CN218758596U - Finalized temporary bearing operation platform - Google Patents

Finalized temporary bearing operation platform Download PDF

Info

Publication number
CN218758596U
CN218758596U CN202222890368.2U CN202222890368U CN218758596U CN 218758596 U CN218758596 U CN 218758596U CN 202222890368 U CN202222890368 U CN 202222890368U CN 218758596 U CN218758596 U CN 218758596U
Authority
CN
China
Prior art keywords
operation platform
supporting
platform according
work platform
temporary load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222890368.2U
Other languages
Chinese (zh)
Inventor
郑德福
朱朝阳
寇明明
赵东宇
张志超
汪梦影
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Aobo Xingye Steel Structure Co ltd
Original Assignee
Beijing Aobo Xingye Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Aobo Xingye Steel Structure Co ltd filed Critical Beijing Aobo Xingye Steel Structure Co ltd
Priority to CN202222890368.2U priority Critical patent/CN218758596U/en
Application granted granted Critical
Publication of CN218758596U publication Critical patent/CN218758596U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to a temporary bearing operation platform of regularization relates to the field of construction, it includes four support columns that are used for supporting building elements, a support unit for stabilizing the support column and set up in the operation platform at support column top, the support column sets up in subaerial, the support unit includes a plurality of fixed mounting in the tie-beam between the adjacent support column, operation platform includes installation frame and a plurality of backup pad, installation frame fixed mounting is on the support column, a plurality of backup pad fixed mounting are on the installation frame. This application has and can build the platform that supplies the workman to stand the operation more simply fast, improves the effect of efficiency of construction.

Description

Finalized temporary bearing operation platform
Technical Field
The application relates to the field of building construction, in particular to a regularization temporary bearing operation platform.
Background
In the construction of cities in China, the application of space large-span structures such as bridges, large-span steel trusses and high-altitude overhanging buildings is common. These large-span buildings are usually constructed by assembling a plurality of building components, and require workers to work high above the ground, so that temporary high-altitude operation platforms need to be constructed
At present, in the construction process of the bridge and the building, a support column is generally required to be built to support the building component in the high air, then a scaffold is built around the support column, and a worker stands on the scaffold to construct the building component.
In view of the above-mentioned related art, the inventor thinks that it is more tedious to build a scaffold for workers to stand around a support column, which results in lower construction efficiency and longer construction period.
SUMMERY OF THE UTILITY MODEL
In order to build the platform that supplies the workman to stand the operation more simply fast, improve the efficiency of construction, this application provides a temporary bearing operation platform of regularization.
The application provides a pair of interim bearing operation platform of regularization adopts following technical scheme:
the utility model provides a temporary bearing operation platform of regularization, includes four support columns that are used for supporting building element, is used for stabilizing the support unit of support column and set up in the operation platform at support column top, the support column sets up on subaerial, the support unit includes a plurality of fixed mounting adjacent the tie-beam between the support column, operation platform includes installation frame and a plurality of backup pad, installation frame fixed mounting in on the support column, it is a plurality of backup pad fixed mounting in on the installation frame.
Through adopting above-mentioned technical scheme, when needing to the operation of large-span building element, earlier with four support post fixed mounting on subaerial, with bolt fixed mounting for the tie-beam on the lateral wall of two adjacent support posts, constitute the support unit, make the support post more stable, later with the installation frame of assembling fix the top at the support post to lay a plurality of backup pads on the installation frame, form the operation platform that supplies the workman to stand, easy operation is swift, workman's efficiency of construction has been improved.
Optionally, the bottom fixedly connected with mounting panel of heel post, the mounting panel is surely connected in ground through the anchoring of chemical crab-bolt.
Through adopting above-mentioned technical scheme, the anchor power of chemical crab-bolt is extremely strong, can firmly install the mounting panel in subaerial, and in addition, the chemical crab-bolt installation is swift, and the operating time is saved in the operation of being convenient for.
Optionally, the bearing column includes a plurality of standard sections, and adjacent standard sections are fixedly connected through flanges.
Through adopting above-mentioned technical scheme, on the one hand, the standard festival is convenient for transport, with a plurality of standard festival transport to job site reuse flange with its built-up mounting can, on the other hand, the idle of the reducible material of standard festival, also be convenient for change it if a certain standard festival damages.
Optionally, a ladder for workers to climb is arranged on the outer wall of the standard section, and a barrier fence is arranged on one side, away from the standard section, of the ladder.
Through adopting above-mentioned technical scheme, the back is accomplished in the installation of standard festival, and the workman can follow the cat ladder and climb to operation platform on, encloses the fender and blocks certain strong point for the workman, reduces the possibility that the workman is in the climbing in-process emergence accident.
Optionally, the mounting frame may be assembled by a plurality of the connecting beams.
Through adopting above-mentioned technical scheme, the workman use the tie-beam equipment installation frame can, need not to prepare in addition and be used for making the material of installation frame, make operation platform build more convenient.
Optionally, a guard rail is fixedly mounted at the edge of the operating platform.
By adopting the technical scheme, the height of the operating platform is usually about twenty meters, so that the construction risk of workers at high positions is extremely high, and the probability of falling of the workers from the operating platform can be reduced by the protective guard.
Optionally, the coupling beam includes fixed part and regulating part, the groove that slides has been seted up to the one end of fixed part, regulating part sliding connection in slide the inslot.
By adopting the technical scheme, because the distance between the supporting columns can not be determined, the length of the connecting beam is controlled by the movable adjusting part, when the distance between the supporting columns is increased, the adjusting part is moved towards the direction far away from the bottom of the sliding groove, the length of the connecting beam is increased, and therefore the applicability of the connecting beam is improved.
Optionally, the adjusting hole has been seted up on the relative lateral wall in groove that slides, the regulating part is close to fastening bolt is worn to be equipped with in one side of groove bottom that slides, fastening bolt sliding connection in the adjusting hole, fastening bolt include connecting portion and with connecting portion fixed connection's joint portion, joint portion joint in the adjusting hole is kept away from one side of regulating part, connecting portion are kept away from one side threaded connection of joint portion has fastening nut.
Through adopting above-mentioned technical scheme, when the length of tie-beam needs to be adjusted, will adjust the portion and remove to the direction of keeping away from the tank bottom that slides, fastening bolt removes along the regulation hole simultaneously, and after the length adjustment of tie-beam is suitable, screws up fastening bolt, makes joint portion closely support in the regulation hole, later screws up fastening nut, makes it support tightly in the regulation hole of opposite side, fixes the tie-beam at suitable length.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when a large-span building component needs to be operated, the four supporting columns are fixedly arranged on the ground, the connecting beam is fixedly arranged on the side walls of the two adjacent supporting columns through bolts to form a supporting unit, so that the supporting columns are more stable, then the assembled mounting frame is fixed at the tops of the supporting columns, and the plurality of supporting plates are laid on the mounting frame to form an operating platform for workers to stand, so that the operation is simple and rapid, and the construction efficiency of the workers is improved;
2. on one hand, the standard sections are convenient to transport, and a plurality of standard sections are transported to a construction site and then are assembled and installed by flanges, on the other hand, the standard sections can reduce the idle of materials, and can be replaced conveniently if one standard section is damaged;
3. because the distance between the supporting columns cannot be determined, the length of the connecting beam is controlled by moving the adjusting part, when the distance between the supporting columns is increased, the adjusting part is moved to the direction far away from the bottom of the sliding groove, the length of the connecting beam is increased, and therefore the applicability of the connecting beam is improved.
Drawings
Fig. 1 is a schematic structural view of a shaped temporary load-bearing operation platform according to embodiment 1 of the present application;
fig. 2 is a schematic structural view of a shaped temporary load-bearing operation platform according to embodiment 2 of the present application;
fig. 3 is an enlarged view of a portion a in fig. 2.
Description of reference numerals: 1. a support column; 11. mounting a plate; 12. a standard section; 13. climbing a ladder; 131. a fence; 2. a support unit; 21. a connecting beam; 211. a fixed part; 2111. a sliding groove; 2112. an adjustment hole; 212. an adjustment section; 3. an operating platform; 31. a mounting frame; 32. a support plate; 33. protecting a fence; 4. fastening a bolt; 41. a connecting portion; 42. a clamping part; 5. and (5) tightening the nut.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
Example 1:
referring to fig. 1, the regularization temporary bearing operation platform disclosed in the embodiment of the present application includes four support columns 1 for supporting building components, a support unit 2 fixedly mounted on the support columns 1 and an operation platform 3 arranged at the tops of the four support columns 1, wherein a mounting plate 11 is welded at the bottom of each support column 1, and the mounting plate 11 can be fixedly fixed on the ground due to the large anchoring force of the chemical anchor bolts, and the chemical anchor bolts are convenient to install and save construction time, so that the mounting plate 11 is fixedly mounted on the ground through a plurality of chemical anchor bolts.
For the convenience of transportation of construction material, support column 1 includes a plurality of standard festival 12, the size homogeneous phase of standard festival 12 is the same, in this embodiment, standard festival 12 sets up to the cylinder, after transporting standard festival 12 to the job site, a plurality of standard festival 12 are along vertical direction fixed mounting, and through flange fixed connection between the adjacent standard festival 12, because the flange is comparatively common connecting piece, and operate fairly simply during the use, consequently when the flange is damaged, it is comparatively easy to change. In addition, still there is cat ladder 13 on the outer wall of standard festival 12 through bolt fixed mounting, assemble a plurality of standard festival 12 and accomplish the back, workman's accessible cat ladder 13 climbs to operation platform 3, in order to improve cat ladder 13's security, one side of keeping away from standard festival 12 at cat ladder 13 has still welded annular fence 131, block the object that drops from the top, reduce the possibility that the workman is hit by the weight thing on the way in the climbing, and simultaneously, if workman climbs on the way and need have a rest, can rely on fence 131 to have a rest for a moment.
The supporting unit 2 comprises four connecting beams 21, the cross section of each connecting beam 21 can be square or round, the four connecting beams 21 are fixedly mounted between the adjacent supporting columns 1 along the horizontal direction through bolts, the four connecting beams 21 are located on the same plane, and the supporting unit 2 is provided with a plurality of connecting beams along the vertical direction so as to improve the stability of the supporting columns 1.
The operation platform 3 comprises a mounting frame 31 and a plurality of support plates 32 fixedly mounted on the mounting frame 31 through bolts, the mounting frame 31 is assembled by connecting a plurality of connecting beams 21 end to end, and the adjacent connecting beams 21 can be fixedly mounted by welding or using connecting pieces. The installation frame 31 is assembled by using the connecting beams 21, a worker does not need to prepare materials for manufacturing the installation frame 31 additionally, idle materials are reduced, and the operation platform 3 is more convenient and efficient to build. More preferably, in order to improve safety of workers during construction, a guard rail 33 is provided at an edge of the operation platform 3 in a vertical direction, and the guard rail 33 is provided with a passage opening through which a worker passes, and the passage opening is provided above the ladder 13.
The implementation principle of the finalized temporary bearing operation platform in the embodiment of the application is as follows: when constructing or repairing a large-span building, a plurality of standard knots 12 are fixedly installed according to the height of the building to assemble four supporting columns 1, an installation plate 11 welded at the bottom of the supporting column 1 is fixed on the ground, then a plurality of connecting beams 21 are installed between the adjacent supporting columns 1, meanwhile, a supporting frame can be manufactured by using a plurality of connecting beams 21 according to the distance between the supporting columns 1, the supporting frame is installed at the top of the four supporting columns 1, then a supporting plate 32 and a protective guard 33 are installed on the supporting frame, and a worker can reach the operation platform 3 through the ladder 13 to operate the building. The process of building the operation platform 3 is simple and convenient, and the construction efficiency of workers can be effectively improved.
Example 2:
referring to fig. 2 and fig. 3, the difference from embodiment 1 is that the connection beam 21 includes a fixing portion 211 and an adjusting portion 212, a sliding groove 2111 is formed at one end of the fixing portion 211, the adjusting portion 212 is slidably connected in the sliding groove 2111, long adjustment holes 2112 are formed in the side walls of two opposite sides of the sliding groove 2111 along the horizontal direction, a fastening bolt 4 is penetrated through one side of the adjusting portion 212 close to the bottom of the sliding groove 2111, the fastening bolt 4 includes a connecting portion 41 and a clamping portion 42 integrally formed with the connecting portion 41, the width of the clamping portion 42 is greater than the width of the adjusting hole 2112, the connecting portion 41 is slidably connected in the adjusting hole 2112, the clamping portion 42 is clamped at one side of the adjusting hole 2112 away from the adjusting portion 212, a fastening nut 5 is threadedly connected to one side of the connecting portion 41 away from the clamping portion 42, and likewise, the width of the fastening nut 5 is also greater than the width of the adjusting hole 2112.
The implementation principle of the finalized temporary bearing operation platform in the embodiment of the application is as follows: after the supporting columns 1 are fixedly installed on the ground, if the distance between the adjacent supporting columns 1 is too long, the adjusting portion 212 can be moved in the direction away from the bottom of the sliding groove 2111, so that the connecting beam 21 is adjusted to be in a proper length, then the fastening nut 5 is screwed down, the adjusting portion 212 is tightly attached to the side wall of the sliding groove 2111 and cannot be moved, and then the connecting beam 21 is fixedly installed between the adjacent supporting columns 1, so that the applicability of the connecting beam 21 is improved. Likewise, the support frame made of the connecting beams 21 can also be adjusted in size in the same way.
The above are preferred embodiments of the present application, and the scope of protection of the present application is not limited thereto, so: equivalent changes in structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a interim bearing operation platform of regularization which characterized in that: including four supporting columns (1) that are used for supporting building element, be used for stabilizing supporting unit (2) of supporting column (1) and set up in operation platform (3) at supporting column (1) top, supporting column (1) sets up on subaerial, supporting unit (2) include a plurality of fixed mounting adjacent connecting beam (21) between supporting column (1), operation platform (3) include installation frame (31) and a plurality of backup pad (32), installation frame (31) fixed mounting in on supporting column (1), it is a plurality of backup pad (32) fixed mounting in on installation frame (31).
2. The modular temporary load-bearing work platform according to claim 1, characterized in that: the bottom fixedly connected with mounting panel (11) of support column, mounting panel (11) are surely connected in ground through the chemical crab-bolt anchor.
3. A shaped temporary load-bearing work platform according to claim 2, characterized in that: the supporting column comprises a plurality of standard joints (12), and adjacent standard joints (12) are fixedly connected through flanges.
4. A shaped temporary load-bearing work platform according to claim 3, characterized in that: be provided with on the outer wall of standard festival (12) and supply cat ladder (13) that the workman climbed, cat ladder (13) are kept away from one side of standard festival (12) is provided with fence (131).
5. The modular temporary load-bearing work platform according to claim 1, characterized in that: the mounting frame (31) can be assembled by a plurality of connecting beams (21).
6. A shaped temporary load-bearing work platform according to claim 1, wherein: and a protective guard (33) is fixedly arranged at the edge of the operating platform (3).
7. A shaped temporary load-bearing work platform according to claim 1, wherein: the connecting beam (21) comprises a fixing portion (211) and an adjusting portion (212), a sliding groove (2111) is formed in one end of the fixing portion (211), and the adjusting portion (212) is connected to the sliding groove (2111) in a sliding mode.
8. The modular temporary load-bearing work platform according to claim 7, characterized in that: adjustment hole (2112) have been seted up on the relative lateral wall in groove (2111) slides, adjusting part (212) are close to fastening bolt (4) are worn to be equipped with by one side of groove (2111) bottom slides, fastening bolt (4) sliding connection in adjusting hole (2112), fastening bolt (4) including connecting portion (41) and with connecting portion (41) fixed connection's joint portion (42), joint portion (42) joint in adjusting hole (2112) is kept away from one side of adjusting part (212), connecting portion (41) are kept away from one side threaded connection of joint portion (42) has fastening nut (5).
CN202222890368.2U 2022-10-31 2022-10-31 Finalized temporary bearing operation platform Active CN218758596U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222890368.2U CN218758596U (en) 2022-10-31 2022-10-31 Finalized temporary bearing operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222890368.2U CN218758596U (en) 2022-10-31 2022-10-31 Finalized temporary bearing operation platform

Publications (1)

Publication Number Publication Date
CN218758596U true CN218758596U (en) 2023-03-28

Family

ID=85644577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222890368.2U Active CN218758596U (en) 2022-10-31 2022-10-31 Finalized temporary bearing operation platform

Country Status (1)

Country Link
CN (1) CN218758596U (en)

Similar Documents

Publication Publication Date Title
EP2539521B1 (en) Scaffolding
CN107090975B (en) Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss
US20040020138A1 (en) Modular platform system
CN114475963A (en) Installation device and installation method for enclosure system of liquid dome area of LNG ship
US20080250579A1 (en) Modular Support Catch System
CN218758596U (en) Finalized temporary bearing operation platform
EP2698486B1 (en) Vertical support structure for roofing safety fence system
CN202401775U (en) Safety protection platform for elevator shaft
CN115726558A (en) Assembled construction platform
EP1206611B1 (en) Scaffolding
CN215212187U (en) Civil engineering construction support frame
CN212201400U (en) Assembled steel structure external hanging type protective frame
CN114725859A (en) Tunnel cable installing support
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN112302320A (en) Building stand column modularized assembly type scaffold module, system and construction method
CN210622816U (en) Movable adjustable novel grouting template
CN112942779A (en) Fine-adjustable cantilever formwork system device and construction method using same
CN218893957U (en) Temporary supporting and fixing device for butt joint of steel beams
CN111894252A (en) Be applied to steel trestle behind dam of power station
CN217323154U (en) Pedestrian passageway for climbing lower structure of frame to tower crane
CN213174700U (en) Building block type splicing operation frame
CN214462302U (en) Building stand modular assembly type scaffold module and system
US11982059B1 (en) Bridge overhang shielding and formwork
CN211817853U (en) A operation platform for steel construction engineering construction
CN218161569U (en) Tunnel cable installing support cross arm mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant