CN214531997U - High-rise steel structure column installation measurement correction structure - Google Patents

High-rise steel structure column installation measurement correction structure Download PDF

Info

Publication number
CN214531997U
CN214531997U CN202121035695.9U CN202121035695U CN214531997U CN 214531997 U CN214531997 U CN 214531997U CN 202121035695 U CN202121035695 U CN 202121035695U CN 214531997 U CN214531997 U CN 214531997U
Authority
CN
China
Prior art keywords
steel structure
fixedly connected
plate
measurement correction
installation measurement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121035695.9U
Other languages
Chinese (zh)
Inventor
陈江红
余富忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Zhibang Housing Industry Group Co ltd
Original Assignee
Jiangxi Zhibang Housing Industry Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Zhibang Housing Industry Group Co ltd filed Critical Jiangxi Zhibang Housing Industry Group Co ltd
Priority to CN202121035695.9U priority Critical patent/CN214531997U/en
Application granted granted Critical
Publication of CN214531997U publication Critical patent/CN214531997U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a high-rise steel structure post installation measurement correction structure relates to building engineering technical field, include the bottom plate and install the support column of antiskid gasket, the through-hole that hydraulic prop was installed to the inner wall is seted up at the top of bottom plate, hydraulic prop's one end fixedly connected with grip block, fixed hasp is installed to the one end of grip block, the inside laminating of grip block is connected with the steel structure post, the front side fixedly connected with deviation dish of bottom plate. The utility model discloses, through installing the antiskid gasket in the bottom of support column, improve the installation stability of bottom plate to the steel structure post, through the setting of through-hole, hydraulic prop, grip block and fixed hasp, when installing the steel structure post, can adjust the position of steel structure post in the through-hole according to the numerical value that the caliber measured, reduce the error of numerical value, and then increase the quality of engineering, through the connection of roof, reinforcing plate and hinge, make the roof centre gripping in the both sides of steel structure post.

Description

High-rise steel structure column installation measurement correction structure
Technical Field
The utility model relates to a building engineering technical field, more specifically relate to a high-rise steel structure post installation measurement corrects structure.
Background
The steel structure is a structure formed by steel materials, is one of main building structure types, mainly comprises beam steel, steel columns, steel trusses and other members made of section steel, steel plates and the like, and adopts rust removing and preventing processes of silanization, pure manganese phosphating, washing drying, galvanization and the like.
Most engineering now is steel construction installation engineering, and in this type of engineering operation, there is strict standard apart from between the steel, if the error appears, probably causes the acceptance of this engineering unqualified, can cause very big influence to the engineering quality more.
In chinese utility model patent application no: the utility model discloses a many high-rise steel structure post installation measurement correction structure in CN201120299978.4, including the steel structure post, the steel structure post forms the butt joint between last section post and lower section post, and characterized by sets up the screw rod regulating unit and is: the upper positioning plate is horizontally arranged on the upper section column, the lower positioning plate is horizontally arranged on the lower section column, the upper positioning plate and the lower positioning plate are located on the same vertical line, an adjusting screw rod is arranged between the upper positioning plate and the lower positioning plate, the adjusting screw rod is fixedly connected with the upper positioning plate and the lower positioning plate through nuts at two ends respectively, and the nuts are in threaded fit with the adjusting screw rod. This many high-rise steel structure post installation measurement rectifies structure, when installing the steel structure post, be not convenient for adjust steel column bottom fixed, produce the deviation easily, during manual adjustment, relatively poor to the top stability of steel column, produce the slope easily, the steel column is fixed unstable, easily produces the shortcoming of rocking the numerical value that increases the error.
Therefore, it is necessary to provide a measurement and correction structure for high-rise steel structural column installation to solve the above problems.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model aims to provide a: in order to solve many high-rise steel structure post erection measurement and correction structure, when installing steel structure post, be not convenient for adjust steel column bottom mounting, produce the deviation easily, during manual adjustment, relatively poor to the top stability of steel column, produce the slope easily, the steel column is fixed unstable, easily produces the problem of rocking the numerical value of increase error, the utility model provides a many high-rise steel structure post erection measurement and correction structure.
(II) technical scheme
The utility model discloses a realize above-mentioned purpose and specifically adopt following technical scheme:
the utility model provides a high-rise steel structure column installation measurement rectifies structure, includes the bottom plate and installs the support column of antiskid gasket, the through-hole that hydraulic prop was installed to the inner wall is seted up at the top of bottom plate, hydraulic prop's one end fixedly connected with grip block, fixed hasp is installed to the one end of grip block, the inside laminating of grip block is connected with the steel structure column, the front side fixedly connected with deviation dish of bottom plate, the rear side fixedly connected with caliber of deviation dish, the bilateral symmetry fixedly connected with motor of through-hole, the mounting groove that is used for installing the gear is offered to one side symmetry of keeping away from the through-hole of motor.
Further, the output shaft end of the motor is fixedly connected with one end of the gear, and the mounting grooves are distributed at equal intervals.
Further, one side of the top of the steel structure column is symmetrically and movably connected with a top plate, and a reinforcing plate used for stabilizing the steel structure column is installed on one side of the top plate.
Furthermore, one side of each of the two top plates is fixedly connected with a hinge, and the bottom of each top plate is symmetrically provided with a fixing shaft for mounting a connecting plate.
Furthermore, the inside swing joint of fixed axle has movable sleeve, movable sleeve's one end fixedly connected with regulation pole.
Furthermore, one side of the top of the mounting groove is fixedly connected with a limiting plate, and the inside of the limiting plate is matched with the adjusting rod.
Furthermore, a rack is fixedly connected to one side of the bottom end of the adjusting rod, and the rack is meshed with the gear.
Further, one side fixedly connected with fixed plate that the roof is far away from the hinge, one side fixedly connected with solid fixed ring of fixed plate.
Furthermore, the opposite side fixedly connected with locking piece of fixed plate, one side swing joint of solid fixed ring has the locking lever, the locking piece is run through to the one end of locking lever.
Furthermore, the top swing joint of locking piece has the gag lever post, the bottom of gag lever post runs through locking piece and locking lever in proper order.
(III) advantageous effects
The utility model has the advantages as follows:
1. the utility model discloses, through installing the antiskid gasket in the bottom of support column, improve the installation stability of bottom plate to the steel structure post, through the cooperation setting of through-hole, hydraulic prop, grip block and fixed hasp, when installing the steel structure post, can adjust the position of steel structure post in the through-hole according to the numerical value that the caliber measured, reduce the error of numerical value, and then increase the quality of engineering, through the connection of roof, reinforcing plate and hinge, make the roof centre gripping in the both sides of steel structure post.
2. The utility model discloses, through the cooperation setting of motor, mounting groove, gear and limiting plate, the rack that makes the regulation pole bottom meshes the activity in one side of gear, drives and adjusts the pole at the limiting plate internalization, through connecting plate, fixed axle and movable sleeve, installs the bottom of roof in top one side of motor, is convenient for remove the regulation to both sides to the steel construction post, prevents the deviation from appearing, influences the quality of building.
3. The utility model discloses, through the cooperation setting of fixed plate, solid fixed ring, locking piece, locking lever and gag lever post, make the one end of two roofs together fixed, prevent to rock when installing the steel construction post, influence measuring accuracy, the locking lever is L type structure, and crooked one end is greater than solid fixed ring's diameter, prevents to drop and influences the use.
Drawings
Fig. 1 is a schematic perspective front view of the structure of the present invention;
FIG. 2 is a schematic perspective side view of the structure of the present invention;
fig. 3 is a schematic perspective top view of the structure of the present invention;
FIG. 4 is an enlarged schematic view of the structure of area A in FIG. 1 according to the present invention;
fig. 5 is an enlarged schematic view of the structure of region B in fig. 2 according to the present invention.
Reference numerals: 1. a base plate; 2. a support pillar; 3. a through hole; 4. a hydraulic prop; 5. a clamping plate; 6. fixing the lock catch; 7. a steel structural column; 8. a deviation disc; 9. a measurer; 10. a motor; 11. mounting grooves; 12. a gear; 13. a limiting plate; 14. a top plate; 15. a reinforcing plate; 16. a hinge; 17. a connecting plate; 18. a fixed shaft; 19. a movable sleeve; 20. adjusting a rod; 21. a rack; 22. a fixing plate; 23. a fixing ring; 24. a locking block; 25. a lock lever; 26. a limiting rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Please refer to fig. 1-4, a high-rise steel structure column installation measurement correction structure, including bottom plate 1 and support column 2 installed with anti-sliding gasket, through-hole 3 installed with hydraulic prop 4 on the inner wall is set up at the top of bottom plate 1, one end fixedly connected with grip block 5 of hydraulic prop 4, fixed hasp 6 is installed to the one end of grip block 5, the inside laminating of grip block 5 is connected with steel structure column 7, the front side fixedly connected with deviation dish 8 of bottom plate 1, the rear side fixedly connected with caliber 9 of deviation dish 8, the bilateral symmetry fixedly connected with motor 10 of through-hole 3, one side symmetry of keeping away from through-hole 3 of motor 10 is set up the mounting groove 11 that is used for installing gear 12, the output shaft tip of motor 10 and the one end fixed connection of gear 12, a plurality of mounting grooves 11 are equidistant distribution.
In this embodiment, install the antiskid gasket through the bottom at support column 2, improve bottom plate 1 and to the installation stability of steel construction post 7, set up through the cooperation of through-hole 3, hydraulic prop 4, grip block 5 and fixed hasp 6, when installing steel construction post 7, can adjust the position of steel construction post 7 in through-hole 3 according to the numerical value that the caliber 9 measured, reduce the error of numerical value, and then increase the quality of engineering.
Example 2
Referring to fig. 1 to 4, the present embodiment is further optimized based on embodiment 1, specifically, a top plate 14 is symmetrically and movably connected to one side of the top of the steel structural column 7, and a reinforcing plate 15 for stabilizing the steel structural column 7 is installed on one side of the top plate 14.
Specifically, one side of each of the two top plates 14 is fixedly connected with a hinge 16, and the bottom of each of the top plates 14 is symmetrically provided with a fixed shaft 18 for mounting a connecting plate 17.
Specifically, a movable sleeve 19 is movably connected inside the fixed shaft 18, and an adjusting rod 20 is fixedly connected to one end of the movable sleeve 19.
Specifically, one side of the top of the mounting groove 11 is fixedly connected with a limiting plate 13, and the inside of the limiting plate 13 is matched with the adjusting rod 20.
In this embodiment, through the rack 21 meshing activity in one side of gear 12 of adjusting pole 20 bottom, motor 10 drives and adjusts pole 20 and move about in limiting plate 13, through connecting plate 17, fixed axle 18 and movable sleeve 19, installs the top one side at motor 10 with the bottom of roof 14, is convenient for remove the regulation to both sides to steel construction post 7, prevents the deviation, influences the quality of building.
Example 3
Referring to fig. 1-5, the present embodiment is optimized based on embodiment 1 or embodiment 2, specifically, a rack 21 is fixedly connected to one side of the bottom end of the adjusting rod 20, and the rack 21 is engaged with the gear 12.
Specifically, a fixing plate 22 is fixedly connected to a side of the top plate 14 away from the hinge 16, and a fixing ring 23 is fixedly connected to a side of the fixing plate 22.
Specifically, the other side of the fixing plate 22 is fixedly connected with a locking block 24, one side of the fixing ring 23 is movably connected with a locking rod 25, and one end of the locking rod 25 penetrates through the locking block 24.
Specifically, the top of the locking block 24 is movably connected with a limiting rod 26, and the bottom end of the limiting rod 26 sequentially penetrates through the locking block 24 and the locking rod 25.
In this embodiment, link together locking piece 24 and locking lever 25 through gag lever post 26, make the one end of two roof 14 fixed together, prevent to rock when installing steel construction post 7, influence measuring accuracy, locking lever 25 is L type structure, and crooked one end is greater than the diameter of solid fixed ring 23, prevents to drop and influences the use.
In summary, the following steps: the utility model discloses, through installing the antiskid gasket in the bottom of support column 2, improve the installation stability of bottom plate 1 to steel structure post 7, through the outer surface fixation to grip block 5 at the inner wall numerical value of through-hole 3 a plurality of hydraulic prop 4, through fixed hasp 6 to grip block 5 one end fixed, when installing steel structure post 7, can adjust the position of steel structure post 7 in through-hole 3 according to the numerical value that caliber 9 measured, reduce the error of numerical value, and then increase the quality of engineering, through the roof 14, the connection of reinforcing plate 15 and hinge 16, make roof 14 centre gripping in the both sides of steel structure post 7, drive gear 12 at mounting groove 11, internal rotation through motor 10, make the rack 21 of adjusting the pole 20 bottom mesh the activity in one side of gear 12, drive regulation pole 20 and move about in limiting plate 13, through connecting plate 17, fixed axle 18 and movable sleeve 19, install the bottom of roof 14 in motor 10 top one side, be convenient for to steel construction post 7 to both sides removal regulation, prevent the deviation, one end through locking lever 25 passes solid fixed ring 23 and locking piece 24, link together locking piece 24 and locking lever 25 through gag lever post 26, make the one end of two roof 14 fixed together, prevent to rock when installing steel construction post 7, influence measuring accuracy, locking lever 25 is L type structure, crooked one end is greater than solid fixed ring 23's diameter, prevent to drop the influence and use.
Above, only be the preferred embodiment of the present invention, not be used for limiting the present invention, the patent protection scope of the present invention is based on the claims, all the structural changes equivalent to the content of the description and drawings of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The utility model provides a high-rise steel structure column installation measurement correction structure, includes bottom plate (1) and installs support column (2) of antiskid gasket, its characterized in that: the top of the bottom plate (1) is provided with a through hole (3) with a hydraulic prop (4) arranged on the inner wall, one end of the hydraulic prop (4) is fixedly connected with a clamping plate (5), one end of the clamping plate (5) is provided with a fixed lock catch (6), and the inside of the clamping plate (5) is connected with a steel structure column (7) in a fitting manner;
the front side fixedly connected with deviation dish (8) of bottom plate (1), rear side fixedly connected with caliber (9) of deviation dish (8), the bilateral symmetry fixedly connected with motor (10) of through-hole (3), mounting groove (11) that are used for installing gear (12) are offered to the one side symmetry of keeping away from through-hole (3) of motor (10).
2. The high-rise steel structure column installation measurement correction structure of claim 1, characterized in that: the end part of an output shaft of the motor (10) is fixedly connected with one end of the gear (12), and the mounting grooves (11) are distributed at equal intervals.
3. The high-rise steel structure column installation measurement correction structure of claim 1, characterized in that: one side of the top of the steel structure column (7) is symmetrically and movably connected with a top plate (14), and a reinforcing plate (15) used for stabilizing the steel structure column (7) is installed on one side of the top plate (14).
4. The high-rise steel structure column installation measurement correction structure of claim 3, characterized in that: hinges (16) are fixedly connected to one sides of the two top plates (14), and fixing shafts (18) used for mounting connecting plates (17) are symmetrically arranged at the bottoms of the top plates (14).
5. The high-rise steel structure column installation measurement correction structure of claim 4, characterized in that: the inner part of the fixed shaft (18) is movably connected with a movable sleeve (19), and one end of the movable sleeve (19) is fixedly connected with an adjusting rod (20).
6. The high-rise steel structure column installation measurement correction structure of claim 1, characterized in that: one side of the top of the mounting groove (11) is fixedly connected with a limiting plate (13), and the inside of the limiting plate (13) is matched with the adjusting rod (20).
7. The high-rise steel structure column installation measurement correction structure of claim 5, characterized in that: one side of the bottom end of the adjusting rod (20) is fixedly connected with a rack (21), and the rack (21) is meshed with the gear (12).
8. The high-rise steel structure column installation measurement correction structure of claim 3, characterized in that: one side fixedly connected with fixed plate (22) that hinge (16) were kept away from in roof (14), one side fixedly connected with solid fixed ring (23) of fixed plate (22).
9. The high-rise steel structure column installation measurement correction structure of claim 8, characterized in that: the opposite side fixedly connected with locking piece (24) of fixed plate (22), one side swing joint of solid fixed ring (23) has locking lever (25), locking piece (24) is run through to the one end of locking lever (25).
10. The high-rise steel structure column installation measurement correction structure of claim 9, characterized in that: the top swing joint of locking piece (24) has gag lever post (26), the bottom of gag lever post (26) runs through locking piece (24) and locking lever (25) in proper order.
CN202121035695.9U 2021-05-14 2021-05-14 High-rise steel structure column installation measurement correction structure Active CN214531997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121035695.9U CN214531997U (en) 2021-05-14 2021-05-14 High-rise steel structure column installation measurement correction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121035695.9U CN214531997U (en) 2021-05-14 2021-05-14 High-rise steel structure column installation measurement correction structure

Publications (1)

Publication Number Publication Date
CN214531997U true CN214531997U (en) 2021-10-29

Family

ID=78284123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121035695.9U Active CN214531997U (en) 2021-05-14 2021-05-14 High-rise steel structure column installation measurement correction structure

Country Status (1)

Country Link
CN (1) CN214531997U (en)

Similar Documents

Publication Publication Date Title
CN214531997U (en) High-rise steel structure column installation measurement correction structure
CN111058647A (en) Assembled building wall and composite beam integrated supporting structure
CN219992453U (en) Lattice column correction fixing device
CN209837698U (en) Reinforcing apparatus of aluminium alloy template system vertical regulation back of body is stupefied
CN217924354U (en) A super large metal furred ceiling structure for steel construction cornice
CN114517701B (en) Tunnel steel arch centering lock foot anchor pipe angle control device
CN216690432U (en) Steel column installation straightness's that hangs down rectifies fixture
CN218061377U (en) Scaffold frame bottom reinforcing apparatus for construction
CN220261414U (en) Reinforcing steel bar binding jig frame for producing prefabricated plate girder
CN206971383U (en) A kind of H profile steel structural supporter
CN219011856U (en) Stable type urban wall restoration support frame
CN218623192U (en) Temporary lap joint climbing frame for construction engineering construction
CN219080307U (en) Lattice column orientation positioning and adjusting device
CN215802303U (en) Steel house assembling connecting part
CN218667879U (en) Assembled steel construction building coupling assembling
CN216196765U (en) Exempt from welded steel column correction equipment
CN220599185U (en) Reinforcing screw for installing single-side template of constructional column
CN221567530U (en) Building support structure
CN220058860U (en) Building aluminum mould wall body reinforcing and leveling combined member
CN220620454U (en) Green building fireproof steel structure
CN219952653U (en) Construction scaffold assembly reinforced structure
CN220889417U (en) Adjustable scaffold base
CN204059903U (en) Large area is encorbelmented the construction bearing platform of building
CN219692739U (en) Suspension device for special-shaped high-rise building window installation measuring instrument
CN219569633U (en) Be used for steel construction beam column installation with supplementary orthotic devices

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant