CN214537309U - Quick drying device of concrete wall - Google Patents

Quick drying device of concrete wall Download PDF

Info

Publication number
CN214537309U
CN214537309U CN202120754009.7U CN202120754009U CN214537309U CN 214537309 U CN214537309 U CN 214537309U CN 202120754009 U CN202120754009 U CN 202120754009U CN 214537309 U CN214537309 U CN 214537309U
Authority
CN
China
Prior art keywords
piece
plate
positioning
bearing plate
drying device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120754009.7U
Other languages
Chinese (zh)
Inventor
单东虎
陈刚
刘世元
魏朝东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Xintaiyang Industrial Co ltd
Original Assignee
Guangdong Xintaiyang Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Xintaiyang Industrial Co ltd filed Critical Guangdong Xintaiyang Industrial Co ltd
Priority to CN202120754009.7U priority Critical patent/CN214537309U/en
Application granted granted Critical
Publication of CN214537309U publication Critical patent/CN214537309U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

The application relates to a quick drying device for a concrete wall, which comprises a bottom support seat, a bearing plate, a blowing piece and a heating piece; the bearing plate is arranged on the upper surface of the base support seat, the air blowing part and the heating part are both arranged on the upper surface of the bearing plate, and the heating part is positioned on one side of an air outlet of the air blowing part; the heating member includes location bounding wall and many electric heating pipe, all electric heating pipe sets up in the location bounding wall. This application has the drying rate in overcast and rainy day and severe cold season of effectively accelerating the wall body, shortens wall body shaping time's effect.

Description

Quick drying device of concrete wall
Technical Field
The application relates to the field of wall drying devices, in particular to a quick drying device for a concrete wall.
Background
The concrete wall is formed by mixing and pouring cement, sand and stone and water. The forming speed of the concrete wall body mainly depends on the drying speed of the concrete slurry, so in order to shorten the construction period and accelerate the forming speed of the concrete wall body, operators mostly accelerate the drying speed of the concrete slurry through a drying device.
In actual operation, operators mostly use high-power fans to blow air to a wall body, and the drying speed of concrete slurry is increased by increasing the airflow speed on the outer surface of the wall body, so that the forming speed of the concrete wall body is increased.
In view of the above-mentioned related technologies, the inventor believes that the wall body is dried by blowing air, which has a poor effect in rainy days and severe cold seasons, and further reduces the drying speed of the concrete slurry and prolongs the forming time of the concrete wall body.
SUMMERY OF THE UTILITY MODEL
In order to improve the slower problem of concrete wall body drying speed in overcast and rainy day and severe cold season, the application provides a concrete wall body's quick drying device.
The application provides a quick drying device of concrete wall adopts following technical scheme:
a quick drying device for a concrete wall comprises a bottom support seat, a bearing plate, an air blowing piece and a heating piece; the bearing plate is arranged on the upper surface of the base support seat, the air blowing part and the heating part are both arranged on the upper surface of the bearing plate, and the heating part is positioned on one side of an air outlet of the air blowing part; the heating member includes location bounding wall and many electric heating pipe, all electric heating pipe sets up in the location bounding wall.
By adopting the technical scheme, the temperature of the space where the heating element is located is raised after the electric heating pipe is electrified and heated, and cold airflow blown by the air blowing element passes through the heating element and reaches the outer surface of the wall body to be converted into hot airflow; the constantly blown hot air flow accelerates the air flow rate of the outer surface of the wall body, and reduces the storage of damp and cool air on the outer surface of the wall body through the characteristic of higher temperature of the hot air flow, thereby accelerating the drying speed of the wall body and shortening the forming time of the wall body.
Preferably, the positioning coaming and the bearing plate are provided with a positioning assembly together, and the positioning assembly comprises a positioning plate and a connecting piece; the locating plate sets up in the lateral wall of location bounding wall orientation accepting the board, the connecting piece is used for fixed connection locating plate and accepting the board.
Through adopting above-mentioned technical scheme, the locating plate has increased the area of contact of location bounding wall with the board of accepting, and the connecting piece passes through the fixed connection locating plate and accepts the board, has ensured the position stability of heating member accepting the board upper surface to be convenient for operating personnel quick dismantlement in order to adjust the interval between heating member and the blast air piece.
Preferably, a plurality of settling tanks are arranged on the upper surface of the bearing plate, and the air blowing piece is positioned in the settling tanks.
By adopting the technical scheme, the outer frame of the air blowing piece can be quickly abutted into the settling tank so as to be preliminarily positioned on the upper surface of the bearing plate; after the air blowing parts slide along the length direction of the settling tank, the positions of the air blowing parts on the bearing plates can be quickly adjusted, the number of the air blowing parts on the bearing plates is convenient to increase, and the air blowing area of the air blowing parts on a wall body is enlarged.
Preferably, the blower and the positioning enclosing plate are provided with an adjusting assembly together, and the adjusting assembly comprises a contact piece and a clamping piece; the collision piece comprises a fixed strip and two extending blocks, the two extending blocks are arranged on the side wall of the air blowing piece far away from the direction of the positioning enclosing plate, and the fixed strip is arranged at one end of the two extending blocks far away from the direction of the air blowing piece; the clamping piece comprises a mounting plate and two clamping blocks, the mounting plate is arranged on the upper surface of the bearing plate, and the two clamping blocks are arranged on the side wall, facing the air blowing piece, of the mounting plate; the two clamping blocks are in clearance fit, and the side walls of the two clamping blocks facing each other are respectively provided with a guide groove for the fixing strip to abut into.
Through adopting above-mentioned technical scheme, in the fixed strip supported into two guide ways, the space between two block pieces is supported into to the extension piece, and then makes the rigidity of the relative mounting panel of air-blast piece, has improved the positional stability of air-blast piece at the board upper surface of accepting, has ensured the stability in use of air-blast piece.
Preferably, the outer side wall of the extension block is longitudinally provided with a through hole in a penetrating manner, the extension block is provided with a limiting rod at the through hole, and the upper surface of the bearing plate is provided with a plurality of locking grooves which are convenient for the limiting rod to abut into.
Through adopting above-mentioned technical scheme, the gag lever post supports behind the through-connection hole and locks the internal thread of groove and screw up for the relative position of accepting the board of extension piece is injectd, and then has ensured the joint strength of blast air piece at accepting the board upper surface, has reduced the phenomenon that the pine of blast air piece blast air in-process appears and has shaken, move partially.
Preferably, the bottom support seat and the bearing plate are provided with a lifting assembly together, and the lifting assembly comprises a bearing column, a directional cylinder and a clamping piece; the butt post sets up in accepting the board lower surface, directional section of thick bamboo sets up in the base prop seat upper surface, the butt post is located directional section of thick bamboo towards the one end of base prop seat, the joint spare is used for fixed connection butt post and directional section of thick bamboo.
Through adopting above-mentioned technical scheme, when the relative wall body of blast air piece highly needs the regulation, operating personnel accessible butt post slides in directional section of thick bamboo to the height of accepting the relative base prop seat of board is accepted in the regulation, joint spare fixed connection butt post and directional section of thick bamboo, in order to ensure to accept the positional stability of board on the base prop seat.
Preferably, the outer side wall of the abutting column is provided with a plurality of embedded grooves at intervals along the longitudinal direction.
Through adopting above-mentioned technical scheme, the embedded groove of predetermineeing in advance is convenient for the quick body of rod of locking joint spare of operating personnel, and then has effectively improved speed and efficiency that operating personnel is fixed in directional section of thick bamboo inner chamber with the butt post.
Preferably, the upper surface of the base support seat is provided with a plurality of bearing cylinders, and a fitting plate is arranged on a piston rod of each bearing cylinder towards one end of each bearing plate along the horizontal direction.
Through adopting above-mentioned technical scheme, the laminating board has increaseed the piston rod of holding up the cylinder and has accepted the area of contact of board for hold up the cylinder and can go up and down fast, stably and accept the board, reduced operating personnel manual control and accepted the intensity of labour that the board goes up and down.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the heating element enables cold air blown by the air blowing element to be converted into hot air by increasing the temperature of the air outlet of the air blowing element, so that the air flow rate of the outer surface of the wall body is increased, the temperature of the outer surface of the wall body is increased, the drying speed of the wall body in rainy days and severe cold seasons is increased, and the forming time of the wall body is shortened;
2. the butting column can adjust the butting depth in the directional cylinder, so that the height of the bearing plate relative to the wall body is adjusted, the drying area of the equipment on the wall body is increased, and the forming time of the wall body is further shortened.
Drawings
Fig. 1 is a schematic structural diagram of a rapid drying device for a concrete wall according to an embodiment of the present disclosure;
FIG. 2 is an exploded view of the ground bearing, receiving plate and heating element connection;
fig. 3 is an exploded schematic view of the positional relationship of the blower member, the contact member, and the card member;
fig. 4 is a schematic view showing a connection relationship of the blower, the extension block and the mounting plate.
Description of reference numerals: 1. a base support seat; 11. a bearing cylinder; 12. attaching a plate; 2. a bearing plate; 21. a blower member; 22. a settling tank; 23. a locking groove; 3. a heating member; 31. positioning a coaming; 32. an electric heating tube; 4. a positioning assembly; 41. positioning a plate; 42. a connecting member; 5. an adjustment assembly; 51. a contact member; 511. a fixing strip; 512. an extension block; 5121. a through hole; 5122. a limiting rod; 52. a clamping and fixing piece; 521. mounting a plate; 522. a clamping block; 5221. a guide groove; 6. a lifting assembly; 61. a butting post; 611. an embedded groove is formed; 62. an orientation cylinder; 63. a clamping piece.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses concrete wall's quick drying device. Referring to fig. 1, a rapid drying apparatus for a concrete wall includes a base frame 1, a receiving plate 2, a blowing member 21, and a heating member 3. Accept board 2 and set up in the upper surface of base prop seat 1 through lifting unit 6, air-blast piece 21 sets up in accepting board 2 upper surface through adjusting part 5, and heating member 3 sets up in accepting board 2 upper surface through locating component 4, and heating member 3 is located the air outlet department of air-blast piece 21. When the wall body needs rapid draing, operating personnel can start simultaneously with air-blast piece 21 with heating member 3, heating member 3 outwards gives off heat energy, the air-blower blows cold wind to the drum-out, cold wind changes into hot-blast when passing through heating member 3, and then in order to accelerate the drying rate of wall body in overcast and rainy day and cold season.
Referring to fig. 1 and 2, the heating element 3 includes a positioning surrounding plate 31 and a plurality of electric heating tubes 32, the electric heating tubes 32 are fixed in the positioning surrounding plate 31 by screws, and adjacent electric heating tubes 32 are in clearance fit so as to allow air flow to pass through. The positioning component 4 enables the heating element 3 to be rapidly fixed on the upper surface of the bearing plate 2, the positioning component 4 comprises a positioning plate 41 and a connecting piece 42, and the connecting piece 42 is a bolt. The positioning plate 41 is welded to the side wall of the positioning surrounding plate 31 facing the receiving plate 2 along the horizontal direction, after the bottom wall of the positioning plate 41 abuts against the top wall of the receiving plate 2, the rod body of the connecting member 42 penetrates through the positioning plate 41 and is screwed into a preset threaded groove on the top wall of the receiving plate 2, so that the positioning plate 41 is fixedly connected with the receiving plate 2, and the heating member 3 is fixed on the upper surface of the receiving plate 2.
Referring to fig. 1 and 2, a settling tank 22 is arranged on the upper surface of the receiving plate 2 along the length direction, and an outer frame of the air blowing member 21 can be abutted into the settling tank 22, so that the air blowing member 21 is positioned on the upper surface of the receiving plate 2, and the air blowing member 21 can slide in the length direction of the settling tank 22 conveniently, so as to adjust the position.
Referring to fig. 3 and 4, the adjusting assembly 5 includes a contact member 51 and a clamping member 52, and the contact member 51 includes a fixing strip 511 and two extending blocks 512. The two extending blocks 512 are welded on the side wall of the positioning enclosing plate 31 far away from the direction of the heating element 3, and the fixing strip 511 is welded on the side wall of the two extending blocks 512 far away from the direction of the positioning enclosing plate 31.
Referring to fig. 3 and 4, the fastening member 52 includes a mounting plate 521 and two fastening blocks 522, the mounting plate 521 is vertically welded to the upper surface of the receiving plate 2, and the mounting plate 521 is located at one end of the blowing member 21 away from the heating member 3. The two engaging blocks 522 are symmetrically welded to the side wall of the mounting plate 521 facing the air blowing member 21, the two engaging blocks 522 are in clearance fit, and the side walls of the two engaging blocks 522 facing each other are respectively provided with a guide groove 5221. After the blower 21 is pushed into the inner cavity of the settling tank 22, the fixing strip 511 can be pushed into the two guiding grooves 5221, and the extending block 512 can be pushed into the gap between the two engaging blocks 522, so as to further improve the position stability of the blower 21 on the upper surface of the receiving plate 2.
Referring to fig. 4, a through hole 5121 is longitudinally formed in the outer side wall of each extension block 512 in a penetrating manner, a limiting rod 5122 is arranged in the through hole 5121 of each extension block 512, and the limiting rod 5122 is a screw rod. The upper surface of the receiving plate 2 is provided with a plurality of locking grooves 23 at intervals along the longitudinal direction, and the locking grooves 23 are thread grooves. After the blower 21 is positioned in the inner cavity of the sliding groove, the limiting rod 5122 can pass through the through hole 5121 and abut against the locking groove 23 to be screwed, so as to limit the position of the blower 21 on the upper surface of the receiving plate 2 and ensure the operation stability of the blower 21.
Referring to fig. 2, the lifting assembly 6 includes an abutment post 61, an orientation cylinder 62, and a catch 63, the catch 63 being a bolt. The orientation cylinder 62 is vertically welded on the upper surface of the base frame seat 1, the abutting column 61 is vertically welded on the lower surface of the bearing plate 2, and the outer diameter dimension of the abutting column 61 is matched with the inner diameter dimension of the orientation cylinder 62. One end of the abutting column 61 facing the base frame seat 1 can abut into the positioning cylinder 62 to ensure the position stability of the bearing plate 2 above the base frame seat 1.
Referring to fig. 2, the outer side wall of the abutment post 61 is provided with a plurality of inner recessed grooves 611 at intervals in the longitudinal direction, and the inner recessed grooves 611 are thread grooves. After the abutting column 61 is adjusted to the abutting depth in the inner cavity of the directional barrel 62, an operator can penetrate the rod body of the clamping member 63 through the positioning barrel and screw the rod body in the embedded groove 611, so that the abutting column 61 is fixed in the directional barrel 62, and the position stability of the bearing plate 2 above the bottom support seat 1 is further ensured.
Referring to fig. 2, the upper surface of the base support seat 1 is provided with two sets of lifting cylinders 11 through bolts, and all the orientation cylinders 62 are located between the two sets of lifting cylinders 11. The piston rod of the bearing cylinder 11 is welded with the attaching plate 12 towards one end of the bearing plate 2 along the horizontal direction, when the bearing plate 2 needs to be lifted up and down, the piston rod of the driving cylinder extends outwards to enable the top wall of the attaching plate 12 to be abutted against the bottom wall of the bearing plate 2, then the bearing plate 2 is lifted up and down, and the labor intensity of the operator for lifting the bearing plate 2 is reduced.
The implementation principle of the quick drying device for the concrete wall body in the embodiment of the application is as follows: the air blowing member 21 blows cold air to the outside, the heating member 3 is electrified to heat, and then the temperature of the region where the heating member 3 is located rises, so that the cold air blown by the air blowing member 21 is converted into hot air when passing through the heating member 3. The hot air accelerates the flow velocity of the air flow on the outer surface of the wall body, and simultaneously improves the temperature of the wall body, thereby effectively reducing the phenomenon that the wall body is not easy to dry in rainy days and severe cold seasons, and shortening the forming time of the wall body.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a quick drying device of concrete wall which characterized in that: comprises a bottom support seat (1), a bearing plate (2), a blast part (21) and a heating part (3); the bearing plate (2) is arranged on the upper surface of the base support seat (1), the air blowing part (21) and the heating part (3) are arranged on the upper surface of the bearing plate (2), and the heating part (3) is positioned on one side of an air outlet of the air blowing part (21); the heating member (3) comprises a positioning enclosing plate (31) and a plurality of electric heating pipes (32), and all the electric heating pipes (32) are arranged in the positioning enclosing plate (31).
2. The quick drying device for the concrete wall according to claim 1, characterized in that: the positioning coaming (31) and the bearing plate (2) are provided with a positioning assembly (4) together, and the positioning assembly (4) comprises a positioning plate (41) and a connecting piece (42); the positioning plate (41) is arranged on the side wall, facing the bearing plate (2), of the positioning enclosing plate (31), and the connecting piece (42) is used for fixedly connecting the positioning plate (41) and the bearing plate (2).
3. The quick drying device for the concrete wall according to claim 2, characterized in that: the upper surface of the bearing plate (2) is provided with a plurality of settling tanks (22), and the air blowing piece (21) is positioned in the settling tanks (22).
4. The quick drying device for the concrete wall according to claim 3, characterized in that: the air blowing piece (21) and the positioning enclosing plate (31) are provided with an adjusting assembly (5) together, and the adjusting assembly (5) comprises a contact piece (51) and a clamping piece (52); the contact piece (51) comprises a fixed strip (511) and two extending blocks (512), the two extending blocks (512) are arranged on the side wall of the air blowing piece (21) far away from the direction of the positioning enclosing plate (31), and the fixed strip (511) is arranged on one end of the two extending blocks (512) far away from the direction of the air blowing piece (21); the clamping piece (52) comprises a mounting plate (521) and two clamping blocks (522), the mounting plate (521) is arranged on the upper surface of the bearing plate (2), and the two clamping blocks (522) are arranged on the side wall, facing the air blowing piece (21), of the mounting plate (521); two block piece (522) clearance fit, two the lateral wall that block piece (522) are towards each other is provided with guide way (5221) that the fixed strip (511) of being convenient for supported into respectively.
5. The quick drying device for the concrete wall according to claim 4, characterized in that: extend piece (512) lateral wall along vertically running through and be provided with logical even hole (5121), it is provided with gag lever post (5122) to extend piece (512) in logical even hole (5121) department, accept board (2) upper surface and be provided with a plurality of locking grooves (23) that are convenient for gag lever post (5122) to support into.
6. The quick drying device for the concrete wall according to claim 1, characterized in that: the bottom support seat (1) and the bearing plate (2) are jointly provided with a lifting assembly (6), and the lifting assembly (6) comprises a butting column (61), a directional cylinder (62) and a clamping piece (63); the butt joint post (61) sets up in accepting board (2) lower surface, a directional section of thick bamboo (62) set up in base prop seat (1) upper surface, butt joint post (61) are located a directional section of thick bamboo (62) towards the one end of base prop seat (1), joint spare (63) are used for fixed connection butt joint post (61) and a directional section of thick bamboo (62).
7. The quick drying device for the concrete wall according to claim 6, characterized in that: the outer side wall of the abutting column (61) is provided with a plurality of embedded grooves (611) at intervals along the longitudinal direction.
8. The quick drying device for the concrete wall according to claim 6, characterized in that: the upper surface of the bottom support seat (1) is provided with a plurality of bearing cylinders (11), and a binding plate (12) is arranged on one end, facing the bearing plate (2), of a piston rod of each bearing cylinder (11) along the horizontal direction.
CN202120754009.7U 2021-04-13 2021-04-13 Quick drying device of concrete wall Active CN214537309U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120754009.7U CN214537309U (en) 2021-04-13 2021-04-13 Quick drying device of concrete wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120754009.7U CN214537309U (en) 2021-04-13 2021-04-13 Quick drying device of concrete wall

Publications (1)

Publication Number Publication Date
CN214537309U true CN214537309U (en) 2021-10-29

Family

ID=78273919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120754009.7U Active CN214537309U (en) 2021-04-13 2021-04-13 Quick drying device of concrete wall

Country Status (1)

Country Link
CN (1) CN214537309U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114353498A (en) * 2022-01-11 2022-04-15 李传旭 Wall quick drying device for architectural decoration construction
CN115031521A (en) * 2022-05-20 2022-09-09 江西省科森建筑科技有限公司 Integrated into one piece formula wall body is pour and is air-dried device with cement paste

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114353498A (en) * 2022-01-11 2022-04-15 李传旭 Wall quick drying device for architectural decoration construction
CN114353498B (en) * 2022-01-11 2023-02-07 深圳市龙岗区耳鼻咽喉医院 Wall quick drying device for architectural decoration construction
CN115031521A (en) * 2022-05-20 2022-09-09 江西省科森建筑科技有限公司 Integrated into one piece formula wall body is pour and is air-dried device with cement paste

Similar Documents

Publication Publication Date Title
CN214537309U (en) Quick drying device of concrete wall
CN202731297U (en) Adjustable beam form support jacking bracket apparatus
CN211903520U (en) Silicon carbide biscuit drying device
CN217799827U (en) Auxiliary tool for welding T-shaped section and flat steel plate with ball
CN215594893U (en) Descending plate formwork device
CN214770099U (en) Pipeline welding platform
CN212002272U (en) Bidirectional adjustable frame beam template clamp structure
CN110318790B (en) Supporting equipment and supporting method for underground chamber in roadway of copper mine area
CN205521852U (en) Board production machine warms up high strong type cement
CN114234602A (en) Drying equipment is used in chemical fiber surface fabric processing
CN208994602U (en) Finger-jointed plate automatic rollover pipeline
CN208918092U (en) A kind of motorization assembly formula curtain wall construction system
CN205926684U (en) Copper covers steel earthing pole straightener
CN214529731U (en) Heat preservation room for cloth fixation
CN214000972U (en) Drying device for ink machine
CN110802927A (en) Wall decoration lithography apparatus
CN219242803U (en) Pipeline laying frame with regulatory function
CN220868832U (en) Adjustable clear water inclined wall template supporting structure
CN212673677U (en) Floor drying equipment
CN218881608U (en) Side wall draw-in groove die carrier of adjustable height
CN220946653U (en) Shaping tool for automobile products
CN211227394U (en) But anchor clamps are placed to laboratory reuse's model
CN219587304U (en) Curing equipment capable of saving energy and uniformly curing
CN204402011U (en) A kind of segmented keel for supporting
CN214448257U (en) Shaping clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant