CN214657226U - Comprehensive prefabricated pipe gallery - Google Patents
Comprehensive prefabricated pipe gallery Download PDFInfo
- Publication number
- CN214657226U CN214657226U CN202120543174.8U CN202120543174U CN214657226U CN 214657226 U CN214657226 U CN 214657226U CN 202120543174 U CN202120543174 U CN 202120543174U CN 214657226 U CN214657226 U CN 214657226U
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- oval
- pipeline
- positioning
- seted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Branch Pipes, Bends, And The Like (AREA)
Abstract
The utility model discloses a synthesize prefabricated piping lane, the utility model discloses a: piping lane main part, the piping lane main part is established to the ellipse, fixed mounting has L type baffle in the piping lane main part, gas pipeline has been seted up in the piping lane main part, power pipeline has been seted up to gas pipeline below, sewage pipes has been seted up on the power pipeline right side, communication pipeline has been seted up on the sewage pipes top, gas pipeline, power pipeline, communication pipeline, sewage pipes all separate through L type baffle, the beneficial effects of the utility model are that: establish the piping lane main part into oval, make its holding power dispersion, the atress is more even, increase of service life, through set up oval recess on piping lane main part right side, fixed mounting rubber seal in the recess, the oval lug of left end fixed mounting, when two piping lane main parts are connected, insert oval lug in the oval recess, rubber seal receives extrusion deformation, seals the gap of junction, avoids leaking.
Description
Technical Field
The utility model relates to an underground utility tunnel technical field especially relates to a prefabricated piping lane of synthesis.
Background
Because the traditional directly buried pipeline occupies more underground space of the road, and the laying of the pipeline is often not synchronous with the road construction, thereby causing frequent excavation of the road, not only seriously affecting the normal passage of the road, but also bringing serious noise and dust raising and serious environmental pollution problems, bringing great inconvenience to the traffic and life of people, so that a pipe gallery appears, which is a comprehensive underground structure integrating a series of pipelines of power cables, telecommunication, water supply, rain sewage and gas, along with the continuous promotion of the novel urbanization of China, the comprehensive pipe gallery becomes an important infrastructure in the process of urban updating and transformation, the construction of the comprehensive pipe gallery has the advantages of solving the problem of repeated excavation of the road surface, improving the urban landscape, saving the underground space, protecting the safety of the pipeline and reserving and developing pipe positions, the existing pipe gallery is square, and when being stressed, the pipeline is not dispersed, damaged and the service life of the product is reduced, various pipelines are next to each other in the piping lane, do not give staff's headspace, can receive the influence of other pipelines or cables when leading to the staff operation, and the operation is laid to the inconvenient, and is very troublesome during the maintenance to two piping lane junctions of current device appear the gap and produce the rainwater seepage, reduce product quality.
Therefore, based on the above technical problems, it is necessary for those skilled in the art to develop a comprehensive prefabricated pipe gallery.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a prefabricated piping lane of synthesis.
In order to achieve the above object, the present invention provides the following technical solutions:
the utility model discloses a prefabricated piping lane synthesizes, include: the pipe rack main body is designed to be oval, an L-shaped clapboard is fixedly arranged in the pipe rack main body, a gas pipeline is arranged in the pipe gallery main body, an electric power pipeline is arranged below the gas pipeline, a sewage discharge pipeline is arranged on the right side of the electric power pipeline, a communication pipeline is arranged at the top end of the sewage discharge pipeline, the gas pipeline, the electric power pipeline, the communication pipeline and the sewage pipeline are all separated by an L-shaped clapboard, human-shaped channels are arranged among the communication pipeline, the sewage discharge pipeline, the gas pipeline and the electric power pipeline, the right end of the pipe gallery main body is provided with an oval groove, a rubber sealing gasket is fixedly arranged in the oval groove, the utility model discloses a pipe gallery, including L type baffle, pipe gallery main part, chamfer, oval lug, oval recess, viewing aperture has been seted up on the L type baffle, chamfer has been seted up at L type baffle corner, pipe gallery main part left side fixed mounting has oval lug, oval lug is corresponding with oval recess.
Furthermore, an escape passage is fixedly installed at the top end of the pipe gallery main body.
Furthermore, a cover plate is installed at the top end of the escape passage and covers the top end of the escape passage.
Furthermore, the cover plate is provided with a ventilation port.
Further, pipe gallery main part both ends are equipped with all and are equipped with location structure, location structure includes locating piece one, locating hole one has been seted up in the oval recess that pipe gallery main part right-hand member was seted up, oval lug left end fixed mounting has locating piece one.
Furthermore, the number of the first positioning blocks is two, and the number of the first positioning holes is two.
Furthermore, the first positioning block corresponds to the first positioning hole.
Furthermore, the positioning structure further comprises a second positioning hole and a second positioning block, the second positioning hole is formed in an oval groove formed in the right end of the pipe gallery main body, the second positioning block is fixedly mounted at the left end of the oval projection, the second positioning hole corresponds to the second positioning block, and the second positioning hole and the second positioning block are respectively provided with four positioning blocks.
In the technical scheme, the utility model provides a pair of prefabricated piping lane synthesizes has following beneficial effect:
the utility model discloses establish the piping lane main part into oval, make its holding power dispersion, the atress is more even, increase of service life, through seting up oval recess on piping lane main part right side, fixed mounting rubber seal in the recess, the oval lug of left end fixed mounting, when two piping lane main parts are connected, insert oval recess with oval lug in, rubber seal receives extrusion deformation, the gap with the junction is sealed, avoid leaking, through separating into six different passageways with the piping lane main part at L type division board, convenient management, and set up the viewing aperture on L type division board, make things convenient for the staff to overhaul.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments described in the present invention, and other drawings can be obtained by those skilled in the art according to these drawings.
Fig. 1 is a front view of an integrated prefabricated pipe gallery provided by an embodiment of the present invention;
fig. 2 is a right side view of an integrated prefabricated pipe gallery provided by an embodiment of the present invention;
fig. 3 is a left side view of an integrated prefabricated pipe gallery provided by an embodiment of the present invention;
fig. 4 is a top view of a sealing cover of an integrated prefabricated pipe gallery according to an embodiment of the present invention;
fig. 5 is a side view of a second positioning hole of an embodiment of the comprehensive prefabricated pipe gallery provided by the embodiment of the present invention;
fig. 6 is a two side views of the positioning block of the embodiment of the utility model provides a prefabricated piping lane of synthesis's embodiment.
Description of reference numerals: the device comprises a pipe gallery main body 1, a gas pipeline 2, an electric power pipeline 3, a communication pipeline 4, a sewage discharge pipeline 5, a man-shaped channel 6, an oval groove 7, an oval bump 8, a rubber sealing gasket 9, an L-shaped partition plate 10, an escape channel 11, a cover plate 12, a ventilation port 13, a positioning structure 14, a first positioning hole 15, a first positioning block 16, a second positioning hole 17, a second positioning block 18, a chamfer 19 and an observation port 20.
Detailed Description
In order to make the technical solution of the present invention better understood by those skilled in the art, the present invention will be further described in detail with reference to the accompanying drawings.
In the first embodiment, refer to fig. 1 to 4;
the utility model discloses a prefabricated piping lane synthesizes, include: the pipe rack comprises a pipe rack main body 1 and is characterized in that the pipe rack main body 1 is oval, an L-shaped partition plate 10 is fixedly installed in the pipe rack main body 1, a gas pipeline 2 is arranged in the pipe rack main body 1, a power pipeline 3 is arranged below the gas pipeline 2, a sewage pipeline 5 is arranged on the right side of the power pipeline 3, a communication pipeline 4 is arranged at the top end of the sewage pipeline 5, the gas pipeline 2, the power pipeline 3, the communication pipeline 4 and the sewage pipeline 5 are all separated by the L-shaped partition plate 10, a human-shaped channel 6 is arranged between the communication pipeline 4 and the sewage pipeline 5 and the gas pipeline 2 and the power pipeline 3, an oval groove 7 is arranged at the right end of the pipe rack main body 1, a rubber sealing gasket 9 is fixedly installed in the oval groove 7, an observation port 20 is arranged on the L-shaped partition plate 10, and a chamfer 19 is arranged at the corner of the L-shaped partition plate 10, 1 left side fixed mounting of piping lane main part has oval lug 8, oval lug 8 is corresponding with oval recess 7, and is specific: through establishing the piping lane main part into oval, make its holding power dispersion, the atress is more even, increase of service life, separate into six different passageways with the piping lane main part through L type division board, convenient management, and set up the viewing aperture on L type division board, make things convenient for the staff to overhaul, through set up oval recess on piping lane main part right side, fixed mounting rubber seal in the recess, the oval lug of left end fixed mounting, when two piping lane main parts are connected, insert oval lug in the oval recess, rubber seal receives extrusion deformation, seal the gap of junction, avoid leaking.
Preferably, an escape passage 11 is fixedly installed at the top end of the pipe gallery main body 1.
Preferably, the top end of the escape passage 11 is provided with a cover plate 12, the cover plate 12 covers the top end of the escape passage 11, specifically: when a danger occurs in the pipeline, the pipeline is quickly transferred through the escape passage 11.
Preferably, the cover plate 12 is provided with a ventilation opening 13, specifically: introduce the air into the piping lane body 1 through ventilative mouthful 13 in, oxygen deficiency when avoiding the staff to inspect the pipeline.
Preferably, 1 both ends of pipe gallery main part are equipped with and all are equipped with location structure 14, location structure 14 includes locating piece one 16, locating hole one 15 has been seted up in oval recess 7 that 1 right-hand member of pipe gallery main part was seted up, 8 left ends fixed mounting of oval lug has locating piece one 16.
Preferably, there are two positioning blocks 16, and there are two positioning holes 15.
Preferably, the positioning block one 16 corresponds to the positioning block one 15, specifically: when two piping lane main parts 1 are connected, insert in locating hole one 15 through two locating piece one 16, play the location effect for it is more convenient to install.
The utility model discloses a use as follows: when the utility model is used, a chamfer 19 is arranged at the corner of an L-shaped clapboard 10, an observation opening 20 is arranged on the L-shaped clapboard 10, four L-shaped clapboards 10 are fixedly arranged in a pipe gallery main body 1, the pipe gallery main body 1 is divided into five channels through the four L-shaped clapboards 10, namely a gas pipeline 2, an electric pipeline 3, a communication pipeline 4, a sewage pipeline 5 and a human-shaped channel 6, an escape channel 11 is arranged at the top end of the pipe gallery main body 1, a cover plate 12 is covered at the top end of the escape channel 11, a ventilation opening 12 is arranged at the top end of the cover plate 12, an oval groove 7 is arranged at the right end of the pipe gallery main body 1, two positioning holes one 15 are arranged in the oval groove 7, a rubber sealing gasket 9 is arranged in the oval groove 7, an oval lug 8 is fixedly arranged at the left end of the pipe gallery main body 1, two positioning blocks one 16 are fixedly arranged at the left end of the oval lug 8, the positioning blocks one 16 corresponds to the positioning holes one 15, and locating hole one 15 is greater than locating piece one 16, when two piping lane main parts 1 need to be connected, correspond oval lug 8 with oval recess 7, locating piece one 16 is corresponding with locating hole one 15, insert oval lug 8 in oval recess 7, locating piece one 16 inserts in locating hole one 15, extrude the rubber packing pad 9 of fixing in oval recess 7 through oval lug 8, thereby plug up the gap of junction, play sealed effect, the installation is accomplished and is put the pipe installation in corresponding position, make things convenient for personnel to get into through anthropomorphic channel 6, inspect the pipeline through viewing aperture 20 of seting up on the L type baffle 10, through seting up chamfer 19 to L type baffle 10 turning, avoid injured personnel, through establishing piping lane main part 1 into oval, make strength more dispersed when bearing pressure, the bearing capacity is more even.
Example two, see fig. 5-6;
the utility model discloses a comprehensive prefabricated pipe gallery, location structure 14 still includes locating hole two 17, locating piece two 18, locating hole two 17 has been seted up in the oval recess 7 that the right-hand member was seted up to pipe gallery main part 1, oval lug 8 left end fixed mounting has locating piece two 18, locating hole two 17, locating piece two 18 are corresponding, locating hole two 17, locating piece two 18 are equipped with four respectively;
the utility model discloses a use as follows: use the utility model discloses time set up four locating hole two 17 in oval recess 7 that 1 right-hand member of piping lane main part was seted up, at four locating piece two 18 of 8 left end fixed mounting of oval lug of 1 left end fixed mounting of piping lane body, locating piece two 18 is corresponding with locating hole two 17 to locating hole two 17 is greater than locating piece two 18, and two piping lane main parts 1 are connected in through inserting corresponding constant head tank 17 respectively with four locating piece two 18, play the location effect, and it is more convenient to install.
While certain exemplary embodiments of the present invention have been described above by way of illustration only, it will be apparent to those of ordinary skill in the art that the described embodiments may be modified in various different ways without departing from the spirit and scope of the present invention. Accordingly, the drawings and description are illustrative in nature and should not be construed as limiting the scope of the invention.
Claims (8)
1. An integrated prefabricated pipe gallery comprising: pipe gallery main body (1), its characterized in that, pipe gallery main body (1) is set to oval, fixed mounting has L type baffle (10) in pipe gallery main body (1), gas pipeline (2) have been seted up in pipe gallery main body (1), power pipeline (3) have been seted up to gas pipeline (2) below, sewage pipes (5) have been seted up on power pipeline (3) right side, communication pipeline (4) have been seted up on sewage pipes (5) top, gas pipeline (2), power pipeline (3), communication pipeline (4), sewage pipes (5) all separate through L type baffle (10), humanoid passageway (6) have been seted up between communication pipeline (4), sewage pipes (5) and gas pipeline (2), power pipeline (3), oval recess (7) has been seted up to pipe gallery main body (1) right-hand member, fixed mounting has rubber packing pad (9) in oval recess (7), the utility model discloses a pipe gallery, including L type baffle (10), chamfer (19), pipe gallery main part (1) left side fixed mounting has oval lug (8), oval lug (8) are corresponding with oval recess (7).
2. The prefabricated comprehensive pipe rack according to claim 1, wherein an escape channel (11) is fixedly installed at the top end of the pipe rack main body (1).
3. The prefabricated comprehensive pipe gallery according to claim 2, wherein a cover plate (12) is installed at the top end of the escape passage (11), and the cover plate (12) covers the top end of the escape passage (11).
4. The prefabricated comprehensive pipe gallery according to claim 3, wherein the cover plate (12) is provided with a ventilation opening (13).
5. The prefabricated comprehensive pipe gallery according to claim 1, wherein the pipe gallery body (1) is provided at both ends thereof with positioning structures (14), each positioning structure (14) comprises a first positioning block (16) and a first positioning hole (15), the first positioning hole (15) is formed in an oval groove (7) formed at the right end of the pipe gallery body (1), and the first positioning block (16) is fixedly mounted at the left end of the oval convex block (8).
6. An integrated prefabricated pipe gallery according to claim 5, wherein the first positioning block (16) is provided with two, and the first positioning hole (15) is provided with two.
7. An integrated prefabricated pipe gallery according to claim 5, wherein the first positioning block (16) corresponds to the first positioning hole (15).
8. The comprehensive prefabricated pipe gallery according to claim 5, wherein the positioning structure (14) further comprises a second positioning hole (17) and a second positioning block (18), the second positioning hole (17) is formed in an oval groove (7) formed in the right end of the pipe gallery body (1), the second positioning block (18) is fixedly mounted at the left end of the oval projection (8), the second positioning hole (17) and the second positioning block (18) correspond to each other, and four positioning holes (17) and four positioning blocks (18) are respectively formed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120543174.8U CN214657226U (en) | 2021-03-16 | 2021-03-16 | Comprehensive prefabricated pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120543174.8U CN214657226U (en) | 2021-03-16 | 2021-03-16 | Comprehensive prefabricated pipe gallery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214657226U true CN214657226U (en) | 2021-11-09 |
Family
ID=78455232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120543174.8U Active CN214657226U (en) | 2021-03-16 | 2021-03-16 | Comprehensive prefabricated pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214657226U (en) |
-
2021
- 2021-03-16 CN CN202120543174.8U patent/CN214657226U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204739329U (en) | A pipeline waterproof construction for concrete wall | |
CN204781016U (en) | Gasbag formula open trench tunnel movement joint seal structure | |
CN204456189U (en) | Subway station top Pipe rack | |
CN209881320U (en) | A waterproof termination for installing gas pipeline spike line | |
CN214657226U (en) | Comprehensive prefabricated pipe gallery | |
CN204919607U (en) | City is prefab for underpass | |
CN207053151U (en) | A kind of pipe gallery cable line outlet arrangement | |
CN210600561U (en) | Internal-moisturizing common-plate flange-connected air-conditioning ventilation pipeline | |
CN215715531U (en) | Prefabricated piping lane socket joint formula connects watertight fittings | |
CN110778344B (en) | Waterproof structure for shield tunnel segment joint | |
CN214657553U (en) | Sleeve structure for passing through barrier for drainage pipeline | |
CN216973489U (en) | Corrugated steel utility tunnel pipeline access & exit | |
CN211524848U (en) | Composite elastic sealing gasket capable of enhancing waterproof performance of segment joint | |
CN206595619U (en) | A kind of tangible European front connector gas-filling cabinet sleeve pipe of full-shield | |
CN204088900U (en) | GIS branch bar wears roof structure | |
CN111395393A (en) | Mountain tunnel utility tunnel structure suitable for new Austrian's method construction | |
CN208136958U (en) | A kind of more storehouse type underground pipe galleries in round corridor | |
CN206962391U (en) | GIS pore structures through walls | |
CN218000761U (en) | Drainage pipe connecting device that leakproofness is good | |
CN220100306U (en) | Curtain wall mounting structure | |
CN218437869U (en) | Roofing exhaust hole device of side wall installation | |
CN218863557U (en) | Multi-path parallel gas distribution joint seat | |
CN204436467U (en) | Cross-river tunnel line construction | |
CN217998165U (en) | Integrated cable tunnel with ventilation and smoke exhaust pipeline | |
CN221523750U (en) | Multi-cabin municipal utility tunnel drainage branch pipe access node structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |