CN214648456U - Material conveyer for building engineering - Google Patents

Material conveyer for building engineering Download PDF

Info

Publication number
CN214648456U
CN214648456U CN202120770853.9U CN202120770853U CN214648456U CN 214648456 U CN214648456 U CN 214648456U CN 202120770853 U CN202120770853 U CN 202120770853U CN 214648456 U CN214648456 U CN 214648456U
Authority
CN
China
Prior art keywords
base
block
lifting rod
pole
rotating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120770853.9U
Other languages
Chinese (zh)
Inventor
方昀
樊敬涛
范克龙
陈旭东
陈小明
黄凯
伊浚铭
沈其峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hwaking Construction Group Co ltd
Original Assignee
Hwaking Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hwaking Construction Group Co ltd filed Critical Hwaking Construction Group Co ltd
Priority to CN202120770853.9U priority Critical patent/CN214648456U/en
Application granted granted Critical
Publication of CN214648456U publication Critical patent/CN214648456U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a material transportation device for building engineering, which comprises a box body, wherein the bottom end of the box body is provided with a base, one side of the base is symmetrically provided with idler wheels, the other side of the base is provided with universal wheels, the front side of the box body is provided with a fixed rod, the two sides of the fixed rod are symmetrically provided with a lifting rod, one end of the lifting rod is fixedly connected with the box body, the surface of the other end of the lifting rod is sleeved and fixed with a protective sleeve, the lifting rod consists of two connecting blocks, the end part of one of the connecting blocks forming the lifting rod is provided with a rotating groove, the inner side of the rotating groove is provided with a rotating block, and one end of the rotating block is connected with the rotating groove through a bolt; through the rotatory piece of design, swivelling chute, improve originally and lift the pole and be protrusion column structure, have the phenomenon that certain space took, through this structure, make to lift the pole and accomodate under the condition that does not, increase this conveyer's safety in utilization.

Description

Material conveyer for building engineering
Technical Field
The utility model belongs to the technical field of the material transportation, concretely relates to material conveyer for building engineering.
Background
The building engineering refers to an engineering entity formed by the construction of various building buildings and their auxiliary facilities and the installation activities of lines, pipelines and equipment matched with the building buildings, wherein the building buildings refer to the engineering which has a top cover, a beam column, a wall, a foundation and can form an internal space and meet the requirements of people on production, living, study and public activities, and in the building process, the materials required for building are transported by a special transportation device.
Present material conveyer for building engineering is through pulling lifting the pole in the use, drives the box upset, accomplishes the unloading operation, because lifting the pole and being protrusion column structure, leads to the staff in to this conveyer operation process, carelessly strikes lifting the pole between careless, causes the problem of damage, for this the utility model provides a material conveyer for building engineering.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a material conveyer for building engineering to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a material conveying device for constructional engineering comprises a box body, wherein a base is arranged at the bottom end of the box body, the rolling wheels are symmetrically arranged on one side of the base, the universal wheels are arranged on the other side of the base, the fixing rod is arranged on the front side of the box body, two sides of the fixed rod are symmetrically provided with lifting rods, one end of each lifting rod is fixedly connected with the box body, a protective sleeve is fixedly sleeved on the surface of the other end of the lifting rod, the lifting rod consists of two connecting blocks, a rotating groove is arranged at the end part of one of the connecting blocks which form the lifting rod, and the inner side of the rotating groove is provided with a rotating block, one end of the rotating block is connected with the rotating groove through a bolt, the other end of the rotating block is fixedly connected with the other connecting block which forms the lifting rod, the rotating block is formed by two supporting blocks, and the two supporting blocks which form the rotating block are connected through a rotating shaft.
Preferably, a clamping block is fixed at the end of one of the connecting blocks forming the lifting rod, a clamping groove matched with the clamping block is formed at the end of the other connecting block forming the lifting rod, and a rubber block is fixed on the inner wall of the clamping groove.
Preferably, the surface of the clamping block is attached to the inner wall of the clamping groove, and the clamping block is of a hollow cylinder structure.
Preferably, the length dimension of the rotating block is consistent with that of the rotating groove, and the rotating block is of a cylindrical structure.
Preferably, the two sides of the fixed rod are provided with rotating handles, and the side surface of the fixed rod, corresponding to the surface of the base, is provided with a parking hand brake.
Preferably, the bottom of base is provided with sealed battery compartment, the side of sealed battery compartment is provided with the thickening corresponding to the bottom of base and aggravates anti rear axle that carries.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) through the rotatory piece of design, swivelling chute, improve originally and lift the pole and be protrusion column structure, have the phenomenon that certain space took, through this structure, make to lift the pole and accomodate under the condition that does not, increase this conveyer's safety in utilization.
(2) Through the fixture block, the rubber block and the clamping groove, a clamping structure and a sealing structure are additionally arranged between the two connecting blocks forming the lifting rod, so that the connecting part is more stable.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of the area A of FIG. 1 according to the present invention;
FIG. 3 is a schematic sectional view of the joint between the lifting rod and the protecting sleeve;
FIG. 4 is a schematic view of the lifting rod of the present invention showing two bent parts;
fig. 5 is an enlarged schematic view of a portion B of fig. 3 according to the present invention;
in the figure: 1. a box body; 2. lifting the rod; 3. a universal wheel; 4. sealing the battery compartment; 5. a roller; 6. fixing the rod; 7. a protective sleeve; 8. rotating the block; 9. a rotating tank; 10. a rubber block; 11. and (7) clamping blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 5, the present invention provides a technical solution: a material conveying device for construction engineering comprises a box body 1, wherein a base is arranged at the bottom end of the box body 1, rollers 5 are symmetrically arranged on one side of the base, universal wheels 3 are arranged on the other side of the base, a fixing rod 6 is arranged on the front side of the box body 1, lifting rods 2 are symmetrically arranged on two sides of the fixing rod 6, one end of each lifting rod 2 is fixedly connected with the box body 1, a protective sleeve 7 is fixedly sleeved on the surface of the other end of each lifting rod 2, each lifting rod 2 consists of two connecting blocks, a rotating groove 9 is formed in the end portion of one connecting block forming each lifting rod 2, a rotating block 8 is arranged on the inner side of each rotating groove 9, one end of each rotating block 8 is connected with each rotating groove 9 through a bolt, the other end of each rotating block 8 is fixedly connected with the other connecting block forming each lifting rod 2, each rotating block 8 consists of two supporting blocks, and the two supporting blocks forming each rotating block 8 are connected through a rotating shaft, through the rotatory piece 8 of design, the swivelling chute 9, improve original pole 2 of lifting and be protrusion column structure, there is the phenomenon that certain space occupy, through this structure, make and lift pole 2 and accomodate under the condition not, increase this conveyer's safety in utilization, the length dimension of rotatory piece 8 is unanimous with the length dimension of swivelling chute 9, rotatory piece 8 is the cylinder structure, the both sides of dead lever 6 all are provided with changeing the handle, the side of dead lever 6 is provided with the parking manual brake corresponding to the surface of base, the bottom of base is provided with sealed battery compartment 4, the side of sealed battery compartment 4 is provided with the thickening and aggravates anti rear axle that carries corresponding to the bottom of base.
In this embodiment, preferably, a clamping block 11 is fixed to an end of one of the connecting blocks constituting the lifting rod 2, a clamping groove matched with the clamping block 11 is formed in an end of the other connecting block constituting the lifting rod 2, a rubber block 10 is fixed to an inner wall of the clamping groove, and a clamping structure and a sealing structure are additionally arranged between the two connecting blocks constituting the lifting rod 2 through the designed clamping block 11, rubber block 10 and clamping groove, so that the joint is more stable, the surface of the clamping block 11 is in a fit state with the inner wall of the clamping groove, and the clamping block 11 is in a hollow cylindrical structure.
The utility model discloses a theory of operation and use flow: in the building process, when materials used in building are required to be transported, the transportation device is driven to move by placing the materials on the inner side of the box body 1 and rotating the rotating handle, the lifting rod 2 in a bent state is unfolded after being transported to a required area, in the unfolding process, one connecting block forming the lifting rod 2 is pulled and is connected through the rotating shafts of the two parts of the rotating block 8, the rotating block 8 synchronously rotates along with the pulling of the lifting rod 2, the two connecting blocks forming the lifting rod 2 and the two supporting blocks of the rotating block 8 are in a vertical state, then one connecting block forming the lifting rod 2 rotates, the distance between the two connecting blocks forming the lifting rod 2 is shortened through the threaded connection between the rotating block 8 and the rotating groove 9, the clamping block 11 is synchronously clamped into the inner side of the clamping groove, and the unfolding operation of the lifting rod 2 is completed, and then, the lifting rod 2 is pulled to drive the box body 1 to turn over so that the material inside the box body 1 quickly falls down, and the material blanking operation is completed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a material conveyer for building engineering, includes box (1), the bottom of box (1) is provided with the base, a side symmetry of base is provided with gyro wheel (5), the opposite side of base is provided with universal wheel (3), the front side of box (1) is provided with dead lever (6), the bilateral symmetry of dead lever (6) is provided with and lifts pole (2), the one end of lifting pole (2) is fixed connection, its characterized in that with box (1): it is fixed with lag (7) to lift the other end surface cup joint of pole (2), it comprises two connecting blocks to lift pole (2) rotatory groove (9) have been seted up to the tip of one of them connecting block of pole (2), and the inboard of rotatory groove (9) is provided with rotatory piece (8), be bolted connection between the one end of rotatory piece (8) and rotatory groove (9), the other end of rotatory piece (8) is fixed connection with another connecting block of constituteing to lift pole (2), rotatory piece (8) comprise two supporting blocks, constitute be connected for the pivot between two supporting shoes of rotatory piece (8).
2. The material transporting device for construction engineering according to claim 1, wherein: a clamping block (11) is fixed to the end portion of one of the connecting blocks forming the lifting rod (2), a clamping groove matched with the clamping block (11) is formed in the end portion of the other connecting block forming the lifting rod (2), and a rubber block (10) is fixed to the inner wall of the clamping groove.
3. The material transporting device for construction engineering according to claim 2, wherein: the surface of the clamping block (11) is attached to the inner wall of the clamping groove, and the clamping block (11) is of a hollow cylinder structure.
4. The material transporting device for construction engineering according to claim 1, wherein: the length dimension of the rotating block (8) is consistent with that of the rotating groove (9), and the rotating block (8) is of a cylindrical structure.
5. The material transporting device for construction engineering according to claim 1, wherein: the parking hand brake is characterized in that rotating handles are arranged on two sides of the fixing rod (6), and a parking hand brake is arranged on the side face of the fixing rod (6) corresponding to the surface of the base.
6. The material transporting device for construction engineering according to claim 1, wherein: the bottom of base is provided with sealed battery compartment (4), the side of sealing battery compartment (4) is provided with the thickening corresponding to the bottom of base and aggravates anti rear axle that carries of aggravating.
CN202120770853.9U 2021-04-15 2021-04-15 Material conveyer for building engineering Active CN214648456U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120770853.9U CN214648456U (en) 2021-04-15 2021-04-15 Material conveyer for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120770853.9U CN214648456U (en) 2021-04-15 2021-04-15 Material conveyer for building engineering

Publications (1)

Publication Number Publication Date
CN214648456U true CN214648456U (en) 2021-11-09

Family

ID=78462715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120770853.9U Active CN214648456U (en) 2021-04-15 2021-04-15 Material conveyer for building engineering

Country Status (1)

Country Link
CN (1) CN214648456U (en)

Similar Documents

Publication Publication Date Title
CN204488862U (en) A kind of band draws the tyre fixing transport trolley of horse device
CN111284539A (en) House engineering is cargo handling car for building
CN207331564U (en) A kind of bridge energy conservation and environmental protection bridge cleaning device
CN214648456U (en) Material conveyer for building engineering
CN207139068U (en) A kind of steel scrap cutting upset dedusting closure assembly
CN213364608U (en) Highway tunnel detection device
CN208586489U (en) A kind of road paving road roller
CN101708730B (en) Inflatable axis handling transport vehicle
CN208266960U (en) A kind of engineering construction Special crushing hammer
CN206050691U (en) Pipeline mobile device
CN205724577U (en) Cubicle switch cabinet transport installation tool
CN206935570U (en) A kind of wet scrubber anode system
CN203593016U (en) Novel concrete pier carrying device
CN213892623U (en) Be used for prosthetic multitube trailer of pipe factory oil pipe
CN108725523B (en) Electric pole trolley for power grid erection
CN207018001U (en) A kind of shield is missed the stop translating device
CN206984028U (en) A kind of trolley for improving precast concrete production efficiency
CN207417681U (en) A kind of novel tire rack
CN205220716U (en) Location is with hydraulic oil top removal handcart
CN202130465U (en) Sample conveying vehicle
CN216681993U (en) Large-scale ground roller bearing frame dismounting device
CN205000259U (en) Hanging basket walking system
CN209833707U (en) Water and electricity equipment of hospital synthesizes maintenance shallow
CN213799965U (en) Single-pipe trailer for repairing oil pipe of pipe plant
CN202016704U (en) Ring type part storage and turnover cart

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant