CN214573766U - Interception equipment for water conservancy flood control dam - Google Patents

Interception equipment for water conservancy flood control dam Download PDF

Info

Publication number
CN214573766U
CN214573766U CN202022046058.3U CN202022046058U CN214573766U CN 214573766 U CN214573766 U CN 214573766U CN 202022046058 U CN202022046058 U CN 202022046058U CN 214573766 U CN214573766 U CN 214573766U
Authority
CN
China
Prior art keywords
water level
flood control
motor
interception
fixed column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022046058.3U
Other languages
Chinese (zh)
Inventor
税勇
赵兴林
郑燕
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lixian Xinghe Electric Power Co ltd
Original Assignee
Lixian Xinghe Electric Power Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lixian Xinghe Electric Power Co ltd filed Critical Lixian Xinghe Electric Power Co ltd
Priority to CN202022046058.3U priority Critical patent/CN214573766U/en
Application granted granted Critical
Publication of CN214573766U publication Critical patent/CN214573766U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Barrages (AREA)

Abstract

The utility model discloses a water conservancy flood control is interception equipment for dam, including the fixed column, the interception wall is installed to one side of fixed column, and the top of fixed column installs the motor, the support arm is installed at the top of interception wall, and one side of interception wall installs hydraulic telescoping rod, the water level valve is installed at the top of support arm, and the top of support arm installs main valve door. This interception equipment for water conservancy flood control dam passes through the fixed column and the bottom of interception wall installs bayonet base, and the fixed column, form fixed knot through the welding between interception wall and the bayonet base and construct, can be very dark insert in the underground soil, make the intercepting device firm, the chain is installed to the one end of motor, and the one end of chain installs down the water level baffle, and constitute swing joint through the chain between motor and the lower water level baffle, the baffle of opening through the power of motor is more quick carries out the drainage, a large amount of labours and time have been saved.

Description

Interception equipment for water conservancy flood control dam
Technical Field
The utility model belongs to the technical field of hydraulic engineering interception equipment, concretely relates to interception equipment for water conservancy flood control dam.
Background
Water conservancy refers to the development of hydraulic resources or the prevention of flood disasters, and is also called hydraulic engineering, the hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in the nature to achieve the purpose of benefiting, the hydraulic engineering needs to build different types of hydraulic buildings such as dams, dikes, spillways, sluice gates, water inlets, channels and the like to achieve the purpose, the flood control dam is one of the hydraulic engineering built for intercepting flood to prevent the loss of water and soil at the downstream and ecological damage, and in order to facilitate the control of water quantity by the flood control dam, intercepting equipment needs to be built on the flood control dam to play the roles of intercepting and releasing.
The existing intercepting equipment has the defect of single function, can not well control releasing and intercepting, wastes time and labor, is relatively poor in stability and high in danger, and therefore, the intercepting equipment for the water conservancy flood control dam, which has various functions, is convenient to open and is simple to operate, is urgently needed to be researched and developed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water conservancy is interception equipment for flood control dam to there is the shortcoming of function singleness in solving the present interception equipment that provides in the above-mentioned background art, the control that can not be fine is released and is dammed, wastes time and energy, and stability is relatively poor moreover, dangerous high problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a water conservancy is interception equipment for flood control dam, includes the fixed column, and the interception wall is installed to one side of fixed column, and the top of fixed column installs motor (Y280M-2), and the support arm is installed at the top of interception wall, and one side of interception wall installs hydraulic telescoping rod (DYTZ450-/110), and the top of support arm is installed the upper water level valve, and the top of support arm installs main valve.
Preferably, the bottom ends of the fixing column and the interception wall are provided with plug-in bases, a fixing structure is formed between the fixing column and the plug-in bases through welding, and a fixing structure is formed between the interception wall and the plug-in bases through welding.
Preferably, one end of the motor (Y280M-2) is provided with a chain, one end of the chain is provided with a lower water level baffle, and the motor and the lower water level baffle are movably connected through the chain.
Preferably, the bottom of the main valve is provided with a stressed screw, the bottom of the stressed screw is provided with a main flow baffle, and a fixed structure is arranged between the main valve and the stressed screw.
Preferably, the bottom of the upper water level valve is provided with an upper water level rotating shaft, the bottom of the upper water level rotating shaft is provided with an upper water level baffle, and the upper water level rotating shaft is fixedly connected with the upper water level valve.
Preferably, a fixing screw is installed on one side of the hydraulic telescopic rod, and a fixing structure is formed between the hydraulic telescopic rod and the ground through the fixing screw.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) this interception equipment for water conservancy flood control dam passes through the fixed column and the bottom of interception wall installs bayonet base, and the fixed column, form fixed knot through the welding between interception wall and the bayonet base and construct, can be very dark insert in the underground soil, make the intercepting device firm, the chain is installed to the one end of motor, and the one end of chain installs down the water level baffle, and constitute swing joint through the chain between motor and the lower water level baffle, the baffle of opening through the power of motor is more quick carries out the drainage, a large amount of labours and time have been saved.
(2) The interception equipment for the water conservancy flood control dam is characterized in that a stressed screw is arranged at the bottom of a main valve, a main flow baffle is arranged at the bottom of the stressed screw, a fixed structure is arranged between the main valve and the stressed screw, the main flow baffle is arranged to accelerate water discharging speed, an upper water level rotating shaft is arranged at the bottom of the upper water level valve, an upper water level baffle is arranged at the bottom of the upper water level rotating shaft, the upper water level rotating shaft is fixedly connected with the upper water level valve, upper-layer floating objects can be discharged and collected by opening the upper water level baffle, gears are arranged on the upper water level valve and the main valve, a chain can be converted on the gears, the upper water level valve or the main valve is opened through the work of a motor, a large amount of manpower and time are saved by opening the valves through the motor, a plurality of channels can better perform water discharging, and a fixed structure is formed between a hydraulic telescopic rod and the ground through the fixed screw, the distance and the angle between the hydraulic telescopic rod and the interception wall can be adjusted in a telescopic mode, the hydraulic telescopic rod and the ground are fixed through the fixing screw rod, the stability of the hydraulic telescopic rod is greatly improved, and flood is intercepted powerfully.
Drawings
Fig. 1 is a schematic front view of the present invention;
fig. 2 is a left side view structure diagram of the present invention;
fig. 3 is a schematic top view of the present invention.
In the figure: 1. a plug-in base; 2. fixing a column; 3. a barrier wall; 4. a chain; 5. a support arm; 6. an electric motor; 7. a stressed screw; 8. a main valve; 9. an upper water level valve; 10. an upper water level rotating shaft; 11. an upper water level baffle; 12. a main flow baffle; 13. fixing the screw rod; 14. a hydraulic telescopic rod; 15. a lower water level baffle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a water conservancy is interception equipment for flood control dam, including bayonet base 1, fixed column 2, interception wall 3, chain 4, support arm 5, motor 6, atress screw rod 7, main valve door 8, go up water level valve 9, go up water level pivot 10, go up water level baffle 11, mainstream baffle 12, fixing screw 13, hydraulic telescoping rod 14 and lower water level baffle 15, interception wall 3 is installed to one side of fixed column 2, and motor 6 is installed at the top of fixed column 2, support arm 5 is installed at the top of interception wall 3, and hydraulic telescoping rod 14 is installed to one side of interception wall 3, go up water level valve 9 is installed at the top of support arm 5, and main valve door 8 is installed at the top of support arm 5.
In this embodiment, the bottom ends of the fixed column 2 and the intercepting wall 3 are provided with the inserted base 1, the fixed column 2 and the inserted base 1 are welded to form a fixed structure, the intercepting wall 3 and the inserted base 1 are welded to form a fixed structure, and the intercepting wall can be deeply inserted into underground soil to stabilize the intercepting device.
In this embodiment, chain 4 is installed to the one end of motor 6, and lower water level baffle 15 is installed to the one end of chain 4, constitutes swing joint through chain 4 between motor 6 and the lower water level baffle 15, opens the baffle through motor 6's power is faster and drains water, has saved a large amount of labours and time.
In this embodiment, the bottom of the main valve 8 is provided with the stressed screw 7, the bottom of the stressed screw 7 is provided with the main flow baffle 12, a fixed structure is arranged between the main valve 8 and the stressed screw 7, and the main flow baffle 12 is arranged to accelerate the water discharge speed.
In this embodiment, upper water level pivot 10 is installed to the bottom of upper water level valve 9, and upper water level baffle 11 is installed to the bottom of upper water level pivot 10, and be fixed connection between upper water level pivot 10 and upper water level valve 9, open upper water level baffle 11 and can emit upper floater and collect, install the gear on upper water level valve 9 and the main valve 8, and chain 4 convertible is on the gear, open upper water level valve 9 or main valve 8 through motor 6 work, open the valve through motor 6 and practiced thrift a large amount of manpowers and time, a plurality of passageways can be better the drainage.
In this embodiment, fixing screw 13 is installed to one side of hydraulic telescoping rod 14, forms fixed knot through fixing screw 13 between hydraulic telescoping rod 14 and the ground and constructs, and hydraulic telescoping rod 14 can stretch out and draw back and adjust and intercept distance and angle between wall 3, fixes through fixing screw 13 between hydraulic telescoping rod 14 and the ground, and to a great extent has improved the stability of itself, powerful interception flood.
The working principle is as follows: the interception equipment for the water conservancy flood control dam is used in the process of using, firstly, the plug-in base 1 is inserted into the underground soil, the length and the angle of the hydraulic telescopic rod 14 are adjusted to well support the interception wall 3, the hydraulic telescopic rod 14 is well fixed with the ground through the fixing screw rod 13 after the adjustment is finished, the stability of the interception wall 3 is improved, when flood comes, can intercept the water level, when the water level is lower, the chain 4 can be sleeved on the gear of the lower water level baffle 15, the lower water level baffle 15 is opened by the operation of the motor 6 to discharge water, and when the water level is high, the chain 4 can be sleeved on the gear of the upper water level valve 9 or the main valve 8, the upper water level baffle 11 or the main flow baffle 12 is opened through the operation of the motor 6 for water drainage, opening the valve by means of the motor 6 saves a lot of manpower and time and the multiple channels allow better drainage.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a water conservancy is interception equipment for flood control dam, includes fixed column (2), its characterized in that: one side of the fixed column (2) is provided with a blocking wall (3), the top of the fixed column (2) is provided with a motor (6), the top of the blocking wall (3) is provided with a support arm (5), one side of the blocking wall (3) is provided with a hydraulic telescopic rod (14), the top of the support arm (5) is provided with an upper water level valve (9), and the top of the support arm (5) is provided with a main valve (8).
2. The intercepting equipment for the water conservancy flood control dam according to claim 1, wherein: the bottom ends of the fixing column (2) and the intercepting wall (3) are provided with the plug-in base (1), a fixing structure is formed between the fixing column (2) and the plug-in base (1) through welding, and a fixing structure is formed between the intercepting wall (3) and the plug-in base (1) through welding.
3. The intercepting equipment for the water conservancy flood control dam according to claim 1, wherein: chain (4) are installed to the one end of motor (6), and lower water level baffle (15) are installed to the one end of chain (4) to constitute swing joint through chain (4) between motor (6) and the lower water level baffle (15).
4. The intercepting equipment for the water conservancy flood control dam according to claim 1, wherein: the bottom of main valve (8) is installed atress screw rod (7), and main flow baffle (12) are installed to the bottom of atress screw rod (7), be fixed knot structure between main valve (8) and atress screw rod (7).
5. The intercepting equipment for the water conservancy flood control dam according to claim 1, wherein: go up water level pivot (10) are installed to the bottom of water level valve (9), and go up water level baffle (11) are installed to the bottom of water level pivot (10), go up water level pivot (10) and go up water level valve (9) between be fixed connection.
6. The intercepting equipment for the water conservancy flood control dam according to claim 1, wherein: and a fixing screw rod (13) is installed on one side of the hydraulic telescopic rod (14), and a fixing structure is formed between the hydraulic telescopic rod (14) and the ground through the fixing screw rod (13).
CN202022046058.3U 2020-09-17 2020-09-17 Interception equipment for water conservancy flood control dam Expired - Fee Related CN214573766U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022046058.3U CN214573766U (en) 2020-09-17 2020-09-17 Interception equipment for water conservancy flood control dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022046058.3U CN214573766U (en) 2020-09-17 2020-09-17 Interception equipment for water conservancy flood control dam

Publications (1)

Publication Number Publication Date
CN214573766U true CN214573766U (en) 2021-11-02

Family

ID=78347749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022046058.3U Expired - Fee Related CN214573766U (en) 2020-09-17 2020-09-17 Interception equipment for water conservancy flood control dam

Country Status (1)

Country Link
CN (1) CN214573766U (en)

Similar Documents

Publication Publication Date Title
CN211285506U (en) Environmental protection irrigation canals and ditches debris retention device
CN207376562U (en) A kind of key water control project that can filter silt
CN214573766U (en) Interception equipment for water conservancy flood control dam
CN213173761U (en) Slope surface collapse prevention device for earthwork operation
CN110080324A (en) A kind of dual anti-mud disperser based on movable shield and high pressure water curtain
CN109056879A (en) A kind of riverway sludge cleaning plant and construction method
CN211340936U (en) Hydraulic engineering irrigation channel rubbish cleaning device
CN201850643U (en) Closure deep well self-siphon hydraulic dredging device
CN212772237U (en) Over-and-under type water sluicegate for hydraulic engineering
CN211772960U (en) Culvert structure for hydraulic engineering
CN203668879U (en) Automatic siltation promotion device for mud flat
CN207959133U (en) A kind of pressure dam with dirt eliminating function
CN209068032U (en) A kind of hydraulic engineering water pipeline
CN205530177U (en) A block dirty structure of floating for connecting high slope and water inlet
CN208348662U (en) A kind of gas pipeline, which passes through aboveground river, prevents the device of piping
CN210827353U (en) Dam structure for hydraulic engineering
CN207160129U (en) A kind of pipeline for hydraulic engineering
CN110195467A (en) A kind of gardens irrigation canals and ditches anti-clogging Accrete clearing device
CN110485378A (en) A kind of stage type urban river water retains system
CN215669347U (en) Gate for water conservancy channel
CN219508780U (en) Anti-blocking pipeline of drainage pump station
CN109339139A (en) Deep-well sludger
CN214363260U (en) A guiding device for hydraulic engineering
CN210151712U (en) Composite pile type structure suitable for coastal deep dredger fill foundation treatment
CN212000944U (en) Submerged bottom type maintenance gate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102

CF01 Termination of patent right due to non-payment of annual fee