CN214576204U - Assembled steel ramp rail guard - Google Patents

Assembled steel ramp rail guard Download PDF

Info

Publication number
CN214576204U
CN214576204U CN202120205108.XU CN202120205108U CN214576204U CN 214576204 U CN214576204 U CN 214576204U CN 202120205108 U CN202120205108 U CN 202120205108U CN 214576204 U CN214576204 U CN 214576204U
Authority
CN
China
Prior art keywords
support
column
steel ramp
support column
ramp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120205108.XU
Other languages
Chinese (zh)
Inventor
王希浩
吴希成
焦明江
陈梦苇
刘绍玉
郭尚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Guoxin Haitian Center Construction Co ltd
Original Assignee
Qingdao Guoxin Haitian Center Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Guoxin Haitian Center Construction Co ltd filed Critical Qingdao Guoxin Haitian Center Construction Co ltd
Priority to CN202120205108.XU priority Critical patent/CN214576204U/en
Application granted granted Critical
Publication of CN214576204U publication Critical patent/CN214576204U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses an assembled steel ramp protective guard, which comprises a steel ramp, a support column, a support base and a support beam, wherein the support column is arranged between the support base and the support beam, the support column is provided with a plurality of assembly holes, the steel ramp is connected on the assembly holes, bolt holes matched with the assembly holes are arranged on two sides of the steel ramp, and the steel ramp is connected with the support column through bolts; the assembling holes are arranged on the surface of the supporting column and are arranged along the axial direction of the supporting column; and the support beam is provided with a spraying device. The assembly holes are formed in the support columns of the protective guard to be matched with the fixed steel ramp, the angle of the steel ramp can be adjusted according to the positions of the assembly holes, smoke and dust and material leakage during feeding are reduced through the spraying devices arranged on the support beams, and the material leakage cannot be raised along with wind after being sprayed, so that pollution is reduced. The whole assembly is simple, the equipment investment is reduced, the energy consumption is reduced, and the construction period is shortened.

Description

Assembled steel ramp rail guard
Technical Field
The utility model relates to a technical field such as assembly quality, metal system utensil, rail guard, concretely relates to assembled steel ramp rail guard.
Background
The vehicle-mounted telescopic belt conveyor is combined with a pipe slipping method and a steel ramp to enter a pit for unloading, various problems in concrete pouring of a large-volume concrete bottom plate and a main structure of a deep foundation pit are successfully solved through reasonable model selection and field orderly arrangement of all devices, the mix proportion of the boosting concrete is optimized, and the concrete pouring speed is greatly improved.
The assembled large-gradient steel ramp is composed of a supporting steel pipe column, an assembled steel truss, a steel plate pavement with anti-slip strips, a protective guard and an adjustable hinged support, the assembled steel ramp is high in free combination degree and convenient to install and detach, the connection part can influence the integrity of the connection degree due to long-time use, the problems of material leakage and the like are caused, the protective guard also has the same problems, and the existing protective guard is low in dustproof capacity and large in pollution to the periphery.
In order to reduce equipment investment, energy consumption and construction period, thereby reducing cost and energy consumption and pollution in the processes of material production, transportation and use, an assembled steel ramp protective guard is needed.
SUMMERY OF THE UTILITY MODEL
To the defect among the prior art, the utility model provides an assembled steel ramp rail guard to reduce equipment input, reduce the energy consumption, reduction of erection time, thereby reduce cost reduces energy consumption and pollution in material production, transportation, the use.
An assembly type steel ramp protective guard comprises a steel ramp, a support column, a support base and a support beam, wherein the support column is arranged between the support base and the support beam, a plurality of assembly holes are formed in the support column, the steel ramp is connected to the assembly holes, bolt holes matched with the assembly holes are formed in two sides of the steel ramp, and the steel ramp is connected with the support column through bolts; the assembling holes are arranged on the surface of the supporting column and are arranged along the axial direction of the supporting column; and the support beam is provided with a spraying device.
The utility model relates to an assembled steel ramp rail guard cooperates fixed steel ramp through setting up the pilot hole on the support column of rail guard, can adjust the angle of steel ramp according to the position of pilot hole, through smoke and dust, hourglass material when the atomizer that sets up on a supporting beam reduces the pay-off, leak the material and can not be raised with the wind through spraying to the pollution abatement. The whole assembly is simple, the equipment investment is reduced, the energy consumption is reduced, and the construction period is shortened.
Preferably, for better angle adjustment of the matched steel ramp, the matched steel ramp is arranged at the turning corner, the support column is a steel column with a circular section, and the assembly holes are circumferentially arranged around the support column.
Optionally, the support column is a steel column with a rectangular cross section, and the assembly hole is formed in the surface of the support column.
Furthermore, the assembled steel ramp protective guard further comprises transverse reinforcing ribs, and the transverse reinforcing ribs are connected between two adjacent supporting columns.
Furthermore, the assembled steel ramp protective guard further comprises a support reinforcing rib, wherein the support reinforcing rib is connected between the support column and the support base, and the support reinforcing rib is connected between the support column and the support beam.
Furthermore, the upper end of the support column is provided with a positioning pin, and the bottom end of the support column is provided with a positioning hole.
Furthermore, the upper part of the supporting base is provided with a positioning pin, and the positioning hole at the bottom end of the supporting column is connected with the positioning pin at the upper part of the supporting base.
Furthermore, a positioning hole is formed in the bottom of the supporting beam, and the positioning pin at the upper end of the supporting column is connected with the positioning hole in the bottom of the supporting beam.
The beneficial effects of the utility model are embodied in:
the utility model relates to an assembled steel ramp protective fence, which reduces the equipment investment, reduces the energy consumption and shortens the construction period, thereby reducing the cost and reducing the energy consumption and pollution in the production, transportation and use processes of materials; the assembly holes are formed in the support columns of the protective guard to be matched with the fixed steel ramp, the angle of the steel ramp can be adjusted according to the positions of the assembly holes, smoke and dust and material leakage during feeding are reduced through the spraying devices arranged on the support beams, and the material leakage cannot be raised along with wind after being sprayed, so that pollution is reduced.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below. Throughout the drawings, like elements or portions are generally identified by like reference numerals. In the drawings, elements or portions are not necessarily drawn to scale.
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
fig. 2 is a schematic structural diagram of an embodiment of the present invention;
fig. 3 is a schematic structural diagram of an embodiment of the support pillar of the present invention.
Detailed Description
Embodiments of the present invention will be described in detail below with reference to the accompanying drawings. The following examples are only for illustrating the technical solutions of the present invention more clearly, and therefore are only examples, and the protection scope of the present invention is not limited thereby.
It is to be noted that unless otherwise specified, technical or scientific terms used herein shall have the ordinary meaning as understood by those skilled in the art to which the present invention belongs.
Examples
As shown in fig. 1-3:
an assembly type steel ramp protective guard comprises a steel ramp 1, a support column 2, a support base 3 and a support beam 4, wherein the support column 2 is installed between the support base 3 and the support beam 4, a plurality of assembly holes 5 are formed in the support column 2, the steel ramp 1 is connected to the assembly holes 5, bolt holes matched with the assembly holes 5 are formed in two sides of the steel ramp 1, and the steel ramp 1 is connected with the support column 2 through bolts; the assembling holes 5 are arranged on the surface of the supporting column 2 and are arranged along the axial direction of the supporting column 2; and a spraying device is arranged on the supporting beam 4.
The utility model relates to an assembled steel ramp rail guard cooperates fixed steel ramp 1 through set up pilot hole 5 on support column 2 of rail guard, can adjust steel ramp 1's angle according to the position of pilot hole 5, through smoke and dust, hourglass material when the atomizer that sets up on a supporting beam 4 reduces the pay-off, leak the material and can not lift up with the wind through spraying to the pollution abatement. The whole assembly is simple, the equipment investment is reduced, the energy consumption is reduced, and the construction period is shortened.
As shown in fig. 3, in the present embodiment, it is preferable that, for better angle adjustment of the steel ramp 1, the support column 2 is a steel column with a circular cross section, and the assembly holes 5 are circumferentially arranged around the support column 2, and are disposed to match the turning corners of the steel ramp 1.
In this embodiment, the supporting column 2 is a steel column with a rectangular cross section, and the assembling hole 5 is arranged on the surface of the supporting column 2.
In the present embodiment, as shown in fig. 1, the assembled steel ramp protective fence further includes a transverse reinforcing rib 6, and the transverse reinforcing rib 6 is connected between two adjacent supporting columns 2.
As shown in fig. 2, in the present embodiment, the assembled steel ramp protective fence further includes a support rib 7, the support rib 7 is connected between the support column 2 and the support base 3, and the support rib 7 is connected between the support column 2 and the support beam 4.
As shown in fig. 2, in this embodiment, the supporting column 2 is provided with a positioning pin at the upper end and a positioning hole at the bottom end.
In this embodiment, the upper portion of the supporting base 3 is provided with a positioning pin, and the positioning hole at the bottom end of the supporting column 2 is connected with the positioning pin at the upper portion of the supporting base 3.
In this embodiment, the bottom of the support beam 4 is provided with a positioning hole, and the positioning pin at the upper end of the support column 2 is connected with the positioning hole at the bottom of the support beam 4.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not substantially depart from the scope of the embodiments of the present invention, and are intended to be covered by the claims and the specification.

Claims (8)

1. An assembly type steel ramp protective guard comprises a steel ramp (1), and is characterized by further comprising a support column (2), a support base (3) and a support beam (4), wherein the support column (2) is installed between the support base (3) and the support beam (4), a plurality of assembly holes (5) are formed in the support column (2), the steel ramp (1) is connected to the assembly holes (5), bolt holes matched with the assembly holes (5) are formed in two sides of the steel ramp (1), and the steel ramp (1) is connected with the support column (2) through bolts; the assembling holes (5) are arranged on the surface of the supporting column (2) and are arranged along the axial direction of the supporting column (2); and the support beam (4) is provided with a spraying device.
2. An assembled steel ramp guard rail according to claim 1 wherein: the support column (2) is a steel column with a circular section, and the assembly holes (5) are circumferentially arranged around the support column (2).
3. An assembled steel ramp guard rail according to claim 1 wherein: the support column (2) is a steel column with a rectangular section, and the assembling holes (5) are formed in the surface of the support column (2).
4. An assembled steel ramp guard rail according to claim 1 wherein: the support column is characterized by further comprising a transverse reinforcing rib (6), wherein the transverse reinforcing rib (6) is connected between every two adjacent support columns (2).
5. An assembled steel ramp guard rail according to claim 1 wherein: still including supporting strengthening rib (7), support strengthening rib (7) and connect between support column (2), support base (3), support strengthening rib (7) and connect between support column (2), a supporting beam (4).
6. An assembled steel ramp guard rail according to claim 1 wherein: the upper end of the support column (2) is provided with a positioning pin, and the bottom end of the support column is provided with a positioning hole.
7. An assembled steel ramp guard rail according to claim 6 wherein: the upper part of the supporting base (3) is provided with a positioning pin, and the positioning hole at the bottom end of the supporting column (2) is connected with the positioning pin at the upper part of the supporting base (3).
8. An assembled steel ramp guard rail according to claim 6 wherein: the bottom of the supporting beam (4) is provided with a positioning hole, and the positioning pin at the upper end of the supporting column (2) is connected with the positioning hole at the bottom of the supporting beam (4).
CN202120205108.XU 2021-01-25 2021-01-25 Assembled steel ramp rail guard Expired - Fee Related CN214576204U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120205108.XU CN214576204U (en) 2021-01-25 2021-01-25 Assembled steel ramp rail guard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120205108.XU CN214576204U (en) 2021-01-25 2021-01-25 Assembled steel ramp rail guard

Publications (1)

Publication Number Publication Date
CN214576204U true CN214576204U (en) 2021-11-02

Family

ID=78371200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120205108.XU Expired - Fee Related CN214576204U (en) 2021-01-25 2021-01-25 Assembled steel ramp rail guard

Country Status (1)

Country Link
CN (1) CN214576204U (en)

Similar Documents

Publication Publication Date Title
CN102689736B (en) Special supporting device of cover head of nuclear island containment vessel made of steel and transportation method
CN111877773A (en) Installation method of large-span annular pressure ring single-layer grid steel roof
CN214576204U (en) Assembled steel ramp rail guard
CN111852169B (en) Method for mounting tower type exhaust funnel
CN110748156B (en) Sliding positioning top supporting structure of large silo and construction method thereof
CN102587676B (en) Method for mounting internal girder structure of nuclear island at nuclear power station
CN208845309U (en) The support platform and wind power generating set of tower
US5305574A (en) Method for erection of absorber towers using jacking system
CN217150619U (en) Annular steel structure mounting structure
CN110439250A (en) A kind of the fixation device and application method of Construction of Steel Structure high-altitude operation platform
CN113404199B (en) Installation method of umbrella-shaped roof structure
CN211522919U (en) Steel case roof beam both sides anticollision barrier installation frock
CN107237515A (en) The support meanss and its application method of circular steel truss structure
JP2579715B2 (en) External tower crane
CN209778099U (en) Lifting and mounting integrated device for steel truss between sections of arc-shaped roof
CN210002826U (en) detachable welding platform for steel column construction
JP3212233B2 (en) Power plant construction method using overhead crane
CN206844680U (en) Steel vestibule installation on ground load transfer device
CN220928911U (en) Erection device
CN218758596U (en) Finalized temporary bearing operation platform
CN220645356U (en) Truss overhead rack bulk auxiliary supporting device
CN219840350U (en) Assembled operating platform for butt joint of steel giant columns
CN108755384A (en) A kind of belt track free cantilever erection steel girder bridge and its construction method
CN218375363U (en) Indoor courtyard material loading platform of unloading
CN215291317U (en) Truss car platform convenient to equipment and economy

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102