CN212830684U - Super high-rise steel structure waste material collecting box - Google Patents

Super high-rise steel structure waste material collecting box Download PDF

Info

Publication number
CN212830684U
CN212830684U CN202021724347.8U CN202021724347U CN212830684U CN 212830684 U CN212830684 U CN 212830684U CN 202021724347 U CN202021724347 U CN 202021724347U CN 212830684 U CN212830684 U CN 212830684U
Authority
CN
China
Prior art keywords
box body
pocket
cover plate
steel structure
super high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021724347.8U
Other languages
Chinese (zh)
Inventor
徐顺超
张晶楠
乔元亮
刘红威
张汝超
刘勤勤
宁召琪
赵玉岐
葛广乐
肖冲冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202021724347.8U priority Critical patent/CN212830684U/en
Application granted granted Critical
Publication of CN212830684U publication Critical patent/CN212830684U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuse Receptacles (AREA)

Abstract

The utility model discloses a super high-rise steel structure waste collecting box, relating to the technical field of building waste collection, and the technical proposal is that the super high-rise steel structure waste collecting box comprises a box body, wherein the top of the box body is provided with a cover plate which can be opened and closed, and the bottom is provided with a pocket bottom; one side of the cover plate is connected with the box body through two hinges, and the hinges are respectively connected with the box body and the cover plate through nuts; the other side of the cover plate is connected with the box body through a closing mechanism; four symmetrical lifting lugs are fixedly arranged on the cover plate. The utility model has the advantages that: the scheme is that the super high-rise steel structure waste material collecting box is developed and placed on a steel structure operation layer, when the waste material is fully collected, the waste material is conveyed downwards to a plane designated area or a waste material vehicle by utilizing equipment such as a tower crane or a winch, and the collecting box realizes that manual overturning and dumping are avoided when the waste material is conveyed downwards and unloaded through a lower bottom-mounting device and a locking mechanism, so that time and labor are saved, and the danger is reduced; this patent design benefit, simple structure, it is easy to draw materials, but recycle.

Description

Super high-rise steel structure waste material collecting box
Technical Field
The utility model relates to a construction waste collects technical field, in particular to super high-rise steel construction garbage collection box.
Background
At present, super high-rise buildings are rapidly developed in domestic building markets, and steel structure engineering is indispensable in super high-rise projects. Concrete and other civil engineering class building rubbish accessible crushing apparatus and refuse channel transport, but the value that steel construction waste material recycled after smashing becomes low, so can't use crushing apparatus and refuse channel to the frame steel construction waste material of super high-rise, perhaps uneconomic. Because steel construction waste material is bulky, weight is also great, and traditional waste material container has the risk that the incasement waste material dropped when hoist and mount are transported down, and is very hard when unhook is unloaded moreover, and dangerous.
SUMMERY OF THE UTILITY MODEL
In order to realize the utility model purpose, to above-mentioned technical problem, the utility model provides a super high-rise steel construction garbage collection box.
The technical scheme is that the device comprises a box body, wherein a cover plate which can be opened and closed is arranged at the top of the box body, and a pocket bottom is arranged at the bottom of the box body;
one side of the cover plate is connected with the box body through two hinges, and the hinges are respectively connected with the box body and the cover plate through nuts; the other side of the cover plate is connected with the box body through a closing mechanism; four symmetrical lifting lugs are fixedly arranged on the cover plate;
the closing mechanism comprises a rotatable rotating handle arranged on the cover plate and a top jack fixedly arranged on the box body and matched with the rotating handle, one end of the rotating handle is rotatably connected with the cover plate, the other end of the rotating handle is provided with a transverse flat bolt, and the tail end of the flat bolt is provided with a round hole;
the pocket bottom comprises two bottom plates which can be combined together to pocket the bottom of the box body and a pocket bottom locking mechanism which is connected with the two bottom plates; bottom plate one end is passed through the hinge and is connected with the box, bolt and bolt fixed block at the bottom of the pocket locking mechanism includes jack, two hinges, a pocket at the bottom of two pockets, one of them the one end of bottom plate articulates there are two hinges, be provided with on another bottom plate with jack at the bottom of the pocket of hinge complex, the bolt comprises a root length round steel and a short round steel at the bottom of the pocket, the root length round steel can penetrate in the jack of jack at the bottom of the pocket.
The bottom of the lifting lug is fixed with the box body through a bolt, and the top of the lifting lug is provided with a through hole.
The short round steel is perpendicular to the long round steel.
The fixed setting of bolt fixed block is in on the bottom plate, the bolt fixed block comprises a horizontal board and "L" template, and the opening part of bolt fixed block deviates from jack at the bottom of the pocket, short round steel can be put into the opening part, the inside upper and lower edge of opening part is provided with the rubber strip.
Four angles at the bottom of the pocket are provided with supports which are of hollow structures, so that the whole device is placed stably.
The box body, the cover plate and the pocket bottom are all composed of iron plates with the thickness of 3mm, and the edges are thickened.
The embodiment of the utility model provides a beneficial effect that technical scheme brought is: the scheme is that the super high-rise steel structure waste material collecting box is developed and placed on a steel structure operation layer, when the waste material is fully collected, the waste material is conveyed downwards to a plane designated area or a waste material vehicle by utilizing equipment such as a tower crane or a winch, and the collecting box realizes that manual overturning and dumping are avoided when the waste material is conveyed downwards and unloaded through a lower bottom-mounting device and a locking mechanism, so that time and labor are saved, and the danger is reduced; this patent design benefit, simple structure, it is easy to draw materials, but recycle effectively accelerates the speed of steel construction waste material transport down, possesses the condition of extensively promoting in similar construction.
Drawings
Fig. 1 is a schematic view of an overall structure of an embodiment of the present invention.
Fig. 2 is a schematic diagram of an overall structure of an embodiment of the present invention.
Fig. 3 is a first schematic structural view of the pocket bottom of the embodiment of the present invention.
Fig. 4 is a partially enlarged view a of fig. 3.
Fig. 5 is a schematic structural view of the pocket bottom according to the embodiment of the present invention.
Wherein the reference numerals are: 1. a cover plate; 2. a box body; 3. lifting lugs; 4. a support; 5. a closing mechanism; 6. a hinge; 7. bottom holding; 8. a pocket bottom locking mechanism; 9. a pocket bottom insertion hole; 10. a bottom pocket bolt; 11. a hinge; 12. A bolt fixing block; 13. a rubber strip.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. Of course, the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
It should be noted that the embodiments and features of the embodiments of the present invention can be combined with each other without conflict.
In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the invention, unless otherwise specified, "a plurality" means two or more.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the creation of the present invention can be understood by those of ordinary skill in the art through specific situations.
Example 1
Referring to fig. 1 to 5, the utility model provides a super high-rise steel structure waste collecting box, which comprises a box body 2, wherein the top of the box body 2 is provided with a cover plate 1 which can be opened and closed, and the bottom is provided with a pocket bottom 7;
one side of the cover plate 1 is connected with the box body 2 through two hinges 6, and the hinges 6 are respectively connected with the box body 2 and the cover plate 1 through nuts; the other side of the cover plate 1 is connected with the box body 2 through a closing mechanism 5; four symmetrical lifting lugs 3 are also fixedly arranged on the cover plate 1;
the closing mechanism 5 comprises a rotatable rotating handle arranged on the cover plate 1 and a top jack fixedly arranged on the box body 2 and matched with the rotating handle, one end of the rotating handle is rotatably connected with the cover plate 1, the other end of the rotating handle is provided with a transverse flat bolt, and the tail end of the flat bolt is provided with a round hole;
the pocket bottom 7 comprises two bottom plates which can be combined together to pocket the bottom of the box body 2 and a pocket bottom locking mechanism 8 which is connected with the two bottom plates; bottom plate one end is passed through hinge 6 and is connected with box 2, and locking mechanical system 8 includes jack 9 at the bottom of two pockets, two hinges 11, bolt 10 and bolt fixed block 12 at the bottom of a pocket, and the one end of one of them bottom plate articulates there are two hinges 11, be provided with on another bottom plate with 11 complex pockets at the bottom of the jack 9 of hinge, and bolt 10 comprises a root length round steel and a root length round steel at the bottom of the pocket, and the root length round steel can wear to go into in the jack of jack 9 at the bottom of the pocket.
The bottom of the lifting lug 3 is fixed with the box body 2 through a bolt, and the top of the lifting lug is provided with a through hole.
The short round steel is vertical to the long round steel.
Bolt fixed block 12 is fixed to be set up on the bottom plate, and bolt fixed block 12 comprises a horizontal board and an "L" template, and the opening part of bolt fixed block 12 deviates from pocket bottom jack 9, and the opening part can be put into to short round steel, and the inside upper and lower edge of opening part is provided with rubber strip 13.
Four angles of 7 are set up by support 4 at the bottom of the pocket, and support 4 is hollow structure, makes whole device place stably.
The box body 2, the cover plate 1 and the pocket bottom 7 are composed of iron plates with the thickness of 3mm, and the edges of the iron plates are thickened.
When the utility model is used, the collecting box is placed on a steel structure operation layer, two hinges 11 are closed when the collecting box is idle or used for loading waste materials, the pocket bottom bolt 10 penetrates into the pocket bottom jack 9, the short round steel part of the pocket bottom bolt 10 is placed into the bolt fixing block 12, and the rubber strips 13 are arranged above and below the edge of the opening of the bolt fixing block 12, so that the short round steel part can be placed into the collecting box without easily sliding out; in the process of collecting waste materials, the cover plate 1 is opened and turned to the back of the box body 2, before the waste materials are transported downwards, the cover plate 1 is closed, the rotary handle is rotated, the transverse flat bolt penetrates into the top jack, and tools such as iron wires and the like can be used for penetrating through the round holes to be simply fixed; when the garbage collection is full, the rope is tied to the four lifting lugs 3, the rope is conveyed downwards to a plane designated area or a garbage truck by utilizing equipment such as a tower crane or a winch, the rope is conveyed downwards to a proper height above a designated position, the short round steel part of the pocket bottom bolt 10 is pulled out from the bolt fixing block 12, the whole pocket bottom bolt 10 is pulled out from the pocket bottom jack 9 by force, then the two bottom plates are opened, and the building waste slides to the designated area along with the building waste.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (6)

1. The super high-rise steel structure waste collection box is characterized by comprising a box body (2), wherein a cover plate (1) capable of being opened and closed is arranged at the top of the box body (2), and a pocket bottom (7) is arranged at the bottom of the box body;
one side of the cover plate (1) is connected with the box body (2) through two hinges (6), and the hinges (6) are respectively connected with the box body (2) and the cover plate (1) through nuts; the other side of the cover plate (1) is connected with the box body (2) through a closing mechanism (5); four symmetrical lifting lugs (3) are fixedly arranged on the cover plate (1);
the closing mechanism (5) comprises a rotatable rotating handle arranged on the cover plate (1) and a top jack fixedly arranged on the box body (2) and matched with the rotating handle, one end of the rotating handle is rotatably connected with the cover plate (1), the other end of the rotating handle is provided with a transverse flat bolt, and the tail end of the flat bolt is provided with a round hole;
the pocket bottom (7) comprises two bottom plates which can be combined together to pocket the bottom of the box body (2) and a pocket bottom locking mechanism (8) which is connected with the two bottom plates; bottom plate one end is passed through hinge (6) and is connected with box (2), at the bottom of the pocket locking mechanism (8) including at the bottom of two pockets jack (9), two hinges (11), at the bottom of a pocket bolt (10) and bolt fixed block (12), one of them the one end of bottom plate articulates there are two hinges (11), be provided with on another bottom plate with jack (9) at the bottom of hinge (11) complex pocket, at the bottom of the pocket bolt (10) comprise a long round steel and a short round steel, long round steel can penetrate in the jack of jack (9) at the bottom of the pocket.
2. The super high-rise steel structure waste collection box according to claim 1, wherein the bottom of the lifting lug (3) is fixed with the box body (2) through a bolt, and the top is provided with a through hole.
3. The super high-rise steel structure scrap collecting box in accordance with claim 1 wherein the short round steel is perpendicular to the long round steel.
4. The scrap collecting box with super high-rise steel structure as claimed in claim 1, wherein the bolt fixing block (12) is fixedly arranged on the bottom plate, the bolt fixing block (12) is composed of a transverse plate and an L-shaped plate, the opening of the bolt fixing block (12) is far away from the pocket bottom jack (9), the short round steel can be placed into the opening, and the upper and lower edges inside the opening are provided with rubber strips (13).
5. The scrap collecting box with super high-rise steel structure according to claim 1, wherein the four corners of the pocket bottom (7) are provided with supports (4), and the supports (4) are hollow structures.
6. The super high-rise steel structure waste collection box according to claim 1, wherein the box body (2), the cover plate (1) and the pocket bottom (7) are all made of 3mm thick iron plates, and the edges are thickened.
CN202021724347.8U 2020-08-18 2020-08-18 Super high-rise steel structure waste material collecting box Active CN212830684U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021724347.8U CN212830684U (en) 2020-08-18 2020-08-18 Super high-rise steel structure waste material collecting box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021724347.8U CN212830684U (en) 2020-08-18 2020-08-18 Super high-rise steel structure waste material collecting box

Publications (1)

Publication Number Publication Date
CN212830684U true CN212830684U (en) 2021-03-30

Family

ID=75137130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021724347.8U Active CN212830684U (en) 2020-08-18 2020-08-18 Super high-rise steel structure waste material collecting box

Country Status (1)

Country Link
CN (1) CN212830684U (en)

Similar Documents

Publication Publication Date Title
CN203078909U (en) Rapid discharging box
CN212830684U (en) Super high-rise steel structure waste material collecting box
CN112918946A (en) Garbage pool for construction site
CN217418023U (en) Material lifting machine for construction with protect function
EP3083452B1 (en) Method of compacting waste and waste collection facility
CN206767422U (en) The hanging basket of bulk solid material can be loaded and unloaded
CN215694757U (en) A crushing apparatus for construction rubbish
CN215853084U (en) Semi-automatic lower opening opposite door discharging type material box
CN210941864U (en) Air entrainment piece handling device for building engineering construction
CN206679666U (en) A kind of bulky refuse case
CN108750499B (en) Comprehensive garbage operation system
CN217313823U (en) Lifting device for building garbage disposal
CN216970503U (en) Steel rope waste recycling box
CN212224639U (en) Reinforcing bar garbage collection device
CN212685661U (en) Building site cement handling device of being convenient for
CN213566012U (en) Building site cement handling device of being convenient for
CN213320945U (en) Falling material collecting device of stirring machine
CN111532627A (en) Assembled construction site construction waste transfer box
CN217416801U (en) Cold shearing hopper with novel discharging mode
CN204822713U (en) Multi -functional hopper
CN214609468U (en) Garbage pool for construction site
CN215625351U (en) Material stacking device for steel structure construction
CN212828596U (en) Material transportation device for building engineering
CN218433002U (en) Domestic waste collection container
CN218141694U (en) Ceramic mosaic piece transfer car (buggy)

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant