CN214696305U CN202120160128.XU CN202120160128U CN214696305U CN 214696305 U CN214696305 U CN 214696305U CN 202120160128 U CN202120160128 U CN 202120160128U CN 214696305 U CN214696305 U CN 214696305U
Authority
CN
China
Prior art keywords
floor
shaped rod
fixed
floor slab
cantilever beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120160128.XU
Other languages
Chinese (zh)
Inventor
宋佰勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202120160128.XU priority Critical patent/CN214696305U/en
Application granted granted Critical
Publication of CN214696305U publication Critical patent/CN214696305U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model provides a high-rise curtain wall construction is with segmentation protector belongs to building construction technical field. The technical scheme is as follows: the floor slab comprises a cantilever beam, wherein the cantilever beam is arranged on the floor slab through a connecting piece, the other end of the cantilever beam is provided with a fixed block, and a socket is arranged on the fixed block; a plurality of cross beams are arranged on the cantilever beam and positioned on the outer side of the floor; the connecting piece comprises a U-shaped rod, the open end of the U-shaped rod penetrates through the floor slab of the floor slab layer and is connected through a connecting plate, and the cantilever beam is arranged between the connecting plate and the floor slab of the floor slab layer and is positioned inside the U-shaped rod; still including setting up at intraoral rail of socket, the rail includes the horizontal pole, and the both ends top of horizontal pole and the inboard that is located the post of inserting all are provided with the otic placode, and the outside of upper floor is provided with the fixed plate through expansion bolts with the corresponding position of otic placode, all is provided with the preformed hole on fixed plate and the otic placode, and the otic placode is fixed through the wire rope that sets up on the preformed hole. The utility model has the advantages that: the method is suitable for protection of high-rise curtain wall construction.

Description

High-rise curtain wall construction is with segmentation protector
Technical Field
The utility model relates to a reactor technical field especially relates to a high-rise curtain wall construction is with segmentation protector.
Background
At present, the number of domestic high-rise business office buildings is increased day by day, the construction period is very short, and the process intervention in advance becomes an important means for ensuring the construction period. Normal curtain construction should be at the major structure capping, the outrigger is demolishd and is begun after finishing, but sometimes for guarantee the time limit for a project, need demolish at the outrigger and carry out the curtain construction in advance to building body completion height half, directly form the protection below the outrigger and keep apart, the curtain carries out the hanging flower basket at the device lower floor and erects, with this reach the curtain construction of advancing in advance, follow-up finishing also can advance to advance, reach the purpose of shortening the time limit for a project, but present protection is kept apart and is all set up temporarily, there is not dedicated protector.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a demolish the segmentation protector that carries out curtain construction usefulness in advance to building body when accomplishing high half in the outer frame.
The utility model discloses a realize through following technical scheme: a segmented protection device for high-rise curtain wall construction is characterized by comprising a plurality of I-shaped cantilever beams, wherein one ends of the cantilever beams are arranged on a floor slab of the floor slab through a plurality of connecting pieces, the other ends of the cantilever beams extend out of the floor slab, the extending ends of the cantilever beams are provided with fixing blocks, and the fixing blocks are provided with inserting ports;
a plurality of cross beams are arranged on the cantilever beam and positioned on the outer side of the floor slab, and a bottom plate is arranged on each cross beam;
the connecting piece comprises a U-shaped rod, the open end of the U-shaped rod penetrates through the floor of the floor, the open end of the U-shaped rod is connected through a connecting plate, the cantilever beam is arranged between the connecting plate and the floor of the floor and positioned inside the U-shaped rod, external threads are arranged at two ends of the U-shaped rod, and the connecting plate and the cantilever beam are fixed through nuts;
the fence comprises a cross rod, inclined rods are arranged on the outer sides of two ends of the cross rod, the upper ends of the inclined rods are connected through fixed rods, inserting columns inserted into the sockets are arranged on the inner sides of two ends of the cross rod, a plurality of side rods are arranged on the inner sides of the inclined rods and above the fixed block, and the side rods are connected through a plurality of vertical rods;
the both ends top of horizontal pole just is located the inboard of inserting the post all is provided with the otic placode, the outside of upper floor with the corresponding position of otic placode is provided with the fixed plate through expansion bolts, all be provided with the preformed hole on fixed plate and the otic placode, the otic placode is through setting up wire rope in the preformed hole is fixed.
And anti-slip blocks are arranged between the U-shaped rod and the vertical plate of the cantilever beam and between the U-shaped rod and the floor of the floor. The protection block can be a wood block or a rubber block.
And a protective net is arranged on the outer side of the fence.
The crossbeam is the I-steel, insert the post and stretch into and be close to the fixed block between two horizontal plates of crossbeam.
The side rod positioned at the lowest part is fixed on the horizontal plate of the cross beam through a bolt.
The utility model has the advantages that: the segmented protection device for curtain wall construction is carried out in advance when the outer frame is dismantled to half of the height of a building, the whole fence is tensioned by the steel wire rope in a splicing mode, and the inserted column is positioned between the two horizontal plates of the cross beam and can be limited; in order to ensure the safety of the device, the fence can be fixed on the cross beam through bolts; in order to ensure the connection strength of the cantilever beam, an anti-skid block is arranged.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a partially enlarged view of a portion a in fig. 1.
Fig. 3 is a schematic structural view of the cantilever beam and the connecting member.
Fig. 4 is a schematic structural view of the fence.
Wherein the reference numerals are: 1. the floor slab; 2. a cantilever beam; 3. a connecting member; 4. a fence; 5. an upper floor slab; 6. a cross beam; 201. a fixed block; 202. a socket; 301. a U-shaped rod; 302. a connecting plate; 303. a nut; 304. anti-skid blocks; 401. a cross bar; 402. inserting a column; 403. an inclined lever; 404. a side lever; 405. an ear plate; 406. fixing the rod; 501. a fixing plate; 601. a horizontal plate; 7. and (4) bolts.
Detailed Description
In order to clearly illustrate the technical features of the present solution, the present solution is explained below by way of specific embodiments.
Referring to fig. 1-4, the utility model relates to a segmented protection device for high-rise curtain wall construction, which comprises a plurality of i-shaped cantilever beams 2, one end of each cantilever beam 2 is arranged on the floor slab 1 through a plurality of connecting pieces 3, the other end extends out of the floor slab 1, the extending end is provided with a fixed block 201, and the fixed block 201 is provided with a socket 202;
a plurality of cross beams 6 are arranged on the cantilever beam 2 and positioned at the outer side of the floor 1 of the floor, and a bottom plate is arranged on the cross beams 6;
the connecting piece 3 comprises a U-shaped rod 301, the open end of the U-shaped rod 301 penetrates through the floor 1 of the floor and is connected through a connecting plate 302, the cantilever beam 2 is arranged between the connecting plate 302 and the floor 1 of the floor and is positioned inside the U-shaped rod 301, external threads are arranged at two ends of the U-shaped rod 301, and the connecting plate 302 and the cantilever beam 2 are fixed through a nut 303;
the fence is characterized by further comprising a fence 4 arranged in the socket 201, wherein the fence 4 comprises a cross rod 401, inclined rods 403 are arranged on the outer sides of two ends of the cross rod 401, the upper ends of the inclined rods 403 are connected through fixing rods 406, inserting columns 402 inserted into the socket 201 are arranged on the inner sides of two ends of the cross rod 401, a plurality of side rods 404 are arranged on the inner sides of the inclined rods 403 and above the fixing block 201, and the side rods 404 are connected through a plurality of vertical rods;
both ends top of horizontal pole 401 and the inboard that is located post 402 all are provided with otic placode 405, and the outside and the corresponding position of otic placode 405 of upper floor 5 are provided with fixed plate 501 through expansion bolts, all are provided with the preformed hole on fixed plate 501 and the otic placode 405, and otic placode 405 is fixed through the wire rope that sets up on the preformed hole.
Anti-skidding blocks 304 are arranged between the U-shaped rod 301 and the vertical plate of the cantilever beam and between the U-shaped rod 301 and the floor 1 of the floor. The protective block 304 may be a wood block or a rubber block.
The outer side of the fence 4 is provided with a protective net.
The cross beam 6 is an i-steel, and the insert column 402 extends between two horizontal plates 601 of the cross beam 6 close to the fixing block 201.
The lowermost side bar is fixed to the horizontal plate 601 of the cross member 6 by means of bolts 7.
The use method comprises the following steps: the cantilever beam 2 is made of galvanized steel, the cantilever beam 2 is arranged on the floor of the floor 1, the U-shaped rod 301 is fixed on the floor, the distance between the cantilever beams 2 is generally 2400mm, the length of the cantilever part is generally 2600mm, the U-shaped rod 301 is generally made of phi 14 round steel and is cold-processed into a U shape on site, an opening device is used for drilling holes in the floor of the floor 1, the U-shaped rod 301 penetrates through the holes, the cantilever beam 2 is positioned in the U-shaped rod 301 and is fixed by a connecting plate 303 and a nut 302, the connecting plate 303 is generally made of 100mm by 200mm by 6mm thick steel plates, the connecting pieces 3 are generally arranged in 3 groups, the distance is 1500mm, the distance between the cantilever beams 2 is 2400mm, the length of the cantilever part is 2600mm, the length of the cantilever beam falling on the floor is 3600mm, and the bottom plate can be made of 18mm thick bamboo plywood;
inserting the inserting column 402 on the fence 4 into the inserting opening 201, tensioning the inserting column by a steel wire rope, wherein the size of the steel wire rope is generally phi 14mm, and finally fixing the lowest side rod 404 on the cross beam 6 by a bolt 7.
In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the invention, unless otherwise specified, "a plurality" means two or more.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the creation of the present invention can be understood by those of ordinary skill in the art through specific situations.
The technical features that the utility model has not been described can be realized through or adopt prior art, and no longer give unnecessary details here, and of course, the above-mentioned explanation is not right the utility model discloses a restriction, the utility model discloses also not only be limited to the above-mentioned example, ordinary skilled person in this technical field is in the utility model discloses a change, modification, interpolation or replacement made in the essential scope also should belong to the utility model discloses a protection scope.

Claims (5)

1. A segmented protection device for high-rise curtain wall construction is characterized by comprising a plurality of I-shaped cantilever beams, wherein one ends of the cantilever beams are arranged on a floor slab of the floor slab through a plurality of connecting pieces, the other ends of the cantilever beams extend out of the floor slab, the extending ends of the cantilever beams are provided with fixing blocks, and the fixing blocks are provided with inserting ports;
a plurality of cross beams are arranged on the cantilever beam and positioned on the outer side of the floor slab, and a bottom plate is arranged on each cross beam;
the connecting piece comprises a U-shaped rod, the open end of the U-shaped rod penetrates through the floor of the floor, the open end of the U-shaped rod is connected through a connecting plate, the cantilever beam is arranged between the connecting plate and the floor of the floor and positioned inside the U-shaped rod, external threads are arranged at two ends of the U-shaped rod, and the connecting plate and the cantilever beam are fixed through nuts;
the fence comprises a cross rod, inclined rods are arranged on the outer sides of two ends of the cross rod, the upper ends of the inclined rods are connected through fixed rods, inserting columns inserted into the sockets are arranged on the inner sides of two ends of the cross rod, a plurality of side rods are arranged on the inner sides of the inclined rods and above the fixed block, and the side rods are connected through a plurality of vertical rods;
the both ends top of horizontal pole just is located the inboard of inserting the post all is provided with the otic placode, the outside of upper floor with the corresponding position of otic placode is provided with the fixed plate through expansion bolts, all be provided with the preformed hole on fixed plate and the otic placode, the otic placode is through setting up wire rope in the preformed hole is fixed.
2. The segmented protection device for the high-rise curtain wall construction according to claim 1, wherein anti-slip blocks are arranged between the U-shaped rod and the vertical plate of the cantilever beam and between the U-shaped rod and the floor of the current floor.
3. The segmental protection device for high-rise curtain wall construction according to claim 1, wherein a protective net is arranged outside the fence.
4. The segmented protection device for the construction of the high-rise curtain wall as claimed in claim 1, wherein the cross beam is an I-shaped steel, and the insert column extends into a position between two horizontal plates of the cross beam close to the fixing block.
5. The segmental protection device for high-rise curtain wall construction as claimed in claim 4, wherein the side bars positioned at the lowermost part are fixed on the horizontal plate of the cross member by bolts.
CN202120160128.XU 2021-01-21 2021-01-21 High-rise curtain wall construction is with segmentation protector Active CN214696305U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120160128.XU CN214696305U (en) 2021-01-21 2021-01-21 High-rise curtain wall construction is with segmentation protector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120160128.XU CN214696305U (en) 2021-01-21 2021-01-21 High-rise curtain wall construction is with segmentation protector

Publications (1)

Publication Number Publication Date
CN214696305U true CN214696305U (en) 2021-11-12

Family

ID=78564059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120160128.XU Active CN214696305U (en) 2021-01-21 2021-01-21 High-rise curtain wall construction is with segmentation protector

Country Status (1)

Country Link
CN (1) CN214696305U (en)

Similar Documents

Publication Publication Date Title
CN101597955A (en) Safety scaffold
CN111676837A (en) Gallows that construction platform of construction was set up behind public road bridge post tie beam under construction
CN214696305U (en) High-rise curtain wall construction is with segmentation protector
CN211498507U (en) Whole reassembling type protection rack
CN110924415A (en) Steel bar support frame structure for 4.5m thick large raft foundation and construction method thereof
CN216840676U (en) Brace rod mounting structure
CN213061745U (en) Basket protective structure is hung to continuous beam bridge construction template
CN114046040A (en) Self-supporting concrete prefabricated formwork for building roof pouring
CN109469083B (en) Foundation beam reinforcement cage assembling system and construction method thereof
CN217080294U (en) Combined ladder stand for establishing temporary passage
CN217810529U (en) Square steel pier stud top assembled operation platform
CN219033985U (en) Suspension type operation platform
CN219240563U (en) Lattice column and structural column integrated structure
CN215760532U (en) Prestressed capping beam tensioning and grouting working platform
CN217536706U (en) Combined type bent cap supporting device
CN217759593U (en) Canopy steel structure construction structure
CN215331451U (en) Hydraulic self-climbing formwork for narrow space
CN217151208U (en) Template frame construction is used in dry wall construction
CN220538423U (en) Reinforcing steel bar reinforcing structure for cast-in-situ box girder construction
CN210316537U (en) Adjustable truss for early-dismantling formwork system
CN212670345U (en) Gallows that construction platform of construction was set up behind public road bridge post tie beam under construction
CN216786890U (en) Active service box girder integrated reinforcing system
CN215889295U (en) Opposite-penetrating pull rod type prestress cantilever outer frame
CN219081076U (en) Face limit protection net of building carrier plate
CN218149654U (en) Overhanging type scaffold

Legal Events

Date Code Title Description
GR01 Patent grant