CN214609468U - Garbage pool for construction site - Google Patents

Garbage pool for construction site Download PDF

Info

Publication number
CN214609468U
CN214609468U CN202120644728.3U CN202120644728U CN214609468U CN 214609468 U CN214609468 U CN 214609468U CN 202120644728 U CN202120644728 U CN 202120644728U CN 214609468 U CN214609468 U CN 214609468U
Authority
CN
China
Prior art keywords
storage box
pull rod
cover plate
upper cover
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120644728.3U
Other languages
Chinese (zh)
Inventor
白慧
程德勇
蒋关云
赵文龙
张平
张煜玺
张志俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
China Railway 12th Bureau Group Construction and Installation Engineering Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
China Railway 12th Bureau Group Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, China Railway 12th Bureau Group Construction and Installation Engineering Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN202120644728.3U priority Critical patent/CN214609468U/en
Application granted granted Critical
Publication of CN214609468U publication Critical patent/CN214609468U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuse Receptacles (AREA)

Abstract

The utility model provides a garbage pool for construction site, belonging to the technical field of garbage pool; the aim is to solve the problem that the existing building rubbish has no good accumulation place; the technical scheme is that the garbage pool comprises a storage box, a sealing mechanism, a discharging mechanism and a lifting mechanism, wherein a feeding port is formed in the upper end of the storage box, a discharging port is formed in the end part of the storage box, the sealing mechanism comprises an upper cover plate which is rotatably connected with the storage box, the discharging mechanism comprises an end cover plate which is arranged at the end part of the storage box, the lifting mechanism comprises a pull rod and a first fixing plate, the first fixing plate is connected with the pull rod in a sliding mode along the vertical direction, a transmission structure is arranged on the pull rod, one end, far away from the pull rod, of the transmission structure is connected with the upper cover plate, when the pull rod is in a lifting state, the upper cover plate is closed and used for sealing the storage box, and when the pull rod is in a ground contact state, the upper cover plate is opened; the technical effect does, the utility model discloses give a fixed position of stacking of building rubbish to the handling of being convenient for.

Description

Garbage pool for construction site
Technical Field
The utility model belongs to the technical field of the rubbish pond, specifically be a rubbish pond that construction site used.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The construction process involves the use of building materials, but a large batch of building materials leave some leftover materials after use, which is common building waste.
At present, some construction sites are all piled up at one corner of the construction site, and the construction wastes can be cleared after being piled up to a sufficient amount, and because the construction wastes do not have good piling places and are usually piled up in the open air, some construction wastes which can be reused are damaged, and the targets of economy and environmental protection are not met, so that related waste piling equipment needs to be designed.
SUMMERY OF THE UTILITY MODEL
The utility model overcomes prior art's is not enough, provides a rubbish pond that construction site used, and the purpose is solved present building rubbish and does not have the fine problem of piling up the place.
In order to achieve the above purpose, the present invention is achieved by the following technical solutions.
A garbage pool for a building construction site comprises a storage box, a sealing mechanism, a discharging mechanism and a lifting mechanism, wherein the upper end of the storage box is provided with a feeding port, and the end part of the storage box is provided with a discharging port; the sealing mechanism comprises an upper cover plate which is rotatably connected with the storage box and is used for opening and closing the feed opening; the discharging mechanism comprises an end cover plate arranged at the end part of the storage box and used for opening and closing the discharging opening; the lifting mechanism comprises a pull rod and a first fixing plate which is arranged on the side portion of the storage box and fixedly connected with the storage box, the first fixing plate is connected with the pull rod in a sliding mode in the vertical direction, a first limiting structure is arranged at the bottom of the pull rod, a transmission structure is arranged on the pull rod, one end of the transmission structure is connected with the pull rod, the other end of the transmission structure is connected with the upper cover plate, when the pull rod is in a lifting state, the upper cover plate is closed and used for sealing the storage box, and when the pull rod is in a ground contact state, the upper cover plate is opened.
Furthermore, the transmission structure comprises a second fixed plate fixedly connected with the pull rod, a sliding rod and a supporting rod, the second fixed plate is connected with the sliding rod in a sliding mode along the vertical direction, a second limiting structure is arranged at the bottom of the sliding rod, the top of the sliding rod is hinged to the supporting rod, and one end, far away from the sliding rod, of the supporting rod is hinged to the upper cover plate.
Furthermore, a second spring is arranged between the second limiting structure and the second fixing plate.
Furthermore, the discharging mechanism comprises an end cover plate which is rotatably connected with the end part of the storage box, and the end cover plate is connected with the storage box through a locking assembly.
Furthermore, the locking assembly comprises a lock head arranged on the end cover plate, and a lock catch matched and connected with the lock head is arranged on the storage box.
Furthermore, one end of the storage box, which is far away from the ground, is provided with a rotating seat, and the rotating seat is rotatably connected with the upper cover plate.
Furthermore, one side of the storage box is provided with two pull rods, and the ends, far away from the ground, of the two pull rods are connected through a fixing rod.
Furthermore, a first spring is arranged between the first limiting structure and the first fixing plate.
Furthermore, the two sides of the storage box are provided with the first fixing plates, the two upper cover plates are arranged, when the pull rod is in a lifting state, the two upper cover plates are aligned and attached, and when the pull rod is in a ground contact state, the two upper cover plates are separated.
The utility model discloses produced beneficial effect for prior art does: the utility model is suitable for a rubbish pond that construction site used drives sealing mechanism and rotates through setting up handling mechanism for this device is placed when subaerial, and the storage box is in the state of opening, and when this device was in the state of handling, the storage box was closed, has improved the convenience that the device used, and also has given a fixed position of stacking of building rubbish.
Drawings
The present invention will be further explained with reference to the accompanying drawings;
FIG. 1 is a schematic structural view of the garbage pool of the present invention;
FIG. 2 is a side view of the garbage can of the present invention;
FIG. 3 is a schematic structural view of a lifting mechanism in the garbage pool of the present invention;
FIG. 4 is a front view of FIG. 3;
wherein, 1 is the storage box, 2 is the end cover board, 3 is the tapered end, 4 is the hasp, 5 is first fixed plate, 6 is first limiting plate, 7 is first spring, 8 is the pull rod, 9 is the second fixed plate, 10 is the second spring, 11 is the second limiting plate, 12 is the upper cover plate, 13 is the dead lever, 14 is for rotating the seat, 15 is the slide bar, 16 is the bracing piece.
Detailed Description
In order to make the technical problem, technical solution and advantageous effects to be solved by the present invention more clear, the present invention is further described in detail with reference to the accompanying embodiments and drawings, it should be understood that the specific embodiments described herein are only used for explaining the present invention, and are not used for limiting the present invention.
In one embodiment, please refer to fig. 1 and 2, a garbage pool for a construction site comprises a storage box 1, a sealing mechanism, a discharging mechanism and a lifting mechanism, wherein a feeding port is arranged at the upper end of the storage box 1, a discharging port is arranged at the end part of the storage box 1, and the discharging mechanism is arranged at the end part of the storage box 1 and is used for opening and closing the discharging port, so that the storage box 1 can rapidly discharge the internal construction garbage; the sealing mechanism comprises an upper cover plate 12 which is rotationally connected with the storage box 1 and is used for opening and closing the feeding port so as to seal the storage box 1; the hoisting mechanism is used for connecting the storage box 1 with a transportation device in a transportation stage, and comprises a pull rod 8, a first fixing plate 5 which is arranged on the side of the storage box and is fixedly connected with the storage box, the first fixing plate 5 is connected with the pull rod 8 in a sliding mode in the vertical direction, a first limiting plate 6 is arranged at the bottom of the pull rod 8, a transmission structure is arranged on the pull rod 8, one end of the transmission structure is connected with the pull rod 8, the other end of the transmission structure is connected with an upper cover plate 12, when the pull rod 8 is in a hoisting state, the upper cover plate 12 is closed and used for sealing the storage box, and when the pull rod 8 is in a ground contact state, the upper cover plate 12 is opened.
In a situation of this embodiment, please refer to fig. 1 and fig. 2, the transmission structure includes a second fixing plate 9, a sliding rod 15, and a supporting rod 16, which are fixedly connected to the pull rod 8 and transversely disposed, the second fixing plate 9 and the sliding rod 15 are slidably connected in an up-down direction, the bottom of the sliding rod 15 is provided with a second limiting plate 11, the top of the second limiting plate is hinged to the supporting rod 16, the upper end of the supporting rod 16 is hinged to the upper cover plate 12, the transmission structure is not limited to this situation, and may be a plurality of link structures, as long as the linkage between the pull rod 8 and the upper cover plate 12 can be realized.
In a case of this embodiment, please refer to fig. 1 and 2, the storage box 1 is provided with first fixing plates 5 on two sides, the first fixing plates 5 are transversely disposed, the pull rod 8 penetrates through one end of the first fixing plates 5 far away from the storage box 1, the second fixing plates 9 are transversely disposed on one end of the pull rod 8 close to the storage box 1, two upper cover plates 12 are disposed in parallel, when the pull rod 8 is in a lifting state, the two upper cover plates 12 are aligned and attached, and when the pull rod 8 is in a ground contact state, the two upper cover plates 12 are separated.
In one aspect of the present embodiment, please refer to fig. 1 and 2, the discharging mechanism includes an end cover plate 2 rotatably connected to an end of the storage box 1, the end cover plate 2 is connected to the storage box 1 through a locking assembly, and when the garbage in the storage box 1 needs to be poured out, the end cover plate 2 can be opened to open the discharging opening, so as to achieve the effect of fast discharging.
In a situation of this embodiment, please refer to fig. 1 and 2, the locking assembly includes a lock head 3 disposed on the end cover plate 2, a lock catch 4 disposed on the storage box 1 and connected to the lock head 3 in a matching manner, and the end cover plate 2 can be effectively fixed to the storage box 1 by the matching between the lock head 3 and the lock catch 4 in a normal state, so as to avoid the leakage of construction waste.
In one aspect of the present embodiment, referring to fig. 3, a rotating base 14 is provided at one end of the storage box 1 far from the ground, the rotating base 14 is rotatably connected to the upper cover plate 12, the rotating base 14 is provided at both sides of the material inlet at the upper end of the storage box 1, and the rotating base 14 is rotatably connected to the upper cover plate 12, so that the upper cover plate 12 can rotate around the upper portion of the storage box 1.
In one aspect of the present embodiment, referring to fig. 1, two pull rods 8 are disposed on one side of the storage box 1, and one end of each pull rod 8 away from the ground is fixedly connected to a fixing rod 13. In order to facilitate the connection of the device and the related carrying machinery, the fixing rod 13 is arranged, so that the carrying machinery can hang the fixing rod 13, the pull rod 8 moves upwards at the same time, and the storage box 1 is lifted and transported.
In a situation of this embodiment, please refer to fig. 3 and 4, a first limiting plate 6 is disposed at one end of the pull rod 8 close to the ground, a first spring 7 is disposed between the first limiting plate 6 and the first fixing plate 5, in order to keep the pull rod 8 moving downward when not stressed, the first spring 7 is disposed between the pull rod 8 and the first fixing plate 5, and the first spring 7 can keep the pull rod 8 moving downward continuously and play a role of buffering the pull rod 8.
In one aspect of this embodiment, referring to fig. 3 and 4, a second limiting plate 11 is disposed at an end of the sliding rod 15 away from the ground, a second spring 10 is disposed between the second limiting plate 11 and the second fixing plate 9, and the second spring 10 can keep the sliding rod 15 moving downward continuously, so that when the sliding rod 15 is in an unstressed state, the sliding rod 15 moves downward and plays a role of buffering the sliding rod 15.
In the implementation process of the embodiment, firstly, when the device is placed on the ground to store garbage, the pull rod 8 moves downwards under the action of the first spring 7, the pull rod 8 enables the sliding rod 15 to move downwards through the second fixing plate 9 and the second spring 10, the sliding rod 15 pulls one end, far away from the storage box 1, of the upper cover plate 12 to move downwards through the supporting rod 16, so that the positions, close to the center of the storage box 1, of the two upper cover plates 12 are lifted upwards, the upper part of the storage box 1 is opened, and the construction garbage can be placed into the storage box 1.
When the storage box 1 needs to be hoisted, the fixing rod 13 is firstly hung on a suspension arm similar to a forklift or a crane, the fixing rod 13 is lifted upwards at the moment, the fixing rod 13 pulls the pull rod 8 to move upwards, the pull rod 8 drives the sliding rod 15 to move upwards, the sliding rod 15 pushes the upper cover plate 12 to rotate through the supporting rod 16, the upper cover plate 12 is enabled to rotate to a state of being attached to the upper portion of the storage box 1, the storage box 1 is closed at the moment, and the storage box can be hoisted normally.
The utility model is suitable for a rubbish pond that construction site used drives sealing mechanism and rotates through setting up handling mechanism for this device is placed when subaerial, and storage box 1 is in the state of opening, and when this device was in the state of handling, storage box 1 closed, has improved the convenience that the device used, and also has given the fixed position of stacking of building rubbish.
The above description is for further details of the present invention with reference to specific preferred embodiments, and it should not be understood that the embodiments of the present invention are limited thereto, and it will be apparent to those skilled in the art that the present invention can be implemented in a plurality of simple deductions or substitutions without departing from the scope of the present invention, and all such alterations and substitutions should be considered as belonging to the present invention, which is defined by the appended claims.

Claims (9)

1. The garbage pool for the construction site is characterized by comprising a storage box, a sealing mechanism, a discharging mechanism and a lifting mechanism, wherein the upper end of the storage box is provided with a feeding port, and the end part of the storage box is provided with a discharging port;
the sealing mechanism comprises an upper cover plate which is rotatably connected with the storage box and is used for opening and closing the feed opening;
the discharging mechanism comprises an end cover plate arranged at the end part of the storage box and used for opening and closing the discharging opening;
the lifting mechanism comprises a pull rod and a first fixing plate which is arranged on the side portion of the storage box and fixedly connected with the storage box, the first fixing plate is connected with the pull rod in a sliding mode in the vertical direction, a first limiting structure is arranged at the bottom of the pull rod, a transmission structure is arranged on the pull rod, one end of the transmission structure is connected with the pull rod, the other end of the transmission structure is connected with the upper cover plate, when the pull rod is in a lifting state, the upper cover plate is closed and used for sealing the storage box, and when the pull rod is in a ground contact state, the upper cover plate is opened.
2. The garbage pool for the building construction site according to claim 1, wherein the transmission structure comprises a second fixing plate fixedly connected with the pull rod, a sliding rod and a support rod, the second fixing plate is slidably connected with the sliding rod in an up-down direction, a second limiting structure is arranged at the bottom of the sliding rod, the top of the sliding rod is hinged with the support rod, and one end of the support rod, far away from the sliding rod, is hinged with the upper cover plate.
3. The rubbish pool as claimed in claim 2, wherein a second spring is provided between the second position-limiting structure and the second fixing plate.
4. The rubbish pool as claimed in claim 1, wherein the discharging mechanism includes an end cover plate rotatably connected to an end of the storage bin, the end cover plate being connected to the storage bin by a locking assembly.
5. The rubbish pool as claimed in claim 4, wherein the locking assembly includes a locking head disposed on the end cover plate, and the storage box is provided with a lock catch cooperatively connected with the locking head.
6. The rubbish pool as claimed in claim 1, wherein a rotary seat is provided at an end of the storage box far from the ground, and the rotary seat is rotatably connected to the upper cover plate.
7. The trash receptacle of claim 1, wherein the storage box is provided with two rods at one side thereof, and ends of the two rods far from the ground are connected by a fixing rod.
8. The trash receptacle of claim 1, wherein a first spring is disposed between the first position-limiting structure and the first fixing plate.
9. The rubbish pool as claimed in claim 1, wherein the first fixing plates are provided on both sides of the storage box, and the two upper cover plates are provided, and are aligned and attached when the pull rod is in the lifting state, and separated when the pull rod is in the ground contact state.
CN202120644728.3U 2021-03-30 2021-03-30 Garbage pool for construction site Active CN214609468U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120644728.3U CN214609468U (en) 2021-03-30 2021-03-30 Garbage pool for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120644728.3U CN214609468U (en) 2021-03-30 2021-03-30 Garbage pool for construction site

Publications (1)

Publication Number Publication Date
CN214609468U true CN214609468U (en) 2021-11-05

Family

ID=78398006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120644728.3U Active CN214609468U (en) 2021-03-30 2021-03-30 Garbage pool for construction site

Country Status (1)

Country Link
CN (1) CN214609468U (en)

Similar Documents

Publication Publication Date Title
CN112918946A (en) Garbage pool for construction site
CN210884273U (en) Baking-free brick stacking machine
CN207524370U (en) The dustbin of bottom dump rubbish
CN214609468U (en) Garbage pool for construction site
CN215286538U (en) Novel garbage container
CN202577993U (en) Hopper for loading and unloading of concrete
CN201801014U (en) Reagent barrel conveying device
CN215853084U (en) Semi-automatic lower opening opposite door discharging type material box
CN109230050B (en) Formula of sinking garbage collection transfer box
CN213677917U (en) Multifunctional bulk cargo collecting device
CN220549359U (en) Stackable garbage collection loading and unloading box
CN211141368U (en) Building construction is lift hopper for bulk cargo
CN211310181U (en) A transfer device for metal is retrieved
CN206679666U (en) A kind of bulky refuse case
CN212830684U (en) Super high-rise steel structure waste material collecting box
CN219669057U (en) Bottom unloading type waste bin capable of being hoisted
CN214297462U (en) Bottom discharge concrete bucket
CN220617027U (en) Construction waste clear case
CN202944982U (en) Automatic discharging swinging hopper
CN219428887U (en) Layered bulk device convenient for discharging
CN216995987U (en) Garbage can
CN213863155U (en) Can place fast assembly box of multiple heavy object that holds
CN220596172U (en) Zinc ingot stack overturning device
CN220449147U (en) Self-discharging formula waste material frame
CN216766804U (en) Hopper for construction machinery engineering