CN212129684U - A prefabricated steel structure building special-shaped column - Google Patents

A prefabricated steel structure building special-shaped column Download PDF

Info

Publication number
CN212129684U
CN212129684U CN202020791427.9U CN202020791427U CN212129684U CN 212129684 U CN212129684 U CN 212129684U CN 202020791427 U CN202020791427 U CN 202020791427U CN 212129684 U CN212129684 U CN 212129684U
Authority
CN
China
Prior art keywords
bearing platform
shaped column
moving groove
steel structure
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020791427.9U
Other languages
Chinese (zh)
Inventor
陈章元
涂勇峰
刘松林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Yunchuang Building Engineering Technology Co ltd
Original Assignee
Ningbo Yunchuang Building Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Yunchuang Building Engineering Technology Co ltd filed Critical Ningbo Yunchuang Building Engineering Technology Co ltd
Priority to CN202020791427.9U priority Critical patent/CN212129684U/en
Application granted granted Critical
Publication of CN212129684U publication Critical patent/CN212129684U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种装配式钢结构建筑异形柱,包括工字柱本体和承载台,所述工字柱本体一端设置有加厚翼缘,且加厚翼缘内部开设有移动槽,并且移动槽一端位于加厚翼缘内部开设有滑槽,所述移动槽内部滑动连接有承载台。有益效果:本实用新型采用了移动槽、螺杆、套筒和承载台,在安装好工字柱本体之后,当承载台产生高低误差时,可通过扳手转动焊接有螺杆外表面的六角螺帽,从而转动螺杆,螺杆转动从套筒中转入或者转出,从而顶升或者拉动承载台在移动槽内部上下移动,从而调整高低误差,使承载台顶面为与统一高度上,便于工作人员安装吊车横梁等构件,极大的方便了工作人员调整,提高了施工效率。

Figure 202020791427

The utility model discloses an assembled steel structure special-shaped column, which comprises an I-shaped column body and a bearing platform. One end of the I-shaped column body is provided with a thickened flange, and a moving groove is opened inside the thickened flange, and One end of the moving groove is located inside the thickened flange and is provided with a chute, and a bearing platform is slidably connected inside the moving groove. Beneficial effects: The utility model adopts a moving groove, a screw, a sleeve and a bearing platform. After the I-shaped column body is installed, when the bearing platform has a height error, the hexagonal nut welded with the outer surface of the screw can be rotated by a wrench. Thus, the screw is rotated, and the screw rotates in or out from the sleeve, so as to lift or pull the bearing platform to move up and down inside the moving groove, so as to adjust the height error, so that the top surface of the bearing platform is at the same height, which is convenient for the staff to install. The crane beam and other components greatly facilitate the adjustment of the staff and improve the construction efficiency.

Figure 202020791427

Description

一种装配式钢结构建筑异形柱A prefabricated steel structure building special-shaped column

技术领域technical field

本实用新型涉及钢结构建筑技术领域,具体来说,涉及一种装配式钢结构建筑异形柱。The utility model relates to the technical field of steel structure buildings, in particular to a prefabricated steel structure building special-shaped column.

背景技术Background technique

钢结构建筑是一种新型的建筑体系,打通房地产业、建筑业、冶金业之间的行业界线,集合成为一个新的产业体系,这就是业内人士普遍看好的钢结构建筑体系,目前钢结构应用于多种建筑中,其中钢结构厂房应用最广,钢结构厂房中一般都会安装吊装小车,吊装小车下方安装吊装横梁,吊装横梁一般架设到钢结构柱表面的承台上。Steel structure building is a new type of building system, which opens up the industry boundaries between the real estate industry, construction industry and metallurgy industry, and integrates them into a new industrial system. This is the steel structure building system that is generally optimistic about the industry. Among various buildings, steel structure workshops are the most widely used. A hoisting trolley is generally installed in a steel structure workshop, and a hoisting beam is installed under the hoisting trolley. The hoisting beam is generally erected on the bearing platform on the surface of the steel structure column.

但是,传统的钢结构柱在工厂预制完成,在安装过程中虽然全程都有经纬仪对准调平,但是,人工安装难免会产生误差,导致承台顶面之间存在高度误差,不方便吊装横梁的安装,而传统的钢结构柱的承载台面不方便进行调整,从而影响了吊装横梁的安装,影响了施工进度,同时,传统的钢结构柱采用工字钢,工字钢由于腹板厚度较薄,还有翼缘板的影响,导致不易与装配式外墙板连接,导致外墙装配麻烦,也影响了施工进度。However, the traditional steel structure column is prefabricated in the factory. Although the theodolite is aligned and leveled during the installation process, manual installation will inevitably cause errors, resulting in a height error between the top surfaces of the caps, which is inconvenient to hoist the beam. However, the bearing table of the traditional steel structure column is inconvenient to adjust, which affects the installation of the hoisting beam and affects the construction progress. Thin, and the influence of the flange plate, it is not easy to connect with the prefabricated exterior wall panel, which leads to trouble in the assembly of the exterior wall, and also affects the construction progress.

针对相关技术中的问题,目前尚未提出有效的解决方案。For the problems in the related technologies, no effective solutions have been proposed so far.

实用新型内容Utility model content

(一)解决的技术问题(1) Technical problems solved

针对现有技术的不足,本实用新型提供了一种装配式钢结构建筑异形柱,具备便于调整、便于连接外墙的优点,进而解决上述背景技术中的问题。Aiming at the deficiencies of the prior art, the utility model provides a prefabricated steel structure building special-shaped column, which has the advantages of easy adjustment and easy connection of external walls, thereby solving the above-mentioned problems in the background technology.

(二)技术方案(2) Technical solutions

为实现上述便于调整、便于连接外墙的优点,本实用新型采用的具体技术方案如下:In order to realize the above advantages of being easy to adjust and easy to connect the outer walls, the specific technical scheme adopted by the present utility model is as follows:

一种装配式钢结构建筑异形柱,包括工字柱本体和承载台,所述工字柱本体一端设置有加厚翼缘,且加厚翼缘内部开设有移动槽,并且移动槽一端位于加厚翼缘内部开设有滑槽,所述移动槽内部滑动连接有承载台,且承载台一端位于滑槽内部焊接有滑动板,并且承载台另一端延伸出移动槽,所述承载台底面焊接有套筒,所述移动槽内底面对应套筒位置通过转动连接座转动连接有螺杆,且螺杆另一端螺纹插入到套筒内部,所述螺杆表面焊接有六角螺帽。A prefabricated steel structure special-shaped column includes an I-shaped column body and a bearing platform, one end of the I-shaped column body is provided with a thickened flange, and a moving groove is opened inside the thickened flange, and one end of the moving groove is located in the thickened flange. A chute is provided inside the thick flange, a bearing platform is slidably connected inside the moving slot, and one end of the bearing platform is located inside the chute and a sliding plate is welded, and the other end of the bearing platform extends out of the moving slot, and the bottom surface of the bearing platform is welded with a sliding plate. A sleeve, the inner bottom surface of the moving groove is rotatably connected with a screw through a rotating connecting seat corresponding to the position of the sleeve, and the other end of the screw is threaded into the sleeve, and a hexagonal nut is welded on the surface of the screw.

进一步的,所述工字柱本体另一端设置有标准翼缘,且标准翼缘外表面焊接有连接钢件,并且连接钢件两端开设有墙板槽,所述墙板槽一侧贯穿螺纹连接有安装螺栓。Further, the other end of the I-shaped column body is provided with a standard flange, and the outer surface of the standard flange is welded with a connecting steel piece, and two ends of the connecting steel piece are provided with a wall plate groove, and one side of the wall plate groove is threaded through the thread. Attached with mounting bolts.

进一步的,所述套筒设置有两个,且套筒关于承载台竖向中线位置对称布置。Further, there are two sleeves, and the sleeves are arranged symmetrically with respect to the vertical centerline of the bearing platform.

进一步的,所述转动连接座为圆盘型结构,且转动连接座内部转动连接有转动圆板,所述螺杆底面贯穿转动连接座顶面与转动圆板顶面中心位置焊接。Further, the rotating connecting seat is a disc-shaped structure, and a rotating circular plate is rotatably connected inside the rotating connecting seat.

进一步的,所述连接钢件和标准翼缘之间填充有保温填料,且保温填料由岩棉板制成。Further, thermal insulation filler is filled between the connecting steel piece and the standard flange, and the thermal insulation filler is made of rock wool board.

进一步的,所述墙板槽内部宽度等于外墙板厚度。Further, the inner width of the wall panel groove is equal to the thickness of the outer wall panel.

(三)有益效果(3) Beneficial effects

与现有技术相比,本实用新型提供了一种装配式钢结构建筑异形柱,具备以下有益效果:Compared with the prior art, the utility model provides a prefabricated steel structure building special-shaped column, which has the following beneficial effects:

(1)、本实用新型采用了移动槽、螺杆、套筒和承载台,在安装好工字柱本体之后,当承载台产生高低误差时,可通过扳手转动焊接有螺杆外表面的六角螺帽,从而转动螺杆,螺杆转动从套筒中转入或者转出,从而顶升或者拉动承载台在移动槽内部上下移动,从而调整高低误差,使承载台顶面为与统一高度上,便于工作人员安装吊车横梁等构件,极大的方便了工作人员调整,提高了施工效率。(1) The utility model adopts a moving groove, a screw, a sleeve and a bearing platform. After the I-shaped column body is installed, when the bearing platform has a height error, the hexagonal nut welded with the outer surface of the screw can be rotated and welded by a wrench. , so as to rotate the screw, the screw rotates in or out from the sleeve, so as to lift or pull the bearing platform to move up and down inside the moving groove, so as to adjust the height error, so that the top surface of the bearing platform is at the same height, which is convenient for the staff The installation of crane beams and other components greatly facilitates the adjustment of the staff and improves the construction efficiency.

(2)、本实用新型采用了连接钢件,连接钢件焊接在标准翼缘外表面,两端开设有墙板槽可插入外墙板,通过安装螺栓即可固定外墙板,从而大大方便了施工人员安装外墙,解决了传统钢结构柱不方便连接外墙的问题,提高了施工的便利性。(2) The utility model adopts the connecting steel pieces, which are welded on the outer surface of the standard flange, and the two ends are provided with wall panel grooves that can be inserted into the exterior wall panels, and the exterior wall panels can be fixed by installing bolts, which is greatly convenient It helps the construction personnel to install the outer wall, solves the problem that the traditional steel structure column is inconvenient to connect the outer wall, and improves the convenience of construction.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the accompanying drawings required in the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only of the present invention. For some embodiments of the present invention, for those of ordinary skill in the art, other drawings can also be obtained from these drawings without any creative effort.

图1是本实用新型提出的一种装配式钢结构建筑异形柱的俯视的结构示意图;Fig. 1 is the structural schematic diagram of a top view of a prefabricated steel structure building special-shaped column proposed by the present utility model;

图2是本实用新型工字柱本体的主视图;Fig. 2 is the front view of the utility model I-column body;

图3是本实用新型工字柱本体的A-A剖视图。FIG. 3 is an A-A sectional view of the I-column body of the present invention.

图中:In the picture:

1、工字柱本体;2、加厚翼缘;3、滑槽;4、承载台;5、滑动板;6、连接钢件;7、标准翼缘;8、墙板槽;9、安装螺栓;10、保温填料;11、移动槽;12、套筒;13、螺杆;14、转动连接座;15、六角螺帽;16、转动圆板。1. I-column body; 2. Thickened flange; 3. Chute; 4. Loading platform; 5. Sliding plate; 6. Connecting steel parts; 7. Standard flange; 8. Wall panel groove; 9. Installation Bolt; 10. Thermal insulation filler; 11. Moving groove; 12. Sleeve; 13. Screw; 14. Rotating connecting seat; 15. Hexagonal nut; 16. Rotating circular plate.

具体实施方式Detailed ways

为进一步说明各实施例,本实用新型提供有附图,这些附图为本实用新型揭露内容的一部分,其主要用以说明实施例,并可配合说明书的相关描述来解释实施例的运作原理,配合参考这些内容,本领域普通技术人员应能理解其他可能的实施方式以及本实用新型的优点,图中的组件并未按比例绘制,而类似的组件符号通常用来表示类似的组件。In order to further illustrate each embodiment, the present invention provides accompanying drawings, which are part of the disclosure of the present invention, which are mainly used to illustrate the embodiments, and can be used to explain the operation principles of the embodiments in conjunction with the relevant descriptions in the specification, With reference to these contents, those of ordinary skill in the art will understand other possible implementations and advantages of the present invention. Components in the figures are not drawn to scale, and similar component symbols are generally used to denote similar components.

根据本实用新型的实施例,提供了一种装配式钢结构建筑异形柱。According to an embodiment of the present invention, a prefabricated steel structure building special-shaped column is provided.

现结合附图和具体实施方式对本实用新型进一步说明,如图1-3所示,根据本实用新型实施例的一种装配式钢结构建筑异形柱,包括工字柱本体1和承载台4,工字柱本体1一端设置有加厚翼缘2,且加厚翼缘2内部开设有移动槽11,并且移动槽11一端位于加厚翼缘2内部开设有滑槽3,移动槽11和滑槽3等高,移动槽11内部滑动连接有承载台4,且承载台4一端位于滑槽3内部焊接有滑动板5,滑动板5在水平方向与滑槽3卡接,表面承载台4倾斜掉落,并且承载台4另一端延伸出移动槽11,承载台4底面焊接有套筒12,移动槽11内底面对应套筒12位置通过转动连接座14转动连接有螺杆13,且螺杆13另一端螺纹插入到套筒12内部,螺杆13表面焊接有六角螺帽15,便于转动螺杆13,在安装好工字柱本体1之后,当承载台4产生高低误差时,可通过扳手转动焊接有螺杆13外表面的六角螺帽15,从而转动螺杆13,螺杆13转动从套筒12中转入或者转出,从而顶升或者拉动承载台4在移动槽11内部上下移动,从而调整高低误差,使承载台4顶面为与统一高度上,便于工作人员安装吊车横梁等构件,极大的方便了工作人员调整,提高了施工效率。The present utility model will now be further described with reference to the accompanying drawings and specific embodiments. As shown in Figs. 1-3, a prefabricated steel structure building special-shaped column according to an embodiment of the present utility model includes an I-shaped column body 1 and a bearing platform 4, One end of the I-shaped column body 1 is provided with a thickened flange 2, and a moving groove 11 is opened inside the thickened flange 2, and one end of the moving groove 11 is located inside the thickened flange 2 with a chute 3, the moving groove 11 and the sliding groove 3. The grooves 3 are of the same height, the moving groove 11 is slidably connected with the carrying table 4, and one end of the carrying table 4 is located inside the chute 3 and welded with a sliding plate 5, the sliding plate 5 is clamped with the chute 3 in the horizontal direction, and the surface carrying table 4 is inclined The bottom surface of the carrying table 4 is welded with a sleeve 12, and the inner bottom surface of the moving groove 11 corresponds to the position of the sleeve 12 through the rotating connection seat 14. The screw rod 13 is rotatably connected, and the screw rod 13 is another One end of the thread is inserted into the sleeve 12, and the surface of the screw 13 is welded with a hexagonal nut 15, which is convenient for rotating the screw 13. After the I-column body 1 is installed, when the bearing platform 4 has a height error, the screw can be rotated and welded with a wrench. 13. The hexagonal nut 15 on the outer surface of 13 rotates the screw 13, and the screw 13 rotates in or out from the sleeve 12, thereby lifting or pulling the bearing platform 4 to move up and down inside the moving groove 11, so as to adjust the height error, so that the The top surface of the bearing platform 4 is at the same height, which is convenient for the staff to install the crane beam and other components, which greatly facilitates the staff to adjust and improves the construction efficiency.

在一个实施例中,工字柱本体1另一端设置有标准翼缘7,且标准翼缘7外表面焊接有连接钢件6,并且连接钢件6两端开设有墙板槽8,墙板槽8一侧贯穿螺纹连接有安装螺栓9,安装螺栓9另一端贯穿墙板并螺旋进入到墙板槽8另一侧内壁,标准翼缘7两端开设有墙板槽8可插入外墙板,通过安装螺栓9即可固定外墙板,从而大大方便了施工人员安装外墙,解决了传统钢结构柱不方便连接外墙的问题,提高了施工的便利性。In one embodiment, the other end of the I-column body 1 is provided with a standard flange 7, and the outer surface of the standard flange 7 is welded with a connecting steel piece 6, and the two ends of the connecting steel piece 6 are provided with wall plate grooves 8, and the wall plate A mounting bolt 9 is threaded through one side of the groove 8, and the other end of the mounting bolt 9 penetrates the wall panel and is screwed into the inner wall of the other side of the wall panel groove 8. The standard flange 7 is provided with a wall panel groove 8 at both ends to insert the outer wall panel. , the external wall panel can be fixed by installing the bolts 9, which greatly facilitates the construction personnel to install the external wall, solves the problem that the traditional steel structure column is inconvenient to connect the external wall, and improves the convenience of construction.

在一个实施例中,套筒12设置有两个,且套筒12关于承载台4竖向中线位置对称布置,对称支撑承载台4和吊车横梁,提高支撑力。In one embodiment, two sleeves 12 are provided, and the sleeves 12 are arranged symmetrically with respect to the vertical centerline of the bearing platform 4 to symmetrically support the bearing platform 4 and the crane beam to improve the supporting force.

在一个实施例中,转动连接座14为圆盘型结构,且转动连接座14内部转动连接有转动圆板16,螺杆13底面贯穿转动连接座14顶面与转动圆板16顶面中心位置焊接,转动螺杆13时,螺杆13带动转动圆板16在转动连接座14内部转动,从而实现螺杆13与套筒12的相对转动。In one embodiment, the rotating connecting seat 14 is a disc-shaped structure, and a rotating circular plate 16 is rotatably connected inside the rotating connecting seat 14 . , When the screw 13 is rotated, the screw 13 drives the rotating circular plate 16 to rotate inside the rotating connecting seat 14, so as to realize the relative rotation of the screw 13 and the sleeve 12.

在一个实施例中,连接钢件6和标准翼缘7之间填充有保温填料10,且保温填料10由岩棉板制成,起到一定的保温隔热作用。In one embodiment, a thermal insulation filler 10 is filled between the connecting steel member 6 and the standard flange 7, and the thermal insulation filler 10 is made of rock wool board, which plays a certain role in thermal insulation.

在一个实施例中,墙板槽8内部宽度等于外墙板厚度,减少外墙板插入到墙板槽8内部后与墙板槽8之间的缝隙,同时,墙板槽8和外墙板之间还可以使用建筑密封胶进一步进行密封。In one embodiment, the internal width of the wall panel groove 8 is equal to the thickness of the external wall panel, reducing the gap between the external wall panel and the wall panel groove 8 after the external wall panel is inserted into the interior of the wall panel groove 8. At the same time, the wall panel groove 8 and the external wall panel A building sealant can also be used for further sealing in between.

工作原理:working principle:

在安装好工字柱本体1之后,当承载台4产生高低误差时,可通过扳手转动焊接有螺杆13外表面的六角螺帽15,从而转动螺杆13,螺杆13转动从套筒12中转入或者转出,从而顶升或者拉动承载台4在移动槽11内部上下移动,从而调整高低误差,使承载台4顶面为与统一高度上,便于工作人员安装吊车横梁等构件,极大的方便了工作人员调整,提高了施工效率,标准翼缘7两端开设有墙板槽8可插入外墙板,通过安装螺栓9即可固定外墙板,从而大大方便了施工人员安装外墙,解决了传统钢结构柱不方便连接外墙的问题,提高了施工的便利性。After the I-shaped column body 1 is installed, when the bearing platform 4 has a height error, the hexagonal nut 15 welded with the outer surface of the screw 13 can be rotated by a wrench, thereby rotating the screw 13, and the screw 13 is rotated from the sleeve 12. Or turn out, so as to lift or pull the carrying platform 4 to move up and down inside the moving groove 11, so as to adjust the height error, so that the top surface of the carrying platform 4 is at the same height, which is convenient for the staff to install the crane beam and other components, which is very convenient It can adjust the staff and improve the construction efficiency. The two ends of the standard flange 7 are provided with wall panel grooves 8 which can be inserted into the external wall panels. It solves the problem that the traditional steel structure column is inconvenient to connect the outer wall, and improves the convenience of construction.

在本实用新型中,除非另有明确的规定和限定,术语“安装”、“设置”、“连接”、“固定”、“旋接”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定,对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。In the present utility model, unless otherwise expressly specified and limited, terms such as "installation", "arrangement", "connection", "fixation", "swivel connection" should be understood in a broad sense, for example, it may be a fixed connection, It can also be detachable connection or integrated; it can be mechanical connection or electrical connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal communication of two elements or the interaction of two elements Unless otherwise clearly defined, those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention according to specific situations.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the within the scope of protection of the present invention.

Claims (6)

1. The assembled steel structure building special-shaped column is characterized by comprising an I-shaped column body (1) and a bearing platform (4), wherein one end of the I-shaped column body (1) is provided with a thickening flange (2), a moving groove (11) is formed in the thickening flange (2), one end of the moving groove (11) is positioned in the thickening flange (2) and provided with a sliding groove (3), the moving groove (11) is connected with the bearing platform (4) in a sliding manner, one end of the bearing platform (4) is positioned in the sliding groove (3) and welded with a sliding plate (5), the other end of the bearing platform (4) extends out of the moving groove (11), a sleeve (12) is welded on the bottom surface of the bearing platform (4), the position of the inner bottom surface of the moving groove (11), which corresponds to the sleeve (12), is rotatably connected with a screw rod (13) through a rotating connecting seat (14), and the other end of the, and a hexagonal nut (15) is welded on the surface of the screw rod (13).
2. The assembly type steel structure building special-shaped column as claimed in claim 1, wherein a standard flange (7) is arranged at the other end of the I-shaped column body (1), a connecting steel member (6) is welded on the outer surface of the standard flange (7), two ends of the connecting steel member (6) are provided with wallboard grooves (8), and one side of each wallboard groove (8) is in threaded connection with a mounting bolt (9).
3. An assembled steel structural building profiled pole as claimed in claim 1, characterized in that said sleeves (12) are provided in two and the sleeves (12) are symmetrically arranged about the vertical centre line position of the load-bearing platform (4).
4. The assembled steel structure building special-shaped column as claimed in claim 1, wherein the rotary connecting seat (14) is a disc-shaped structure, a rotary circular plate (16) is rotatably connected inside the rotary connecting seat (14), and the bottom surface of the screw (13) penetrates through the top surface of the rotary connecting seat (14) and is welded with the center position of the top surface of the rotary circular plate (16).
5. An assembled steel structure building shaped column according to claim 2, characterized in that, the insulation filler (10) is filled between the connecting steel member (6) and the standard flange (7), and the insulation filler (10) is made of rock wool board.
6. An assembled steel structural building profile post according to claim 2, characterized in that the inner width of the wallboard channel (8) is equal to the thickness of the external wallboard.
CN202020791427.9U 2020-05-13 2020-05-13 A prefabricated steel structure building special-shaped column Expired - Fee Related CN212129684U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020791427.9U CN212129684U (en) 2020-05-13 2020-05-13 A prefabricated steel structure building special-shaped column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020791427.9U CN212129684U (en) 2020-05-13 2020-05-13 A prefabricated steel structure building special-shaped column

Publications (1)

Publication Number Publication Date
CN212129684U true CN212129684U (en) 2020-12-11

Family

ID=73693467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020791427.9U Expired - Fee Related CN212129684U (en) 2020-05-13 2020-05-13 A prefabricated steel structure building special-shaped column

Country Status (1)

Country Link
CN (1) CN212129684U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116480064A (en) * 2022-04-21 2023-07-25 重庆中迎智居装配式建筑科技有限公司 Mortise and tenon type splicing factory building structure with crown block

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116480064A (en) * 2022-04-21 2023-07-25 重庆中迎智居装配式建筑科技有限公司 Mortise and tenon type splicing factory building structure with crown block

Similar Documents

Publication Publication Date Title
CN110258816B (en) Adjustable rotary type prefabricated concrete externally-hung wallboard and steel beam connection bearing node structure and construction method
CN210316009U (en) Adjustable rotary type bearing node structure for connecting precast concrete external wall panel and steel beam
CN212129684U (en) A prefabricated steel structure building special-shaped column
CN209941906U (en) PC (polycarbonate) external wallboard connecting structure
CN103848361B (en) The support beam of tower crane wall-attaching equipment
CN201895191U (en) Round pipe component with auxiliary butt welding mechanism
CN211687924U (en) Assembled wall body hoist and mount auxiliary device
CN212105190U (en) Convenient calibration positioning device for connecting steel structures
CN113585567A (en) Self-adjusting rotary type prefabricated concrete external wall panel connecting node and construction method
CN219177098U (en) Hoisting frame and fire-fighting spraying pipeline installation device
CN203767885U (en) Tower crane wall attaching device
CN214144858U (en) Steel structure support with reinforcing mechanism for building
CN209854937U (en) Modular assembly type building structure capable of being spliced
CN209494239U (en) A steel structure column installation device
CN206000167U (en) Adjustable Alminum Project slab form support meanss
CN114775865A (en) Slightly-inclined trapezoidal plate curtain wall
CN223441529U (en) An assembly device for roller kiln shell
CN219825799U (en) Suspended ceiling structure for steel structure
CN223386790U (en) Steel structure connecting device for building
CN115162588B (en) Correcting device for construction method of externally hung wallboard structure
CN221590242U (en) Square tube support for movable floor
CN223482304U (en) Verticality correction device for high-rise box column installation
CN110576280A (en) Machining platform for assembling weldment
CN223853750U (en) A dry-hanging structure for wall bricks
CN220934805U (en) Cable hook for secondary structure construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201211