CN214498447U CN202120341390.4U CN202120341390U CN214498447U CN 214498447 U CN214498447 U CN 214498447U CN 202120341390 U CN202120341390 U CN 202120341390U CN 214498447 U CN214498447 U CN 214498447U
Authority
CN
China
Prior art keywords
clip
vertical
reinforcing bar
positioning device
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120341390.4U
Other languages
Chinese (zh)
Inventor
艾鹏
高大勇
高欣欣
杨荣
李鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Runya Construction Engineering Development Co ltd
Original Assignee
Beijing Runya Construction Engineering Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Runya Construction Engineering Development Co ltd filed Critical Beijing Runya Construction Engineering Development Co ltd
Priority to CN202120341390.4U priority Critical patent/CN214498447U/en
Application granted granted Critical
Publication of CN214498447U publication Critical patent/CN214498447U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model belongs to the technical field of the construction of shear force wall and specifically relates to a shear force wall reinforcing bar positioner is related to, it includes the riser, be provided with two first buckles that are used for the fixed vertical reinforcing bar of centre gripping on the riser, the perpendicular rigid coupling of both sides difference of riser has a diaphragm, two the diaphragm is located the both sides of vertical reinforcing bar respectively, two be provided with a second buckle that is used for the fixed transverse reinforcement of centre gripping on the diaphragm respectively. This application has the effect that promotes the perpendicular, transverse reinforcement connection stability of shear force wall.

Description

Shear force wall reinforcing bar positioner
Technical Field
The application relates to the field of shear wall construction, in particular to a shear wall steel bar positioning device.
Background
Shear walls are typically made of steel rebar and concrete. When the shear wall is constructed on site, firstly binding reinforcing steel bars, then erecting a template and finally pouring concrete; when the steel bars are bound, a constructor generally uses the steel wires to bind the vertical steel bars and the horizontal steel bars, winds the steel wires around the vertical steel bars and the horizontal steel bars, and then winds the two ends of the steel wires together by using the steel bar hooks.
Aiming at the related technologies, the inventor thinks that when vertical and horizontal steel bars are wound by using steel wires, the condition that the steel wires are not wound in place or are excessively wound by constructors often occurs, so that the connection stability between the vertical and horizontal steel bars is lower than expected, and the conditions that the quality of the shear wall is influenced by dislocation, even separation and the like of the vertical and horizontal steel bars occur when concrete is poured.
SUMMERY OF THE UTILITY MODEL
In order to promote the stability that the shear force wall is erect, transverse reinforcement connects, this application provides a shear force wall reinforcing bar positioner.
The application provides a shear force wall reinforcing bar positioner adopts following technical scheme:
the utility model provides a shear force wall reinforcing bar positioner, includes the riser, be provided with two first buckles that are used for the fixed vertical reinforcing bar of centre gripping on the riser, the perpendicular rigid coupling respectively in both sides of riser has a diaphragm, two the diaphragm is located the both sides of vertical reinforcing bar respectively, two be provided with a second buckle that is used for the fixed transverse reinforcement of centre gripping on the diaphragm respectively.
Through adopting above-mentioned technical scheme, constructor installs first clip on vertical reinforcing bar, then installs horizontal reinforcing bar on the second clip to link together vertical reinforcing bar and horizontal reinforcing bar through reinforcing bar positioner, can represent after the positioner installation and erect, the fixed completion of horizontal reinforcing bar, thereby improve the quality problems that constructor error leads to.
Optionally, the first clip is arc-shaped, the opening of the arc-shaped faces the vertical steel bar, and a plurality of rows of first teeth are arranged in the first clip along the length direction of the vertical steel bar.
Through adopting above-mentioned technical scheme, first clip is detained and is established on vertical reinforcing bar, and the cooperation is established with the crescent rib card on the vertical reinforcing bar to promote the stability of first clip, first clip is simple and convenient in the operation, and is fixed effectual.
Optionally, two ends of the first clip are respectively provided with a first turning edge extending towards a direction away from each other.
Through adopting above-mentioned technical scheme, first edge of turning over has the effect that the vertical reinforcing bar was established to the first clip knot of guide, has promoted the convenience of constructor operation.
Optionally, two first installation pipes are arranged on the top surface or the bottom end of the first clamp, and the two first installation pipes are respectively located on two sides of the vertical steel bar.
Through adopting above-mentioned technical scheme, constructor can penetrate same root steel wire in two first installation pipes, tie up the steel wire afterwards and fix on vertical reinforcing bar to the stability of first clip has been promoted.
Optionally, the second clip is arc-shaped, an opening of the arc-shaped is upward, and a plurality of rows of second teeth are arranged in the second clip along the length direction of the transverse steel bar.
Through adopting above-mentioned technical scheme, the second clip is structural the same with first clip to be convenient for batch processing production, by supreme bearing horizontal reinforcing bar down, promoted the stability of horizontal reinforcing bar simultaneously.
Optionally, two ends of the second clip are respectively provided with a second turning edge extending in a direction away from each other.
By adopting the technical scheme, the second turned edge has the effect of guiding the transverse steel bar to be clamped into the second clamp buckle, thereby improving the construction efficiency, facilitating the operation of constructors,
optionally, a second mounting tube is arranged on the side surface of the second clip.
Through adopting above-mentioned technical scheme, constructor can penetrate the steel wire in two second installation pipes to link together two second buckles, promoted the stability of second buckle.
Optionally, a reinforcing plate is arranged between the transverse plate and the vertical plate.
Through adopting above-mentioned technical scheme, promoted the stability of diaphragm.
Optionally, a reinforcing strip is arranged on one side of the vertical plate, which faces away from the first clip.
Through adopting above-mentioned technical scheme, vertical anti buckling performance has been promoted.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the first clamp fastener is installed on the vertical steel bar by a constructor, then the transverse steel bar is installed on the second clamp fastener, so that the vertical steel bar and the transverse steel bar are connected together through the steel bar positioning device, and the positioning device can represent that the vertical steel bar and the transverse steel bar are fixed after being installed, so that the quality problem caused by the error of the constructor is solved;
2. the first clamping buckle is arranged on the vertical steel bar in a buckled mode, and the first teeth are matched with the crescent ribs on the vertical steel bar in a clamped mode, so that the stability of the first clamping buckle is improved, the first clamping buckle is simple and convenient to operate, and the fixing effect is good;
3. the second clip is structurally the same as the first clip, so that batch processing and production are facilitated, and meanwhile, the stability of the transverse steel bar is improved by bearing the transverse steel bar from bottom to top.
Drawings
Fig. 1 is a schematic installation position diagram of a shear wall rebar positioning device according to an embodiment of the present application.
Fig. 2 is a first perspective structural diagram of a shear wall rebar positioning device according to an embodiment of the present application.
Fig. 3 is a second perspective view structural diagram of a shear wall rebar positioning device according to an embodiment of the present application.
Description of reference numerals: 1. a vertical plate; 10. a reinforcing strip; 2. a transverse plate; 20. a reinforcing plate; 3. a first clip; 30. a first tooth; 31. a first turned edge; 32. a first mounting tube; 4. a second clip; 40. a second tooth; 41. a second turning edge; 42. a second mounting tube.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses shear force wall reinforcing bar positioner. Referring to fig. 1 and 2, a shear wall steel bar positioning device comprises a vertical plate 1, a transverse plate 2 arranged on the vertical plate 1, a first clamp 3 arranged on the vertical plate 1 and used for clamping vertical steel bars, and a second clamp 4 arranged on the transverse plate 2 and used for clamping transverse steel bars.
Referring to fig. 1, a plurality of positioning devices are arranged on the same reinforcing steel bar net, and the positioning devices are arranged at intervals, so that the stability of vertical and horizontal reinforcing steel bars is ensured, the construction efficiency is improved, and the construction cost is reduced; referring to fig. 2 and 3, a vertical plate 1 is vertically arranged, a reinforcing strip 10 is fixedly connected to one side of the vertical plate 1, which is far away from a vertical steel bar, the reinforcing strip 10 is vertically arranged at the middle position of the vertical plate 1, the top surface of the reinforcing strip 10 is flush with the top surface of the vertical plate 1, and the bottom surface of the reinforcing strip 10 is flush with the bottom surface of the vertical plate 1; the two transverse plates 2 are respectively arranged on two opposite sides of the vertical plate 1 and positioned on two sides of the vertical steel bar, the plane of the transverse plates 2 is vertical to the plane of the vertical plate 1, and the connecting point of the transverse plates 2 and the vertical plate 1 is positioned on the vertically arranged end wall of the vertical plate 1; be provided with reinforcing plate 20 that is used for reinforcing joint strength in diaphragm 2 and riser 1's junction, every diaphragm 2 corresponds two reinforcing plates 20, two reinforcing plates 20 are located the upper and lower both sides of diaphragm 2 respectively, reinforcing plate 20 is a right angle triangle-shaped board, a right angle limit rigid coupling of reinforcing plate 20 is on diaphragm 2, another right angle limit rigid coupling of reinforcing plate 20 is on the end wall of the vertical setting of riser 1, two reinforcing plates 20 carry out vertical support to diaphragm 2, thereby the stability of diaphragm 2 with riser 1 junction has been promoted.
Referring to fig. 2 and 3, two first clips 3 are provided, the two first clips 3 are respectively positioned at the upper end and the lower end of one side of the vertical plate 1 close to the vertical steel bar, the first clips 3 are arc-shaped, the arc-shaped openings face to one side close to the vertical steel bar, and the arc-shaped openings of the first clips 3 are matched with the vertical steel bar; a plurality of rows of first teeth 30 are arranged in the first clamp 3 along the length direction of the vertical steel bar, the first teeth 30 are arranged around the inner wall of the first clamp 3, and the extending direction of the first teeth 30 is perpendicular to the extending direction of the reinforcing bar 10, so that the first teeth 30 are used for clamping crescent ribs on the vertical steel bar; the two ends of the first clip 3 are respectively provided with a first turning edge 31 extending in the direction away from each other, the first turning edge 31 and the first clip 3 are integrally formed and arc-shaped, and when the first clip 3 is installed, the first turning edge 31 has the effect of guiding the first clip 3 to clamp the vertical steel bars; still the rigid coupling has two first installation pipes 32 on first clip 3, and the axis direction of first installation pipe 32 is perpendicular with the 1 place plane of riser, and two first installation pipes 32 are with top or the bottom that is located first clip 3 to be convenient for constructor penetrates the steel wire and ties up vertical reinforcing bar in two first installation pipes 32, promote positioner and vertical bar connection's stability.
Referring to fig. 2 and 3, two second clips 4 are arranged, the two second clips 4 are respectively and fixedly connected to the top ends of the two transverse plates 2, the second clips 4 are arc-shaped, arc-shaped openings are arranged upwards, and the arc-shaped openings of the second clips 4 are matched with the transverse steel bars; a plurality of rows of second teeth 40 are arranged in the second clamp 4 along the length direction of the transverse steel bar, and the second teeth 40 are arranged around the inner wall of the second clamp 4; two ends of the second clip 4 are respectively provided with a second turning edge 41 extending in a direction away from each other, and the second turning edges 41 have the effect of guiding the second clip 4 to clip the reinforcing steel bars; still the rigid coupling has a second installation pipe 42 on the outer wall of reinforcing plate 20 one side is kept away from to second clip 4, and the axis direction of second installation pipe 42 is perpendicular with the axis direction of horizontal reinforcing bar, and after two second clips 4 press from both sides and establish on horizontal reinforcing bar, constructor can wear to establish same steel wire and bind in two second installation pipes 42 to connect two second clips 4, promoted the stability of second clip 4.
The implementation principle of the shear wall steel bar positioning device in the embodiment of the application is as follows: the constructor marks the vertical steel bars with the positioning devices, clamps the first clamp buckles 3 on the vertical steel bars, then installs the transverse steel bars, and clamps the transverse steel bars in the second clamp buckles 4, so as to connect the vertical steel bars and the transverse steel bars together; constructor can penetrate the steel wire in first installation pipe 32 afterwards, and tie up the steel wire on vertical reinforcing bar, penetrate same root steel wire and ligature on two second installation pipes 42, thereby be in the same place two second clip 4 are fixed, compare in correlation technique, the positioner of this application need not anxious to prick the silk and twist not target in place or prick the silk and twist the excessive condition soon, install and erect, can fix the reinforcing bar behind the transverse reinforcement, can cooperate simultaneously to prick the silk setting, with reduction engineering cost, promote engineering quality.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. The utility model provides a shear force wall reinforcing bar positioner which characterized in that: including riser (1), be provided with two first clip (3) that are used for the fixed vertical reinforcing bar of centre gripping on riser (1), the perpendicular rigid coupling respectively in both sides of riser (1) has a diaphragm (2), two diaphragm (2) are located the both sides of vertical reinforcing bar respectively, two be provided with a second clip (4) that are used for the fixed transverse bar of centre gripping on diaphragm (2) respectively.
2. A shear wall rebar positioning device as defined in claim 1, wherein: first clip (3) are the arc type, and the arc type opening is towards vertical reinforcing bar, be provided with a plurality of rows of first tooth (30) along the length direction of vertical reinforcing bar in first clip (3).
3. A shear wall rebar positioning device as defined in claim 2, wherein: two ends of the first clip (3) are respectively provided with a first turning edge (31) extending towards the direction away from each other.
4. A shear wall rebar positioning device as defined in claim 3, wherein: two first installation pipes (32) are arranged on the top surface or the bottom end of the first clamp (3), and the two first installation pipes (32) are respectively located on two sides of the vertical steel bar.
5. A shear wall rebar positioning device as defined in any one of claims 2-4, wherein: the second clamp fastener (4) is arc-shaped, the opening of the arc-shaped is upward, and a plurality of rows of second teeth (40) are arranged in the second clamp fastener (4) along the length direction of the transverse steel bars.
6. A shear wall rebar positioning device as defined in claim 5, wherein: two ends of the second clip (4) are respectively provided with a second turning edge (41) which extends towards the direction away from each other.
7. A shear wall rebar positioning device as defined in claim 6, wherein: and a second mounting pipe (42) is arranged on the side surface of the second clamping buckle (4).
8. A shear wall rebar positioning device as defined in claim 7, wherein: and a reinforcing plate (20) is arranged between the transverse plate (2) and the vertical plate (1).
9. A shear wall rebar positioning device as defined in claim 7, wherein: and a reinforcing strip (10) is arranged on one side of the vertical plate (1) departing from the first clamping buckle (3).
CN202120341390.4U 2021-02-06 2021-02-06 Shear force wall reinforcing bar positioner Active CN214498447U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120341390.4U CN214498447U (en) 2021-02-06 2021-02-06 Shear force wall reinforcing bar positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120341390.4U CN214498447U (en) 2021-02-06 2021-02-06 Shear force wall reinforcing bar positioner

Publications (1)

Publication Number Publication Date
CN214498447U true CN214498447U (en) 2021-10-26

Family

ID=78219322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120341390.4U Active CN214498447U (en) 2021-02-06 2021-02-06 Shear force wall reinforcing bar positioner

Country Status (1)

Country Link
CN (1) CN214498447U (en)

Similar Documents

Publication Publication Date Title
JP5715503B2 (en) Reinforcing bar clip, closed type reinforcing bar using the same, and manufacturing method of the closed type reinforcing bar
CN214498447U (en) Shear force wall reinforcing bar positioner
CN208072733U (en) A kind of silent floor support plate of 360 degree of seamings connection
CN111677016A (en) Water stop steel plate structure and mounting method
CN213204952U (en) Structure is set up to roof movement joint department template
CN209353708U (en) Upper anti-bank template reinforcing device
CN209163200U (en) Prefabricated sandwich heat preservation wallboard stainless steel adapting piece and manufactured heat-insulation wall plate
CN110984241A (en) Installation method of middle-buried steel-edged rubber water stop
CN113719031B (en) Reinforcing structure of open beam and construction method thereof
CN211849631U (en) Bury formula steel limit rubber waterstop fixing device in underground structure
CN110984396A (en) Rear-mounted anchor net and operation method thereof
CN213742317U (en) Beam-penetrating embedded sleeve positioning assembly
CN211974283U (en) Wall connecting piece and fastener type scaffold connecting device
CN217481312U (en) Device for positioning longitudinal water stop belt of tunnel
CN219952679U (en) Reinforced concrete wall post part template reinforced structure
CN215057464U (en) Device for ensuring straight installation of longitudinal water stop strip of tunnel arch wall
CN217439578U (en) Steel bar positioning device
CN217679102U (en) Prestressed concrete tubular pile cap template fixed knot constructs
CN211572254U (en) Easily-disassembled stirrup
CN109372180A (en) Prefabricated sandwich heat preservation wallboard stainless steel adapting piece, heat-insulation wall plate and construction method
CN219298756U (en) Guide wall template fixing device based on canopy face crossbeam
CN215367440U (en) Fixing device for water stop
CN219808756U (en) Steel wire mesh cloth anchorage device and steel wire mesh cloth anchorage system
CN217379819U (en) Steel-edged water stop positioning device
JP3055508U (en) Fastener

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant