CN209353708U - Upper anti-bank template reinforcing device - Google Patents

Upper anti-bank template reinforcing device Download PDF

Info

Publication number
CN209353708U
CN209353708U CN201821753931.9U CN201821753931U CN209353708U CN 209353708 U CN209353708 U CN 209353708U CN 201821753931 U CN201821753931 U CN 201821753931U CN 209353708 U CN209353708 U CN 209353708U
Authority
CN
China
Prior art keywords
bank template
bank
upper anti
gear part
drawknot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821753931.9U
Other languages
Chinese (zh)
Inventor
殷海瑞
马德龙
许传玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201821753931.9U priority Critical patent/CN209353708U/en
Application granted granted Critical
Publication of CN209353708U publication Critical patent/CN209353708U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The utility model relates to a kind of anti-bank template reinforcing devices, comprising: the folder gear part being erected on the outside of anti-bank template, top are equipped with connecting hole;It is laterally disposed in the drawknot connector on the upper anti-bank template top, the end of the drawknot connector has part to protrude out the corresponding anti-bank template and is located at the outside of the upper anti-bank template, offers an exhausting hole on the drawknot connector;And connection bolt, the drawknot connector and the folder gear part are connected by the connection bolt fastening, and make the clamping anti-bank template of folder gear part positioned at the upper anti-bank template two sides.The utility model forms inverted U fastener using folder gear part and drawknot connector, block anti-bank template, it is clamping to be carried out to upper anti-bank template, and an exhausting hole is provided on drawknot connector, the width of different upper anti-banks can be adapted to by the through-hole that selection adapts to, the scope of application for improving bracing means be used in turn it can repeatedly.

Description

Upper anti-bank template reinforcing device
Technical field
The utility model relates to construction engineering fields, refer in particular to a kind of anti-bank template reinforcing device.
Background technique
With the fast development of building trade, the saving of construction quality and material has become two that unit in charge of construction most payes attention to Aspect.The problem of construction of upper anti-bank is related to later period wall bottom leaky, the reinforcing of existing anti-bank template are using wood The method that side and split bolt drawknot are fixed can leave split bolt in upper anti-bank structure using split bolt to connection is drawn Hole, the closure of the hole can bring the trouble of secondary construction again, and since the height of upper anti-bank structure is smaller, plugging operations It is more difficult, it is easy to leave later period hidden leakage defect.
Utility model content
The purpose of the utility model is to overcome the defects of the prior art, provide a kind of anti-bank template reinforcing device, solution Certainly existing anti-bank template is fixed and the trouble of the secondary construction of existing split bolt hole using flitch and split bolt With the more difficult problem for easily leaving hidden leakage defect etc. of plugging operations.
Realizing the technical solution of above-mentioned purpose is:
The utility model provides a kind of anti-bank template reinforcing device, comprising:
The top of the folder gear part being erected on the outside of anti-bank template, the folder gear part is equipped with connecting hole;
It is laterally disposed in the drawknot connector on the upper anti-bank template top, the end of the drawknot connector has part to protrude out The corresponding anti-bank template and it is located at the outside of the upper anti-bank template out, it is logical that a row is offered on the drawknot connector There are part in hole, the end of the drawknot connector and are affixed at the top of the folder gear part;And
Across the connection bolt of corresponding through-hole and the connecting hole, the drawknot is connected by the connection bolt fastening Connector and the folder gear part, and make the clamping anti-bank template of folder gear part positioned at the upper anti-bank template two sides.
The utility model forms inverted U fastener using folder gear part and drawknot connector, anti-bank template is blocked, thus to upper Anti- bank template progress is clamping, and an exhausting hole is provided on drawknot connector, can be by the through-hole that selection adapts to be adapted to difference Upper anti-bank width, improve the scope of application of bracing means, be used in turn it can repeatedly.The reinforcing of the utility model fills It sets with feature easy to operate, convenient and efficient.
On the utility model anti-bank template reinforcing device further improvement lies in that, being sticked on the outside of the upper anti-bank template has Flitch, the flitch are set at the bottom and top of the upper anti-bank template;
The folder gear part is tightly attached to the flitch.
On the utility model anti-bank template reinforcing device further improvement lies in that, the folder gear part includes and the flitch The side plate that fits of surface, and the side plate is fixedly connected by screw with the flitch for being located at bottom.
On the utility model anti-bank template reinforcing device further improvement lies in that, the bottom surface and position of the drawknot connector Flitch in top is affixed merga pass screw and is fixedly connected with corresponding flitch.
On the utility model anti-bank template reinforcing device further improvement lies in that, the folder gear part include the company of being mutually perpendicular to The side plate and wing plate connect, and the end vertical being affixed on the side plate and the wing plate with drawknot connector bottom is connected with The connecting plate to fit with the bottom of the drawknot connector opens up the connecting hole on the connecting plate.
On the utility model anti-bank template reinforcing device further improvement lies in that, the drawknot connector include be placed in institute State the first batten on the top of anti-bank template and with first batten the second batten connected vertically, first batten On open up an exhausting hole.
Detailed description of the invention
Fig. 1 is the schematic perspective view that anti-bank template reinforcing device reinforces upper anti-bank template on the utility model.
Fig. 2 is the cross-sectional view of structure shown in Fig. 1.
Fig. 3 is the structural schematic diagram of anti-bank template reinforcing device on the utility model.
Fig. 4 is the knot of the folder gear part and drawknot connector not-connected status on the utility model in anti-bank template reinforcing device Structure schematic diagram.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
Refering to fig. 1, the utility model provides a kind of anti-bank template reinforcing device, upper anti-in work progress for solving The problem of bank formwork reinforcement is not easy.The bracing means of the utility model, which assembles to be formed by folder gear part and drawknot connector, is inverted U Type ruggedized construction can effectively reinforce upper anti-bank template, and bracing means can be used for the upper anti-bank template of different in width and add Gu can repeatedly be used in turn, installing and dismounting is simple.With reference to the accompanying drawing to bank template reinforcing device anti-on the utility model into Row explanation.
Refering to fig. 1, it is shown that the stereochemical structure that anti-bank template reinforcing device reinforces upper anti-bank template on the utility model is shown It is intended to.Referring to Fig.2, showing the cross-sectional view of structure shown in Fig. 1.Below with reference to Fig. 1 and Fig. 2, to bank mould anti-on the utility model Plate bracing means is illustrated.
As depicted in figs. 1 and 2, the upper anti-bank template reinforcing device 20 of the utility model includes folder gear part 21, drawknot connection Part 22 and connection bolt 23, folder gear part 21 are erected on the outside of anti-bank template 11, in conjunction with shown in Fig. 3 and Fig. 4, folder gear part 21 Top is equipped with connecting hole 211;Drawknot connector 22 is laterally disposed in the top of anti-bank template 11, and the end of drawknot connector 22 There is part to protrude out corresponding anti-bank template 11 and be located at the outside of upper anti-bank template 11, offers one on drawknot connector 22 Exhausting hole 221, the end of drawknot connector 22 have part and the top of folder gear part 21 to be affixed;It connects bolt 23 and passes through corresponding lead to Hole 221 and connecting hole 211 are fastenedly connected drawknot connector 22 and folder gear part 21 by connecting bolt 23, so that being located at upper anti-bank The clamping anti-bank template 11 of the folder gear part 21 of 11 two sides of template;Then in the inside casting concrete of upper anti-bank template 11, utilize Space between two upper anti-bank templates 11 pours to form anti-bank structure, and folder gear part 21 is blocked in the outer of anti-bank template 11 Side can withstand anti-bank template 11, avoid anti-bank template 11 there is a phenomenon where sidesway or topple over.
The utility model forms inverted U fastener using folder gear part and drawknot connector, anti-bank template is blocked, thus to upper Anti- bank template progress is clamping, and an exhausting hole is provided on drawknot connector, can be by the through-hole that selection adapts to be adapted to difference Upper anti-bank width, improve the scope of application of bracing means, be used in turn it can repeatedly.Bracing means is to upper anti-bank mould Plate progress is clamping, avoids and leaves split bolt hole in upper anti-bank structure, to save the plugging operations in split bolt hole And also avoid hidden leakage defect.
As a better embodiment of the utility model, as depicted in figs. 1 and 2, the outside of upper anti-bank template 11 is sticked Have a flitch 12, flitch 12 is set at the bottom and top of upper anti-bank template 11, preferably, the upper surface of the flitch 12 at top with it is upper The top end face flush of anti-bank template 11, the bottom face flush of the lower surface of the flitch 12 of bottom and upper anti-bank template 11;? When formwork, upper anti-bank template 11 is erected on floor at corresponding position, in upper anti-bank template 11 outer surface along upper Flitch 12 is arranged in the setting direction of anti-bank, and flitch 12 is fixedly connected by screw with upper anti-bank template 11.The utility model The folder gear part 21 of bracing means 20 be tightly attached to the setting of flitch 12, two folder gear parts 21 positioned at two upper anti-11 outsides of bank templates Tightly clamping corresponding anti-bank template 11, realizes the reinforcement effect to upper anti-bank template 11, and ensure that anti-bank mould The stability of plate 11.
Further, folder gear part 21 includes the side plate 212 to fit with the surface of flitch 12, and side plate 212 passes through screw 24 are fixedly connected with the flitch 12 for being located at bottom.When folder gear part 21 is arranged, the side plate 212 of the folder gear part 21 is erected on floor, The top of side plate 212 connect 22 connections with drawknot, and the bottom of side plate 212, which is fixed by screw 24 with the flitch 12 for being located at bottom, to be connected It connects, and flitch 12 is fixedly connected with corresponding anti-bank template 11, improves the firm stable of side plate 212, and side plate 212 It links together with upper anti-bank template 11, the overall stability of anti-bank template 11 can be gone up, and then improve and be formed by anti-bank The quality of structure.
Still further, the bottom surface of drawknot connector 22 be located at top flitch 12 be affixed merga pass screw 24 with it is right The flitch 12 answered is fixedly connected.Drawknot connector 22 is fixedly connected with the flitch 12 at top, and flitch 12 and upper anti-bank template 11 are fixedly connected, so that drawknot connector 22 links together with upper anti-bank template 11, improve anti-11 He of bank template The integraty of bracing means 20, also improves consolidation effect.Preferably, folder gear part 21 includes the side plate 212 being mutually connected vertically With wing plate 213, the end vertical being affixed on side plate 212 and wing plate 213 with 22 bottom of drawknot connector is connected with to be connect with drawknot The connecting plate 214 that the bottom of part 22 fits, offers connecting hole 211 on connecting plate 214.Drawknot connector 22 includes being placed in The first batten 222 on the top of upper anti-bank template 11 and the second batten 223 with the perpendicular connection of the first batten 222, the An exhausting hole 221 is offered on one batten 222.
In one embodiment, the aluminium alloy angle steel of 50mm*50mm*3mm can be used in folder gear part 21 and a steel plate welds to be formed, Steel plate is welded on to the end of aluminium alloy angle steel, and the hole for opening up diameter 10mm on the steel plate is preferably opened up as connecting hole 211 Two connecting holes, the spacing of connecting hole are 20mm.Drawknot connector 22 uses the aluminium alloy angle steel of 50mm*50mm*3mm, at angle The through-hole of multiple 10mm, pitch of holes 20mm are opened up in one plate face of steel.It connects bolt 23 and uses hex bolts, and be configured with Attaching nut.In use, the side plate of two folder gear parts is vertically prevented in the outside of upper anti-bank template, drawknot connector is lateral It is placed in the top of anti-bank template and is fixedly connected with corresponding folder gear part by connecting bolt, so as to form inverted U Bracing means plays the role of reinforcing to upper anti-bank template.Support of bracing means of the utility model can be used for not With the fixation of the upper anti-bank template of width, can repeatedly be used in turn, it is easy to operate, it is convenient and efficient.
Combine figure embodiment that the utility model is described in detail above, those skilled in the art can root Many variations example is made to the utility model according to above description.Thus, certain details in embodiment should not constitute practical to this Novel restriction, the utility model will be using the ranges that the appended claims define as the protection scope of the utility model.

Claims (6)

1. a kind of anti-bank template reinforcing device characterized by comprising
The top of the folder gear part being erected on the outside of anti-bank template, the folder gear part is equipped with connecting hole;
It is laterally disposed in the drawknot connector on the upper anti-bank template top, the end of the drawknot connector has part to protrude out pair The upper anti-bank template answered and the outside for being located at the upper anti-bank template offer an exhausting hole on the drawknot connector, There is part in the end of the drawknot connector and is affixed at the top of the folder gear part;And
Across the connection bolt of corresponding through-hole and the connecting hole, the drawknot is connected by the connection bolt fastening and is connected Part and the folder gear part, and make the clamping anti-bank template of folder gear part positioned at the upper anti-bank template two sides.
2. upper anti-bank template reinforcing device as described in claim 1, which is characterized in that being sticked on the outside of the upper anti-bank template has Flitch, the flitch are set at the bottom and top of the upper anti-bank template;
The folder gear part is tightly attached to the flitch.
3. upper anti-bank template reinforcing device as claimed in claim 2, which is characterized in that the folder gear part includes and the flitch The side plate that fits of surface, and the side plate is fixedly connected by screw with the flitch for being located at bottom.
4. upper anti-bank template reinforcing device as claimed in claim 2, which is characterized in that the bottom surface and position of the drawknot connector Flitch in top is affixed merga pass screw and is fixedly connected with corresponding flitch.
5. upper anti-bank template reinforcing device as described in claim 1, which is characterized in that the folder gear part includes the company of being mutually perpendicular to The side plate and wing plate connect, and the end vertical being affixed on the side plate and the wing plate with drawknot connector bottom is connected with The connecting plate to fit with the bottom of the drawknot connector opens up the connecting hole on the connecting plate.
6. upper anti-bank template reinforcing device as described in claim 1, which is characterized in that the drawknot connector includes being placed in institute State the first batten on the top of anti-bank template and with first batten the second batten connected vertically, first batten On open up an exhausting hole.
CN201821753931.9U 2018-10-26 2018-10-26 Upper anti-bank template reinforcing device Expired - Fee Related CN209353708U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821753931.9U CN209353708U (en) 2018-10-26 2018-10-26 Upper anti-bank template reinforcing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821753931.9U CN209353708U (en) 2018-10-26 2018-10-26 Upper anti-bank template reinforcing device

Publications (1)

Publication Number Publication Date
CN209353708U true CN209353708U (en) 2019-09-06

Family

ID=67781152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821753931.9U Expired - Fee Related CN209353708U (en) 2018-10-26 2018-10-26 Upper anti-bank template reinforcing device

Country Status (1)

Country Link
CN (1) CN209353708U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112459480A (en) * 2020-11-20 2021-03-09 中冶天工集团有限公司 Constructional engineering template fixing device and using method thereof
CN115853264A (en) * 2022-12-08 2023-03-28 中国十七冶集团有限公司 Reinforcing method for plain concrete reversed ridge aluminum template in kitchen and toilet
CN116122565A (en) * 2023-03-31 2023-05-16 中国建筑第七工程局有限公司 Floor secondary cast-in-situ reverse bank template mounting and positioning device and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112459480A (en) * 2020-11-20 2021-03-09 中冶天工集团有限公司 Constructional engineering template fixing device and using method thereof
CN115853264A (en) * 2022-12-08 2023-03-28 中国十七冶集团有限公司 Reinforcing method for plain concrete reversed ridge aluminum template in kitchen and toilet
CN116122565A (en) * 2023-03-31 2023-05-16 中国建筑第七工程局有限公司 Floor secondary cast-in-situ reverse bank template mounting and positioning device and construction method

Similar Documents

Publication Publication Date Title
CN209353708U (en) Upper anti-bank template reinforcing device
CN109339292A (en) A kind of shaped steel combination double steel plate combined concrete shear wall
CN211736345U (en) Basement outer wall unilateral template strutting arrangement
CN112796514A (en) Masonry corner constructional column template shaping and reinforcing device and construction method
CN207314833U (en) A kind of construction Novel scissors blade square column shuttering fastening member
CN108035444B (en) Method for connecting double-steel-plate shear wall and floor slab hogging moment reinforcing steel bars
CN208472972U (en) A kind of steel bar girder plate end connecting joint structure
CN204676733U (en) A kind of steel sheet concrete shear force wall
CN206360358U (en) A kind of external corner connecting elements
CN205976530U (en) A pin -connected panel chute that is used for huge steel column column base to be in milk
CN205805002U (en) A kind of safety rope fixing device for job site
CN105604314B (en) Tool-type Quick Release mould bases combined system
CN207063480U (en) The triangular support bracket set up for exterior wall scaffold
CN214364845U (en) Adjustable positioning pile of overhanging scaffold
CN207435906U (en) For the bracket of bridge construction
CN212453067U (en) Divergent beam column joint area reinforcement structure
CN201424808Y (en) Rapidly assembled and disassembled wooden formwork structure
CN208267120U (en) A kind of steel I-beam connection steel construction
CN108005372A (en) A kind of setting assembling type suspension scaffold
CN211396215U (en) Oblique roofing truss floor board
CN209620264U (en) A kind of novel anti-pulling connector
CN209585295U (en) Tower crane attaches wall built-in fitting
CN208702146U (en) Adjustable template fixture for cast-in-place concrete column
CN202689560U (en) Fixing device and vertical template system
CN209585620U (en) A kind of stair construction template clamp device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190906