7) are both in sliding connection with the rotating shaft (8).
3. A pipe rack for construction engineering according to claim 2, characterized in that the bottom end of the rotating shaft (8) is provided with a second spring (16).
4. The pipeline placing rack for the construction engineering according to claim 2, wherein a moving rod (11) is arranged on the outer wall of the inner meshing ratchet wheel (15), a strip-shaped through hole is formed in the inner wall of the fixing box (17), the moving rod (11) extends to the outside of the fixing box (17) at the strip-shaped through hole, a moving ring (12) is arranged at one end of the moving rod (11), a fixing ring (14) is arranged on the outside of the fixing box (17), a first spring (13) is arranged at the top end of the fixing ring (14), and the top end of the first spring (13) is fixedly connected with the moving rod (11).
5. A pipe rack for construction engineering according to claim 4, characterized in that the outside of the moving ring (12) is arc-shaped.
6. The pipeline placing rack for the construction engineering as claimed in claim 1, wherein the supporting seat (6) is U-shaped, a strip-shaped groove is formed at the top end of the supporting seat (6), and a pulley (601) is arranged at the strip-shaped groove of the supporting seat (6).
7. The pipe rack for construction engineering according to claim 1, wherein the top end of the sliding rod (18) is provided with a support plate (4).
8. The pipe rack for the construction engineering according to any one of claims 1 to 7, wherein the supporting columns (1) are inclined, and connecting rods (2) are arranged between the supporting columns (1).
9. The pipe rack for the construction engineering as claimed in claim 2, wherein the top ends of the supporting seat (6) and the moving plate (9) are provided with sponge (19).
CN202120975145.9U 2021-05-10 2021-05-10 Pipeline rack for building engineering Expired - Fee Related CN214724139U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120975145.9U CN214724139U (en) 2021-05-10 2021-05-10 Pipeline rack for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120975145.9U CN214724139U (en) 2021-05-10 2021-05-10 Pipeline rack for building engineering

Publications (1)

Publication Number Publication Date
CN214724139U true CN214724139U (en) 2021-11-16

Family

ID=78620045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120975145.9U Expired - Fee Related CN214724139U (en) 2021-05-10 2021-05-10 Pipeline rack for building engineering

Country Status (1)

Country Link
CN (1) CN214724139U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116062423A (en) * 2023-03-07 2023-05-05 西南石油大学 Pipeline transportation device convenient to dump

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116062423A (en) * 2023-03-07 2023-05-05 西南石油大学 Pipeline transportation device convenient to dump

Similar Documents

Publication Publication Date Title
CN109849763B (en) Transport vechicle with climbing mechanism
CN214724139U (en) Pipeline rack for building engineering
CN111644857A (en) Height-adjustable high-altitude machining equipment
CN112647988A (en) Panel turning device is used in tunnel construction with inside safeguard function
CN112962986A (en) Multi-point diagonal bracing device for prefabricated building vertical surface
CN211107515U (en) Logistics transportation device for electronic commerce
CN210944657U (en) Petrochemical pipeline installation hoisting accessory
CN114658203B (en) Attached scaffold operation table with anti-falling mechanism
CN214493806U (en) Storage device is used in cleaner production
CN215159358U (en) Efficient loading robot of loading
CN213352431U (en) Channel placing rack
CN110136318B (en) Coin packaging machine
CN112173383A (en) Safe carrying and using equipment for building material barrel
CN221868517U (en) Pipe section storing and taking device
CN112627551A (en) Construction is with platform of unloading
CN215464558U (en) A test platform for hydraulic engineering is experimental
CN214359989U (en) Indoor transfer equipment for silicon rod processing
CN218287817U (en) Steel structural component transfer device
CN220199958U (en) Storage and transportation device of vernier caliper
CN218402150U (en) Gripping device, carrying device and refrigeration bin
CN212507552U (en) Supporting structure for steel structure
CN220363991U (en) Novel container cargo dumping frame
CN219649848U (en) Three-dimensional flexible casting platform device
CN220199342U (en) Building site material floor truck
CN221763285U (en) Unloading device based on gas storage tank for gas conveying

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211116

CF01 Termination of patent right due to non-payment of annual fee