CN214855511U - Building engineering management comprehensive operation platform - Google Patents

Building engineering management comprehensive operation platform Download PDF

Info

Publication number
CN214855511U
CN214855511U CN202120756750.7U CN202120756750U CN214855511U CN 214855511 U CN214855511 U CN 214855511U CN 202120756750 U CN202120756750 U CN 202120756750U CN 214855511 U CN214855511 U CN 214855511U
Authority
CN
China
Prior art keywords
fixedly connected
fixed
lead screw
fixed block
convenient
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120756750.7U
Other languages
Chinese (zh)
Inventor
潘利民
杨成龙
赵亚虎
苟亚飞
沈有强
王吉平
姜骋
陈旭鹏
贺宏刚
董国亮
孔爱平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huating Coal Industry Group Co ltd
Original Assignee
Huating Coal Industry Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huating Coal Industry Group Co ltd filed Critical Huating Coal Industry Group Co ltd
Priority to CN202120756750.7U priority Critical patent/CN214855511U/en
Application granted granted Critical
Publication of CN214855511U publication Critical patent/CN214855511U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses an operation panel is synthesized in building engineering management, including the storing frame, the bottom both sides fixedly connected with universal wheel of storing frame, the top fixedly connected with mount of storing frame, the clearance of mount is provided with the extrusion device, the utility model relates to a construction technical field. This kind of building engineering management integrated operation platform, reached whole be convenient for remove, set up the mounting bracket, be used for installing a plurality of display screens, monitor the job site, managers of being convenient for know the construction progress, support the mounting bracket through buffer, make the display screen have certain shock attenuation performance, improve equipment life, set up the show board in the both sides of display screen, be convenient for fix the drawing, set up extrusion device, be convenient for fix the drawing, improve the clean degree of drawing, set up strutting arrangement, be convenient for support ground, and then improve the integral erection stability, satisfy user demand's purpose.

Description

Building engineering management comprehensive operation platform
Technical Field
The utility model relates to a construction field, more specifically say, relate to a building engineering management integrated operation platform.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. In the building engineering management, managers are required to supervise and manage the construction progress of a construction site, so that the construction efficiency is improved. It is often necessary to use a building engineering management complex. At present, current building engineering management synthesizes operation panel, single structure, the function singleness is not convenient for remove the use, and overall stability is poor, influences equipment life, is not convenient for fix the file simultaneously, and inconvenient staff manages, influences work efficiency, can't satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
Aiming at the problems of the prior building engineering management comprehensive operation platform in the prior art, such as single structure, single function, inconvenient movement and use, poor overall stability, influence on the service life of equipment, inconvenient fixation of files, inconvenient management of workers, influence on the working efficiency and incapability of meeting the use requirement, the utility model aims to provide a building engineering management comprehensive operation platform which can realize the integration of a storage frame, a universal wheel, a fixed frame, an extrusion device, a supporting device, a buffer device, a mounting frame, a display screen, a display board and a fixed clamp, is convenient to move overall, is provided with the mounting frame, is used for mounting a plurality of display screens to monitor a construction site, is convenient for managers to know the construction progress, supports the mounting frame through the buffer device, and ensures that the display screen has certain shock absorption performance, improve equipment life sets up the show board in the both sides of display screen, is convenient for fix the drawing, makes things convenient for the staff to refer to the drawing and contrasts with the display screen, in time manages the job site, sets up the extrusion device, is convenient for fix the drawing, improves the drawing and neatly cleans the matter, makes things convenient for the staff to use, sets up strutting arrangement, is convenient for support ground, and then improves the overall installation stability, makes things convenient for the staff to operate, satisfies the user demand.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
The utility model provides an operation panel is synthesized in building engineering management, includes the storing frame, the bottom both sides fixedly connected with universal wheel of storing frame, the top fixedly connected with mount of storing frame, the clearance of mount is provided with the extrusion device, the both sides of storing frame are provided with strutting arrangement, the top fixedly connected with buffer of mount, buffer's clearance fixedly connected with mounting bracket, the fixed surface of mounting bracket is connected with the display screen, buffer's both sides fixedly connected with show board, the surface of show board is provided with the fixation clamp.
Preferably, the extrusion device includes the fixed plate, fixed plate and mount fixed connection, fixed plate sliding connection has the stripper bar, the bottom fixedly connected with stripper plate of stripper bar, the top fixedly connected with supporting spring of stripper plate, supporting spring cup joints with the stripper bar, the stripper plate is connected with the fixed plate through supporting spring, the top fixedly connected with baffle of stripper bar, the top fixedly connected with pull ring of baffle.
Preferably, strutting arrangement includes first fixed block, second fixed block, first fixed block, second fixed block all with storing frame lateral wall fixed connection, the clearance fixedly connected with slide bar of first fixed block, second fixed block, first fixed block, second fixed block rotate and are connected with the rotation lead screw, the top fixedly connected with rolling disc of rotation lead screw, it has the lead screw slider to rotate lead screw threaded connection, lead screw slider and slide bar sliding connection, the bottom fixedly connected with support frame of lead screw slider, support frame and second fixed block sliding connection.
Preferably, buffer includes first connecting block, mount and first connecting block fixed connection, positive pole is led to the top fixedly connected with of first connecting block, lead the top fixedly connected with second connecting block of positive pole, lead positive pole sliding connection and have the slider, the upper and lower both ends of slider all are provided with compression spring, compression spring cup joints with leading positive pole, first connecting block, second connecting block all with show board fixed connection, slider and mounting bracket fixed connection.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of: the display screen is convenient to move integrally through the storage frame, the universal wheels, the fixing frame, the extruding device, the supporting device, the buffering device, the mounting frame, the display screen, the display board and the fixing clamp, the mounting frame is arranged and used for mounting a plurality of display screens and monitoring a construction site, managers can conveniently know the construction progress, the mounting frame is supported through the buffering device, the display screens have certain damping performance, the service life of equipment is prolonged, the display boards are arranged on two sides of the display screens, the drawings can be conveniently fixed, workers can conveniently compare the drawings with the display screens according to the drawings and manage the construction site in time, the extruding device is arranged and can conveniently fix the drawings, the drawing neatness is improved, the workers can conveniently use the display boards, the supporting device is arranged and is convenient to support the ground, the integral installation stability is improved, and the workers can conveniently operate the display screens, the device is provided with an extrusion device which is convenient for fixing a drawing file, a pull ring is pulled to move upwards to drive an extrusion rod to move upwards and drive an extrusion plate to move upwards, the elastic potential energy of a supporting spring is increased, the file is placed below the extrusion plate, the pull ring is loosened, the elastic potential energy of the supporting spring is converted into kinetic energy to drive the extrusion plate to move downwards and extrude and fix the file, the neatness of the file is improved, the supporting device is arranged to support the ground conveniently, the overall stability is improved, a rotating disc is rotated to drive a rotating lead screw to rotate, a lead screw sliding block is driven to move, the lead screw sliding block and a sliding rod slide, the motion stability of the lead screw sliding block is improved, the lead screw sliding block drives a supporting frame to move, the ground is supported, the overall stability is improved, a buffer device is arranged, the sliding block and a guide rod slide, and a compression spring supports the sliding block, so that the sliding block has certain buffer performance, the protection to the display screen is improved, the service life of the equipment is prolonged, the storage frame, the universal wheels, the fixing frame, the extruding device, the supporting device, the buffering device, the mounting frame, the display screen, the display board and the fixing clamp are integrated, the whole display screen and the fixing clamp are convenient to move, the mounting frame is arranged and used for mounting a plurality of display screens, a construction site is monitored, managers can conveniently know the construction progress, the mounting frame is supported through the buffering device, the display screen has certain damping performance, the service life of the equipment is prolonged, the display boards are arranged on two sides of the display screen, the drawing is convenient to fix, workers can conveniently compare the drawing with the display screen according to the drawing and manage the construction site in time, the extruding device is arranged to conveniently fix the drawing, the drawing cleanliness is improved, the workers can conveniently use the equipment, the supporting device is arranged and is convenient to support the ground, and then improve whole installation stability, make things convenient for the staff to operate, satisfy user demand's purpose.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the enlarged structure of the part A of FIG. 1 according to the present invention;
fig. 3 is a schematic structural view of the supporting device of the present invention.
The reference numbers in the figures illustrate:
1. a storage frame; 2. a universal wheel; 3. a fixed mount; 4. an extrusion device; 41. a fixing plate; 42. an extrusion stem; 43. a pressing plate; 44. a support spring; 45. a baffle plate; 46. a pull ring; 5. a support device; 51. a first fixed block; 52. a second fixed block; 53. a slide bar; 54. rotating the screw rod; 55. rotating the disc; 56. a lead screw slider; 57. a support frame; 6. a buffer device; 61. a first connection block; 62. a guide rod; 63. a second connecting block; 64. a slider; 65. a compression spring; 7. a mounting frame; 8. a display screen; 9. a display board; 10. and (4) fixing clips.
Detailed Description
The drawings in the embodiments of the present invention will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described; obviously; the described embodiments are only some of the embodiments of the present invention; rather than all embodiments. Based on the embodiment of the utility model; all other embodiments obtained by a person skilled in the art without making any inventive step; all belong to the protection scope of the utility model.
Example 1:
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides an operation panel is synthesized in building engineering management, including storing frame 1, the bottom both sides fixedly connected with universal wheel 2 of storing frame 1, the top fixedly connected with mount 3 of storing frame 1, the clearance of mount 3 is provided with extrusion device 4, the both sides of storing frame 1 are provided with strutting arrangement 5, the top fixedly connected with buffer 6 of mount 3, buffer 6's clearance fixedly connected with mounting bracket 7, the fixed surface of mounting bracket 7 is connected with display screen 8, buffer 6's both sides fixedly connected with show board 9, the surface of show board 9 is provided with fixation clamp 10. The storage frame 1, the universal wheels 2, the fixing frame 3, the extruding device 4, the supporting device 5, the buffering device 6, the mounting frame 7, the display screens 8, the display boards 9 and the fixing clamps 10 form a whole body, the whole body is convenient to move, the mounting frame 7 is arranged and used for mounting a plurality of display screens 8 and monitoring a construction site, managers can conveniently know the construction progress, the mounting frame 7 is supported through the buffering device 6, the display screens 8 have certain damping performance, the service life of equipment is prolonged, the display boards 9 are arranged on two sides of the display screens 8 and are convenient to fix drawings, workers can conveniently compare the drawings with the display screens 8 according to the drawings and manage the construction site in time, the extruding device 4 is arranged and is convenient to fix the drawings, the smoothness of the drawings is improved, the workers can conveniently use, the supporting device 5 is arranged and is convenient to support the ground, and then improve whole installation stability, make things convenient for the staff to operate.
Example 2:
referring to fig. 2, a building engineering management integrated operation console is substantially the same as that in embodiment 1, and further, the extruding device 4 includes a fixing plate 41, the fixing plate 41 is fixedly connected to the fixing frame 3, the fixing plate 41 is slidably connected to an extruding rod 42, a bottom of the extruding rod 42 is fixedly connected to an extruding plate 43, a top of the extruding plate 43 is fixedly connected to a supporting spring 44, the supporting spring 44 is sleeved with the extruding rod 42, the extruding plate 43 is connected to the fixing plate 41 through the supporting spring 44, a top of the extruding rod 42 is fixedly connected to a baffle 45, and a top of the baffle 45 is fixedly connected to a pull ring 46. The extrusion device 4 is arranged to fix a drawing file conveniently, the pull ring 46 is pulled to move upwards to drive the baffle 45 to move upwards to drive the extrusion rod 42 to move upwards to drive the extrusion plate 43 to move upwards, the elastic potential energy of the supporting spring 44 is increased, the file is placed below the extrusion plate 43, the pull ring 46 is loosened, the elastic potential energy of the supporting spring 44 is converted into kinetic energy to drive the extrusion plate 43 to move downwards to extrude and fix the file, and the file neatness is improved.
Example 3:
referring to fig. 3, a building engineering management integrated console is substantially the same as that in embodiment 1, and further, the supporting device 5 includes a first fixed block 51 and a second fixed block 52, both the first fixed block 51 and the second fixed block 52 are fixedly connected to the side wall of the storage frame 1, a sliding rod 53 is fixedly connected to a gap between the first fixed block 51 and the second fixed block 52, the first fixed block 51 and the second fixed block 52 are rotatably connected to a rotating lead screw 54, a rotating disc 55 is fixedly connected to the top of the rotating lead screw 54, a lead screw slider 56 is connected to the rotating lead screw 54 through a thread, the lead screw slider 56 is slidably connected to the sliding rod 53, a supporting frame 57 is fixedly connected to the bottom of the lead screw slider 56, and the supporting frame 57 is slidably connected to the second fixed block 52. Set up strutting arrangement 5, be convenient for support ground, improve overall stability, rotate rolling disc 55, drive and rotate lead screw 54 and rotate, drive the motion of lead screw slider 56, lead screw slider 56 slides with slide bar 53, improves lead screw slider 56 motion stability, and lead screw slider 56 drives the motion of support frame 57, supports ground, and then improves overall stability.
Example 4:
referring to fig. 1, a building engineering management integrated operation platform is substantially the same as that in embodiment 1, and further, the buffering device 6 includes a first connecting block 61, the fixing frame 3 is fixedly connected to the first connecting block 61, a guiding rod 62 is fixedly connected to the top of the first connecting block 61, a second connecting block 63 is fixedly connected to the top of the guiding rod 62, the guiding rod 62 is slidably connected to a sliding block 64, compression springs 65 are disposed at the upper and lower ends of the sliding block 64, the compression springs 65 are sleeved with the guiding rod 62, the first connecting block 61 and the second connecting block 63 are fixedly connected to the display board 9, and the sliding block 64 is fixedly connected to the mounting frame 7. Set up buffer 6, slider 64 slides with leading positive pole 62, and compression spring 65 supports slider 64 simultaneously for slider 64 has certain shock-absorbing capacity, improves the protection to display screen 8, and the whole use of removing of being convenient for improves equipment life.
The above; is only a preferred embodiment of the present invention; however, the scope of protection of the present invention is not limited thereto; any person skilled in the art is within the technical scope of the present disclosure; according to the technical scheme of the utility model and the improvement conception, equivalent substitution or change is carried out; are all covered by the protection scope of the utility model.

Claims (4)

1. The utility model provides an operation panel is synthesized in building engineering management, includes storing frame (1), its characterized in that: the utility model discloses a show board, including bottom both sides fixedly connected with universal wheel (2) of storing frame (1), top fixedly connected with mount (3) of storing frame (1), the clearance of mount (3) is provided with extrusion device (4), the both sides of storing frame (1) are provided with strutting arrangement (5), the top fixedly connected with buffer (6) of mount (3), the clearance fixedly connected with mounting bracket (7) of buffer (6), the fixed surface of mounting bracket (7) is connected with display screen (8), the both sides fixedly connected with show board (9) of buffer (6), the surface of show board (9) is provided with fixation clamp (10).
2. The integrated operation desk for building engineering management according to claim 1, wherein: extrusion device (4) are including fixed plate (41), fixed plate (41) and mount (3) fixed connection, fixed plate (41) sliding connection has squeeze stem (42), bottom fixedly connected with stripper plate (43) of squeeze stem (42), the top fixedly connected with supporting spring (44) of stripper plate (43), supporting spring (44) cup joint with stripper stem (42), stripper plate (43) are connected with fixed plate (41) through supporting spring (44), the top fixedly connected with baffle (45) of stripper stem (42), the top fixedly connected with pull ring (46) of baffle (45).
3. The integrated operation desk for building engineering management according to claim 1, wherein: support arrangement (5) include first fixed block (51), second fixed block (52), first fixed block (51), second fixed block (52) all with storing frame (1) lateral wall fixed connection, clearance fixedly connected with slide bar (53) of first fixed block (51), second fixed block (52), first fixed block (51), second fixed block (52) rotate and are connected with rotation lead screw (54), top fixedly connected with rolling disc (55) of rotation lead screw (54), it has lead screw slider (56) to rotate lead screw (54) threaded connection, lead screw slider (56) and slide bar (53) sliding connection, the bottom fixedly connected with support frame (57) of lead screw slider (56), support frame (57) and second fixed block (52) sliding connection.
4. The integrated operation desk for building engineering management according to claim 1, wherein: buffer (6) include first connecting block (61), mount (3) and first connecting block (61) fixed connection, positive pole (62) are led to the top fixedly connected with of first connecting block (61), lead top fixedly connected with second connecting block (63) of positive pole (62), lead positive pole (62) sliding connection has slider (64), the upper and lower both ends of slider (64) all are provided with compression spring (65), compression spring (65) cup joint with lead positive pole (62), first connecting block (61), second connecting block (63) all with show board (9) fixed connection, slider (64) and mounting bracket (7) fixed connection.
CN202120756750.7U 2021-04-14 2021-04-14 Building engineering management comprehensive operation platform Active CN214855511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120756750.7U CN214855511U (en) 2021-04-14 2021-04-14 Building engineering management comprehensive operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120756750.7U CN214855511U (en) 2021-04-14 2021-04-14 Building engineering management comprehensive operation platform

Publications (1)

Publication Number Publication Date
CN214855511U true CN214855511U (en) 2021-11-26

Family

ID=78949770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120756750.7U Active CN214855511U (en) 2021-04-14 2021-04-14 Building engineering management comprehensive operation platform

Country Status (1)

Country Link
CN (1) CN214855511U (en)

Similar Documents

Publication Publication Date Title
CN214855511U (en) Building engineering management comprehensive operation platform
CN108888164A (en) Telescopic Fixed formula wipes the robot with frame glass
CN210510820U (en) Shock attenuation formula oil cleaner installing support
CN219085603U (en) Multifunctional LED display screen
CN216384563U (en) Damping support convenient to install for air conditioning unit
CN211126915U (en) Cable supporting bracket
CN211288155U (en) Energy-saving glass fiber reinforced plastic fan
CN201217001Y (en) Weight type cleaner for sintering elastic slide track plate of trolley
CN214548314U (en) Building construction data management device
CN214548223U (en) Engineering cost progress management device
CN213515745U (en) Electronic monitor for engineering machinery
CN213512859U (en) Civil engineering design management device based on BIM
CN213183505U (en) Intelligent supervision and management device for electric power marketing operation site
CN214504581U (en) Alarm for hydraulic and hydroelectric engineering construction management
CN216655611U (en) Workstation with surface cleaning function for computer equipment assembly debugging
CN221574572U (en) Switch board convenient to location
CN219198816U (en) Wall-mounted multifunctional display
CN214479325U (en) Pipeline fixing device on construction frame
CN216248778U (en) Holographic display
CN215126234U (en) Urban and rural planning field investigation tool
CN216010309U (en) Electric power marketing device that conveniently carries
CN217871117U (en) Anti-seismic structure based on building engineering
CN214207909U (en) Road and bridge design show shelf
CN214790151U (en) Building engineering management video acquisition equipment
CN217109992U (en) Installation base convenient to air conditioner drainage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant