CN214656305U - Pier suitable for high-speed railway - Google Patents

Pier suitable for high-speed railway Download PDF

Info

Publication number
CN214656305U
CN214656305U CN202023183132.2U CN202023183132U CN214656305U CN 214656305 U CN214656305 U CN 214656305U CN 202023183132 U CN202023183132 U CN 202023183132U CN 214656305 U CN214656305 U CN 214656305U
Authority
CN
China
Prior art keywords
pier
speed railway
stone
concrete
fence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023183132.2U
Other languages
Chinese (zh)
Inventor
许三平
赵会东
杨翔
韩嫁春
罗斌
张玲
姜文恺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN202023183132.2U priority Critical patent/CN214656305U/en
Application granted granted Critical
Publication of CN214656305U publication Critical patent/CN214656305U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a pier suitable for high-speed railway, includes the pier, the stone setting is installed on the mound top of pier, the mound top outside of pier is provided with the concrete rail all around, the stone setting is located in the concrete rail, the mound top just all is provided with the passageway that supports the personnel and stand and walk around the stone setting. The utility model discloses the construction is simple, with traditional steel construction hanging fence cancellation, under the prerequisite that does not change the required each item function of structure, does not increase the engineering investment and can greatly reduce the potential safety hazard in the later stage maintenance. Meanwhile, the pier fence is made of concrete materials, and has better durability and small maintenance workload compared with a steel structure.

Description

Pier suitable for high-speed railway
Technical Field
The utility model relates to a bridge engineering field, concretely relates to pier suitable for high-speed railway.
Background
Traditional railway pier sets up in both sides and hangs the rail, pre-buried U type bolt in pier top cap department during the construction, waits that the pier pours the installation again and hangs the rail after accomplishing, and the installation procedure is more complicated, hangs the rail installation simultaneously and belongs to high altitude construction, and the safety risk is higher.
In the maintenance in later stage, hang the rail durability relatively poor, the steel structure support corrosion appears easily. The reinforced concrete step plate is easy to crack, damage, fracture and fall off in operation, and the corner position and the angle steel gap are large.
The arrangement of a plurality of angle iron brackets and other structures on the two sides of the bridge enables the bridge pier to look messy, and the overall aesthetic feeling of the elevated structure is affected.
SUMMERY OF THE UTILITY MODEL
In view of technical defect and the technical drawback that exist among the prior art, the embodiment of the utility model provides a pier suitable for high-speed railway who overcomes above-mentioned problem or solve above-mentioned problem at least partially is provided, and the concrete scheme is as follows:
the utility model provides a pier suitable for high-speed railway, includes the pier, the stone setting is installed on the mound top of pier, the mound top outside of pier is provided with the concrete rail all around, the stone setting is located in the concrete rail, the mound top just all is provided with the passageway that supports the personnel and stand and walk around the stone setting.
Further, a certain gap is formed between the cushion stone and the concrete fence, and the gap is used as a passageway for the support staff to stand and walk.
Further, the concrete fence has a height flush with the bolster.
Further, the cross section of the pier top is rectangular.
Furthermore, the two cushion stones are respectively positioned on two sides of the pier top along the transverse bridge direction.
Further, a support used for supporting the cover beam is installed on the cushion stone.
Furthermore, two supports are installed on the cushion stone and are respectively installed on two sides of the cushion stone along the direction along the bridge direction.
The utility model discloses following beneficial effect has:
the utility model discloses the construction is simple, with traditional steel construction hanging fence cancellation, under the prerequisite that does not change the required each item function of structure, does not increase the engineering investment and can greatly reduce the potential safety hazard in the later stage maintenance. Meanwhile, the pier fence is made of concrete materials, and has better durability and small maintenance workload compared with a steel structure.
Drawings
Fig. 1 is a plan view of a pier top of a pier suitable for a high-speed railway according to an embodiment of the present invention;
in the figure: 1. pier top, 2, concrete fence, 3, cushion, 4 and support.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the present invention, and not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
As shown in fig. 1, for the utility model provides a pair of pier suitable for high-speed railway, including the pier, base stone 3 is installed to pier top 1 of pier, be provided with concrete fence 2 around the pier top 1 outside of pier, base stone 3 is located in the concrete fence 2, 1 is gone up on the pier top and all is provided with the passageway that supplies the maintainer to stand and walk around base stone 3.
Wherein, the base stone 3 with certain clearance has between the concrete rail 2, the clearance is as supplying the passageway that the maintainer stood and walked, the maintainer through based on base stone 3 with clearance between the concrete rail 2 passes in the mound top 1 of pier, inspects the operation, and based on the concrete rail 2 is as the safety protection of mound top 1 operation.
Preferably, the concrete fence 2 has a height flush with the stepping stone 3.
Preferably, the cross section of the pier top 1 is rectangular, and in order to meet the space requirement, the longitudinal dimension of the top hat top is properly widened, so that enough clearance can be reserved between the cushion stone 3 and the concrete fence 2 for the walking of the maintenance personnel.
Preferably, the two cushion stones 3 are respectively positioned at two sides of the pier top 1 along the transverse bridge direction.
Preferably, a support 4 for supporting the capping beam is mounted on the bolster 3.
Preferably, two supports 4 are installed on the base stone 3, and are respectively installed on two sides of the base stone 3 along the bridge direction.
The utility model provides a pair of pier suitable for high-speed railway hangs the fence cancellation with traditional steel construction, under the prerequisite that does not change the required each item function of structure, is provided with concrete rail 2 all around in the mound top 1 outside of pier, just all is provided with the passageway that supplies the maintainer to stand and walk all around in base stone 3 on mound top 1, makes things convenient for the maintainer later stage to carry out the maintenance to the pier.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (7)

1. The utility model provides a pier suitable for high-speed railway, a serial communication port, includes the pier, the bed stone is installed on the mound top of pier, the mound top outside of pier is provided with the concrete rail all around, the bed stone is located in the concrete rail, the mound top just all is provided with the passageway that supplies the support personnel to stand and walk all around in the bed stone.
2. The pier suitable for the high-speed railway according to claim 1, wherein a certain gap is formed between the cushion stone and the concrete fence, and the gap is used as a passageway for a maintenance worker to stand and walk.
3. The pier suitable for the high-speed railway according to claim 1, wherein the concrete fence has a height flush with the pad stone.
4. The pier suitable for the high-speed railway according to claim 1, wherein the pier top is rectangular in cross section.
5. The pier applicable to the high-speed railway according to claim 1, wherein the two pads are respectively arranged on two sides of the pier top in the transverse bridge direction.
6. The pier suitable for the high-speed railway according to claim 1, wherein a support for supporting the cap beam is installed on the pad stone.
7. The pier suitable for the high-speed railway according to claim 4, wherein two supports are mounted on the pad stone and are respectively mounted on two sides of the pad stone along the bridge direction.
CN202023183132.2U 2020-12-25 2020-12-25 Pier suitable for high-speed railway Active CN214656305U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023183132.2U CN214656305U (en) 2020-12-25 2020-12-25 Pier suitable for high-speed railway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023183132.2U CN214656305U (en) 2020-12-25 2020-12-25 Pier suitable for high-speed railway

Publications (1)

Publication Number Publication Date
CN214656305U true CN214656305U (en) 2021-11-09

Family

ID=78502817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023183132.2U Active CN214656305U (en) 2020-12-25 2020-12-25 Pier suitable for high-speed railway

Country Status (1)

Country Link
CN (1) CN214656305U (en)

Similar Documents

Publication Publication Date Title
CN104005338B (en) A kind of long-span cablestayed bridges tower beam three-dimensional temporary consolidation structure
CN208702197U (en) A kind of big displacement integral jacking Compact Mounts
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN105908629B (en) Downlink movable mould frame and its application method for combined highway and metro section highway box beam
CN214656305U (en) Pier suitable for high-speed railway
CN203866711U (en) Large span cable-stayed bridge tower beam three-way temporary consolidation structure
CN201665822U (en) Novel bridge girder erection machine
CN106978783B (en) Hanging basket for pouring inclined web type continuous beam cantilever
CN206736717U (en) A kind of general maintenance platform of packaged type bridges
CN109531802B (en) T-beam combined steel template mounting and dismounting structure and method
CN209039993U (en) A kind of device carrying out the tensioning of great cantilever bent cap using movable supporting frame
CN207277197U (en) A kind of operating platform suitable for the installation of high pier Wavelike steel webplate cantilever
CN212832438U (en) Crown block rail joint fixing device
CN205663282U (en) Light -duty lattice formula steel column of large capacity
CN1200185C (en) Construction method and concrete-steel beams and floor slabs of building with steel frame and its form hoist
CN210828409U (en) Novel protection canopy of encorbelmenting
CN211817907U (en) Technical interlayer maintenance carriageway for sterile production workshop
CN109082953A (en) A kind of anti-bias clamp device of track
CN207998763U (en) Railroad track hydraulic tool for taking up tracks
CN204551271U (en) A kind of reinforcement type Hanging Basket
CN111463689A (en) Distribution transformer hangs core and overhauls specialized tool
CN209538714U (en) A kind of bracket device for overhanging unloading platform
CN217087472U (en) Supplementary ladder of medium-low speed magnetic levitation contact rail arrester installation
CN216551374U (en) Efficient cement pillow replacement support