CN214697867U - Tunnel mid-partition wall pouring die frame - Google Patents

Tunnel mid-partition wall pouring die frame Download PDF

Info

Publication number
CN214697867U
CN214697867U CN202023326659.6U CN202023326659U CN214697867U CN 214697867 U CN214697867 U CN 214697867U CN 202023326659 U CN202023326659 U CN 202023326659U CN 214697867 U CN214697867 U CN 214697867U
Authority
CN
China
Prior art keywords
template
frame
partition wall
driving plate
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023326659.6U
Other languages
Chinese (zh)
Inventor
黄江华
赵良云
姜叶翔
彭书生
曾国栋
桂焱平
康根平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Huadong Mapping And Engineering Safety Technology Co ltd
PowerChina Huadong Engineering Corp Ltd
Original Assignee
Zhejiang Huadong Mapping And Engineering Safety Technology Co ltd
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Huadong Mapping And Engineering Safety Technology Co ltd, PowerChina Huadong Engineering Corp Ltd filed Critical Zhejiang Huadong Mapping And Engineering Safety Technology Co ltd
Priority to CN202023326659.6U priority Critical patent/CN214697867U/en
Application granted granted Critical
Publication of CN214697867U publication Critical patent/CN214697867U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a die carrier is pour to tunnel mid-board. The utility model aims at providing a simple structure, convenient operation, safe and reliable's tunnel mid-board pours die carrier. The technical scheme of the utility model is that: the utility model provides a die carrier is pour to tunnel mid-board which characterized in that: the single-side template device is respectively arranged at two sides of the partition wall; the single-side template device is provided with a frame, a template arranged on one side of the frame and a driving plate arranged on the other side of the frame, wherein the frame is provided with a plurality of sliding tracks which are parallel to each other and of which two ends respectively face the template and the driving plate; the bottom of the frame is provided with a plurality of rollers and a plurality of first jacks capable of stretching up and down; and a plurality of second jacks capable of stretching up and down are mounted at the lower end of the driving plate.

Description

Tunnel mid-partition wall pouring die frame
Technical Field
The utility model relates to a die carrier is pour to tunnel mid-board. The mould frame is suitable for pouring the partition wall in the tunnel.
Background
In the subway construction field, single-hole double-track subway tunnel sets up mid-board and partition board structure usually, can guarantee the current safety of both sides train through setting up the mid-board, and can satisfy fire control and ventilation requirement through setting up the partition board. In the actual construction process, in order to guarantee the steadiness of structure, usually let mid-board and smoke baffle pour together. The traditional pouring construction method mainly adopts a mode of repeatedly erecting, assembling and pouring by combining a small template with a scaffold, and the mode has the problem of more storage and is mainly represented by the following method: a large number of templates need to be manufactured, the influence of cross operation of related procedures is large, and the construction progress is slow; the risk of scaffold collapse exists, and the security is relatively poor.
Disclosure of Invention
The to-be-solved technical problem of the utility model is: to the problem that above-mentioned exists, provide a simple structure, convenient operation, safe and reliable's tunnel mid-board and pour the die carrier.
The utility model adopts the technical proposal that: the utility model provides a die carrier is pour to tunnel mid-board which characterized in that: the single-side template device is respectively arranged at two sides of the partition wall;
the single-side template device is provided with a frame, a template arranged on one side of the frame and a driving plate arranged on the other side of the frame, wherein the frame is provided with a plurality of sliding tracks which are parallel to each other and of which two ends respectively face the template and the driving plate;
the bottom of the frame is provided with a plurality of rollers and a plurality of first jacks capable of stretching up and down; and a plurality of second jacks capable of stretching up and down are mounted at the lower end of the driving plate.
The template is formed by splicing a plurality of template monomers which are vertically arranged, and the template monomers are connected with the driving plate through a plurality of sliding rod pieces.
The upper edge and the lower edge of each template monomer are of step structures capable of being matched with the adjacent template monomers.
And the step structure is provided with bolt holes for arranging split bolts.
The sliding rail is of an axial hollow structure, and the sliding rod piece is coaxially inserted into the sliding rail and is longer than the sliding rail.
The utility model has the advantages that: the utility model discloses a drive arrangement, drive plate and slip member cooperation control template remove, adjust the distance between the partition wall both sides template, are applicable to the concrete placement construction of the mid-board of various thickness and variable cross section.
The utility model discloses set up template and drive plate respectively in frame both sides side, reduce the gravity difference of the frame both sides part, improve the stability of frame, avoid the frame slope and turn on one's side, the construction is safer.
The utility model discloses a gyro wheel of frame bottom shifts to support ground through first jack when moving the operation position, realize the rigidity, and make the second jack support ground after the template moves corresponding position, reinforcing means stability, so that the construction is safer.
Drawings
Fig. 1 is a schematic cross-sectional view of a tunnel mid-partition pouring formwork according to the present invention;
FIG. 2 is a side view of the frame prior to the installation of the form;
fig. 3 is an enlarged structural diagram of the a node in fig. 1.
1. A frame; 2. a template; 3. a transverse support bar; 4. a sliding track; 5. a slide bar; 6. a drive device; 7. a roller; 8. a first jack; 9. a drive plate; 10. oppositely pulling the bolts; 11. the inner side is connected with a steel plate; 12. the outer side is connected with a steel plate; 13. a template monomer; 14. and a second jack.
Detailed Description
The embodiment is a die carrier is pour to partition wall in tunnel, has the unilateral template device that sets up respectively in partition wall both sides, unilateral template device have the frame, arrange in the template of frame one side and arrange in the drive plate of frame opposite side, the drive plate is parallel to each other with the template, the template has the template monomer amalgamation of a plurality of upper and lower arrangements to form.
In this example, the bottom of the frame is provided with a plurality of rollers and a first jack which can stretch up and down, the frame is provided with a layer of transverse supporting rods at certain intervals from top to bottom, each layer of transverse supporting rods is provided with two horizontal supporting rods which are parallel to the template, and the transverse supporting rods are welded on the upright posts of the frame.
In this embodiment, a plurality of sliding rails are erected on the two transverse supporting rods on each layer, and the sliding rails are arranged horizontally and vertically to the transverse supporting rods. The sliding rail is of an axial hollow structure, a sliding rod piece is coaxially and slidably inserted in the sliding rail, the length of the sliding rod piece is larger than that of the sliding rail, one end of the sliding rod piece is connected with the template through an inner side connecting steel plate matching bolt, and the other end of the sliding rod piece is connected with the driving plate through an outer side connecting steel plate matching bolt. In the embodiment, the sliding rod pieces positioned at the same height and the same layer are connected with the same template single body on the template together.
In this embodiment, a plurality of driving devices are installed on the frame, the actuating end of each driving device is connected to the driving plate, and the driving devices can drive the driving plates to axially move back and forth along the sliding rod pieces, so as to drive the templates to axially move back and forth along the sliding rod pieces.
In the embodiment, a plurality of second jacks are arranged at the bottom of the driving plate, and after the distance between the templates on two sides of the partition wall is determined, the driving plate can be supported at the bottom of the lining structure in a mode of extending the second jacks, so that the stability is improved.
In this embodiment, the upper and lower edges of the single template are step structures capable of being matched with adjacent single templates, and the step structures are provided with bolt holes for arranging split bolts.
During construction, a first jack and a second jack are retracted, the single-side formwork devices on two sides of the partition wall are moved into a tunnel through rollers, the two single-side formwork devices are guaranteed to be parallel to each other, the first jack extends the supporting frame to achieve position fixing, then the distance between the formworks on two sides is controlled and adjusted through the driving device, the formworks on two sides of the partition wall are connected through the split bolts after the formworks are accurately positioned, the driving device cannot be started after the split bolts are connected, the second jack supports the supporting driving plate, and finally concrete is poured between the formworks on two sides to form the partition wall;
after one section mid-board maintenance shaping, demolish the split bolt, pack up first jack and second jack and prop, remove the frame and carry out the construction that the construction was pour to the next section mid-board to next section mid-board position, until accomplishing the construction of whole face mid-board.
The above-mentioned embodiment is only used for explaining the utility model concept, and not to the limit of the utility model protection, and all utilize this concept to be right the utility model discloses carry out insubstantial change, all shall fall into the scope of protection of the utility model.

Claims (5)

1. The utility model provides a die carrier is pour to tunnel mid-board which characterized in that: the single-side template device is respectively arranged at two sides of the partition wall;
the single-side template device is provided with a frame, a template arranged on one side of the frame and a driving plate arranged on the other side of the frame, wherein the frame is provided with a plurality of sliding tracks which are parallel to each other and of which two ends respectively face the template and the driving plate;
the bottom of the frame is provided with a plurality of rollers and a plurality of first jacks capable of stretching up and down; and a plurality of second jacks capable of stretching up and down are mounted at the lower end of the driving plate.
2. The formwork for casting the partition wall in the tunnel according to claim 1, wherein: the template is formed by splicing a plurality of template monomers which are vertically arranged, and the template monomers are connected with the driving plate through a plurality of sliding rod pieces.
3. The formwork for casting the partition wall in the tunnel according to claim 2, wherein: the upper edge and the lower edge of each template monomer are of step structures capable of being matched with the adjacent template monomers.
4. The formwork for casting a tunnel intermediate wall according to claim 3, wherein: and the step structure is provided with bolt holes for arranging split bolts.
5. The formwork for casting the partition wall in the tunnel according to claim 1, wherein: the sliding rail is of an axial hollow structure, and the sliding rod piece is coaxially inserted into the sliding rail and is longer than the sliding rail.
CN202023326659.6U 2020-12-31 2020-12-31 Tunnel mid-partition wall pouring die frame Active CN214697867U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023326659.6U CN214697867U (en) 2020-12-31 2020-12-31 Tunnel mid-partition wall pouring die frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023326659.6U CN214697867U (en) 2020-12-31 2020-12-31 Tunnel mid-partition wall pouring die frame

Publications (1)

Publication Number Publication Date
CN214697867U true CN214697867U (en) 2021-11-12

Family

ID=78561573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023326659.6U Active CN214697867U (en) 2020-12-31 2020-12-31 Tunnel mid-partition wall pouring die frame

Country Status (1)

Country Link
CN (1) CN214697867U (en)

Similar Documents

Publication Publication Date Title
CN105736016B (en) Tunnel double-lining framework of steel reinforcement construction equipment and its application
CN105926929B (en) Pouring construction method of straight wall concrete
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN113235472B (en) Concrete placement platform truck is contained to apron
CN109594479B (en) Die carrier and method for simultaneous construction of central anti-collision guardrails of double-width parallel viaduct
CN212336714U (en) Self-propelled truss supporting template
CN202991063U (en) Large-section tunnel hydraulic trolley
CN112647436A (en) Porous cast-in-situ box culvert bottom plate and construction method
CN205936645U (en) A full liquid die plate system for culvert is pour
CN205100119U (en) Steel form device in self -propelled
CN214993219U (en) Concrete placement platform truck is contained to apron
CN104929660B (en) Formation and construction set for continuous open-cut tunnel
CN214697867U (en) Tunnel mid-partition wall pouring die frame
CN206035507U (en) Rectangle box culvert and for tunnel construction platform truck
CN204126257U (en) Integral movable formwork for straight wall concrete pouring
CN217151958U (en) Tunnel center ditch pouring trolley
CN115418983A (en) Construction method for prefabricated box culvert in highway-railway combined large-section shield tunnel
CN210317334U (en) A template platform truck for tunnel thin wall mid-board concrete placement
CN213297130U (en) Electric lifting sliding formwork device
CN114717940A (en) Movable U-shaped section beam inner mold support
CN204663546U (en) A kind of simple and easy backform chassis of adjustable width
CN211948026U (en) Cast-in-place splayed wall template system of apron culvert
CN202730709U (en) Movable formwork for construction of dock wall
CN112177631A (en) Construction method for lake bottom single-box three-chamber folded plate box culvert and integral trolley system
CN218953323U (en) Tunnel vault formwork construction trolley

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant