CN214548223U - Engineering cost progress management device - Google Patents
Engineering cost progress management device Download PDFInfo
- Publication number
- CN214548223U CN214548223U CN202120265437.3U CN202120265437U CN214548223U CN 214548223 U CN214548223 U CN 214548223U CN 202120265437 U CN202120265437 U CN 202120265437U CN 214548223 U CN214548223 U CN 214548223U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- frame
- progress management
- spacing
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims abstract description 14
- 238000001125 extrusion Methods 0.000 claims description 14
- 230000006835 compression Effects 0.000 claims description 9
- 238000007906 compression Methods 0.000 claims description 9
- 238000009434 installation Methods 0.000 abstract description 12
- 238000000034 method Methods 0.000 abstract description 7
- 238000007726 management method Methods 0.000 description 17
- 230000003139 buffering effect Effects 0.000 description 6
- 238000005381 potential energy Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Assembled Shelves (AREA)
Abstract
The utility model discloses an engineering cost progress management device, including the locker, the bottom fixedly connected with universal wheel of locker, the both sides fixedly connected with installation piece of locker, the clearance fixedly connected with gag lever post of installation piece, the utility model relates to an engineering cost technical field. This engineering cost progress management device, reached whole removal of being convenient for, set up the locker, the staff of being convenient for places a large amount of engineering cost files, make things convenient for the staff to carry, in time show, the slider slides with the gag lever post, make things convenient for the staff to adjust the height of installing frame, and utilize stop device to fix the slider, and then fix the installing frame, make things convenient for the staff to install the show board, show cost data, carry out construction progress management, set up buffer, make the show board at the in-process of installation, certain shock-absorbing capacity has, improve the protection to the show board, satisfy user demand's purpose.
Description
Technical Field
The utility model relates to an engineering cost field, more specifically say, relate to an engineering cost progress management device.
Background
The work process of forecasting, planning, controlling, accounting, analyzing and evaluating the engineering cost by comprehensively using knowledge and skills in the aspects of management, economics, engineering technology and the like is called engineering cost management. In the construction process of the building, workers need to use the engineering cost progress management device to manage and supervise the construction progress. At present, current engineering cost progress management device, the single structure is not convenient for the staff and deposits a large amount of engineering cost files, and is not convenient for the staff and installs and accomodate the show board, can't satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
Aiming at the problems that the prior engineering cost progress management device in the prior art has a single structure, is inconvenient for workers to store a large amount of engineering cost files, is inconvenient for workers to install and store the display board and cannot meet the use requirement, the utility model aims to provide an engineering cost progress management device which can realize that a storage cabinet, a universal wheel, an installation block, a limiting rod, a sliding block, a limiting device, a support frame, a connecting frame, an installation frame, a display board, a buffer device, a baffle and a handle form a whole body, the whole body is convenient to move, a storage cabinet is arranged, the workers can conveniently place a large amount of engineering cost files, the workers can conveniently carry and display in time, the sliding block and the limiting rod slide, the workers can conveniently adjust the height of the installation frame, the sliding block is fixed by utilizing the limiting device, and then the installation frame is fixed, make things convenient for the staff to install the show board, show the cost data, carry out construction progress management, set up buffer for the show board has certain shock-absorbing capacity at the in-process of installation, improves the protection to the show board, and wholly is convenient for accomodate, makes things convenient for the staff to operate, satisfies the user demand.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
A project cost progress management device comprises a storage cabinet, universal wheels are fixedly connected with the bottom of the storage cabinet, the two sides of the storage cabinet are fixedly connected with mounting blocks, the gaps of the mounting blocks are fixedly connected with limiting rods, the limiting rod is connected with a sliding block in a sliding way, the bottom of the sliding block is fixedly connected with a limiting device, the limiting device is clamped with the limiting rod, the top of the sliding block is fixedly connected with a supporting frame, the top of the supporting frame is fixedly connected with a connecting frame, the gap of the connecting frame is fixedly connected with a mounting frame, the top of the mounting frame is provided with a rectangular through hole, the through hole of the mounting frame is connected with a display plate in a sliding way, the top of the storage cabinet is fixedly connected with a buffer device, the display board corresponds to the buffer device, the top of the display board is fixedly connected with a baffle, and the top of the baffle is fixedly connected with a handle.
Preferably, a placing frame is arranged above the storage cabinet, and the display board corresponds to the placing frame.
Preferably, stop device includes the fixed block, fixed block and slider fixed connection, fixed block sliding connection has the pull rod, the tip fixedly connected with arm-tie of pull rod, the fixed surface of arm-tie is connected with the pull ring, the one end fixedly connected with extrusion piece of arm-tie is kept away from to the pull rod, the lateral wall fixedly connected with supporting spring of extrusion piece, supporting spring cup joints with the pull rod, the extrusion piece is connected with the fixed block through supporting spring, the fixed surface of extrusion piece is connected with the fixture block, the surface of gag lever post is provided with the draw-in groove, fixture block and draw-in groove joint.
Preferably, buffer includes the underframe, underframe and locker fixed connection, the spacing frame of inner wall bottom fixedly connected with of underframe, the inner wall fixedly connected with compression spring of spacing frame, spacing frame passes through compression spring fixedly connected with supporting shoe, the top fixedly connected with bracing piece of supporting shoe, bracing piece and spacing frame sliding connection, the top fixedly connected with backup pad of bracing piece, the backup pad corresponds with the bottom of show board.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of: the storage cabinet, the universal wheels, the mounting block, the limiting rod, the sliding block, the limiting device, the supporting frame, the connecting frame, the mounting frame, the display board, the buffer device, the baffle and the handle form a whole body, the whole body is convenient to move, the storage cabinet is arranged, a large number of engineering cost files are convenient to place for workers, the workers can conveniently carry the files and display in time, the sliding block and the limiting rod slide, the workers can conveniently adjust the height of the mounting frame, the sliding block is fixed by the limiting device and further fixed by the limiting device, the workers can conveniently mount the display board, the display cost data is displayed, construction progress management is carried out, the buffer device is arranged, the display board has certain buffer performance in the mounting process, the protection of the display board is improved, the whole body is convenient to store, the workers can conveniently operate, the placing frame is arranged, and the display board can be conveniently stored, then the limit of the limiting device on the limiting rod is removed, the mounting frame can be put down, the whole body is convenient to store and is convenient for workers to use, the limiting device is arranged, the workers can fix the sliding block and adjust the height of the mounting frame, when the position of the sliding block needs to be adjusted, the pull ring is pulled to drive the pull plate to move and drive the pull rod to move and drive the extrusion block to move, the elastic potential energy of the supporting spring is increased, the clamping block is driven to move, the limit of the clamping block and the clamping groove is removed, the sliding block and the limiting rod can slide, the workers can adjust the position of the mounting frame conveniently, the buffering device is arranged, so that when the display board is mounted, the display board has certain buffering performance, the supporting block is supported by the compression spring, the supporting rod is driven to move upwards, the supporting plate is driven to move upwards, when the display board is mounted, the display board falls into the bottom frame and is in contact with the supporting plate, and the supporting plate is driven to move downwards, the display board has certain buffering performance, the protection of the display board is improved, the storage cabinet, the universal wheels, the mounting block, the limiting rod, the sliding block, the limiting device, the supporting frame, the connecting frame, the mounting frame, the display board, the buffering device, the baffle and the handle are integrated, the overall movement is convenient, the storage cabinet is arranged, a large number of engineering cost files can be conveniently placed by a worker, the worker can conveniently carry the display in time, the sliding block and the limiting rod slide, the worker can conveniently adjust the height of the mounting frame, the sliding block is fixed by the limiting device, the mounting frame is further fixed, the display board is conveniently mounted by the worker, cost data are displayed, construction progress management is carried out, the buffering device is arranged, the display board has certain buffering performance in the mounting process, the protection of the display board is improved, the overall storage is convenient, and the operation of the worker is convenient, the purpose of meeting the use requirement is achieved.
Drawings
Fig. 1 is a schematic view of the overall external structure of the present invention;
FIG. 2 is a schematic view of the overall internal structure of the present invention;
fig. 3 is a schematic view of a partial enlarged structure at a in fig. 2 according to the present invention;
fig. 4 is a schematic diagram of a partial enlarged structure at B of fig. 2 according to the present invention.
The reference numbers in the figures illustrate:
1. a storage cabinet; 2. a universal wheel; 3. placing the frame; 4. mounting blocks; 5. a limiting rod; 6. a slider; 7. a limiting device; 71. a fixed block; 72. a pull rod; 73. pulling a plate; 74. a pull ring; 75. extruding the block; 76. a support spring; 77. a clamping block; 78. a card slot; 8. a support frame; 9. a connecting frame; 10. installing a frame; 11. a display board; 12. a buffer device; 121. a bottom frame; 122. a limiting frame; 123. a compression spring; 124. a support block; 125. a support bar; 126. a support plate; 13. a baffle plate; 14. a handle.
Detailed Description
The drawings in the embodiments of the present invention will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described; obviously; the described embodiments are only some of the embodiments of the present invention; rather than all embodiments. Based on the embodiment of the utility model; all other embodiments obtained by a person skilled in the art without making any inventive step; all belong to the protection scope of the utility model.
Example 1:
referring to fig. 1-4, the present invention provides a technical solution: the utility model provides an engineering cost progress management device, including locker 1, the bottom fixedly connected with universal wheel 2 of locker 1, locker 1's both sides fixedly connected with installation piece 4, the clearance fixedly connected with gag lever post 5 of installation piece 4, gag lever post 5 sliding connection has slider 6, slider 6's bottom fixedly connected with stop device 7, stop device 7 and 5 joints of gag lever post, slider 6's top fixedly connected with support frame 8, support frame 8's top fixedly connected with link 9, the clearance fixedly connected with installing frame 10 of link 9, the installing frame 10 top is provided with the rectangle through-hole, the through-hole sliding connection of installing frame 10 has show board 11, locker 1's top fixedly connected with buffer 12, show board 11 is corresponding with buffer 12, show board 11's top fixedly connected with baffle 13, the top fixedly connected with handle 14 of baffle 13. The storage cabinet 1, the universal wheels 2, the mounting block 4, the limiting rod 5, the sliding block 6, the limiting device 7, the supporting frame 8, the connecting frame 9, the mounting frame 10, the display board 11, the buffer device 12, the baffle 13 and the handle 14 form a whole body which is convenient to move integrally, the storage cabinet 1 is arranged, a large number of engineering cost files can be conveniently placed by a worker, the worker can conveniently carry and display in time, the sliding block 6 and the limiting rod 5 slide, the worker can conveniently adjust the height of the mounting frame 10, the sliding block 6 is fixed by the limiting device 7, the mounting frame 10 is further fixed, the display board 11 can be conveniently installed by the worker, the handle 14 is held by a hand to drive the baffle 13 to move, the display board 11 passes through the rectangular through hole of the mounting frame 10, the worker can conveniently install the display board, display cost data and conduct construction progress management, the buffer device 12 is arranged, make show board 11 at the in-process of installation, have certain shock-absorbing capacity, improve the protection to show board 11, and wholly be convenient for accomodate, make things convenient for the staff to operate.
Example 2:
referring to fig. 2, a construction cost progress management device is substantially the same as that of embodiment 1, and further, a placing frame 3 is disposed above the storage cabinet 1, and a display board 11 corresponds to the placing frame 3. Frame 3 is placed in the setting, is convenient for accomodate show board 11, then removes stop device 7 to the restriction of gag lever post 5, can put down installing frame 10, and whole be convenient for accomodate, make things convenient for the staff to use.
Example 3:
referring to fig. 3, a construction cost progress management device is substantially the same as that in embodiment 1, and further, the limiting device 7 includes a fixed block 71, the fixed block 71 is fixedly connected to the slider 6, the fixed block 71 is slidably connected to a pull rod 72, an end portion of the pull rod 72 is fixedly connected to a pull plate 73, a pull ring 74 is fixedly connected to a surface of the pull plate 73, an extrusion block 75 is fixedly connected to one end of the pull rod 72, which is far away from the pull plate 73, a support spring 76 is fixedly connected to a side wall of the extrusion block 75, the support spring 76 is sleeved with the pull rod 72, the extrusion block 75 is connected to the fixed block 71 through the support spring 76, a clamping block 77 is fixedly connected to a surface of the extrusion block 75, a clamping groove 78 is formed in a surface of the limiting rod 5, and the clamping block 77 is clamped to the clamping groove 78. Set up stop device 7, the staff of being convenient for fixes slider 6, adjusts the height of installing frame 10, and when the position of slider 6 was adjusted to needs, pulling pull ring 74 drove arm-tie 73 motion, drove pull rod 72 motion, drove the motion of extrusion piece 75, increased supporting spring 76's elastic potential energy, drove fixture block 77 motion, the restriction of removing fixture block 77 and draw-in groove 78, can slide slider 6 and gag lever post 5, made things convenient for the staff to adjust the position of installing frame 10.
Example 4:
referring to fig. 4, a construction cost progress management device is substantially the same as that of embodiment 1, and further, the buffer device 12 includes a bottom frame 121, the bottom frame 121 is fixedly connected to the cabinet 1, a position-limiting frame 122 is fixedly connected to the bottom of the inner wall of the bottom frame 121, a compression spring 123 is fixedly connected to the inner wall of the position-limiting frame 122, a supporting block 124 is fixedly connected to the position-limiting frame 122 through the compression spring 123, a supporting rod 125 is fixedly connected to the top of the supporting block 124, the supporting rod 125 is slidably connected to the position-limiting frame 122, a supporting plate 126 is fixedly connected to the top of the supporting rod 125, and the supporting plate 126 corresponds to the bottom of the display board 11. Set up buffer 12 for show board 11 has certain shock-absorbing capacity when the installation, and compression spring 123 supports supporting shoe 124, drives bracing piece 125 upward movement, drives backup pad 126 upward movement, installs when show board 11, falls into in underframe 121, contacts with backup pad 126, and drives backup pad 126 downward movement, has certain shock-absorbing capacity, improves the protection to show board 11.
The above; is only a preferred embodiment of the present invention; however, the scope of protection of the present invention is not limited thereto; any person skilled in the art is within the technical scope of the present disclosure; according to the technical scheme of the utility model and the improvement conception, equivalent substitution or change is carried out; are all covered by the protection scope of the utility model.
Claims (4)
1. The utility model provides a construction cost progress management device, includes locker (1), its characterized in that: the bottom of the storage cabinet (1) is fixedly connected with universal wheels (2), two sides of the storage cabinet (1) are fixedly connected with mounting blocks (4), a spacing rod (5) is fixedly connected with a gap of each mounting block (4), a sliding block (6) is slidably connected with each spacing rod (5), a spacing device (7) is fixedly connected with the bottom of each sliding block (6), the spacing devices (7) are clamped with the spacing rods (5), a supporting frame (8) is fixedly connected with the top of each sliding block (6), a connecting frame (9) is fixedly connected with the top of each supporting frame (8), a mounting frame (10) is fixedly connected with the gap of each connecting frame (9), a rectangular through hole is formed in the top of each mounting frame (10), a display plate (11) is slidably connected with the through hole of each mounting frame (10), and a buffer device (12) is fixedly connected with the top of the storage cabinet (1), the display board (11) corresponds to the buffer device (12), the top of the display board (11) is fixedly connected with a baffle (13), and the top of the baffle (13) is fixedly connected with a handle (14).
2. A construction cost progress management apparatus according to claim 1, characterized in that: a placing frame (3) is arranged above the storage cabinet (1), and the display board (11) corresponds to the placing frame (3).
3. A construction cost progress management apparatus according to claim 1, characterized in that: stop device (7) include fixed block (71), fixed block (71) and slider (6) fixed connection, fixed block (71) sliding connection has pull rod (72), tip fixedly connected with arm-tie (73) of pull rod (72), fixed surface of arm-tie (73) is connected with pull ring (74), one end fixedly connected with extrusion piece (75) of arm-tie (73) are kept away from in pull rod (72), the lateral wall fixedly connected with supporting spring (76) of extrusion piece (75), supporting spring (76) cup joint with pull rod (72), extrusion piece (75) are connected with fixed block (71) through supporting spring (76), the fixed surface of extrusion piece (75) is connected with fixture block (77), the surface of gag lever post (5) is provided with draw-in groove (78), fixture block (77) and draw-in groove (78) joint.
4. A construction cost progress management apparatus according to claim 1, characterized in that: buffer (12) include underframe (121), underframe (121) and locker (1) fixed connection, the spacing frame of inner wall bottom fixedly connected with (122) of underframe (121), the inner wall fixedly connected with compression spring (123) of spacing frame (122), spacing frame (122) are through compression spring (123) fixedly connected with supporting shoe (124), the top fixedly connected with bracing piece (125) of supporting shoe (124), bracing piece (125) and spacing frame (122) sliding connection, the top fixedly connected with backup pad (126) of bracing piece (125), backup pad (126) correspond with the bottom of show board (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120265437.3U CN214548223U (en) | 2021-01-31 | 2021-01-31 | Engineering cost progress management device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120265437.3U CN214548223U (en) | 2021-01-31 | 2021-01-31 | Engineering cost progress management device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214548223U true CN214548223U (en) | 2021-11-02 |
Family
ID=78348267
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120265437.3U Expired - Fee Related CN214548223U (en) | 2021-01-31 | 2021-01-31 | Engineering cost progress management device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214548223U (en) |
-
2021
- 2021-01-31 CN CN202120265437.3U patent/CN214548223U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109013858A (en) | A kind of robot punching common apparatus | |
CN210800643U (en) | Precise projector | |
CN214548223U (en) | Engineering cost progress management device | |
CN114658983A (en) | Mining area surface of water phytoplankton is diagnostic with remote sensing mapping equipment | |
CN209654372U (en) | A kind of panorama numbers show device | |
CN208832034U (en) | A kind of film later period special efficacy presentation device being easily installed | |
CN216650220U (en) | Portable LED display screen front maintenance tool | |
CN212805120U (en) | Building engineering cost statistics display device | |
CN113854739B (en) | Multifunctional intelligent office desk | |
CN212912546U (en) | Staff salary comparison and analysis system | |
CN214323324U (en) | Tool box for operation and maintenance of power distribution cabinet | |
CN211176092U (en) | Adjustable projector support | |
CN205121428U (en) | Can be fixed in graphoscope of desktop | |
CN210627639U (en) | Sand table for urban planning | |
CN214855511U (en) | Building engineering management comprehensive operation platform | |
CN112763113A (en) | Dynamic torque sensing device | |
CN216940676U (en) | Precise linear module for manipulator | |
CN218781029U (en) | Digital media projection device | |
CN213512859U (en) | Civil engineering design management device based on BIM | |
CN214594638U (en) | Road bridge engineering cost budget toolbox for management | |
CN220303204U (en) | Teaching conference all-in-one of convenient dismouting | |
CN219583170U (en) | Telegraph pole spraying curing frame | |
CN220623349U (en) | LED screen mounting structure | |
CN214207911U (en) | Template display device for building engineering construction | |
CN220128750U (en) | Intelligent storage box for transformer overhaul tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211102 |
|
CF01 | Termination of patent right due to non-payment of annual fee |