CN220620454U CN202322239807.8U CN202322239807U CN220620454U CN 220620454 U CN220620454 U CN 220620454U CN 202322239807 U CN202322239807 U CN 202322239807U CN 220620454 U CN220620454 U CN 220620454U
Authority
CN
China
Prior art keywords
steel
steel structure
boss
water pipe
green building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322239807.8U
Other languages
Chinese (zh)
Inventor
黄美霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Chengri Construction Co ltd
Original Assignee
Zhejiang Chengri Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Chengri Construction Co ltd filed Critical Zhejiang Chengri Construction Co ltd
Priority to CN202322239807.8U priority Critical patent/CN220620454U/en
Application granted granted Critical
Publication of CN220620454U publication Critical patent/CN220620454U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a green building fireproof steel structure, which comprises a steel structure base, wherein a steel structure boss is welded at the top of the steel structure base, a steel structure support column is welded at the position, close to the inner side of the steel structure boss, of the top center of the steel structure base, a concave cavity is formed at the position, close to the lower side of the steel structure boss, of the bottom of the steel structure base, a balance adjusting steel column penetrates through the top of the steel structure boss, a pin hole is formed in the outer wall of one side of the balance adjusting steel column, a threaded rod is connected at the position, close to the balance adjusting steel column, of the outer wall of one side of the steel structure boss in a screwed mode, and a pin rod is welded at one end of the threaded rod. The green building fireproof steel structure can jack up the steel structure base to the position of the horizontal position with the horizontal plane through a plurality of balance adjustment steel columns on the steel structure boss, so that the steel structure base is fully contacted with uneven ground, and the stability and firmness of the installation of the steel structure base are ensured.

Description

Green building fireproof steel structure
Technical Field
The utility model relates to the technical field of steel structures, in particular to a green building fireproof steel structure.
Background
The steel structure is a structure formed by steel materials, is one of main building structure types, is simple and convenient to construct due to lighter self weight, and is widely applied to the fields of large-scale plants, venues, super high-rise and the like.
In the prior art, the following problems exist: the in-process of installation of current green building steel construction needs to be adjusted owing to ground unevenness, and most steel construction does not have adjustment mechanism, need cut steel, and it is slow to lead to the progress of installation to, most green building steel construction has fire prevention mechanism, but fire prevention mechanism's water through pipe is inconvenient fixed, leads to the water through pipe to take place to drop easily.
Therefore, a green building fireproof steel structure is provided.
Disclosure of Invention
The utility model aims to provide a green building fireproof steel structure for solving the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a green building fire prevention steel construction, includes the steel construction base, the top welding of steel construction base has the steel construction boss, and the inside position department welding that the top central authorities of steel construction base are close to the steel construction boss has the steel construction support column, the below position department that the bottom of steel construction base is close to the steel construction boss has seted up the cavity, the top of steel construction boss runs through has balanced regulation steel column, the pinhole has been seted up on the outer wall of one side of balanced regulation steel column, be close to the one side position department that the balanced regulation steel column is connected with the threaded rod through the screw thread turn on the outer wall of one side of steel construction boss, the one end welding of threaded rod has the round disc, through screw fixedly connected with water pipe mounting bracket on the inner wall of one side of steel construction support column, the water pipe mounting hole has been seted up at the top of water pipe mounting bracket, the inside of keeping away from on the water pipe mounting bracket is connected with fastening nut through the screw thread turn on the outer wall of one side of steel construction support column.
Compared with the prior art, the utility model has the beneficial effects that: this green building fire prevention steel construction can jack-up steel construction base to the department with horizontal plane horizontal position through a plurality of balance adjustment steel columns on the steel construction boss to make steel construction base and the abundant contact of uneven ground, guarantee steel construction base installation's stable firm, thereby guarantee steel construction support column perpendicular to ground, guarantee the stable firm that steel construction support column set up, the one end extrusion water pipe through fastening nut can realize the fixed on the water pipe position, realize the convenient of water pipe and fix, avoid the water pipe not hard up droing.
Drawings
FIG. 1 is a front view of the present utility model;
FIG. 2 is a front view of a steel structure base of the present utility model;
FIG. 3 is a front view of the water tube mounting bracket of the present utility model;
FIG. 4 is a front view of a balance adjustment steel column of the present utility model;
FIG. 5 is a front view of a threaded rod according to the present utility model;
fig. 6 is an enlarged view of the utility model at a in fig. 1.
In the figure: 1. a steel structure base; 2. a steel structure boss; 3. a steel structure support column; 4. a cavity; 5. balance adjusting the steel column; 6. a pin hole; 7. a threaded rod; 8. a pin rod; 9. a disc; 10. a water pipe mounting rack; 11. a water pipe mounting hole; 12. a water pipe; 13. and (5) fastening the nut.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-6, the present utility model provides a technical solution: the cross section of the steel structure boss 2 and the concave cavity 4 is of a rectangular frame structure, the steel structure boss 2 and the concave cavity 4 can be arranged on the outer side of the steel structure supporting column 3, the balance adjusting steel column 5 is arranged on the outer side of the steel structure supporting column 3, and the steel structure base 1 is jacked up through the contact between the balance adjusting steel column 5 and the ground.
One end of the balance adjusting steel column 5 is located in the concave cavity 4, and the steel structure base 1 can be jacked up through the contact between the bottom end of the balance adjusting steel column 5 and the ground, so that the steel structure base 1 is stably installed and fixed.
The top of the steel structure base 1 is provided with a bolt mounting hole near the outer side position of the steel structure boss 2, and the steel structure base 1 can be fixedly connected with an expansion bolt on the ground.
The pin rod 8 is matched with the pin hole 6, one end of the pin rod 8 is inserted into the pin hole 6, so that the pin rod 8 is inserted into the pin hole 6, the position of the balance adjusting steel column 5 is fixed, and the balance adjusting steel column 5 is fixed at different positions of the steel structure boss 2.
Twelve balance adjustment steel columns 5 are arranged in total, and twelve balance adjustment steel columns 5 are symmetrically arranged at the top of the steel structure boss 2, so that the steel structure base 1 can be supported at a plurality of positions in four directions, the steel structure base 1 and uneven ground are horizontal, and the steel structure support columns 3 are vertically arranged and installed.
The steel structure support column 3 is I-shaped steel, and the water pipe 12 is L-shaped steel water pipe, guarantees the structural strength of steel structure support column 3, also is convenient for water pipe 12 accomodate in the inboard of steel structure support column 3.
One end of the fastening nut 13 is pressed on the outer side wall of the water pipe 12, and the water pipe 12 can be fixed in position by pressing one end of the fastening nut 13 on the water pipe 12.
Working principle: when the novel water pipe fixing device is used, the steel structure base 1 is hoisted to a position where installation is needed, when the ground is uneven, the bottom of the steel structure base 1 is contacted with the protruding position of the ground, the balance adjusting steel column 5 is lifted in the steel structure boss 2, the bottom end of the balance adjusting steel column 5 is contacted with the concave surface of the ground, the disc 9 is rotated, the disc 9 drives the threaded rod 7 to rotate, one end of the threaded rod 7 moves, the pin rod 8 on the threaded rod 7 synchronously moves, the pin rod 8 is inserted into the pin hole 6 on the balance adjusting steel column 5, fixing on the position of the balance adjusting steel column 5 is achieved, the steel structure base 1 can be jacked to the position of the horizontal plane through adjusting the position of the bottom end of the balance adjusting steel column 5, so that the steel structure support column 3 is perpendicular to the ground, the stability and firmness of the steel structure support column 3 are guaranteed, the steel structure base 1 is fixedly connected with the reserved expansion bolt hole on the ground, the water pipe mounting frame 10 is fixedly mounted on the inner wall of the steel structure support column 3, the water pipe 12 passes through the water pipe mounting hole 11 on the water pipe mounting frame 10, the water pipe 13 is rotatably fastened, and one end of the water pipe 12 can be fixedly pressed by the nut 13.
To sum up: this green building fire prevention steel construction can jack-up steel construction base 1 to the position department with horizontal plane horizontal position through a plurality of balance adjustment steel columns 5 on the steel construction boss 2 to make steel construction base 1 and the abundant contact of uneven ground, guarantee the stability of steel construction base 1 installation firm, thereby guarantee steel construction support column 3 perpendicular to ground, guarantee the stability firm that steel construction support column 3 set up, the one end extrusion water pipe 12 through fastening nut 13 can realize the fixed on the position of water pipe 12, realize the convenient fixed of water pipe 12, avoid water pipe 12 not hard up droing.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a green building fire prevention steel construction, includes steel construction base (1), its characterized in that: the top welding of steel construction base (1) has steel construction boss (2), and the inside position department welding that the top central authorities of steel construction base (1) are close to steel construction boss (2) has steel construction support column (3), cavity (4) have been seted up to the below position department that the bottom of steel construction base (1) is close to steel construction boss (2), balanced regulation steel column (5) have been run through at the top of steel construction boss (2), pinhole (6) have been seted up on the outer wall of one side of balanced regulation steel column (5), be close to one side position department that balances regulation steel column (5) on the outer wall of steel construction boss (2) and be connected with threaded rod (7) through the screw, the one end welding of threaded rod (7) has round disc (9), through screw fixedly connected with water pipe mounting bracket (10) on the inner wall of one side of steel construction support column (3), water pipe mounting bracket (10) have been seted up through water pipe mounting hole (11), water pipe mounting bracket (12) have water pipe (3) to keep away from on the outer wall of screw through screw thread connection screw nut (13).
2. A green building fire protection steel structure according to claim 1, characterized in that: the cross sections of the steel structure boss (2) and the concave cavity (4) are rectangular frame structures.
3. A green building fire protection steel structure according to claim 1, characterized in that: one end of the balance adjusting steel column (5) is positioned in the concave cavity (4).
4. A green building fire protection steel structure according to claim 1, characterized in that: the top of the steel structure base (1) is provided with a bolt mounting hole at a position close to the outer side of the steel structure boss (2).
5. A green building fire protection steel structure according to claim 1, characterized in that: the pin rod (8) is matched and matched with the pin hole (6), and one end of the pin rod (8) is inserted into the pin hole (6).
6. A green building fire protection steel structure according to claim 1, characterized in that: twelve balance adjustment steel columns (5) are arranged in total, and the twelve balance adjustment steel columns (5) are symmetrically arranged at the top of the steel structure boss (2).
7. A green building fire protection steel structure according to claim 1, characterized in that: the steel structure support column (3) is an I-shaped steel, and the water pipe (12) is an L-shaped steel water pipe.
8. A green building fire protection steel structure according to claim 1, characterized in that: one end of the fastening nut (13) is extruded on the outer side wall of the water pipe (12).
CN202322239807.8U 2023-08-18 2023-08-18 Green building fireproof steel structure Active CN220620454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322239807.8U CN220620454U (en) 2023-08-18 2023-08-18 Green building fireproof steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322239807.8U CN220620454U (en) 2023-08-18 2023-08-18 Green building fireproof steel structure

Publications (1)

Publication Number Publication Date
CN220620454U true CN220620454U (en) 2024-03-19

Family

ID=90216069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322239807.8U Active CN220620454U (en) 2023-08-18 2023-08-18 Green building fireproof steel structure

Country Status (1)

Country Link
CN (1) CN220620454U (en)

Similar Documents

Publication Publication Date Title
CN220620454U (en) Green building fireproof steel structure
CN212153855U (en) Building curtain wall structure
CN219196719U (en) Cantilever support template for water inlet tower construction
CN209099189U (en) A kind of steel structure supporting column
CN215168502U (en) Environment-friendly energy-saving type steel structure factory building has
CN210194974U (en) Steel construction curtain bearing structure
CN219161316U (en) Multifunctional detection equipment for house building construction
CN107269014B (en) Hydraulic climbing formwork angle-variable protective net system
CN218990825U (en) Externally hung socket type disc buckle type steel pipe support scaffold for special-shaped cantilever structure
CN219316294U (en) Steel pipe column for raised floor system
CN214090310U (en) Effectual building structure of anti-wind rain
CN212129684U (en) Assembled steel construction building dysmorphism post
CN214034882U (en) Building structure reinforcing apparatus
CN218492332U (en) Safety warning device for electric power construction
CN220556714U (en) But reuse's roofing photovoltaic mounting bracket
CN219247421U (en) Improved single-side bridge support
CN212012005U (en) Environment-friendly crane span structure that antidetonation effect is good
CN219569697U (en) Supporting device for roof color steel plate replacement
CN221298706U (en) Steel construction anti-seismic support for house construction
CN217812477U (en) High and large space composite sound insulation wallboard mounting device
CN215407589U (en) Assembled architectural design support roof beam board
CN220167598U (en) Adjustable supporting structure for bailey frame distribution beam or profile steel
CN220440297U (en) Cable bridge bracket convenient for angle adjustment
CN221919935U (en) Reinforced connection composite seat body for aluminum-clad wood curtain wall upright post
CN218061377U (en) Scaffold frame bottom reinforcing apparatus for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant